Sie sind auf Seite 1von 3

298 Project Management / Miscellaneous

Issues Organization(s) ................ Delhi Metro Rail


The Burj Dubai Project: Gain insights into the planning for a major Corporation Ltd.
A Symbol of Economic Strength project. Countries ............................................. India
or a Monument to Hubris? Appreciate the importance of planning in order Industry .................................. Engineering,
to reduce risks, cost, and delays. Construction, and Real Estate
Abstract Understand the importance of technology in Pub/Rev Date ..................................... 2006
The case study discusses the construction modern civil engineering projects. Case Length ............................... 22 Pages
of the Burj Dubai (later renamed the Burj Khalifa Appreciate the possibilities offered by the Build- TN Length ..................................... 3 Pages
on its inauguration), the world's tallest building, Operate-Transfer model in the execution of
in Dubai. The project, which commenced in large and complex infrastructure projects
September 2004, was conceived by the The Concorde Project:
Dubai government and Emaar Properties A Technical and Engineering
PJSC to consolidate the emirate's status as a Reference Numbers
Triumph but a
key business and tourist hub. ICMR ..................................... PROM 006
Commercial Disaster
The case talks about the design of the tower ECCH ........................................................
and mentions its unique features. It also Organization(s) .............. Eiffage Group TP
provides some details about the construction Abstract
Countries ......................................... France
process and the various challenges and This case narrates the various stages in the
Industry .................................. Engineering,
delays that arose during the project. The case project life cycle for an ambitious project taken
Construction, and Real Estate
concludes with a mention of the conditions in up by two governments, UK and France, to
the real estate market in Dubai at the end of Pub/Rev Date ..................................... 2006 create a plane that would break down the
2009 and its effect on companies like Emaar Case Length ............................... 22 Pages barriers of distance by traveling at speeds
and projects like the Burj Dubai. TN Length ..................................... 3 Pages greater than that of sound. The case tells how
the project sponsors' (UK and France) dream
Issues
of creating a supersonic passenger plane
Evaluate the prospects of the worlds tallest The Delhi Metro Project: materialized and the various problems that
building in improving the economic prospects Effective Project Management resulted in huge cost and schedule over runs.
of a region. in the Indian Public Sector This is a typical example of a project that
Evaluate the economic benefits and costs was technologically successful but was a
associated with supertall structures. commercial failure.
Abstract
Recognize the risks associated with long- Issues
The Delhi Metro project gave Delhi a world-
term projects.
class mass rapid transit system. More The importance of a project plan and control.
importantly, it stood out from most other public
Reference Numbers sector projects in India in that it was completed Reference Numbers
ICMR ..................................... PROM 007 on schedule and within the budgeted cost.
The case describes the organization and ICMR ..................................... PROM 004
ECCH ...................................... 610-017-1
planning of the project and highlights the steps ECCH ...................................... 604-006-1
Organization(s) .. Emaar Properties PJSC taken by the DMRC to ensure the successful Organization(s) ............................................
Countries ............................................ Dubai completion of the project. It also explains how Countries ......................................................
Industry ................. Construction and Real the DMRC managed the various stakeholders
Industry ........................................................
Estate like the central and state governments, the
contractors, and the citizens of Delhi, to ensure Pub/Rev Date ..................................... 2004
Pub/Rev Date ..................................... 2010
that the project was implemented smoothly. Case Length ................................. 4 Pages
Case Length ............................... 19 Pages
The case ends with a brief discussion on the TN Length ..................................... 4 Pages
TN Length ..................................... 3 Pages future plans of the DMRC.
Issues
Millau Viaduct: Creating an
Understand the preliminary activities to be
Engineering Marvel taken up before a large infrastructure project
can be started
Abstract Appreciate the significance of the role of a
The Millau viaduct was constructed to solve project manager in project execution
a severe traffic bottleneck on the A75 highway Understand the importance of the right work
in France. The cutting-edge technology used culture in successful project management
in its design and construction, and the
impressive aesthetics of the structure made it Recognize the importance of managing the
an engineering marvel. The case describes various stakeholders in a project
the inception and the execution of the project. Appreciate the difficulties involved in the WORKBOOK
It discusses the detailed planning that went execution of large infrastructure projects in
into the project, and the advanced construction developing countries, and how these can be
methods adopted by the consortium that took overcome
up the project. With careful planning, and by
making optimum use of technologies that have Project Management
Reference Numbers
become available only recently, the project Paperback; 388 Pages,
consortium was able to complete the ICMR ..................................... PROM 005 (Workbook also available)
extremely complex project ahead of schedule. ECCH ...................................... 606-052-1
Project Management / Miscellaneous 299

