Sie sind auf Seite 1von 11

TARGET: 1152 960 576 384 384 384 3840

% 30% 25% 15% 10% 10% 10% TOTAL 100%


MY HOURS 1272 1152 776 540 560 512 4812 5104
CANDIDATE: BALBUENA,MELERIZSA KATE T.
617
PERIOD COVERED NO. OF NO. OF HRS. NO. OF
PROJECT NAME
DD MM YEAR DD MM YEAR DAYS A B C D E F HRS.
1. Proposed two-storey residence
rainbow street corner burnet street parkland estates marikina city

AIDED IN PREPARATION OF WORKING DRAWINGS AND 4 APR 2011 11 APR 2011 7 56


TECHNICAL SPECIFICATIONS

ARCHITECTURAL DESIGN: INITIAL SET OF SCHEMES 12 APR 2011 19 APR 2011 7 56

ARCHITECTURAL LAYOUTING: 20 APR 2011 20 MAY 2011 7 56


POWER AND AUXILIARY

FIELD SUPERINTENDENCE 21 MAY 2011 1 JUN 2011 10 80

ARCHITECTURAL INTERIORS: 2 JUN 2011 8 JUN 2011 6 48


DETAILING OF FURNITURES 296

2. PROPOSED 2 - STOREY RESIDENTIAL


lot 1 and 2 blk 10, corner rainbow and silver spring park street,
parkland estates, malanday marikina city

