Sl .No. Descriptions
All Floor
1 Every circuit should have Earthing as per BNBC code.
2 All light fixture should be incorporate as per interior design. But present layout is ok.
Power point should be revised as per the furniture layout. But present layout is ok.
3
11th Floor
4 Need to review Green area light.
13th Floor
5 Multipurpose Area
a) Required Powder or toilet room
b) All light fixture should be incorporate as per interior design
6 Water Future
Water filtration system should be incorporate.
8 GYM
b) Green area lighting need to check based on the final landscaping drawing.
Sanitary Services
1 water Distribution (HW & CW) pipe should be food grade cPVC pipe.
2 water distribution design is ok.
3 Developer should be supply better quality valve , fittings and Pump.
4 After completion toilet, all internal pipe system should be pressure tested at a pressure of 5
bar for 24 hours.
5 without completion of pressure test report, developer should not be install the wall tiles/all
the counseled pipe.
6 AC Drainage: should be separate piping system.
7 Green area water supply and drainage system should be proper.
8 Hot water design is ok.
9 Rain water is ok.
10 Slope should be maintain as per BNBC code.