Industry .................................... Derivatives


Scheduling the Project Activities Need for Project Management Pub/Rev Date ..................................... 2003
Case Length ............................... 18 Pages
Abstract Abstract TN Length ..................................... 3 Pages
The effectiveness of a project manager can Projects are different from processes in many
be seen in the way he manages key project ways. Projects are carried out in an uncertain A Note on
variables like time, cost and quality. Caselet environment and project managers have to
01 discusses a typical project management manage many external and internal factors
Interest Rate Futures
problem which requires the manager to use that are ignored while managing a process.
various techniques to schedule activities so Caselet 01 highlights the need to adopt a project Abstract
as to complete the project within the minimum management approach to cater to the diverse The note covers in detail the applications of
possible time. Caselet 02 explains the process needs of customers. Caselet 02 focuses on interest rate futures including T-Bill futures,
of identifying the project activities while the need to manage the interests of various Eurodollar futures and T-bond futures. It
preparing a project schedule. stakeholders to implement a project explains how an investor can use these
successfully. This case also introduces the instruments to obtain either a predictable cost
Issues readers to various project roles and the of funds or a predictable return on assets.
The process of scheduling project activities. reporting relationships that exist in a project The note also explains how an investor can
organization. use T-Bill futures for arbitraging. In addition,
Reference Numbers Issues the note gives a detailed explanation of the
pricing of T-bond futures and explains how
ICMR ..................................... PROM 003 The need for project management and the one can determine cheapest to deliver bond.
ECCH ...................................... 604-001-1 impact of stakeholders on a project's. The objective of this note is to help the reader
Organization(s) ............................................ understand the concept and applications of
Countries ...................................................... Reference Numbers interest rate futures better.
Industry ........................................................ ICMR ..................................... PROM 001 Issues
Pub/Rev Date ..................................... 2004 ECCH ...................................... 304-008-1 Interest Rate Futures.
Case Length ................................. 4 Pages Organization(s) ............................................
TN Length ..................................... 5 Pages Countries ...................................................... Reference Numbers
Industry ........................................................
ICMR ....................................... MISC 011
Implementing Risk Management Pub/Rev Date ..................................... 2004
ECCH ...................................... 104-019-6
Program Case Length ................................. 4 Pages
Organization(s) ............................................
TN Length ..................................... 4 Pages
Countries ........................................... Global
Abstract
Industry .................. Banking and Financial
The element of risk is inherent in every A Note on Currency and Services
activity of a project. Projects are exposed to Index Futures Pub/Rev Date ..................................... 2003
various types of risks like technical risks,
Case Length ............................... 15 Pages
economic risks, social risks, production risks,
Abstract TN Length ..................................... 3 Pages
financial risks and human risks. This case
describes how a company developed and The note provides some of the basic
implemented a risk management system to definitions used in futures contracts. It covers
help it deal with the uncertainties in the business in detail the application of futures as a
environment. The case explains the various derivative instrument, and how market
stages involved in developing a risk participants like hedgers, speculators and
management system: identifying the areas to arbitrageurs use futures. The note also
be monitored by the risk management system; explains the role of the clearing house and
setting priorities for managing risks and settlement procedures in futures contracts,
developing appropriate risk responses; and why the contracts need to be marked to
implementing the risk response; and market. The objective of this note is to make
monitoring the effectiveness of the risk the reader understand better, the use of futures
management program. as a tool for the purpose of hedging, speculating
and arbitraging particularly, in terms of
Issues currency and index futures. The note is
The need to develop a risk response strategy. intended to provide supporting material for
case studies/courseware pertaining to
currency and index futures.
Reference Numbers
Issues
ICMR ..................................... PROM 002
ECCH ...................................... 604-008-1 Currency and Index Futures.
Organization(s) ............................................
Reference Numbers Case Studies in
Countries ......................................................
Management Control Systems
Industry ........................................................ ICMR ....................................... MISC 013
Paperback; 490 Pages,
Pub/Rev Date ..................................... 2004 ECCH ...................................... 104-018-6 20 Case Studies,
Case Length ................................. 4 Pages Organization(s) ............................................ INR 2500/-
Countries ........................................... Global
TN Length ..................................... 4 Pages
300 Project Management / Miscellaneous

