Sie sind auf Seite 1von 8

LusailRealEstateDevelopmentCompany

Health,Safety,Security,Environment,Logistics&Quality
Department










STANDARD OPERATION PROCEDURE ENVIRONMENTAL ASPECTS


ANDIMPACTSPROCEDURE&REGISTER

DocumentNo LUSHSESP2446007.01 Rev 1



UncontrolledCopy ControlledCopy x Date 01Apr2015

COMPANYPROPRIETARYINFORMATION

Prior to use, ensure this document is the most recent revision by checking the Master Document List. To request a change,
submitaDocumentChangeRequesttotheDocumentControlRepresentative.Mastercopyofthisdocumentwillbemaintained
bytheLREDCQA/QCManager.Notcontrolledifprinted.

LusailRealEstateDevelopmentCompany HSEEnvironmentalAspectsandImpactProcedure&Register


AmendmentRecord
Thisdocumentisreviewedtoensureitscontinuingrelevancetothesystemsandprocessthatitdescribes.Arecordof
contextualadditionsoromissionsisgivenbelow:

Rev. No Description / Comments Prepared By Checked By Approved By Issue Date


(Pg. 1) Company Propriety Information
HSE Working
1 Not controlled if printed has been Michael Ford Uwe Krueger 1st April 2015
Group
added.

HSE Working Michael Ford st


1 (Pg. 2) Revised Amendment Table Uwe Krueger 1 April 2015
Group


DocumentNo:LUSHSESP2446007.01 Page2of8

LusailRealEstateDevelopmentCompany HSEEnvironmentalAspectsandImpactProcedure&Register

Contents
1. ENVIRONMENTALASPECTSANDIMPACTSPROCEDURE&REGISTER 4
1.1.PURPOSEOFTHEPROCEDURE&REGISTER 4
1.2.ENVIRONMENTALPOLICY 4
2. SCOPEOFTHEPROCEDURE&REGISTER 4
2.1DEFINITIONS 4
3. RESPONSIBILITIES 5
4. RELATEDDOCUMENTS 5
5. REGISTER 5
6. APPENDIXA:ENVIRONMENTALASPECTSANDIMPACTRATING/REGISTER 6


DocumentNo:LUSHSESP2446007.01 Page3of8

LusailRealEstateDevelopmentCompany HSEEnvironmentalAspectsandImpactProcedure&Register

1.0 ENVIRONMENTALASPECTSANDIMPACTSPROCEDUREANDREGISTER

1.1 PurposeoftheProcedure&Register
ThepurposeofthisProcedure&RegisteristodocumentthemainEnvironmentalAspectsandImpactsand
tolisttherespectivemitigationmeasuresusedbyLusailRealEstateDevelopmentCompany(LREDC)within
their respective Projects during Construction and Operation in order to achieve Environmental best
Practice. The Register is not meant to replace the respective EIAs which are elaborated upfront to any
Project launch in order to obtain an Environmental Permit from the Environmental Authority in charge
(MoE in Qatar). The EIAs list and assess all possible Environmental Aspects and Impacts in much greater
detailthanthisRegister.
TheRegisterisalsotobeappliedassupportfordeterminingtherespectiveEnvironmentalriskslinkedto
respectiveConstruction,workplaceorOperational.
1.2 EnvironmentalPolicy
LREDCarecommittedtosetstandardsthatcomplywithallenvironmentallegislation.
TheProjectsEnvironmentalManagementPlans(OCEMP,OOEMPandCEMPsofsingleProjects)describe
the Methods and Procedures to be adopted in order to meet state of the art requirements for the
protectionofourEnvironmentandtofulfilLREDCEnvironmentalPolicy.
Being fully aware of LREDC various responsibilities concerning the natural Environment LREDC adopts a
holisticapproachwhichisconveyedtoallstaffandoperatorsinordertopreservetheEnvironmentandits
biodiversity.Thisapproachincludedplanninginthedesignstagetoavoidimpactswhereeverpossibleas
wellasassessingandmitigatingallunavoidablechangesinthemostadvancedandsustainablemannerthat
istechnicallyfeasibleandeconomicallyviable.

2.0SCOPEOFTHEPROCEDUREANDREGISTER

A similar individual Register has to be elaborated for each and applied to all LREDC construction and
operations, both purely terrestrial or on a coastline, as applied to normal construction and operating
conditions, abnormal operating conditions (e.g. commissioning, testing, startup & shutdown) and
potentialemergencyconditions.

2.1Definitions
Environmental Aspect Element of LREDCs activities, products or services that can
interactwiththeenvironment

EnvironmentalImpactAnychangetotheenvironment,whetheradverseorbeneficial,
whollyorpartiallyresultingfromLREDCactivities,productsorservices.

