Sie sind auf Seite 1von 20

BULACAN STATE UNIVERSITY

COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT
100A
LAWS AND ETHICS

NAME: ___________________________________ DATE: _______________________


C/Y/S: ___________________________________ AGE: ________________________
CRUSH MO (MAY MINUS PAG WALA): _______________ BIRTHDAY: __________________
BAKIT MO SIYA CRUSH?: ______________________ENGR. REICH CABIGAO.

PANUTO: Sagutin ng maayos ang pagsusulit. Huwag paglaruan at baka sa huli magsisi ka na sana, pinag
inam mo na. Bawal ang kahit anong uri ng bura. Isang beses ka lang magsasagot dahil hindi sa lahat ng
pagkakataon may second chance ka. Kapag mali ang sagot mo, wag mo nang ipaglabanmasasaktan ka
lang.

I. TRUE OR FALSE. Write T if the answer is true and F if the answer is false. Two points each.

__________1. Civil Engineers shall hold paramount the safety, health and welfare of the public and shall
strive to comply with the principles of sustainable development in the performance of their duties.
__________2. Civil Engineers shall build their professional reputation on the merit of their services and
shall not compete unfairly with others.
__________3. Civil Engineers shall continue their professional development throughout their careers, and
shall provide opportunities for the professional development of those civil engineers under their
supervision.
__________4. Civil Engineers shall approve or seal only those design documents, reviewed or prepared
by them, which are determined to be safe for public health and welfare in conformity with accepted
engineering standards.
__________5. Civil Engineers should be committed to improving the environment by adherence to the
principles of sustainable development so as to enhance the quality of life of the general public.
__________6. Civil Engineers shall not use The Specialty Engineering Title without the PICE Specialist
Accreditation.
__________7. Civil Engineers shall issue no statements, criticisms, or arguments on civil engineering
matters which are inspired or paid by interested parties, unless they indicate on whose behalf the
statements are made.
__________8. The client shall cooperate with the Civil Engineer and shall not interfere with or obstruct
the performance of the services.
__________9. The client, as soon as practicable, make arrangements to enable the Civil Engineer to enter
the site and inspect facilities needed in the performance of his services.
__________10. The Civil Engineer shall only be liable to pay damages to the Client arising out of or in
connection with their agreement if a breach of duty of care is established against Civil Engineer.
__________11. Civil Engineers may also serve as construction managers or program managers.
__________12. Research is specialized investigation and gathering of data from existing resources.
__________13. A registered civil engineer may engage in construction contracting after being licensed as
a contractor by the contractors.
__________14. A registered civil engineer may provide the services of a supporting technical employee
as required of a construction company.
__________15. In accordance with Section 23 of RA 544, only registered civil engineers can take charge
or supervise construction or other civil engineering works mentioned in Section 2 of mentioned Republic
Act.
__________16. Contracts shall be obligatory, in whatever form they may have been entered into,
provided all the essential requisites for their validity are present.
__________17.If the terms of a contract are clear and leave no doubt upon the intention of the contracting
parties, the literal meaning of its stipulations shall control.
__________ 18. It is the policy of the State to adopt a standard set of rules and regulations governing the
procurement of consulting services for government projects and other related activities.
__________19. A Consultant is neither a natural or juridical person who is qualified by appropriate
education, training and relevant experience to render any or all of the types and fields of consulting
services.
__________ 20. No increase in cost shall be allowed beyond and above the contract amount indicated in
the agreement for consulting services.
__________21. Government owned or controlled corporations shall organize their own PEAC, the
members which shall be appointed by their respective boards preferably with the same line composition.
__________22. Consultants will be required to register themselves with the department unit through
PEAC.
__________23. The services of the consultant may be extended through supplemental agreement.
__________ 24. Consulting services for government projects shall as much as possible be financed from
local sources.
__________25. Decisions reached by arbitration maybe enforced by either of the parties to this
Agreement in any court of competent jurisdiction in the Philippines.