AIDED IN ARCHITECTURAL PROGRAM FOR THE SITE 7 APR 2014 22 APR 2014 14 112

ARCHITECTURAL DESIGN, DRAFTING 23 JUL 2014 30 APR 2014 7 56


& STRUCTURAL CONCEPTUALIZATION

PREPARATION OF WORKING DRAWINGS AND 2 MAY 2014 17 MAY 2014 14 112


TECHNICAL SPECIFICATIONS

FIELD SUPERINTENDENCE AND SITE MEETINGS 19 MAY 2014 31 MAY 2014 12 96

376

3 PROPOSED 8-UNIT TWO-STOREY TOWNHOUSE (The Nest)


Champaca St. Blk. 3 Lot 16-22 Brgy. Fortune, Marikina City

ACCOMPLISHED THE ARCHITECTURAL PROGRAM FOR THE SITE 17 FEB 2015 27 MAR 2015 34 204

ARCHITECTURAL DESIGN: INITIAL SET OF SCHEMES 28 MAR 2015 29 APR 2015 28 168

ARCHITECTURAL DESIGN: SECOND SET OF SCHEMES 30 APR 2015 30 MAY 2015 27 216

ARCHITECTURAL DESIGN: FINAL SET OF SCHEMES 1 JUN 2015 27 JUN 2015 24 192

ARCHITECTURAL DESIGN & DRAFTING: FINAL PLANS 29 JUN 2015 22 JUL 2015 20 160

PRESENTATION OF PERSPECTIVES 23 JUL 2015 12 AUG 2015 18 144

PREPARATION OF WORKING DRAWINGS AND 13 AUG 2015 16 SEP 2015 30 240


TECHNICAL SPECIFICATIONS

PREPARATIONG FOR ARCHITECTURAL INTERIORS 17 SEP 2015 24 OCT 2015 32 256

FIELD SUPERINTENDENCE AND SITE MEETINGS 26 OCT 2015 12 JAN 2015 63 504 2084

4 PROPOSED FOUR-STOREY COMMERCIAL BUILDING (ALGERS 5)


Lot 6, Block 8 Gen. Ordoez St. Marikina Height, Marikina City

AIDED IN PREPARATION OF WORKING DRAWINGS AND 13 JAN 2016 24 FEB 2016 37 296
TECHNICAL SPECIFICATIONS

PRESENTATION OF PERSPECTIVES 25 FEB 2016 4 MAR 2016 8 64

ARCHITECTURAL DESIGN: INITIAL SET OF SCHEMES 5 MAR 2016 23 MAR 2016 16 128

ARCHITECTURAL DESIGN: SECOND SET OF SCHEMES 24 MAR 2016 8 APR 2016 14 112

ARCHITECTURAL DESIGN: FINAL SET OF SCHEMES 9 APR 2016 25 APR 2016 14 112

ARCHITECTURAL DESIGN & DRAFTING: FINAL PLANS 26 APR 2016 12 MAY 2016 15 120

FIELD SUPERINTENDENCE AND SITE MEETINGS 13 MAY 2016 26 MAY 2016 12 96

PREPARATIONG FOR AS BUILT PLANS 27 JUN 2016 8 JUN 2016 10 80 1008

Page 1
5 PROPOSED TWO-STOREY RESIDENTIAL (3-UNITS)
Ipil St. Marikina Heights, Marikina City

PREPARATION OF WORKING DRAWINGS AND 9 JUN 2016 12 JUL 2016 28 224


TECHNICAL SPECIFICATIONS

ARCHITECTURAL DESIGN, DRAFTING 13 JUL 2016 28 JUL 2016 14 112


& STRUCTURAL CONCEPTUALIZATION

ARCHITECTURAL LAYOUTING: 29 JUL 2016 15 AUG 2016 15 120


POWER AND AUXILIARY

ARCHITECTURAL LAYOUTING: 16 AUG 2016 31 AUG 2016 14 112


PLUMBING AND SANITARY

AIDED IN PROJECT ADVERTISING OF RENTABLE SPACES 1 SEP 2016 8 SEP 2016 6 48

616

6 PROPOSED THREE-STOREY BUILDING (XELAND)


Gil Fernando Avenue Corner Guerilla St. Sto. Nio, Marikina City

ACCOMPLISHED THE ARCHITECTURAL PROGRAM FOR THE SITE 9 SEP 2015 22 SEP 2016 12 96

ARCHITECTURAL DESIGN: INITIAL SET OF SCHEMES 23 SEP 2016 9 OCT 2016 14 112

PREPARATION OF WORKING DRAWINGS AND 10 OCT 2016 12 NOV 2016 28 224


TECHNICAL SPECIFICATIONS

208

1272 1152 776 540 560 512 4812

Page 2
TARGET: 1152 960 576 384 384 384 3840
% 30% 25% 15% 10% 10% 10% TOTAL 100%
MY HOURS 1424 1136 624 472 544 752 4952 5104
CANDIDATE: BALBUENA,MELERIZSA KATE T.
619
PERIOD COVERED NO. OF NO. OF HRS. NO. OF
PROJECT NAME
DD MM YEAR DD MM YEAR DAYS A B C D E F HRS.
1. Proposed two-storey residence

