RPLC SITE PREPARATION PROJECT
1 Project Instruction
Additional works due to the site conditions (ex. Existing piping removal)
2) EW-08: Site preparation new tanks area in the refinery area Chaure
Mount cutting;
Soil backfill;
Drainage channel;
Piping work
RPLC SITE PREPARATION PROJECT
Slope protection
Gates
Electrical work
Concrete
Fence.
Deforestation
1.2 Purpose
Any deviation from this execution plan shall be documented and submitted in
advance to the WISON Project QA/QC Manager, who will obtain approval
from the appropriate authorities.
2.1 Abbreviations
2.2 Definitions
Company:
Project:
CONFEED:
Contactor
Quality
RPLC SITE PREPARATION PROJECT
All those features and characteristics of a product or service that bear on its
ability to satisfy a given need, i.e. that render it fit the purpose intended for
Company/CONFEED Satisfaction.
Quality Control
A document setting out the general quality policy, procedures and practices
of an organization.
Quality Plan
Quality Audit
Inspection
H: (Hold) point
The Vendor/Sub-supplier can not carry out the specified controls and tests
without Inspector attendance. Consequently, the attendance to witnessing is
mandatory. The Supplier must notify Purchaser (WISON) by fax of the
dedicated inspection activity at least two weeks in advance. The Vendor can
not deviate from this rule unless written approval has given by involved
operating team.
W: (Witness)
Vendor can proceed with the test/inspection when CFD inspection is not
present at the notified time.
R: ( Record Review)
The Vendor has either to submit to inspector for comments the documents
required prior to the performance of the dedicated activity or to transmit or
make available for the review of inspector the result of the controls and tests
conducted, as the case may be.
Vendor shall provide CFD with certificated, reports and records as applicable
for review and confirmation.
M:(Monitor)
Vendor is not requested notify to CFD, CFD inspector will monitor workman ship,
test/inspection during the visit or periodical inspection.
Verification
Corrective Active
Preventive Action
Traceability
3 Reference Documents
Contractors;
Note: For the WISON company quality policy see the attachment A4.
100% rate of return visit and 100% rate of issues disposal and
following-up;
The project quality plan shall be applied to all the processes including
identification of Company/CONFEEDs requirements, design,
procurement, construction and services.
3) WISON Project will carry out control of all project documents, records,
correspondence and other internal and external information with the
requirements of Company/CONFEED and Information Security
Management Manual and Document Control Procedure, to ensure that
valid versions are used in all work places.
8) Document receipt and issue will comply with the following requirements:
9) WISON Project will establish and update the Applicable Documents List
for project so as to ensure that appropriate and valid versions are used in
all work places;
1) WISON project will perform quality record control as per Quality Record
Control Procedure(12098-PI0311-Q-002) to ensure to meet the
Company/CONFEED requirements;
3) The records will be numbered, compiled, classified, bound up, hand over
in accordance with requirements of Company/CONFEED and WISON
Procedure for Documents Control(12098-PI0315-M-001).
In quality management work, process data shall be paid attention to, records
shall be made well. Engineering quality shall be judge according to
inspection data in order to avoid being affected by personnel factors.
a work environment which encourages and assists all organizations for their
efficient and effective work with Project Quality Police.
Ensure all personnel involved in the project follow the project quality
policies, regulations and specifications;
Develop the project quality plan and Inspection & Testing Plan (ITP) and
submit to WISON for review and approval before implementation;
Review and approval subcontractors the inspection and test plan and
quality control point setting;
Attend regular meetings and special meetings for quality, and exchange
quality information;
6.6.6 QC Inspector
Verify that the latest edition of construction drawings and documents are
availability on the site;
Attend regular meetings and special meetings for quality, and exchange
quality information;
team meeting;
Non-conformities;
7 Resource Management
The training needs shall be identified, considering the object, the results
of previous training, work accomplishment and the content of training,
and they shall be reflected on the yearly training plan, be implemented
RPLC SITE PREPARATION PROJECT
Project Manager shall control to provide the latest data and information
by periodically reviewing and revising those used in the project.
Project Manager shall identify and determine the work environment related
to facilities, equipment and information system needed to achieve conformity
to product requirements and enhance work efficiency, and may control to
change, if necessary.
8 Product Realization
WISON will communicate and coordinate with related parities for quality
information according to requirements of Company/CONFEED and WISON
in order to ensure that related quality information can be transmit timely and
accurately, benefit engineering quality, and improve efficiency and effect of
quality management.
WISON will periodically compiles quality reports and submits quality reports
to Company/CONFEED and WISONs QHSE department. The quality
reports includes quality week report, quality month report and special topic
report, report engineering quality status and circulated situation of project
quality management system.
Commercial Inquiry
The Project Manager shall review the Material Requisitions in general and
the Project Engineering Manager shall review technical matter base on the
contractual requirements and approved specifications.
The Project Procurement Manager shall review the inquiry documents for the
adequacy of specified requirements prior to release.
The Project Procurement Manager shall evaluate and select the eligible
vendors on the basis of their ability to meet subcontract requirements
including quality system and quality assurance requirements.
2) Issue of inquiry
3) Purchase Requisitions
Selection of inspection
Witness by Company/CONFEED
& records for calibration & verification & maintained by entering such
information in tracking system, for use in managing contractor equipment
/ devices & that of its subcontractor;
1) Requirement
WISON QHSE department shall carry out quality audit to project quality
system performance on a regular basis including auditing the status of
quality system implementation, quality management activity
effectiveness and work physical quality.
WISON quality team shall also perform project quality audit regularly to
determine if the project quality related procedures have been being
implemented effectively and work quality meet the related project
specification and code requirements.
3) Corrective Action
The audited organization shall inform the Lead Auditor of a written plan
and result of corrective action.
The adequacy of the corrective action for the audit findings proposed by
the audited organization shall be evaluated to determine the
effectiveness of the corrective action and approved by the Lead Auditor,
and the audited organization shall implement the corrective action as
approved.
The Lead Auditor shall verify the implementation and effectiveness of the
corrective action through follow-up action.
4) Audit Report
The Lead Auditor shall prepare the Quality Audit Report and the report
shall be reviewed by the Project QA Manager and approved by the
RPLC SITE PREPARATION PROJECT
The Lead Auditor shall notify the audited organization of the approved
Quality Audit Report
The quality audit records shall be controlled in accordance with Para. 5.2.3
of this plan.
1) General Requirement
The hold point and witness point for the inspection and test activities
shall be designated on the Field Inspection and Test Plan.
The nonconformity which has found out during the inspection and testing
shall be controlled in accordance with Nonconformity Procedure
(12098-PI0311-Q-005).
The process shall not be passed to next stage until the required
inspection and testing have been completed, or necessary reports have
been received and verified.
Inspection and test records shall show whether the product has passed
or failed according to defined type of test & its acceptance criteria.
Records shall have the clearly written name and signature of authority
responsible and date of inspection for the release of product.
disposed.
Rejected or scrapped
9.6 Improvement
1) Requirement
The organization requested to issue CAR shall review relevant data and,
for the action needed, issue CAR which requests the receiving
organization to take necessary action in due date designated on the
CAR.
CAR receiving organization shall take necessary action within due date,
confirm resolution of problems by self-evaluation and transfer the CAR
with attaching evidence document of the result.
CAR issuing organization shall close the CAR in case that the action
taken and its results are confirmed to be effective.
In case that the action and/or its results is found unsatisfactory, CAR
issuing organization shall expedite the organization to take additional
action.
11 Attachment