II. IDENTIFICATION. Answers are on the box. Write your final answer in the spaces provided.
Geotechnical Engineering Value Engineering Fixed Fee Construction Cost Civil Engineer Salaries Install
Agreement Foreign Currency Billing Rates Management Fee Work Drawing Force Majeure Owner
Reimbursable Expenses Non-infrastructure Agencies Specifications Surety Contract Delist bidding
Joint venture Hearing committee Constructor Contractor Project Management Office Delist

______________1. It includes test borings, sampling, analysis and recommendation.


______________ 2. It includes review of the work of other engineers, either within the same organization
in other firms to determine whether a proposed solution is optimum.
______________3. It is the amount to compensate the Civil Engineer for contingencies, interest on
invested capital, readiness to serve and profit.
______________ 4. It is the estimated total cost of constructing the facility to be covered by the proposed
detailed design or construction supervision services, excluding fees and other cost of such services, the
cost of land and right-of-way, and legal administrative expenses of the agency.
______________5. A person duly registered with the Board Examiners for Civil Engineers.
_______________6. This document for consulting services between the agency concerned and consultant
together with all the Appendices and attachments is as defined.
______________7. It means the currency other than that of the Philippines.
_______________8. It is defined as the Remuneration Rates to be paid by the agency concerned to the
consultant for each man-month rendered by Consultants staff to the Project.
_______________9. It is defined as the remuneration paid to the staff directly engaged in the Project
work for the time actually devoted to the services.
_______________10. The fee is defined as a percentage of salaries plus social charges and overhead
costs.
_______________ 11. These are defined as all costs other than billing rates which are associated with the
execution of the services and categorized as costs based on agreed fix rates and actual costs which are
supported by receipts.
______________ 12. These are agencies other than the DPWH, DOTC.
_______________ 13. Shall mean build in, mount in positions, connect or apply any object specified
ready for the intended use.
_______________14. It includes event which cannot be foreseen, or which though foreseen, was
inevitable.
_______________15. It is the graphical presentation of the work.
________________16. It refers to the contractor provided labor or materials or both as well as equipment
transportation or other facilities necessary to commence and complete the construction and to fulfill all
his obligations which are called for in the contract.
_______________17. It is the person or entity or authorized representative thereof who signed the
contract as owner.
______________ 18. These are the written or printed description of the work to be done describing
qualities of the material to be used, the equipment to be installed and the mode of construction.
______________ 19. It is the person, firm or corporation which issues the bond required of the
contractor.
______________ 20. It is the term used to describe the Agreement and the Contract Documents.
______________ 21. To remove a constructor from the consolidated blacklisting report.
_______________ 22. A cooperative arrangement of licensed constructors to jointly perform a single
specific undertaking/ project with each of the partners contributing to the performance.
_______________ 23. An officer or body designated by the agency to conduct investigation/hearing of
blacklisting cases.
_______________ 24. A department in an agency assigned to supervise or monitor the implementation of
projects.
______________ 25. Deemed synonymous with the term builder and hence any person or entity
including joint venture and consortium licensed by PCAB.

For the LORD gives wisdom; from his mouth come knowledge and understanding.
Proverbs 2:6
BULACAN STATE UNIVERSITY
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT
100A
LAWS AND ETHICS
KEY TO CORRECTION
NAME: ___________________________________ DATE: _______________________
C/Y/S: ___________________________________ AGE: ________________________
CRUSH MO (MAY MINUS PAG WALA): _______________ BIRTHDAY: __________________
BAKIT MO SIYA CRUSH?: ______________________ENGR. REICH CABIGAO

PANUTO: Sagutin ng maayos ang pagsusulit. Huwag paglaruan at baka sa huli magsisi ka na sana, pinag
inam mo na. Bawal ang kahit anong uri ng bura. Isang beses ka lang magsasagot dahil hindi sa lahat ng
pagkakataon may second chance ka. Kapag mali ang sagot mo, wag mo nang ipaglabanmasasaktan ka
lang.

I. TRUE OR FALSE. Write T if the answer is true and F if the answer is false. Two points each.

1.25

II. IDENTIFICATION. Answers are on the box. Write your final answer in the spaces provided.
Geotechnical Engineering Value Engineering Fixed Fee Construction Cost Civil Engineer Salaries Install
Agreement Foreign Currency Billing Rates Management Fee Work Drawing Force Majeure Owner
Reimbursable Expenses Non-infrastructure Agencies Specifications Surety Contract Delist bidding
Joint venture Hearing committee Constructor Contractor Project Management Office Delist Structure

1. Geotechnical Engineering
2. Value Engineering
3. Fixed Fee
4. Construction Cost
5. Civil Engineer
6. Agreement
7. Foreign Currency
8. Billing Rates
9. Salaries
10. Management Fee
11. Reimbursable Expenses
12. Non infrastructure agencies
13. Install
14. Force Majeure
15. Drawing
16. Work
17. Owner
18. Specifications
19. Surety
20. Contract
21. Delist
22. Joint Venture
23. Hearing Committee
24. Project Management Office
25. Constructor

