Sie sind auf Seite 1von 14

Test Report of Generator Protection Relay (G60-A) for 1

Engro Powergen Project

Customer Engro Powergen


Relay Type Numerical Generator Management Relay
Panel Identification Generator Protection Panel GPP
Relay Identification Generator Protection
Relay Make GENERAL ELECTRIC
Model G60-G01-HCH-F8F-H67-M8F-P6D-U6D-W6C
Serial No. AALC07000443
Firmware Revision 5.4
Auxiliary Voltage 125V DC
Test Starting Date 16-04-2015
Test Set Used Freja 300
Mr.Mubasher Ahmed, Testing/Commissioning Engineer.
Tested By Contact Number: +92 333 408 30 86
Witnessed By Mr.Ijlal, Engro Powergen

General Data
Generator Genout Voltage 11.0 kV
Connection Type WYE
CT Ratio Genout Side (CT-6) 8000/1
CT Ratio Neutral Side (CT-1) 8000/1
VT Ratio (VT-G) 13.8kV/100V
Aux. Neutral VT(NET) 13.8kV/200V

Testing Procedure

1. Verify that the relay rear connection/wiring is according to referred drawings.


2. Power up relay at its rated voltage mentioned on face plate of relay.
3. Verify that In Service green LED on face plate is lit up.
4. Verify that different protection units inside the relay are configured on desired
settings.
5. Isolate the relay from field side wiring as per referred drawing.
6. Inject different voltage & current values (according to relay trip settings) to
relay and check its functionality and behavior.
7. Note down all test results in tables given below.

EPESOL(PVT)LTD

SHT1OF14 Partner
GEEnergy
Test Report of Generator Protection Relay (G60-A) for 2
Engro Powergen Project

1. Measuring / Metering Accuracy

Phase Applied Analog Measured Value


Source Ratio
Involved Signals (Secondary) (Primary)

Source 2,Line Side Ia1 8000/1 1.00 0A 7.994-0 kA


Source 2, Line Side Ia2 8000/1 1.00 240A 8.002-119 kA
Source 2, Line Side Ia3 8000/1 1.00 120A 7.994-240kA
Source 1, Neutral Side Ib1 8000/1 1.00 0A 7.995-0 kA
Source 1, Neutral Side Ib2 8000/1 1.00 240A 8.002-119 kA
Source 1, Neutral Side Ib3 8000/1 1.00 120A 7.994-240kA
Main PTs (VTG-P) V1 13.8kV/100V (57.70)100V 13.796-330 kV
Main PTs (VTG-P) V2 13.8kV/100V (57.7240)100V 13.794-90 kV
Main PTs (VTG-P) V3 13.8kV/100V (57.7120)100V 13.808-210 kV
NET VT 13.8kV/220V 1000 V 6.27-0 kV

2. Stator Differential Protection (87G)

Pickup = 0.083 P.U


Slope 1 = 10 %
Break 1 = 1.00 P.U
Break 2 = 3.07 P.U
Slope 2 = 60 %

2.1 Pickup Accuracy

I Applied at Gen out Side( (Amp) I Applied at Neutral Side (Amp)


Sr. Status
Ia1 Ia2 Ia3 Ib1 Ib2 Ib3
1 1.00 0 1.00 240 1.00 120 1.00 0 1.00 240 1.00 120 Stable
2 0.90 0 0.90 240 0.90 120 0.810 0 0.810 240 0.810 120 No Pickup
3 0.90 0 0.90 240 0.90 120 0.809 0 0.809 240 0.809 120 Pickup
4 3.50 0 3.50 240 3.50 120 1.41 0 1.41 240 1.41 120 No Pickup
5 3.50 0 3.50 240 3.50 120 1.40 0 1.40 240 1.40 120 Pickup

EPESOL(PVT)LTD

SHT2OF14 Partner
GEEnergy
Test Report of Generator Protection Relay (G60-A) for 3
Engro Powergen Project

2.2 Operating Time Accuracy

I Applied at Genout Side( (Amp) I Applied at Neutral Side (Amp) Measured


Sr. Time Status
Ia1 Ia2 Ia3 Ib1 Ib2 Ib3 (msec)
1 1.00 0 1.00 240 1.00 120 0.00 0 0.00 240 0.00 120 13.00 Trip

3. Negative Phase Sequence (Generator Unbalance Alarm 46A)

3.1 Pickup Accuracy

Inom. = 0.830 P.U.


