Beruflich Dokumente
Kultur Dokumente
ASSIGNMENT 2: 10%
Group of engineers have to assembly a preliminary database, implement the steps in creating
preliminary flowsheet, identify the principal pieces of equipment and create a detailed process
flow diagram with stream summary table for the process and list of major equipment items.