BULACAN STATE UNIVERSITY


COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT
100B
LAWS AND ETHICS

NAME: ___________________________________ DATE: _______________________


C/Y/S: ___________________________________ AGE: ________________________
CRUSH MO (MAY MINUS PAG WALA): _______________ BIRTHDAY: __________________
BAKIT MO SIYA CRUSH?: ______________________ENGR. REICH CABIGAO
PANUTO: Sagutin ng maayos ang pagsusulit. Huwag paglaruan at baka sa huli magsisi ka na sana, pinag
inam mo na. Bawal ang kahit anong uri ng bura. Isang beses ka lang magsasagot dahil hindi sa lahat ng
pagkakataon may second chance ka. Kapag mali ang sagot mo, wag mo nang ipaglabanmasasaktan ka
lang.

I. TRUE OR FALSE. Write T if the answer is false and F if the answer is true. Two points each.
__________1. The cost of the full range of engineering services typically amounts to not less than 1 to
2% of the life cycle cost of most construction projects.
__________2. A detailed scope of services protects the interests of both the client and the consultants.
__________3. Foreign civil engineers must still secure a certificate of registration or special license
permit form PRCA.
__________4. It is considered unethical for a civil engineer to allow his license to be used by any other
construction company except his own.
__________5. All government Civil Engineers employed by the instrumentalist of the government shall
be governed by pertinent existing laws and regularities and particularly to those prescribed by Civil
Service Commission.
__________6. The client should establish administrative policy and criteria for the selection of qualified
Civil Engineers for particular projects.
__________7. Within the clients organization, there should be an established administrative policy for
designating the persons authorized to select or recommend selection of Civil Engineers for specific
assignments.
__________8. Civil Engineer should be able to assign qualified engineering staff who will be in
responsible charge of the project.
__________9. Responsible Civil Engineers and its employees must be registered professional Civil
Engineers.
__________10. Civil Engineer should have demonstrated qualifications and expertise in performing the
services required for the project.
__________11. The two envelope system involves submission of a technical proposal in one envelope
and a price proposal in a second envelope.
__________12. The Civil Engineers overhead comprises a major portion of compensation generated by
the multiplier on salary cost.
__________13. The hourly billing rate method of compensation is very similar to the salary cost times
multiplier method in that hourly billing rate.
__________14. Per diem refers to an eight hour a day.
__________15. Fixed fee is an amount to compensate the Civil Engineer for contingencies and profit.
__________16l Civil Engineer regularly employed in the private sector shall have a minimum
compensation corresponding to 10% more than a minimum wage prevailing in the region as basic
monthly salary.
__________17. As the project move forward from the study and report phase through the final design
phase.
__________18. Estimates of probable total project cost should be periodically revised by the engineers as
the design moves forward and more information becomes known.
__________19. The debtor cannot exempt himself from the performance of the obligation by paying the
penalty.
__________20. The creditor is not bound to accept payment or performance by the third party.
__________21. Payment means not only the delivery of money but also the performance, in any manner
of an obligation.
__________22. Payment made in good faith to any person in any possession of the credit shall release the
debtor.
__________23. Unless it is otherwise stipulated, the extra judicial expenses required by the payment shall
be for the account of the debtor,
__________24. Contracts shall be obligatory in whatever form they have been into.
__________25. A contract which is the direct result of a previous illegal is void and existence.

II. IDENTIFICATION. Answers are on the box. Write the corresponding letter in the space provided.
A. Salaries N. Non Infrastructure Agencies
B. Construction Phase O. Consulting Services
C. Operation phase P. Construction Cost
D. Bidding Q. Multiplier
E. Study and Report Phase R. Change Order
F. Final Design Phase S. Final payment
G. Operation Phase T. Laws
H. Agreement U. Owner
I. Staff V. Specifications
J. Local Currency W. Subcontractor
K. Advertisement X. Surety
L. Bid bond Y. Work
M. Bid bulletin Z. Ethics

