2 2 MW 6.49 6.2 Cr with Land & EPC 3 10 MW ( Already Installaed) 6.9 6.8 Cr with all assets Approx Refundable BG Location Total Project Cost Generation per Year
15 Cr. UP 1,200,000,000.00 32000000
20 Lakh Telangana 124,000,000.00 3200000 - MP 680,000,000.00 16500000 Approx ROI Yearly Income Status without AD
241280000 4.97 All approval done EPC need to do
20768000 5.97 All approval done EPC need to do 113850000 5.97 allready instelled in june -2015