Sie sind auf Seite 1von 34

Electrical Running Account Bill No - 001

Name of the Project : 2 X 150MW Coastal Thermal Power Project.


Name of the Client : M/s. Meenakshi Energy Private Limited
Name of the EPC Contractor : M/s. Thermax Instrumentation Limited
Reference : LOI: CTP/10/DC/THX/01/2009-10/07 Dt : 10-08-2009

Billing Break Certified Qty by MEPL


Qty
Sl.No Up No Description UoM Basic Rate Qty Amount
1 Ele- Ere -01 Structure Erection Lot 1 1093598.08 0.81 885814.4448
2 Ele- Ere -04 Equipment erection Lot 1 976425.68 0.66 644440.9488
3 Ele- Ere -05 Earthing Lot 1 1757568.35 0.35 615148.9225
4 Ele- Ere -06 Cable tray in SWYRD Lot 1 128888.35 0.86 110843.981
5 Ele- Ere -07 Cable tray support FAB.AND Erection Lot 1 117171.22 0.95 111312.659
6 Ele- Ere -11 Control &Relay panel Lot 1 7323203.01 1 7323203.01
7 Ele- Ere -12 PLCC Lot 1 34174.94 1 34174.94
8 Ele- Ere -19 Genrator T/F ,180MVA, Lot 1 2929280.58 0.8 2343424.464
9 Ele- Ere -33 Unit Board-1A Lot 1 61514.69 1 61514.69
10 Ele- Ere -34 Unit Board-1B Lot 1 57120.97 1 57120.97
11 Ele- Ere -37 Sea water Intake Lot 1 53312.91 1 53312.91
12 Ele- Ere -46 415V,DM plant PMCC Lot 1 24410.67 1 24410.67
13 Ele- Ere -47 415V,DM plant MCC Lot 1 29292.81 1 29292.81
14 Ele- Ere -48 415V,FW plant MCC Lot 1 13669.98 1 13669.98
15 Ele- Ere -49 415V,PW plant MCC Lot 1 13669.98 1 13669.98
16 Ele- Ere -50 Intake water switchgear PMCC Lot 1 17087.47 1 17087.47
17 Ele- Ere -92 Cable tray for TG area and cable cellar room(Strl Steel) Lot 1 19430.89 0.5 9715.445
18 Ele- Ere -101 Cable tray for intake Pump House(Strl Steel) Lot 1 2216.34 0.3 664.902
19 Ele- Ere -104 Cable tray for DM tank And PT tank area(Strl Steel) Lot 1 9764.37 0.42 4101.0354
20 Ele- Ere -110 Cable tray for TG area and cable cellar room Lot 1 268517.39 0.4 107406.956
21 Ele- Ere -119 Cable tray for intake Pump House Lot 1 21363.75 0.3 6409.125
22 Ele- Ere -122 Cable tray for DM tank And PT tank area Lot 1 79383.5 0.42 33341.07
23 Ele- Ere -155 BTG area Earth Mat Lot 1 761141.49 0.36 274010.9364
24 Ele- Ere -156 Earthing of DM,WT,PT,Plant area Lot 1 102524.82 0.35 35883.687
25 Ele- Ere -157 Earthing of Sea water intake Lot 1 65908.81 0.2 13181.762
Total Amount Claimed 15960641.05 12823157.77

Instrumentation Running Account Bill No -001


Billing Break Certified Qty by MEPL
Qty
Sl.No Up No Description UoM Basic Rate Qty Amount
1 CNI-ERE-06 WTP (Erection of Cable trays) Lot 1 150000 0.46 69000
2 CNI-ERE-20 WTP (Erection of Field Instruments) Lot 1 1578000 0.24 378720
Total Amount Claimed 1728000 447720

HVAC Running Account Bill No -001


Billing Break Certified Qty by MEPL
Qty
Sl.No Up No Description UoM Basic Rate Qty Amount
1 ACV-ERE-01 Erection of Ducts (STG Area) Lot 1 234887.5 0.3 70466.25

Total Certified Amount for Electrical, Instrumentation & HVAC (12823157.77 + 447720 + 70466.25 ) = 13341344
(Rupees in Words : One Crore Thirty Three Lakhs Fouty one Thousand Three Hundred and Fourty Four only.)