SignificantImpact:(AsperISO14001)beingthoseEnvironmentalImpactshavingthegreatest
effectontheenvironmentandwhicharetobeappropriatelymanagedandmitigatedbyLREDC
toachievestateoftheartenvironmentalperformance.

3.0RESPONSIBILITIES


DocumentNo:LUSHSESP2446007.01 Page4of8

LusailRealEstateDevelopmentCompany HSEEnvironmentalAspectsandImpactProcedure&Register


The LREDC HSE Department is responsible for maintaining a Register of Environmental Aspects and
Impacts.ItisresponsibleforupdatingtheRegister,amendingitaccordinglyandpublicizinganyrelevant
changes.
TheEnvironmentalManagershallinformrelevantpersonnelofanychangesthatmayaffectthem.

4.0RELATEDDOCUMENTS

OCEMPOverallConstructionEnvironmentalManagementPlan
OOEMPOverallOperationEnvironmentalManagementPlan
EnvironmentalRiskAssessmentForm
EIA(s)oftherespectiveProject

5.0REGISTER

5.1. DeterminationofEnvironmentalAspectsandImpacts

LREDCdeterminesEnvironmentalAspectsandtheirpotentialImpactsintheirrespectiveProjectsusingthe
followingprocess:
EnvironmentalAspectsaredeterminedbyLREDCtoconsistofanyelementofLREDCconstructionand/or
operationactivitiesthatcaninteractwiththeenvironment.Therelevantinputsandoutputscategoriesare
asfollows:
I. Emissionstoatmosphere
II. Emissionstowater
III. Emissionstoland
IV. Useofrawmaterialsandothernaturalresources
V. Other local environmental and community issues, e.g. noise, odour, flora and fauna,
archaeologyandvisualimpact.
ThisallowstheidentificationoftheaspectsofLREDCbusiness.
Once identified, the relevant aspect is catalogued in PLUSEMS003 Environmental Aspects and Impacts
Procedure&RegisterhavingitspotentialEnvironmentalImpactdetermined.Theimpactisthensubjected
toasignificancereviewinordertoprioritizeAspectsindevelopingEnvironmentalObjectivesandTargets.

5.2 DeterminingEnvironmentalImpactSignificance
EnvironmentalImpactRatingEachidentifiedimpactmustfirsthaveanEnvironmentalImpactRatingfor
eachapplicablereceptor.ThisratingisselectedusingthecategoriesgiveninAppendixA.
FrequencyRatingTheImpactmustalsohaveaFrequencyRatingdeterminedbytheindividuallyassessed
probabilityofoccurrence.
Environmental Impact Significance Matrix Utilizing the Environmental Impact and Probability ratings,
eachAspect/Impactcombinationshallhaveanumericalvaluedevelopedbasedonthefollowingmatrix:


DocumentNo:LUSHSESP2446007.01 Page5of8

LusailRealEstateDevelopmentCompany HSEEnvironmentalAspectsandImpactProcedure&Register

PROBABILIT
Y

0 Almostno 1Minor 2Average 3Major


Probabilit Probabilit Probability Probability
y y

0 No Env. 0 0 0 0
Impact

1 Minor 0 1 2 3
Impact

CONSEQUEN 2Average 0 2 4 6
CE Impact

3 Major 0 3 6 9
Impact

Riskcategories:
GreenLow
OrangeAverage
RedMajor
The matrix calculates a simple multiple of Impact rating and Probability rating. From the matrix, any
outcomewithavalueofgreaterthanfour(i.e.thoseitemsratingintheredboxes)isconsideredbyLREDC
asbeingsignificantforplanningpurposes.AllsuchImpactsneedtobemitigatedinordertobereducedto
alowrisk.
Cataloging of Impact Significance Once the significance for each Aspect/Impact combination is
determined using the matrix, the values for each rating and the significance value are entered in to the
RegisterofEnvironmentalAspectsandImpacts.

5.3ReviewPeriod
The Register of Environmental Aspects and Impacts shall be reviewed annually or as needed due to
operationalchanges.

5.4ObjectivesandTargets
The Register of Environment Aspects and Impacts shall be used to develop and maintain LREDC
EnvironmentalObjectivesandTargetsasrecordedintheOCEMPandOOEMP.