______________1. This document for consulting services between agency and consultants together with
all the Appendices and attachment is where defined as.
______________2. All technical members if Consultants Project Team other than the Principals are
defined.
______________3. Peso and sign P means of the currency of the Philippines.
______________4. Notice published by the Owner or the Invitation issued to prospective bidders, giving
information as to the nature of the proposed project.
______________5. It refers to any acceptable form of bond accompanying the Bid submitted by the
bidder as a guarantee that the bidder will enter into contract with the owner for the construction of the
work.
______________6. It is a document containing additional information on Bid Documents issued to
bidders before date of bidding.
______________7. It is a written order to the contractor issued by the owner after the execution of the
contract, authorizing a change or variation in the work or an adjustment in the Contract Price of Contract
Documents.
______________8. It refers to the payment of the final progress billing and approved claims including
but not limited to those variations in the work.
______________9. It refers to the law, ordinances and other governmental rules and regulations
applicable to the project and to its execution.
______________10. It is the person or entity or authorized representative thereof who signed the Contract
Owner.
______________11. There are written or printed description of the work to be done describing qualities
of the material to be used.
______________12. A contractor duly registered and licensed by the PCAB having a direct contract with
the contractor who acts for in behalf of the Contractor in executing any part of the contract.
______________13. It is the person, firm or corporation which issues the bond required of the contractor.
______________14. It refers to all the contractor provided labor or materials or both as well as equipment
transportation or other facilities necessary to commence and complete the construction and to fulfill all
his obligations which are called for in the Contract.
______________15. Agencies other than the DPWH and DOTC, their attached agencies and other
Infrastructure Corporations.
______________16. Services requiring adequate technical expertise and financial capability in
undertaking. or construction supervision services, excluding the fees and other costs of such services, the
cost of land and right of way and legal administrative expenses of the agency.
______________17. It is the estimated total cost of constructing the facility to be covered by the
proposed detailed design or construction supervision services, excluding fees and other cost of such
services, the cost of land and right-of-way, and legal administrative expenses of the agency.
______________18. It is a factor that compensates the Civil Engineer for overhead plus reasonable
margin for contingencies, interest or invested capital readiness to serve and profit.
______________19. Assistance to the client in start up and operation of the project including periodic
inspections.
______________20. Preparation of design calculations, constructing drawings, specifications, estimated
construction cost and other contract documents.
______________21. Analysis of the clients needs, conceptual design, and conceptual opinions of
probable construction cost.
______________22. Assistance to the client with the bidding or negotiating process for construction of
the project.
______________23. Assistance to the client in start-up and operation of the project, including periodic
inspections.
______________24. Advice and consultation on matters related to his services.
______________25. It is defined as the remuneration paid to the staff directly engaged in the Project
work for the time actually devoted to the services.

For the LORD gives wisdom; from his mouth come knowledge and understanding.
Proverbs 2:6

BULACAN STATE UNIVERSITY


COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT
100B
LAWS AND ETHICS
KEY TO CORRECTION

NAME: ___________________________________ DATE: _______________________


C/Y/S: ___________________________________ AGE: ________________________
CRUSH MO (MAY MINUS PAG WALA): _______________ BIRTHDAY: __________________
BAKIT MO SIYA CRUSH?: ______________________ENGR. REICH CABIGAO
PANUTO: Sagutin ng maayos ang pagsusulit. Huwag paglaruan at baka sa huli magsisi ka na sana, pinag
inam mo na. Bawal ang kahit anong uri ng bura. Isang beses ka lang magsasagot dahil hindi sa lahat ng
pagkakataon may second chance ka. Kapag mali ang sagot mo, wag mo nang ipaglabanmasasaktan ka
lang.

I. TRUE OR FALSE. Write T if the answer is false and F if the answer is true. Two points each.

1-25 F

II. IDENTIFICATION. Answers are on the box. Write the corresponding letter in the space provided.

A. Salaries N. Non Infrastructure Agencies


B. Construction Phase O. Consulting Services
C. Operation phase P. Construction Cost
D. Bidding Q. Multiplier
E. Study and Report Phase R. Change Order
F. Final Design Phase S. Final payment
G. Operation Phase T. Laws
H. Agreement U. Owner
I. Staff V. Specifications
J. Local Currency W. Subcontractor
K. Advertisement X. Surety
L. Bid bond Y. Work
M. Bid bulletin Z. Ethics

1. H
2. I
3. J
4. K
5. L
6. M
7. R
8. S
9. T
10. U
11. V
12. W
13. X
14. Y
15. N
16. O
17. P
18. Q
19. G/C
20. F
21. E
22. D
23. C/G
24. B
25. A