Engineer Manager Vice President (Projects )


Electrical Running Account Bill No - 002
Name of the Project : 2 X 150MW Coastal Thermal Power Project.
Name of the Client : M/s. Meenakshi Energy Private Limited
Name of the EPC Contractor : M/s. Thermax Instrumentation Limited
Reference : LOI: CTP/10/DC/THX/01/2009-10/07 Dt : 10-08-2009

Billing Break Quantity


Qty
Sl.No Up No Description UoM Basic Rate Cumulative
1 Ele- Ere -01 Structure Erection Lot 1 1093598.08 0.83
2 Ele- Ere -02 Moose - Stringing Lot 1 683498.8 0.24
3 Ele- Ere -04 Equipment erection Lot 1 976425.68 0.69
4 Ele- Ere -05 Earthing Lot 1 1757568.35 0.53
5 Ele- Ere -06 Cable tray in SWYRD Lot 1 128888.35 0.86
6 Ele- Ere -07 Cable tray support FAB.AND Erection Lot 1 117171.22 0.95
7 Ele- Ere -08 Cable laying - Control Lot 1 336867.27 0.6
8 Ele- Ere -09 Cable laying - Power Lot 1 164039.71 0.5
9 Ele- Ere -10 PVC pipe laying Lot 1 58585.61 0.5
10 Ele- Ere -11 Control &Relay panel Lot 1 7323203.01 1
11 Ele- Ere -12 PLCC Lot 1 34174.94 1
12 Ele- Ere -14 Battery and Battery charger 220V DC Lot 1 24410.67 1
13 Ele- Ere -15 ACDB Lot 1 24410.67 0.8
14 Ele- Ere -16 DCDB Lot 1 24410.67 0.8
15 Ele- Ere -18 GCB Lot 1 97642.69 0.8
16 Ele- Ere -19 Genrator T/F ,180MVA, Lot 1 2929280.58 0.8
17 Ele- Ere -20 Station T/F, 20MVA Lot 1 488213.43 0.5
18 Ele- Ere -21 UAT T/F 40MVA Lot 1 683498.8 0.5
19 Ele- Ere -24 DM plant T/F, 2MVA Lot 1 39057.07 1
20 Ele- Ere -25 Intake T/F, 250KVA Lot 1 29292.81 1
21 Ele- Ere -32 Station Board switchgear Lot 1 156228.3 0.8
22 Ele- Ere -33 Unit Board-1A Lot 1 61514.69 1
Billing Break Quantity
Qty
Sl.No Up No Description UoM Basic Rate Cumulative
23 Ele- Ere -34 Unit Board-1B Lot 1 57120.97 1
24 Ele- Ere -37 Sea water Intake Lot 1 53312.91 1
25 Ele- Ere -46 415V,DM plant PMCC Lot 1 24410.67 1
26 Ele- Ere -47 415V,DM plant MCC Lot 1 29292.81 1
27 Ele- Ere -48 415V,FW plant MCC Lot 1 13669.98 1
28 Ele- Ere -49 415V,PW plant MCC Lot 1 13669.98 1
29 Ele- Ere -50 Intake water switchgear PMCC Lot 1 17087.47 1
30 Ele- Ere -56 415V ACDB Lot 1 13659.98 0.8
31 Ele- Ere -65 220V DCDB Lot 1 2441.07 0.8
32 Ele- Ere -73 110V DC Lead acid battery & charger Lot 1 19526.54 0.6
33 Ele- Ere -81 Erection of SPBD for ST Lot 1 58585.61 0.75
34 Ele- Ere -82 Erection of SPBD for U1A Lot 1 39057.07 0.5
35 Ele- Ere -83 Erection of SPBD for U1B Lot 1 39057.07 0.5
36 Ele- Ere -92 Cable tray for TG area and cable cellar room(Strl Steel) Lot 1 19430.89 0.5
37 Ele- Ere -101 Cable tray for intake Pump House(Strl Steel) Lot 1 2216.34 0.6
38 Ele- Ere -104 Cable tray for DM tank And PT tank area(Strl Steel) Lot 1 9764.37 0.55
39 Ele- Ere -110 Cable tray for TG area and cable cellar room Lot 1 268517.39 0.4
40 Ele- Ere -119 Cable tray for intake Pump House Lot 1 21363.75 0.6
41 Ele- Ere -122 Cable tray for DM tank And PT tank area Lot 1 79383.5 0.55
42 Ele- Ere -139 DM Plant cable laying Lot 1 839727.1 0.74
43 Ele- Ere -155 BTG area Earth Mat Lot 1 761141.49 0.36
44 Ele- Ere -156 Earthing of DM,WT,PT,Plant area Lot 1 102524.82 0.35
45 Ele- Ere -157 Earthing of Sea water intake Lot 1 65908.81 0.4
Total Amount Claimed 19782851.99

