Beruflich Dokumente
Kultur Dokumente
COURSE INFORMATION
LEVEL : 1 SEMESTER 2
PREREQUISITE : -
CORE REQUISITE : -
1
Last Edited 10-13 Nov 2013
course Page 1/5 Document Page 1
December Edition 2013
COURSE OUTCOMES:
COURSE DESCRIPTION
This course is designed as an introduction for students who wish to develop their competency relating to materials, methods of
works, safety and cleanliness in sanitation, drainage and sewerage system. The content will be discussed in the scope of domestic
functions. It is part of the maintenance module that combines old methods with new but may also be of beneficial to students who
have a working knowledge of the subject and wish to broaden their knowledge.
2
Last Edited 10-13 Nov 2013
course Page 2/5 Document Page 2
December Edition 2013
1.4 Identify tools and equipment used 1.4.1 List out tools and equipment used for internal
for Internal sanitation system. sanitation system to comply with the
specification.
1.4.2 Select proper types of tools and equipment for
internal sanitation using blue print according to
Job specification.
1.4.3 Describe the functions of the selected tools
in accordance with manufacturer's instruction
and specification
3
Last Edited 10-13 Nov 2013
course Page 3/5 Document Page 3
December Edition 2013
2.1 Recognise drainage system 2.1.1 Define domestic drainage system according to
2 DETERMINE standard requirement
MATERIALS FOR 2.1.2 Describe types of drainage system for domestic
DRAINAGE SYSTEM usage according to job specification.
2.2Identify the materials. 2.2.1 List out the materials for domestic drainage
system according to the work specification .
2.2.2 Select proper types of materials for draining
foul water and surface water from domestic
sanitary fitting and outlet to sewer pipe
according to standard requirement .
2.2.3 Describe the functions of the selected materials
in accordance with manufacturer's instruction
and specification.
2.3 Identify tools and equipment used for 2.3.1 List out tools equipment used for domestic
drainage system. drainage system to comply with the work
specification.
2.3.2 Select proper types of tools and equipment for
domestic drainage system according to Job
specification.
2.3.3 Describe the functions of the selected tools
in accordance with manufacturer's instruction.
3.1 Recognise Sewerage system 3.1.1 Define Sewerage system according to standard
3 DETERMINE requirement
MATERIALS FOR 3.1.2 Describe types of Sewerage system for
SEWERAGE SYSTEM domestic according to job specification
3.2 Identify the materials. 3.2.1 List out the materials for Sewerage system
according to the job specification.
3.2.2 select proper types of materials for Sewerage
using blue print and specification according to
standard requirement.
3.2.3 Describe the functions of the selected materials
in accordance with manufacturer's instruction
and specification.
3.3 Identify tools and equipment use 3.3.1 List out tools and equipment used for sewerage
for sewerage system. system to comply with the work specification.
3.3.2 Select proper types of tools and equipment for
Sewerage system using blue print according to
Job specification
3.3.3 Describe the functions of the selected tools
in accordance with manufacturer's instruction
and specification.
5
Last Edited 10-13 Nov 2013
course Page 5/5 Document Page 5