BULACAN STATE UNIVERSITY


COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT
100C
LAWS AND ETHICS

NAME: ___________________________________ DATE: _______________________


C/Y/S: ___________________________________ AGE: ________________________
CRUSH MO (MAY MINUS PAG WALA): _______________ BIRTHDAY: __________________
BAKIT MO SIYA CRUSH?: ______________________ENGR. REICH CABIGAO.
PANUTO: Sagutin ng maayos ang pagsusulit. Huwag paglaruan at baka sa huli magsisi ka na sana, pinag
inam mo na. Bawal ang kahit anong uri ng bura. Isang beses ka lang magsasagot dahil hindi sa lahat ng
pagkakataon may second chance ka. Kapag mali ang sagot mo, wag mo nang ipaglabanmasasaktan ka
lang.

I. TRUE OR FALSE. Write T if the answer is true and F if the answer is false. Two points each.

__________1. The Civil Engineer shall only be liable to pay damages to the Client arising out of or in
connection with their agreement if a breach of duty of care is established against Civil Engineer.
__________2. Civil Engineers may also serve as construction managers or program managers.
__________3. Research is specialized investigation and gathering of data from existing resources.
__________4. A registered civil engineer may engage in construction contracting after being licensed as a
contractor by the contractors.
__________5. A registered civil engineer may provide the services of a supporting technical employee as
required of a construction company.
__________6. In accordance with Section 23 of RA 544, only registered civil engineers can take charge
or supervise construction or other civil engineering works mentioned in Section 2 of mentioned Republic
Act.
__________7. Contracts shall be obligatory, in whatever form they may have been entered into, provided
all the essential requisites for their validity are present.
__________8.If the terms of a contract are clear and leave no doubt upon the intention of the contracting
parties, the literal meaning of its stipulations shall control.
__________ 9. It is the policy of the State to adopt a standard set of rules and regulations governing the
procurement of consulting services for government projects and other related activities.
__________10. A Consultant is neither a natural or juridical person who is qualified by appropriate
education, training and relevant experience to render any or all of the types and fields of consulting
services.
__________ 11. No increase in cost shall be allowed beyond and above the contract amount indicated in
the agreement for consulting services.
__________12. Government owned or controlled corporations shall organize their own PEAC, the
members which shall be appointed by their respective boards preferably with the same line composition.
__________13. Consultants will be required to register themselves with the department unit through
PEAC.
__________14. The services of the consultant may be extended through supplemental agreement.
__________15. Consulting services for government projects shall as much as possible be financed from
local sources.
__________16. Decisions reached by arbitration maybe enforced by either of the parties to this
Agreement in any court of competent jurisdiction in the Philippines.
__________17. Civil Engineers shall hold paramount the safety, health and welfare of the public and shall
strive to comply with the principles of sustainable development in the performance of their duties.
__________18. Civil Engineers shall build their professional reputation on the merit of their services and
shall not compete unfairly with others.
__________19. Civil Engineers shall continue their professional development throughout their careers,
and shall provide opportunities for the professional development of those civil engineers under their
supervision.
__________20. Civil Engineers shall approve or seal only those design documents, reviewed or prepared
by them, which are determined to be safe for public health and welfare in conformity with accepted
engineering standards.
__________21. Civil Engineers should be committed to improving the environment by adherence to the
principles of sustainable development so as to enhance the quality of life of the general public.
__________22. Civil Engineers shall not use The Specialty Engineering Title without the PICE Specialist
Accreditation.
__________23. Civil Engineers shall issue no statements, criticisms, or arguments on civil engineering
matters which are inspired or paid by interested parties, unless they indicate on whose behalf the
statements are made.
__________24. The client shall cooperate with the Civil Engineer and shall not interfere with or obstruct
the performance of the services.
__________25. The client, as soon as practicable, make arrangements to enable the Civil Engineer to
enter the site and inspect facilities needed in the performance of his services.