Instrumentation Running Account Bill No -002


Quantity
Billing Break Qty
Sl.No Up No Description UoM Basic Rate Cumulative
1 CNI-ERE-06 WTP (Erection of Cable trays) Lot 1 150000 0.46
Billing Break Quantity
Qty
Sl.No Up No Description UoM Basic Rate Cumulative
2 CNI-ERE-20 WTP (Erection of Field Instruments) Lot 1 1578000 0.24
Total Amount Claimed 1728000
HVAC Running Account Bill No -002
Quantity
Billing Break Qty
Sl.No Up No Description UoM Basic Rate Cumulative
1 ACV-ERE-01 Erection of Ducts (STG Area) Lot 1 234887.5 0.3

Total Certified Amount for Electrical, Instrumentation & HVAC (2526606.406 + 0 + 0 ) =


(Rupees in Words : Twenty Five Lakhs Twenty Two Thousand Six hundred and Six only.)

Engineer Manager
- 002

Quantity Amount
Previous Present Cumulative Previous Present
0.81 0.02 907686.4064 885814.44 21871.9616
0 0.24 164039.712 0.00 164039.712
0.66 0.03 673733.7192 644440.95 29292.7704
0.35 0.18 931511.2255 615148.92 316362.303
0.86 0 110843.981 110843.98 0
0.95 0 111312.659 111312.66 0
0 0.6 202120.362 0.00 202120.362
0 0.5 82019.855 0.00 82019.855
0 0.5 29292.805 0.00 29292.805
1 0 7323203.01 7323203.01 0
1 0 34174.94 34174.94 0
0 1 24410.67 0.00 24410.67
0 0.8 19528.536 0.00 19528.536
0 0.8 19528.536 0.00 19528.536
0 0.8 78114.152 0.00 78114.152
0.8 0 2343424.464 2343424.46 0
0 0.5 244106.715 0.00 244106.715
0 0.5 341749.4 0.00 341749.4
0 1 39057.07 0.00 39057.07
0 1 29292.81 0.00 29292.81
0 0.8 124982.64 0.00 124982.64
1 0 61514.69 61514.69 0
Quantity Amount
Previous Present Cumulative Previous Present
1 0 57120.97 57120.97 0
1 0 53312.91 53312.91 0
1 0 24410.67 24410.67 0
1 0 29292.81 29292.81 0
1 0 13669.98 13669.98 0
1 0 13669.98 13669.98 0
1 0 17087.47 17087.47 0
0 0.8 10927.984 0.00 10927.984
0 0.8 1952.856 0.00 1952.856
0 0.6 11715.924 0.00 11715.924
0 0.75 43939.2075 0.00 43939.2075
0 0.5 19528.535 0.00 19528.535
0 0.5 19528.535 0.00 19528.535
0.5 0 9715.445 9715.45 0
0.3 0.3 1329.804 664.90 664.902
0.42 0.13 5370.4035 4101.04 1269.3681
0.4 0 107406.956 107406.96 0
0.3 0.3 12818.25 6409.13 6409.125
0.42 0.13 43660.925 33341.07 10319.855
0 0.74 621398.054 0.00 621398.054
0.36 0 274010.9364 274010.94 0
0.35 0 35883.687 35883.69 0
0.2 0.2 26363.524 13181.76 13181.762
15349764.1745 12823157.77 2526606.406

o -002
Quantity Amount
Previous Present Previous Present
Qty Quantity Cumulative Amount Amount
0.46 0 69000 69000 0
Quantity Amount
Previous Present Cumulative Previous Present
0.24 0 378720 378720 0
0
2
Quantity Amount
Previous Present Previous Present
Qty Quantity Amount Amount
Cumulative
0.3 0 70466.25 70466.25 0

2526606.406

Vice President (Projects )