ARCHITECTURAL DESIGN: INITIAL SET OF SCHEMES 22 OCT 2009 14 NOV 2009 20 160

ARCHITECTURAL DESIGN: SECOND SET OF SCHEMES 16 NOV 2009 5 DEC 2009 21 168

PRESENTATION OF 3D MODEL, PERSPECTIVES AND WALK-THROUGH 6 DEC 2009 7 JAN 2010 16 128

ARCHITECTURAL DESIGN, DRAFTING 8 JAN 2010 27 JAN 2010 17 136


& STRUCTURAL CONCEPTUALIZATION

ARCHITECTURAL LAYOUTING: 28 JAN 2010 25 FEB 2010 25 200


POWER AND AUXILIARY

ARCHITECTURAL LAYOUTING: 26 FEB 2010 20 MAR 2010 20 160


PLUMBING AND SANITARY

PREPARATION OF WORKING DRAWINGS AND 22 MAR 2010 30 APR 2010 32 256


TECHNICAL SPECIFICATIONS

ARCHITECTURAL INTERIORS:
FURNITURE LAYOUTS FOR ALFRESCO AND MATERIALS 2 MAY 2010 20 MAY 2010 15 120

AIDED IN PROJECT ADVERTISING OF RENTABLE SPACES 21 MAY 2010 10 JUN 2010 18 144

2. PROPOSED 2 - STOREY RESIDENTIAL

AIDED IN ARCHITECTURAL PROGRAM FOR THE SITE 11 JUN 2010 28 JUN 2010 14 112

ARCHITECTURAL DESIGN: INITIAL SET OF SCHEMES 29 JUN 2010 20 JUL 2010 18 144

PRESENTATION OF 3D MODEL AND PERSPECTIVES 21 JUL 2010 28 JUL 2010 7 56

ARCHITECTURAL DESIGN, DRAFTING 29 JUL 2010 14 AUG 2010 15 120


& STRUCTURAL CONCEPTUALIZATION

ARCHITECTURAL LAYOUTING: 16 AUG 2010 27 AUG 2010 11 88


POWER AND AUXILIARY

ARCHITECTURAL LAYOUTING: 28 AUG 2010 11 SEPT 2010 12 96


PLUMBING AND SANITARY

PREPARATION OF WORKING DRAWINGS AND 13 SEPT 2010 26 OCT 2010 37 296


TECHNICAL SPECIFICATIONS

ARCHITECTURAL INTERIORS: 27 OCT 2010 18 NOV 2010 18 144


3D RENDERED PERSPECTIVES OF MAJOR SPACES

FIELD SUPERINTENDENCE AND SITE MEETINGS 19 NOV 2010 5 JAN 2011 31 248

Page 3
3. PROPOSED 8-UNIT TOWNHOUSE (The Nest)
Champaca St. Brgy. Fortune, Marikina City

ACCOMPLISHED THE ARCHITECTURAL PROGRAM FOR THE SITE 6 JAN 2011 22 JAN 2011 15 120

ARCHITECTURAL DESIGN: INITIAL SET OF SCHEMES 24 JAN 2011 15 FEB 2011 20 160

ARCHITECTURAL DESIGN: SECOND SET OF SCHEMES 16 FEB 2011 18 MAR 2011 27 216

ARCHITECTURAL DESIGN: FINAL SET OF SCHEMES 19 MAR 2011 13 APR 2011 21 168

ARCHITECTURAL DESIGN & DRAFTING: FINAL PLANS 14 APR 2011 9 MAY 2011 19 152

PRESENTATION OF 3D MODEL AND PERSPECTIVES 10 MAY 2011 1 JUN 2011 20 160

PREPARATION OF WORKING DRAWINGS AND 2 JUN 2011 16 JUL 2011 39 312


TECHNICAL SPECIFICATIONS

FIELD SUPERINTENDENCE 18 JUL 2011 15 AUG 2011 25 200

4. PROPOSED MALL REDEVELOPMENT


C.M. Recto, Tutuban Divisoria, Mla.

AIDED IN PREPARATION OF WORKING DRAWINGS AND 16 AUG 2011 24 SEPT 2011 34 272
TECHNICAL SPECIFICATIONS

FIELD SUPERINTENDENCE 26 SEPT 2011 20 OCT 2011 22 176

ARCHITECTURAL INTERIORS: 21 OCT 2011 12 NOV 2011 18 144


3D RENDERED PERSPECTIVES OF MAJOR SPACES

AIDED IN PROJECT ADVERTISING OF RENTABLE SPACES 14 NOV 2011 26 NOV 2011 12 96

Page 4
5.

1424 1136 624 472 544 752 4952

Page 5
MONTH Su M T W Th F S TOTAL NO. OF HOURS MONTH Su M

JANUARY JULY

FEBRUARY AUGUST

MARCH
SEPT

APRIL 4 5
OCT 11 12
18 19
25 26

1 2
MAY 8 9
15 16
NOV
22 23
29 30

JUNE 6 7
13 14
DEC
20 21
28 29
2 0 0 9
T W Th F S TOTAL NO. OF HOURS

1 2 3
6 7 8 9 10
13 14 15 16 17
20 21 22 23 24
27 28 29 30 31

3 4 5 6 7
10 11 12 13 14
17 18 19 20 21
24 25 26 27 28

1 2 3 4 5
4 5 6 7 8
15 16 17 18 19
22 23 24 25 26
30 31
MONTH Su M T W Th F S TOTAL NO. OF HOURS MONTH Su M
1 2
3 4 5 6 7 8 9 4 5
10 11 12 13 14 15 16 11 12
JANUARY JULY
17 18 19 20 21 22 23 18 19
24 25 26 27 28 29 30 25 26
31

