Sie sind auf Seite 1von 1

Call drop HO

Problem detection:
1. High call drop rate on the cell > 1 %.
2. % HO drops > 30% of total dropped calls on the cell.
Investigation:

No High HO out Yes


execution
failure rate?
>40 %
Identify critical pair of
cells, (with Out HO
drop > 5 %) using NO
Type 26 (on demand Majority Yes
counter) of failure
is Inter
BSC?
Check for BCCH/BSIC Check for BCCH/BSIC
*Check better conditions duplication in cell duplication in cell
parameters. adjacencies adjacencies
Good % of NO *Check for severe
better condition interference on serving cell Check for database For neighbors in different
(>40%) * Check for coverage inconsistency between OMC-R , check if relation is
continuity OMC-R and BSC defined correctly (external
Yes cells)

Check DL Qual / UL Qual on Check for synchronization


target cell to locate interference problems
High problem.
% Yes Check DL Lev /UL Lev on Check neighbor plan for
ROC? target cell for coverage problem unnecessary (Far) neighbor
declarations.
NO

Check DL Qual / UL Qual on both


serving & target cell to locate
interference problem.
Check DL Lev /UL Lev on both
serving & target cell for coverage
problem

Das könnte Ihnen auch gefallen