Electrical Running Account Bill No - 003
Name of the Project : 2 X 150MW Coastal Thermal Power Project.
Name of the Client : M/s. Meenakshi Energy Private Limited
Name of the EPC Contractor : M/s. Thermax Instrumentation Limited
Reference : LOI: CTP/10/DC/THX/01/2009-10/07 Dt : 10-08-2009

Billing Break Quantity Amount


Qty
Sl.No Up No Description UoM Basic Rate Cumulative Previous Present Cumulative Previous Present
1 Ele- Ere -01 Structure Erection Lot 1 1093598.08 0.91 0.83 0.08 996639.360276 907686.41 88952.953876
2 Ele- Ere -02 Moose - Stringing Lot 1 683498.8 0.89 0.24 0.65 608313.932 164039.71 444274.22
3 Ele- Ere -03 Shield wire Lot 1 97542.69 0.8 0 0.8 78034.152 0.00 78034.152
4 Ele- Ere -04 Equipment erection Lot 1 976425.68 0.85 0.69 0.16 829961.828 673733.72 156228.1088
5 Ele- Ere -05 Earthing Lot 1 1757568.35 0.53 0.53 0 931511.2255 931511.23 0
6 Ele- Ere -06 Cable tray in SWYRD Lot 1 128888.35 0.86 0.86 0 110843.981 110843.98 0
7 Ele- Ere -07 Cable tray support FAB.AND Erection Lot 1 117171.22 1 0.95 0.05 117171.22 111312.66 5858.561
8 Ele- Ere -08 Cable laying - Control Lot 1 336867.27 0.6 0.6 0 202120.362 202120.36 0
9 Ele- Ere -09 Cable laying - Power Lot 1 164039.71 0.5 0.5 0 82019.855 82019.86 0
10 Ele- Ere -10 PVC pipe laying Lot 1 58585.61 0.5 0.5 0 29292.805 29292.81 0
11 Ele- Ere -11 Control &Relay panel Lot 1 7323203.01 1 1 0 7323203.01 7323203.01 0
12 Ele- Ere -12 PLCC Lot 1 34174.94 1 1 0 34174.94 34174.94 0
13 Ele- Ere -14 Battery and Battery charger 220V DC Lot 1 24410.67 1 1 0 24410.67 24410.67 0
14 Ele- Ere -15 ACDB Lot 1 24410.67 1 0.8 0.2 24410.67 19528.54 4882.134
15 Ele- Ere -16 DCDB Lot 1 24410.67 1 0.8 0.2 24410.67 19528.54 4882.134
16 Ele- Ere -18 GCB Lot 1 97642.69 0.8 0.8 0 78114.152 78114.15 0
17 Ele- Ere -19 Genrator T/F ,180MVA, Lot 1 2929280.58 0.8 0.8 0 2343424.464 2343424.46 0
18 Ele- Ere -20 Station T/F, 20MVA Lot 1 488213.43 1 0.5 0.5 488213.43 244106.72 244106.715
19 Ele- Ere -21 UAT T/F 40MVA Lot 1 683498.8 1 0.5 0.5 683498.8 341749.40 341749.4
20 Ele- Ere -24 DM plant T/F, 2MVA Lot 1 39057.07 1 1 0 39057.07 39057.07 0
21 Ele- Ere -25 Intake T/F, 250KVA Lot 1 29292.81 1 1 0 29292.81 29292.81 0
21 Ele- Ere -26 CW pump house 2.5MVA,6.6/0.415 kv Lot 1 39057.07 1 0 1 39057.07 0.00 39057.07
22 Ele- Ere -32 Station Board switchgear Lot 1 156228.3 1 0.8 0.2 156228.3 124982.64 31245.66
23 Ele- Ere -33 Unit Board-1A Lot 1 61514.69 1 1 0 61514.69 61514.69 0
24 Ele- Ere -34 Unit Board-1B Lot 1 57120.97 1 1 0 57120.97 57120.97 0
25 Ele- Ere -37 Sea water Intake Lot 1 53312.91 1 1 0 53312.91 53312.91 0
25 Ele- Ere -39 6.6KV station board unit switchgear Lot 1 24410.67 0.8 0 0.8 19528.536 0.00 19528.536
26 Ele- Ere -46 415V,DM plant PMCC Lot 1 24410.67 1 1 0 24410.67 24410.67 0
27 Ele- Ere -47 415V,DM plant MCC Lot 1 29292.81 1 1 0 29292.81 29292.81 0
28 Ele- Ere -48 415V,FW plant MCC Lot 1 13669.98 1 1 0 13669.98 13669.98 0
29 Ele- Ere -49 415V,PW plant MCC Lot 1 13669.98 1 1 0 13669.98 13669.98 0
30 Ele- Ere -50 Intake water switchgear PMCC Lot 1 17087.47 1 1 0 17087.47 17087.47 0
31 Ele- Ere -56 415V ACDB Lot 1 13659.98 1 0.8 0.2 13659.98 10927.98 2731.996
31 Ele- Ere -61 220V DCDB Station Lot 1 1952.85 0.8 0 0.8 1562.28 0.00 1562.28
31 Ele- Ere -62 220V Unit #1 Lot 1 2441.07 0.8 0 0.8 1952.856 0.00 1952.856
31 Ele- Ere -63 220V Unit #2 Lot 1 2441.07 0.8 0 0.8 1952.856 0.00 1952.856
32 Ele- Ere -65 220V DCDB Lot 1 2441.07 1 0.8 0.2 2441.07 1952.86 488.214
33 Ele- Ere -73 110V DC Lead acid battery & charger Lot 1 19526.54 1 0.6 0.4 19526.54 11715.92 7810.616
34 Ele- Ere -81 Erection of SPBD for ST Lot 1 58585.61 0.75 0.75 0 43939.2075 43939.21 0
35 Ele- Ere -82 Erection of SPBD for U1A Lot 1 39057.07 0.5 0.5 0 19528.535 19528.54 0
36 Ele- Ere -83 Erection of SPBD for U1B Lot 1 39057.07 0.5 0.5 0 19528.535 19528.54 0
37 Ele- Ere -92 Cable tray for TG area and cable cellar room(Strl Steel) Lot 1 19430.89 0.5 0.5 0 9715.445 9715.45 0
38 Ele- Ere -101 Cable tray for intake Pump House(Strl Steel) Lot 1 2216.34 0.6 0.6 0 1329.804 1329.80 0
39 Ele- Ere -104 Cable tray for DM tank And PT tank area(Strl Steel) Lot 1 9764.37 0.55 0.55 0 5370.4035 5370.40 0
40 Ele- Ere -110 Cable tray for TG area and cable cellar room Lot 1 268517.39 0.4 0.4 0 107406.956 107406.96 0
41 Ele- Ere -119 Cable tray for intake Pump House Lot 1 21363.75 0.6 0.6 0 12818.25 12818.25 0
42 Ele- Ere -122 Cable tray for DM tank And PT tank area Lot 1 79383.5 0.55 0.55 0 43660.925 43660.93 0
43 Ele- Ere -139 DM Plant cable laying Lot 1 839727.1 0.74 0.74 0 621398.054 621398.05 0
44 Ele- Ere -155 BTG area Earth Mat Lot 1 761141.49 0.36 0.36 0 274010.9364 274010.94 0
45 Ele- Ere -156 Earthing of DM,WT,PT,Plant area Lot 1 102524.82 0.35 0.35 0 35883.687 35883.69 0
Ele- Ere -157 Earthing of Sea water intake Lot 1 65908.81 0.4 0.4 0 26363.524 26363.52 0
Total Amount Claimed 19950697.41 16825062.6372 15349764.17 1475298.463