II. IDENTIFICATION. Answers are on the box. Write your final answer in the spaces provided.
Geotechnical Engineering Value Engineering Fixed Fee Construction Cost Civil Engineer Salaries Install
Agreement Foreign Currency Billing Rates Management Fee Work Drawing Force Majeure Owner
Reimbursable Expenses Non-infrastructure Agencies Specifications Surety Contract Delist bidding
Joint venture Hearing committee Constructor Contractor Project Management Office Delist

_______________1. It is the graphical presentation of the work.


_______________2. It refers to the contractor provided labor or materials or both as well as equipment
transportation or other facilities necessary to commence and complete the construction and to fulfill all
his obligations which are called for in the contract.
_______________3. It is the person or entity or authorized representative thereof who signed the contract
as owner.
______________ 4. These are the written or printed description of the work to be done describing
qualities of the material to be used, the equipment to be installed and the mode of construction.
______________ 5. It is the person, firm or corporation which issues the bond required of the contractor.
______________ 6. It is the term used to describe the Agreement and the Contract Documents.
______________ 7. To remove a constructor from the consolidated blacklisting report.
_______________8. A cooperative arrangement of licensed constructors to jointly perform a single
specific undertaking/ project with each of the partners contributing to the performance.
_______________9. An officer or body designated by the agency to conduct investigation/hearing of
blacklisting cases.
_______________10. A department in an agency assigned to supervise or monitor the implementation of
projects.
______________ 11. Deemed synonymous with the term builder and hence any person or entity
including joint venture and consortium licensed by PCAB.
_______________12. It includes test borings, sampling, analysis and recommendation.
______________ 13. It includes review of the work of other engineers, either within the same
organization in other firms to determine whether a proposed solution is optimum.
______________ 14. It is the amount to compensate the Civil Engineer for contingencies, interest on
invested capital, readiness to serve and profit.
______________ 15. It is the estimated total cost of constructing the facility to be covered by the
proposed detailed design or construction supervision services, excluding fees and other cost of such
services, the cost of land and right-of-way, and legal administrative expenses of the agency.
______________ 16. A person duly registered with the Board Examiners for Civil Engineers.
_______________17. This document for consulting services between the agency concerned and
consultant together with all the Appendices and attachments is as defined.
______________ 18. It means the currency other than that of the Philippines.
_______________19. It is defined as the Remuneration Rates to be paid by the agency concerned to the
consultant for each man-month rendered by Consultants staff to the Project.
_______________20. It is defined as the remuneration paid to the staff directly engaged in the Project
work for the time actually devoted to the services.
_______________21. The fee is defined as a percentage of salaries plus social charges and overhead
costs.
_______________ 22. These are defined as all costs other than billing rates which are associated with the
execution of the services and categorized as costs based on agreed fix rates and actual costs which are
supported by receipts.
_______________23. These are agencies other than the DPWH, DOTC.
_______________24. Shall mean build in, mount in positions, connect or apply any object specified
ready for the intended use.
_______________25. It includes event which cannot be foreseen, or which though foreseen, was
inevitable.

For the LORD gives wisdom; from his mouth come knowledge and understanding.
Proverbs 2:6

BULACAN STATE UNIVERSITY


COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT
100C
LAWS AND ETHICS
KEY TO CORRECTION
NAME: ___________________________________ DATE: _______________________
C/Y/S: ___________________________________ AGE: ________________________
CRUSH MO (MAY MINUS PAG WALA): _______________ BIRTHDAY: __________________
BAKIT MO SIYA CRUSH?: ______________________ENGR. REICH CABIGAO
PANUTO: Sagutin ng maayos ang pagsusulit. Huwag paglaruan at baka sa huli magsisi ka na sana, pinag
inam mo na. Bawal ang kahit anong uri ng bura. Isang beses ka lang magsasagot dahil hindi sa lahat ng
pagkakataon may second chance ka. Kapag mali ang sagot mo, wag mo nang ipaglabanmasasaktan ka
lang.

I. TRUE OR FALSE. Write T if the answer is true and F if the answer is false. Two points each.

1.25 T

II. IDENTIFICATION. Answers are on the box. Write your final answer in the spaces provided.
Geotechnical Engineering Value Engineering Fixed Fee Construction Cost Civil Engineer Salaries Install
Agreement Foreign Currency Billing Rates Management Fee Work Drawing Force Majeure Owner
Reimbursable Expenses Non-infrastructure Agencies Specifications Surety Contract Delist bidding
Joint venture Hearing committee Constructor Contractor Project Management Office Delist Structure

1. Drawing
2. Work
3. Owner
4. Specifications
5. Surety
6. Contract
7. Delist
8. Joint Venture
9. Hearing Committee
10. Project Management Office
11. Constructor
12. Geotechnical Engineering
13. Value Engineering
14. Fixed Fee
15. Construction Cost
16. Civil Engineer
17. Agreement
18. Foreign Currency
19. Billing Rates
20. Salaries
21. Management Fee
22. Reimbursable Expenses
23. Non infrastructure agencies
24. Install
25. Force Majeure
BULACAN STATE UNIVERSITY
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT
100D
LAWS AND ETHICS