Stage 2 Pickup = 10.00%
Time Delay = 6.0 sec
Applied Current Gen out Source 2 (Amp)
Sr. Status
Ia1 Ia2 Ia3 I1 I2 I3
1 0.050 0.050 0.050 0 120 240 No Pickup
2 0.051 0.051 0.051 0 120 240 Pickup

: Phase T
OC and Stator Diff. Settings should be switched off to test this function.
4. Negative Phase Sequence ( Generator Unbalance Trip 46T)

4.1 Pickup Accuracy

Stage 1 Pickup = 10.00 %


Stage 1 K Value = 6.40
Stage 1 min. = 0.250 Sec
Stage 1 max. = 640.0 Sec
Stage 1 K Reset = 256.0 Sec

Applied Current Gen Out Source 2 (Amp) Status


Sr.
Ia1 Ia2 Ia3 I1 I2 I3
1 0.084 0.084 0.084 0 120 240 No Pickup
2 0.085 0.085 0.085 0 120 240 Pickup

EPESOL(PVT)LTD

SHT3OF14 Partner
GEEnergy
Test Report of Generator Protection Relay (G60-A) for 4
Engro Powergen Project

4.2 Operating Time Accuracy

Applied Current Neutral Source 2 (Amp) Measured Time


Sr.
Ia1 Ia2 Ia3 I1 I2 I3 ( Sec )
1 1.00 1.00 1.00 0 120 240 4.434
2 1.50 1.50 1.50 0 120 240 1.994
3 2.50 2.50 2.50 0 120 240 0.733

5. Sensitive Directional Power Stage 1(32 N. Stop)

5.1 Pickup Accuracy

Directional Power RCA = 180


Stage 1 SMIN = 0.035 P.U
Stage 1 Delay = 3.0 Sec

Applied Voltage (Volts) Applied Current Source 2 (Amp)


Sr. Status
V1 V2 V3 V1 V2 V3 Ia1 Ia2 Ia3 I1 I2 I3
No
1 57.70 57.70 57.70 0 240 120 0.035 0.035 0.035 180 60 300 Pickup
2 57.70 57.70 57.70 0 240 120 0.036 0.036 0.036 180 60 300 Pickup

5.2 Operating Time Accuracy


Applied Voltage (Volts) Applied Current Source 2 (Amp) Measured
Sr. Time (m
V1 V2 V3 V1 V2 V3 Ia1 Ia2 Ia3 I1 I2 I3
Sec)
1 57.70 57.70 57.70 0 240 120 0.2 0.2 0.2 180 60 300 3.074

6. Sensitive Directional Power Stage 2 (32-2)

6.1 Pickup Accuracy

Directional Power RCA = 180


Stage 2 SMIN = -0.007
Stage 2 Delay = 0.50 Sec

Applied Voltage (Volts) Applied Current Source 2 (Amp)


Sr. Status
V1 V2 V3 V1 V2 V3 Ia1 Ia2 Ia3 I1 I2 I3
No
1 57.70 57.70 57.70 0 240 120 0.007 0.007 0.007 180 60 300 Pickup
2 57.70 57.70 57.70 0 240 120 0.008 0.008 0.008 180 60 300 Pickup

EPESOL(PVT)LTD

SHT4OF14 Partner
GEEnergy
Test Report of Generator Protection Relay (G60-A) for 5
Engro Powergen Project

6.2 Operating Time Accuracy

Applied Voltage (Volts) Applied Current Source 2 (Amp) Measured


Sr. Time
V1 V2 V3 V1 V2 V3 Ia1 Ia2 Ia3 I1 I2 I3
(mSec)
1 57.70 57.70 57.70 0 240 120 0.005 0.005 0.005 180 60 300 579

7. Loss of Field Stage 1 (40):

7.1 Pickup Accuracy

Center = 44.14 ohm


Radius = 34.76 ohm
Time Delay = 1.000 sec
Off Set = 9.38 ohm

Applied Voltage (Volts) Applied Current Sorce 2 (Amp) Z


Sr. Pickup
V1 V2 V3 V1 V2 V3 Ia1 Ia2 Ia3 I1 I2 I3 ohm
1 20 20 20 0 240 120 0.254 0.254 0.254 90 330 210 78.74 No
2 20 20 20 0 240 120 0.255 0.255 0.255 90 330 210 78.41 Yes