Instrumentation Running Account Bill No -003


Quantity Amount
Billing Break Qty Previous Present Previous Present
Sl.No Up No Description UoM Basic Rate Cumulative Qty Quantity Cumulative Amount Amount
1 CNI-ERE-06 WTP (Erection of Cable trays) Lot 1 150000 0.46 0.46 0 69000 69000 0
2 CNI-ERE-20 WTP (Erection of Field Instruments) Lot 1 1578000 0.24 0.24 0 378720 378720 0
Total Amount Claimed 1728000 0
HVAC Running Account Bill No -003
Quantity Amount
Qty Previous Present Previous Present
Billing Break
Qty Quantity Amount Amount
Sl.No Up No Description UoM Basic Rate Cumulative Cumulative
1 ACV-ERE-01 Erection of Ducts (STG Area) Lot 1 234887.5 0.3 0.3 0 70466.25 70466.25 0

Total Certified Amount for Electrical, Instrumentation & HVAC (1475298 + 0 + 0 ) = 1475298.463

Engineer Manager Vice President (Projects )


Electrical Running Account Bill No - 004
Name of the Project : 2 X 150MW Coastal Thermal Power Project.
Name of the Client : M/s. Meenakshi Energy Private Limited
Name of the EPC Contractor : M/s. Thermax Instrumentation Limited
Reference : LOI: CTP/10/DC/THX/01/2009-10/07 Dt : 10-08-2009