NAME: ___________________________________ DATE: _______________________


C/Y/S: ___________________________________ AGE: ________________________
CRUSH MO (MAY MINUS PAG WALA): _______________ BIRTHDAY: __________________
BAKIT MO SIYA CRUSH?: ______________________ENGR. REICH CABIGAO

PANUTO: Sagutin ng maayos ang pagsusulit. Huwag paglaruan at baka sa huli magsisi ka na sana, pinag
inam mo na. Bawal ang kahit anong uri ng bura. Isang beses ka lang magsasagot dahil hindi sa lahat ng
pagkakataon may second chance ka. Kapag mali ang sagot mo, wag mo nang ipaglabanmasasaktan ka
lang.
I. TRUE OR FALSE. Write T if the answer is false and T if the answer is true. Two points each.
__________1. Fixed fee is an amount to compensate the Civil Engineer for contingencies and profit.
__________2. Civil Engineer regularly employed in the private sector shall have a minimum
compensation corresponding to 10% more than a minimum wage prevailing in the region as basic
monthly salary.
__________3. As the project move forward from the study and report phase through the final design
phase.
__________4. Estimates of probable total project cost should be periodically revised by the engineers as
the design moves forward and more information becomes known.
__________5. The debtor cannot exempt himself from the performance of the obligation by paying the
penalty.
__________6. The creditor is not bound to accept payment or performance by the third party.
__________7. Payment means not only the delivery of money but also the performance, in any manner of
an obligation.
__________8. Payment made in good faith to any person in any possession of the credit shall release the
debtor.
__________9. Unless it is otherwise stipulated, the extra judicial expenses required by the payment shall
be for the account of the debtor,
__________10. Contracts shall be obligatory in whatever form they have been into.
__________11. A contract which is the direct result of a previous illegal is void and existence.
__________12. The cost of the full range of engineering services typically amounts to not less than 1 to
2% of the life cycle cost of most construction projects.
__________13. A detailed scope of services protects the interests of both the client and the consultants.
__________14. Foreign civil engineers must still secure a certificate of registration or special license
permit form PRCA.
__________15. It is considered unethical for a civil engineer to allow his license to be used by any other
construction company except his own.
__________16. All government Civil Engineers employed by the instrumentalist of the government shall
be governed by pertinent existing laws and regularities and particularly to those prescribed by Civil
Service Commission.
__________17. The client should establish administrative policy and criteria for the selection of qualified
Civil Engineers for particular projects.
__________18. Within the clients organization, there should be an established administrative policy for
designating the persons authorized to select or recommend selection of Civil Engineers for specific
assignments.
__________19. Civil Engineer should be able to assign qualified engineering staff who will be in
responsible charge of the project.
__________20. Responsible Civil Engineers and its employees must be registered professional Civil
Engineers.
__________21. Civil Engineer should have demonstrated qualifications and expertise in performing the
services required for the project.
__________22. The two envelope system involves submission of a technical proposal in one envelope
and a price proposal in a second envelope.
__________23. The Civil Engineers overhead comprises a major portion of compensation generated by
the multiplier on salary cost.
__________24. The hourly billing rate method of compensation is very similar to the salary cost times
multiplier method in that hourly billing rate.
__________25. Per diem refers to an eight hour a day.
II. IDENTIFICATION. Answers are on the box. Write the corresponding letter in the space provided.
A. Salaries N. Non Infrastructure Agencies
B. Construction Phase O. Consulting Services
C. Operation phase P. Construction Cost
D. Bidding Q. Multiplier
E. Study and Report Phase R. Change Order
F. Final Design Phase S. Final payment
G. Operation Phase T. Laws
H. Agreement U. Owner
I. Staff V. Specifications
J. Local Currency W. Subcontractor
K. Advertisement X. Surety
L. Bid bond Y. Work
M. Bid bulletin Z. Ethics