7.2 Operating Time Accuracy

Applied Voltage (Volts) Applied Current Sorce 2 (Amp) Measured


Sr. Time
V1 V2 V3 V1 V2 V3 Ia1 Ia2 Ia3 I1 I2 I3
(sec)
1 20 20 20 0 240 120 0.51 0.51 0.51 90 330 210 1.024

8. Loss of Field Stage 2 (40):

8.1 Pickup Accuracy

Center = 80.98 ohm


Radius = 71.60 ohm
Time Delay = 1.00 sec
Off Set = 9.38

Applied Voltage (Volts) Applied Current Sorce 2 (Amp) Z


Sr. Status
V1 V2 V3 V1 V2 V3 Ia1 Ia2 Ia3 I1 I2 I3 ohm
No
1 20 20 20 0 240 120 0.132 0.132 0.132 90 330 210 151.52
Pickup
2 20 20 20 0 240 120 0.133 0.133 0.133 90 330 210 150.38 Yes

EPESOL(PVT)LTD

SHT5OF14 Partner
GEEnergy
Test Report of Generator Protection Relay (G60-A) for 6
Engro Powergen Project

8.2 Operating Time Accuracy (at 36.0 ohm)

Applied Voltage (Volts) Applied Current Source 2 (Amp) Measured


Sr.
V1 V2 V3 V1 V2 V3 Ia1 Ia2 Ia3 I1 I2 I3 Time (sec)
1 20 20 20 0 240 120 0.17 0.17 0.17 90 330 210 1.034

9. Phase Over Voltage Element (59P1):

9.1 Pickup Accuracy

Pickup = 1.200 P.U.


Time Delay = 0.50 Sec

Applied Voltage (Volts)


Sr. Status
V1 V2 V3 V1 V2 V3
1 69.18 69.18 69.18 0 240 120 No Pickup
2 69.19 69.19 69.19 0 240 120 Pickup

9.2 Operating Time Accuracy

Applied Voltage (Volts) Measured Time


Sr.
V1 V2 V3 V1 V2 V3 (Sec)

1 75.00 75.00 75.00 0 240 120 0.554

10. Under Frequency (81-1U):

10.1 Pickup Accuracy

Pickup Level = 49.00 Hz

Voltage Applied Applied Frequency


Sr. Status
(Volts) (Hz)
1 63.50 49.01 No Pickup
2 63.50 49.00 Pickup

EPESOL(PVT)LTD

SHT6OF14 Partner
GEEnergy
Test Report of Generator Protection Relay (G60-A) for 7
Engro Powergen Project

11. Under Frequency (81-2U):

11.1 Pickup Accuracy

Pickup Level = 47.50 Hz


Time Delay = 3.00 Sec

Voltage Applied Applied Frequency


Sr. Status
(Volts) (Hz)
1 63.50 47.50 No Pickup
2 63.50 47.49 Pickup

11.2 Operating Time Accuracy

Voltage Applied Applied Frequency Measured Time


Sr.
(Volts) (Hz) ( Sec)
1 63.50 47.00 3.10 Sec

12. Over-Frequency (81-1O):

12.1 Pickup Accuracy

Pickup Level = 51.00 Hz

Voltage Applied Applied Frequency


Sr. Status
(Volts) (Hz)
1 63.50 50.98 No Pickup
2 63.50 50.99 Pickup

13. Over-Frequency (81-2O):

13.1 Pickup Accuracy

Pickup Level = 52.50 Hz


Time Delay = 3.00Sec

Voltage Applied Applied Frequency


Sr. Status
(Volts) (Hz)
1 63.50 52.49 No Pickup
2 63.50 52.50 Pickup

EPESOL(PVT)LTD

SHT7OF14 Partner
GEEnergy
Test Report of Generator Protection Relay (G60-A) for 8
Engro Powergen Project

13.2 Operating Time Accuracy

Voltage Applied Applied Frequency Measured Time


Sr.
(Volts) (Hz) ( Sec)
1 63.50 53.00 3.10

14. Over-Frequency (81-3O):

14.1 Pickup Accuracy

Pickup Level = 52.50 Hz


Time Delay = 30.00 Sec

Voltage Applied Applied Frequency


Sr. Status
(Volts) (Hz)
1 63.50 52.49 No Pickup
2 63.50 52.50 Pickup

14.2 Operating Time Accuracy

Voltage Applied Applied Frequency Measured Time


Sr.
(Volts) (Hz) ( Sec)
1 63.50 53.00 30.10

Note: Overfrequency Stage 2 & Stage 3 has same pickups

15. Phase Under Voltage (27-U1):

15.1 Pickup Accuracy

Pickup = 0.90 P.U (Phase to Ground)


