Sie sind auf Seite 1von 2

MISys Primer

C. MISys Level 2 C-1


I. C-3
II. MANUFACTURING ORDERS NOTEBOOK C-4
1. HEADER TAB (L2 MANUFACTURING ORDER NOTEBOOK) C-5
2. NOTES TAB (L2 MANUFACTURING ORDER NOTEBOOK) C-6
3. DETAILS TAB (L2 MANUFACTURING ORDER NOTEBOOK) C-7
4. COSTS TAB (L2 MANUFACTURING ORDER NOTEBOOK) C-9
5. ROUTING TAB (L3 MANUFACTURING ORDER NOTEBOOK) C-12
6. BILL OF MANUFACTURING TAB (L3 MO NOTEBOOK) C-14
7. RELEASING THE MO (L2 MO NOTEBOOK) C-15
III. WORK CALENDAR (L2 MO NOTEBOOK) C-16
IV. SCHEDULE SETUP C-17
1. PERIOD TAB (L2 SCHEDULE SETUP NOTEBOOK) C-17
2. CRITERIA TAB FOR MFG (L2 SCHEDULE SETUP NOTEBOOK) C-19
3. FILTER TAB FOR MFG (L2 SCHEDULE SETUP NOTEBOOK) C-21
D. MISys Level 3 D-24
II. WORK CENTERS NOTEBOOK D-26
1. HEADER TAB (L3 WORK CENTER NOTEBOOK) D-26
2. SHIFTS TAB (L3 WORK CENTER NOTEBOOK) D-27
3. RESOURCES TAB (L3 WORK CENTER NOTEBOOK) D-29
4. INQUIRY TAB (L3 WORK CENTER NOTEBOOK) D-31
III. TOOLS NOTEBOOK D-33
IV. SHOP OPERATIONS D-35

Figure C-1 MISys MRP - Scheduling Cycle C-3


Figure C-2 - Creating Manufacturing Order C-4
Figure C-3 Notes Tab Manufacturing Order C-6
Figure C-4 Detail Tab (Scrap function) Manufacturing Order C-7
Figure C-5 Costs Tab Manufacturing Order C-9
Figure C-6 Routing Tab Manufacturing Orders C-12
Figure C-7 Bill of Manufacturing Tab Manufacturing Orders C-14
Figure C-8 Releasing a Manufacturing Order C-15
Figure C-9 Work Calendar C-16
Figure C-10 MPS Period Tab C-17
Figure C-11 Schedule Setup for MFG C-19
Figure C-12 Schedule Setup Filter Tab C-21
Figure D-1 Work Center Header Tab D-26
Figure D-2 Work Center Shifts Tab D-27
Figure D-3 Work Center Resources Tab D-29
Figure D-4 Work Center Inquiry Tab D-31
Figure D-5 Tools Notebook Tool Tab D-33
Figure D-6 Shop Operations D-35

CA Plus i printed Sep 07, 2014


MISys Primer

C. MISys Level 2

I. LEVEL 2 OVERVIEW

Objectives for MISys Level 2


Master Files Manufacturing Order
Master Scheduling Database
MRP
How to Create, modify, start and complete a Manufacturing order
How to setup the Master Scheduling Database
How to create and post Master Scheduling Batches
How to use the MRP for Manufacturing and Purchasing
How to use the Scheduling Reports
Concepts Shifts
Current, Scheduled and Planned
Filtering
Periods (Pre and Post)
Scheduling Batch
Audit List
Scheduling Events

3 kings of Orders
Sales Orders Material goes out to the customer
Manufacturing Orders Converts material, labour, and overhead into higher level
material
It is the authority to build a defined quantity of one
assembly for a certain date.
A manufacturing order is the supply side of an assembled
item and the demand side of a purchased item.

Purchase Orders Material comes in from the supplier

Planning and Scheduling


Order type Definition
Current Released available to be acted upon
Scheduled From the scheduling Batches
Planned Recommendations the purpose of MPS/MRP
is to recommend stuff.

What is the big deal about MRP?


MEET ALL OF THE DEMAND REQUIREMENTS ON TIME USING AVAILABLE CAPACITY
WITHIN A BUDGET. .

The planning and scheduling function within MISys makes recommendations:


Cancel an existing order,
Place a new order,
Reduce/increase the quantity of an existing order, or
Move the dates for an existing order