1 2 3 4 5 6 1 2
7 8 9 10 11 12 13 8 9
FEBRUARY 14 15 16 17 18 19 20 AUGUST 15 16
21 22 23 24 25 26 27 22 23
28 29 30

1 2 3 4 5 6
7 8 9 10 11 12 13 5 6
MARCH 14 15 16 17 18 19 20 12 13
SEPT
21 22 23 24 25 26 27 19 20
28 29 30 31 26 27

1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17 3 4
APRIL
18 19 20 21 22 23 24 10 11
OCT
25 26 27 28 29 30 17 18
24 25
31
1
2 3 4 5 6 7 8 1
MAY 9 10 11 12 13 14 15 7 8
16 17 18 19 20 21 22 14 15
NOV
23 24 25 26 27 28 29 21 22
30 31 28 29

1 2 3 4 5
6 7 8 9 10 11 12
JUNE 13 14 15 16 17 18 19 7 8
20 21 22 23 24 25 26 12 13
DEC
27 28 29 30 19 20
26 27
2 0 1 0
T W Th F S TOTAL NO. OF HOURS
1 2 3
6 7 8 9 10
13 14 15 16 17
20 21 22 23 24
27 28 29 30 31

3 4 5 6 7
10 11 12 13 14
17 18 19 20 21
24 25 26 27 28
31

1 2 3 4
7 8 9 10 11
14 15 16 17 18
21 22 23 24 25
28 29 30

1 2
5 6 7 8 9
12 13 14 15 16
19 20 21 22 23
26 27 28 29 30

2 3 4 5 6
9 10 11 12 13
16 17 18 19 20
23 24 25 26 27
30

1 2 3 4
9 10 11 12 13
14 15 16 17 18
21 22 23 24 25
28 29 30 31
MONTH Su M T W Th F S TOTAL NO. OF HOURS MONTH Su M
1
2 3 4 5 6 7 8 3 4
9 10 11 12 13 14 15 10 11
JANUARY JULY
16 17 18 19 20 21 22 17 18
23 24 25 26 27 28 29 24 25
30 31 31

1 2 3 4 5 1
6 7 8 9 10 11 12 7 8
FEBRUARY 13 14 15 16 17 18 19 AUGUST 14 15
20 21 22 23 24 25 26 21 22
27 28 28 29

1 2 3 4 5
6 7 8 9 10 11 12 4 5
MARCH 13 14 15 16 17 18 19 11 12
SEPT
20 21 22 23 24 25 26 18 19
27 28 29 30 31 25 26

1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16 2 3
APRIL
17 18 19 20 21 22 23 9 10
OCT
24 25 26 27 28 29 30 16 17
23 24
30 31
1 2 3 4 5 6 7
8 9 10 11 12 13 14
MAY 15 16 17 18 19 20 21 6 7
22 23 24 25 26 27 28 13 14
NOV
29 30 31 20 21
27 28

1 2 3 4
5 6 7 8 9 10 11
JUNE 12 13 14 15 16 17 18
19 20 21 22 23 24 25
DEC
26 27 28 29 30
2 0 11
T W Th F S TOTAL NO. OF HOURS
1 2
5 6 7 8 9
12 13 14 15 16
19 20 21 22 23
26 27 28 29 30

2 3 4 5 6
9 10 11 12 13
16 17 18 19 20
23 24 25 26 27
30 31

1 2 3
6 7 8 9 10
13 14 15 16 17
20 21 22 23 24
27 28 29 30

1
4 5 6 7 8
11 12 13 14 15
18 19 20 21 22
25 26 27 28 29

1 2 3 4 5
8 9 10 11 12
15 16 17 18 19
22 23 24 25 26
29 30

Das könnte Ihnen auch gefallen