6.0APPENDIX

AppendixA AspectsandImpacts

AppendixB SafetyLeadershipSystem


DocumentNo:LUSHSESP2446007.01 Page6of8

LusailRealEstateDevelopmentCompany HSEEnvironmentalAspectsandImpactProcedure&Register

APPENDIXA :EnvironmentalAspectsandImpactRating/Register

TherelevantEnvironmentalAspectsarelistedandtheImpactsofeachemissionareratedandregisteredin
thebelowTable.Theconsequentimpactratingappliedisgivenbasedonexperience.

EnvironmentalAspectsandImpactsRegister

Aspect EnvironmentalImpact Impact


Rating
EmissiontoAtmosphere
LocalAirQuality Photochemicalreactionwithsunlighttoproducelowlevelozone,which 1
contributestopoorairquality(e.g.hydrocarbons)
Dustnuisanceandhazardtoworkersandnearbyresidents 2
Constantreleaseofdustoffsite 3
Cement,MicroSilicanuisancetoworkers,staff,nearbyresidents 2
GreenhouseGas Greenhousegas,whichcontributestoglobalwarming(e.g.CO2) 1
OzoneDepletion Persistent pollutant that causes depletion of stratospheric ozone and 3
thereforepermittinganincreaseintheamountofharmfulUVradiation
gettingthroughtotheearthssurface
Toxic Toxic gas which has potential acute health effects for employees who 3
comeintodirectcontactandcouldcausefatalitiesathighconcentrations
(e.g.H2S,CO)

EmissiontoWater
Inert, suspended or Reducesavailablelightinwaterorsettlesandsmotherslifeonbottom 0
settlingmaterial
Biodegradable Increases biological oxygen demand (BOD) in seawater (e.g. kitchen / 1
suspendedsolids sewagewaste)
Chemical oxygen Increases COD in sea water (e.g. drilling chemicals, water treatment 2
demand (COD) chemicals,runofffromroads,runoff,spillsfrombarges)
increasingpollutants
Nitrifyingchemicals Increasesalgalactivityinwatertothedetrimentofotherorganisms 3
Toxicreleases Toxic to aquatic life (e.g. chlorine forming chlorinated hydrocarbons or 3
organochlorides,oil)
Marine habitat Impact on Benthic fauna, Marine mammals (e.g. dugong, dolphin), 2
destruction turtles,fishandshrimpthroughmarineworks

EmissiontoLand(includingContamination,solidandliquidWasteDisposal)
Wastespills Deteriorating terrestrial environment through uncontrolled disposal of 1
e.g.excessconcrete,constructionwaste,tyres,sewageetc.
Domesticwaste Taking up nonhazardous waste landfill space; attracting pest; possible 1
healthhazardtoworkers,staff,residents
Clinicalwaste Hazardousemissionstotheenvironmentwithpotentialofhealthhazard 2
toworkers,staff,residents
Hazardouswaste Unsuitabledisposalinnonhazardouswastelandfillwherespecialwaste
facilitiesdonotexist,orlongtermstoragependingthedevelopmentof 2
facilities
Groundand Spillage of material leading to ground and / or groundwater
Groundwater contaminationandaffectingorganiclife 3
pollution


DocumentNo:LUSHSESP2446007.01 Page7of8

LusailRealEstateDevelopmentCompany EnvironmentalAspectsandImpactsProcedure&Register


Aspect EnvironmentalImpact Impact
Rating

OtherLocalEnvironmentalandCommunityIssues
VisualImpact Eachofthefollowingattractsonepoint;visiblemaintenanceequipment,
discolouredormissingcladding,incompletelagging,discoloredorpoorly 03
alignedovergroundutilities.
Odour Intermittentodourinplantoranyoperation(<12timesperyear) 1
Persistentodourinplantoranyoperation 2

Noise Noiselevelinplantoperationoronroads7075dB(A) 0
Noiselevelinplantoperationoronroads7580dB(A) 1
Noiselevelinplantoperationoronroads8085dB(A) 2
Noiselevelinplantoperationoronroads>85dB(A) 3
FloraandFauna Damageuptocompletelossoffaunaandflora 13
Archaeology, Eventualdamageuptocompletelossofnationalheritage 13
historical sites,
heritage, nature
preserves

UseofRawMaterialsandotherNaturalResources
EnergyUsage 01MWh 0
12MWh 1
23MWh 2
>3MWh 3
PotableWaterUsage 010m3 0
10100m3 1
1001000m3 2
100010,000m3 3

Note: wheremorethanoneimpactappliestoanyoneaspect,justtheenvironmentalimpactsshouldbe
recordedthathaveaverageoraboveimpactratings.

Note: where a positive sustainability initiative is noted, e.g., use of solar panels used to generate
electricityandtherebynotusingnonrenewablefossilfuels,avalueofzeroisallocatedmakingthe
overallenvironmentalimpactzero.