______________1 Agencies other than the DPWH and DOTC, their attached agencies and other
Infrastructure Corporations.
______________2. Services requiring adequate technical expertise and financial capability in
undertaking. or construction supervision services, excluding the fees and other costs of such services, the
cost of land and right of way and legal administrative expenses of the agency.
______________3. It is the estimated total cost of constructing the facility to be covered by the proposed
detailed design or construction supervision services, excluding fees and other cost of such services, the
cost of land and right-of-way, and legal administrative expenses of the agency.
______________4. It is a factor that compensates the Civil Engineer for overhead plus reasonable margin
for contingencies, interest or invested capital readiness to serve and profit.
______________5. Assistance to the client in start up and operation of the project including periodic
inspections.
______________6. Preparation of design calculations, constructing drawings, specifications, estimated
construction cost and other contract documents.
______________7. Analysis of the clients needs, conceptual design, and conceptual opinions of probable
construction cost.
______________8. Assistance to the client with the bidding or negotiating process for construction of the
project.
______________9. Assistance to the client in start-up and operation of the project, including periodic
inspections.
______________10. Advice and consultation on matters related to his services.
______________11. It is defined as the remuneration paid to the staff directly engaged in the Project
work for the time actually devoted to the services.
______________12. This document for consulting services between agency and consultants together with
all the Appendices and attachment is where defined as.
______________13. All technical members if Consultants Project Team other than the Principals are
defined.
______________14. Peso and sign P means of the currency of the Philippines.
______________15. Notice published by the Owner or the Invitation issued to prospective bidders,
giving information as to the nature of the proposed project.
______________16. It refers to any acceptable form of bond accompanying the Bid submitted by the
bidder as a guarantee that the bidder will enter into contract with the owner for the construction of the
work.
______________17. It is a document containing additional information on Bid Documents issued to
bidders before date of bidding.
______________18. It is a written order to the contractor issued by the owner after the execution of the
contract, authorizing a change or variation in the work or an adjustment in the Contract Price of Contract
Documents.
______________19. It refers to the payment of the final progress billing and approved claims including
but not limited to those variations in the work.
______________20. It refers to the law, ordinances and other governmental rules and regulations
applicable to the project and to its execution.
______________21. It is the person or entity or authorized representative thereof who signed the Contract
Owner.
______________22. There are written or printed description of the work to be done describing qualities
of the material to be used.
______________23. A contractor duly registered and licensed by the PCAB having a direct contract with
the contractor who acts for in behalf of the Contractor in executing any part of the contract.
______________24. It is the person, firm or corporation which issues the bond required of the contractor.
______________25. It refers to all the contractor provided labor or materials or both as well as equipment
transportation or other facilities necessary to commence and complete the construction and to fulfill all
his obligations which are called for in the Contract.

For the LORD gives wisdom; from his mouth come knowledge and understanding.
Proverbs 2:6

BULACAN STATE UNIVERSITY


COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT
100D
LAWS AND ETHICS
KEY TO CORRECTION

NAME: ___________________________________ DATE: _______________________


C/Y/S: ___________________________________ AGE: ________________________
CRUSH MO (MAY MINUS PAG WALA): _______________ BIRTHDAY: __________________
BAKIT MO SIYA CRUSH?: ______________________ENGR. REICH CABIGAO

PANUTO: Sagutin ng maayos ang pagsusulit. Huwag paglaruan at baka sa huli magsisi ka na sana, pinag
inam mo na. Bawal ang kahit anong uri ng bura. Isang beses ka lang magsasagot dahil hindi sa lahat ng
pagkakataon may second chance ka. Kapag mali ang sagot mo, wag mo nang ipaglabanmasasaktan ka
lang.
III. TRUE OR FALSE. Write T if the answer is false and T if the answer is true. Two points each.

1-25 F

IV. IDENTIFICATION. Answers are on the box. Write the corresponding letter in the space provided.

A. Salaries N. Non Infrastructure Agencies


B. Construction Phase O. Consulting Services
C. Operation phase P. Construction Cost
D. Bidding Q. Multiplier
E. Study and Report Phase R. Change Order
F. Final Design Phase S. Final payment
G. Operation Phase T. Laws
H. Agreement U. Owner
I. Staff V. Specifications
J. Local Currency W. Subcontractor
K. Advertisement X. Surety
L. Bid bond Y. Work
M. Bid bulletin Z. Ethics

1. N
2. O
3. P
4. Q
5. G/C
6. F
7. E
8. D
9. C/G
10. B
11. A
12. H
13. I
14. J
15. K
16. L
17. M
18. R
19. S
20. T
21. U
22. V
23. W
24. X
25. Y

Das könnte Ihnen auch gefallen