A Note on GSM Vs CDMA:


Financial Ratios Analysis A Comparative Study

Abstract Abstract
This technical note explains in detail the The cellular industry is dominated by two
analysis of financial statements of a company. technologies - Global System for Mobile
It provides insights into two widely used Communication (GSM) and Code Division
financial tools, ratio analysis and common Multiple Access (CDMA). This note gives an
size statements analysis. overview of the two different technologies.
The objective of this note is to help the reader The note starts with the history of GSM and
understand how these tools should be used goes on to describe the GSM architecture
to analyze the financial position of a firm. To and the GSM family. It also provides
demonstrate the process of financial analysis, information on the services provided by GSM
Hindustan Lever Limited's (HLL's) balance and the working of GSM. The note also takes
sheet and income statements are analyzed a look at the history of CDMA and its
in this note. commercial development. It then does a
comparative study of the two technologies
Issues and discusses their advantages and
Financial Ratios Analysis. disadvantages.
Issues
Reference Numbers Technologies in the mobile telephony industry.
ICMR ....................................... MISC 010
ECCH ...................................... 104-001-6 Reference Numbers
Organization(s) ............................................
ICMR ....................................... MISC 008
Countries ........................................... Global
ECCH ........................................................
Industry .................. Banking and Financial
Services Organization(s) ............................................
Pub/Rev Date ..................................... 2003 Countries ........................................... Global
Case Length ............................... 21 Pages Industry .............. Telecom and Broadband
TN Length ..................................... 3 Pages Pub/Rev Date ..................................... 2003
Case Length ............................... 12 Pages
A Note on Financial Evaluation TN Length ..................................... 3 Pages
of Projects
A Note on Investment
Abstract Strategies Involving Options
This note provides guidance on the financial
evaluation of projects. It explains in detail the Abstract
various financial appraisal techniques of a The note discusses some of the basic
project, including non-discounted and definitions often used in option contracts. It
discounted cash flow techniques, with suitable covers in detail the various investment
explanations, formulaes and numerical strategies involving options. The objective of
examples. this note is to make the reader understand
The objective of this note is to make the reader better the potential of options as an investment
understand the concept and applications of tool and how an options strategy can be
various financial appraisal techniques for the designed to take advantage of certain market
financial evaluation of projects. conditions.
Issues Issues
Financial Evaluation of Projects. Investment strategies involving options.

Reference Numbers Reference Numbers


ICMR ....................................... MISC 009 ICMR ....................................... MISC 003
ECCH ...................................... 104-002-6 ECCH ...................................... 103-031-6
Organization(s) ............................................ Organization(s) ............................................
Countries ........................................... Global Countries ........................................... Global
Industry .................. Banking and Financial Industry .................. Banking and Financial
Services Services
Pub/Rev Date ..................................... 2003 Pub/Rev Date ..................................... 2003
Case Length ............................... 22 Pages Case Length ............................... 18 Pages
TN Length ..................................... 3 Pages
TN Length ..................................... 3 Pages

Das könnte Ihnen auch gefallen