Curve = Definite Time
Time Delay = 10.00 Sec

Applied Voltage (Volts)


Sr. Status
V1 V2 V3 V1 V2 V3
1 51.94 51.94 51.94 0 240 120 No Pickup
2 51.93 51.93 51.93 0 240 120 Pickup

EPESOL(PVT)LTD

SHT8OF14 Partner
GEEnergy
Test Report of Generator Protection Relay (G60-A) for 9
Engro Powergen Project

16. Phase Under Voltage (27-U2):

16.1 Pickup Accuracy

Pickup = 0.90 P.U (Phase to Ground)


Curve = Definite Time
Time Delay = 3.00Sec
Applied Voltage (Volts)
Sr. Status
V1 V2 V3 V1 V2 V3
1 40.41 40.41 40.41 0 240 120 No Pickup
2 40.40 40.40 40.40 0 240 120 Pickup

16.2 Operating Time Accuracy

Applied Voltage (Volts) Measured Time


Sr.
V1 V2 V3 V1 V2 V3 (Sec)
1 30.0 30.0 30.0 0 240 120 3.034

17. Phase Time Over Current with Voltage Restraint (51V)

17.1 Pickup Accuracy

Pickup Level = 0.997 P.U


Curve = IEEE Mod Inv
TD Multiplier = 2.00
Voltage Restrained = Enabled

Applied Voltage (Volts) Applied Current Source 2 (Amp)


Sr. Status
V1 V2 V3 V1 V2 V3 Ia1 Ia2 Ia3 I1 I2 I3
No
1 57.70 57.70 57.70 0 240 120 0.997 0.997 0.997 0 240 120
Pickup
2 57.70 57.70 57.70 0 240 120 0.998 0.998 0.998 0 240 120 Pickup
No
3 0.00 0.00 0.00 0 240 120 0.100 0.100 0.100 0 240 120
Pickup
4 0.00 0.00 0.00 0 240 120 0.101 0.101 0.101 0 240 120 Pickup

EPESOL(PVT)LTD

SHT9OF14 Partner
GEEnergy
Test Report of Generator Protection Relay (G60-A) for 10
Engro Powergen Project

17.2 Operating Time Accuracy

Sr. Applied Voltage (Volts) Applied Current Source 2 (Amp) Measured


V1 V2 V3 V1 V2 V3 Ia1 Ia2 Ia3 I1 I2 I3 Time(Sec)

1 57.70 57.70 57.70 0 240 120 2.00 2.00 2.00 0 240 120 7.574

2 50.00 50.00 50.00 0 240 120 2.00 2.00 2.00 0 240 120 6.334

3 40.00 40.00 40.00 0 240 120 2.00 2.00 2.00 0 240 120 5.044

4 30.00 30.00 30.00 0 240 120 2.00 2.00 2.00 0 240 120 4.004

5 10.00 10.00 10.00 0 240 120 2.00 2.00 2.00 0 240 120 2.294

6 0.00 0.00 0.00 0 240 120 2.00 2.00 2.00 0 240 120 1.915

18. Phase Instantaneous Time Over Current-1 for (50 P)

18.1 Pickup Accuracy

Pickup Level = 3.076 P.U


Time Delay = 0.01Sec

Applied Current Source 2 (Amp) Status


Sr.
Ia1 Ia2 Ia3 I1 I2 I3
1 3.077 3.077 3.077 0 240 120 No Pickup
2 3.078 3.078 3.078 0 240 120 Pickup

18.2 Operating Time Accuracy

Applied Current Neutral Source 1 (Amp) Measured Time


Sr.
Ia1 Ia2 Ia3 I1 I2 I3 ( Sec )
1 4.00 4.00 4.00 0 240 120 0.041

EPESOL(PVT)LTD

SHT10OF14 Partner
GEEnergy
Test Report of Generator Protection Relay (G60-A) for 11
Engro Powergen Project

19. Phase Instantaneous Time Over Current-1 for (50BF)

19.1 Operating Time Accuracy

Pickup Level = 0.200 P.U


Time Delay = 0.250 Sec (in logic)

Applied Current Source 2 (Amp) Measured Time


Sr.
Ia1 Ia2 Ia3 I1 I2 I3 (mSec)
1 1.39 1.39 1.39 0 240 120 268.9

20. Over Excitation Protection Stage 1(24):

20.1 Pickup Accuracy

Pickup = 1.12 P.U.