Billing Break Quantity Amount


Qty
Sl.No Up No Description UoM Basic Rate Cumulative Previous Present Cumulative Previous Present
1 Ele- Ere -01 Structure Erection Lot 1 1093598.08 0.91 0.91 0.00 996639.360276 996639.36 0
2 Ele- Ere -02 Moose - Stringing Lot 1 683498.8 0.89 0.89 0.00 608313.932 608313.93 0
3 Ele- Ere -03 Shield wire Lot 1 97542.69 1 0.80 0.20 97542.69 78034.15 19508.538
4 Ele- Ere -04 Equipment erection Lot 1 976425.68 0.855 0.85 0.01 834843.9564 829961.83 4882.1284
5 Ele- Ere -05 Earthing Lot 1 1757568.35 0.53 0.53 0.00 931511.2255 931511.23 0
6 Ele- Ere -06 Cable tray in SWYRD Lot 1 128888.35 0.86 0.86 0.00 110843.981 110843.98 0
7 Ele- Ere -07 Cable tray support FAB.AND Erection Lot 1 117171.22 1 1.00 0.00 117171.22 117171.22 0
8 Ele- Ere -08 Cable laying - Control Lot 1 336867.27 0.6 0.60 0.00 202120.362 202120.36 0
9 Ele- Ere -09 Cable laying - Power Lot 1 164039.71 0.5 0.50 0.00 82019.855 82019.86 0
10 Ele- Ere -10 PVC pipe laying Lot 1 58585.61 0.5 0.50 0.00 29292.805 29292.81 0
11 Ele- Ere -11 Control &Relay panel Lot 1 7323203.01 1 1.00 0.00 7323203.01 7323203.01 0
12 Ele- Ere -12 PLCC Lot 1 34174.94 1 1.00 0.00 34174.94 34174.94 0
13 Ele- Ere -14 Battery and Battery charger 220V DC Lot 1 24410.67 1 1.00 0.00 24410.67 24410.67 0
14 Ele- Ere -15 ACDB Lot 1 24410.67 1 1.00 0.00 24410.67 24410.67 0
15 Ele- Ere -16 DCDB Lot 1 24410.67 1 1.00 0.00 24410.67 24410.67 0
16 Ele- Ere -18 GCB Lot 1 97642.69 0.8 0.80 0.00 78114.152 78114.15 0
17 Ele- Ere -19 Genrator T/F ,180MVA, Lot 1 2929280.58 0.8 0.80 0.00 2343424.464 2343424.46 0
18 Ele- Ere -20 Station T/F, 20MVA Lot 1 488213.43 1 1.00 0.00 488213.43 488213.43 0
19 Ele- Ere -21 UAT T/F 40MVA Lot 1 683498.8 1 1.00 0.00 683498.8 683498.80 0
20 Ele- Ere -22 Station Service T/F 2.5 MVA Lot 1 39057.07 1 0.00 1.00 39057.07 0.00 39057.07
21 Ele- Ere -23 Unit Service T/F 1.6 MVA Lot 1 29292.81 1 0.00 1.00 29292.81 0.00 29292.81
22 Ele- Ere -24 DM plant T/F, 2MVA Lot 1 39057.07 1 1.00 0.00 39057.07 39057.07 0
23 Ele- Ere -25 Intake T/F, 250KVA Lot 1 29292.81 1 1.00 0.00 29292.81 29292.81 0
24 Ele- Ere -26 CW pump house 2.5MVA,6.6/0.415 kv Lot 1 39057.07 1 1.00 0.00 39057.07 39057.07 0
25 Ele- Ere -32 Station Board switchgear Lot 1 156228.3 1 1.00 0.00 156228.3 156228.30 0
26 Ele- Ere -33 Unit Board-1A Lot 1 61514.69 1 1.00 0.00 61514.69 61514.69 0
27 Ele- Ere -34 Unit Board-1B Lot 1 57120.97 1 1.00 0.00 57120.97 57120.97 0
28 Ele- Ere -33 Unit Board-2A Lot 1 61514.69 1 0.00 1.00 61514.69 0.00 61514.69