Curve = Definite Time
T.D = 5.00
Applied Voltage (Volts) Applied Freq Status
Sr.
V1 V2 V3 V1 V2 V3 Hz
1 64.59 64.59 64.59 0 240 120 50 No Pickup
2 64.60 64.60 64.60 0 240 120 50 Pickup

20. Over Excitation Protection Stage 2(24 T):

20.1 Pickup Accuracy

Pickup = 1.15 pu
Curve = Definite Time
T.D = 3.00

Applied Voltage (Volts) Applied Freq Status


Sr.
V1 V2 V3 V1 V2 V3 Hz
1. 66.30 66.30 66.30 0 240 120 50 No Pickup
2. 66.32 66.32 66.32 0 240 120 50 Pickup

EPESOL(PVT)LTD

SHT11OF14 Partner
GEEnergy
Test Report of Generator Protection Relay (G60-A) for 12
Engro Powergen Project

20.2 Operating Time Accuracy

Applied Voltage (Volts) Applied Freq Measured Time


Sr.
V1 V2 V3 V1 V2 V3 Hz ( Sec )
1. 72.0 72.0 72.0 0 240 120 50 3.114

21. 3rd Harmonic Neutral Under Voltage Protection (27TN)

21.1 Pickup Accuracy

Pickup Level = 0.0087 pu


Time Delay = 5.00 sec

Sr. Voltage Applied Neutral Source 1 Aux VT (Volts) Status


1 2.00 No Pickup
2 1.90 Pickup

23. Accidental Energization(AE)

23.1 Pickup Accuracy

AE Armed = UV & OFFLINE


Under Voltage = 0.7 PU
Over Current = 0.3 PU

Applied Voltage (Volts) Applied Current Source 2 (Amp)


Sr. Status
V1 V2 V3 V1 V2 V3 Ia1 Ia2 Ia3 I1 I2 I3
No
1 0.00 0.00 0.00 0 240 120 0.301 0.301 0.301 0 240 120
Pickup
2 0.00 0.00 0.00 0 240 120 0.300 0.300 0.300 0 240 120 Pickup

3 41.50 41.50 41.50 0 240 120 0.301 0.301 0.301 0 240 120 Normal
De-
4 41.60 41.60 41.60 0 240 120 0.300 0.300 0.300 0 240 120
latched

EPESOL(PVT)LTD

SHT12OF14 Partner
GEEnergy
Test Report of Generator Protection Relay (G60-A) for 13
Engro Powergen Project

23.2 Operating Time Accuracy

Applied Voltage (Volts) Applied Current Source 2 (Amp) Measured


Sr.
V1 V2 V3 V1 V2 V3 Ia1 Ia2 Ia3 I1 I2 I3 Time(msec)

1 0.00 0.00 0.00 0 240 120 0.80 0.80 0.80 0 240 120 23.50
hase TOC and Stator Diff.
Settings should
be switched off to test this function.
24. Ground Time Over Current-1 (51G)

24.1 Pickup Accuracy

Pickup Level = 0.065 P.U


Time Delay = 1.00 Sec

Applied Ground Current (Amp) Status


Sr.
Ig I1
1 0.066 0 No Pickup
2 0.067 0 Pickup

24.2 Operating Time Accuracy

Applied Ground Current (Amp) Measured Time


Sr.
(Sec)
Ig I1
1 0.100 0 1.02

EPESOL(PVT)LTD

SHT13OF14 Partner
GEEnergy
Test Report of Generator Protection Relay (G60-A) for 14
Engro Powergen Project

25. Verification of LEDs

Sr. Configuration Remarks


1 Stator differential Functional
2 Phase TOC Functional
3 Phase IOC Functional
4 Ground TOC Functional
5 Generator Unbalance Functional
6 Phase UV 1 Functional
7 Phase UV 2 Functional
8 Phase OV 1 Functional
9 Volts Per Hz 1 Functional
10 Volts Per Hz 2 Functional
11 Loss of excitation Functional
12 Accidental Energization Functional
13 3rd harmonic under voltage Functional
14 Sensitive directional Power stage 1 Functional
15 Sensitive directional Power stage 2 Functional

Tested By Witnessed By

Mr.Mubasher Ahmed Mr.Ijlal


EPESOL PVT LTD Engro Powergen

EPESOL(PVT)LTD

SHT14OF14 Partner
GEEnergy

Das könnte Ihnen auch gefallen