29 Ele- Ere -34 Unit Board-2B Lot 1 57120.97 1 0.00 1.00 57120.97 0.00 57120.97
30 Ele- Ere -37 Sea water Intake Lot 1 53312.91 1 1.00 0.00 53312.91 53312.91 0
31 Ele- Ere -39 6.6KV station board unit switchgear Lot 1 24410.67 1 0.80 0.20 24410.67 19528.54 4882.134
32 Ele- Ere -40 Station Switchgear Lot 1 28316.38 1 0.00 1.00 28316.38 0.00 28316.38
33 Ele- Ere -41 Boiler MCC Lot 1 27339.95 1 0.00 1.00 27339.95 0.00 27339.95
34 Ele- Ere -45 415V, CW MCC Lot 1 9764.27 1 0.00 1.00 9764.27 0.00 9764.27
35 Ele- Ere -46 415V,DM plant PMCC Lot 1 24410.67 1 1.00 0.00 24410.67 24410.67 0
36 Ele- Ere -47 415V,DM plant MCC Lot 1 29292.81 1 1.00 0.00 29292.81 29292.81 0
37 Ele- Ere -48 415V,FW plant MCC Lot 1 13669.98 1 1.00 0.00 13669.98 13669.98 0
38 Ele- Ere -49 415V,PW plant MCC Lot 1 13669.98 1 1.00 0.00 13669.98 13669.98 0
39 Ele- Ere -50 Intake water switchgear PMCC Lot 1 17087.47 1 1.00 0.00 17087.47 17087.47 0
40 Ele- Ere -56 415V ACDB Lot 1 13659.98 1 1.00 0.00 13659.98 13659.98 0
41 Ele- Ere -61 220V DCDB Station Lot 1 1952.85 0.8 0.80 0.00 1562.28 1562.28 0
42 Ele- Ere -62 220V Unit #1 Lot 1 2441.07 1 0.80 0.20 2441.07 1952.86 488.214
43 Ele- Ere -63 220V Unit #2 Lot 1 2441.07 1 0.80 0.20 2441.07 1952.86 488.214
44 Ele- Ere -65 220V DCDB Lot 1 2441.07 1 1.00 0.00 2441.07 2441.07 0
45 Ele- Ere -73 110V DC Lead acid battery & charger Lot 1 19526.54 1 1.00 0.00 19526.54 19526.54 0
46 Ele- Ere -81 Erection of SPBD for ST Lot 1 58585.61 0.75 0.75 0.00 43939.2075 43939.21 0
47 Ele- Ere -82 Erection of SPBD for U1A Lot 1 39057.07 0.5 0.50 0.00 19528.535 19528.54 0
48 Ele- Ere -83 Erection of SPBD for U1B Lot 1 39057.07 0.5 0.50 0.00 19528.535 19528.54 0
49 Ele- Ere -92 Cable tray for TG area and cable cellar room(Strl Steel) Lot 1 19430.89 0.5 0.50 0.00 9715.445 9715.45 0
50 Ele- Ere -101 Cable tray for intake Pump House(Strl Steel) Lot 1 2216.34 0.6 0.60 0.00 1329.804 1329.80 0
51 Ele- Ere -104 Cable tray for DM tank And PT tank area(Strl Steel) Lot 1 9764.37 0.55 0.55 0.00 5370.4035 5370.40 0
52 Ele- Ere -110 Cable tray for TG area and cable cellar room Lot 1 268517.39 0.4 0.40 0.00 107406.956 107406.96 0
53 Ele- Ere -119 Cable tray for intake Pump House Lot 1 21363.75 0.6 0.60 0.00 12818.25 12818.25 0
54 Ele- Ere -122 Cable tray for DM tank And PT tank area Lot 1 79383.5 0.55 0.55 0.00 43660.925 43660.93 0
55 Ele- Ere -139 DM Plant cable laying Lot 1 839727.1 0.74 0.74 0.00 621398.054 621398.05 0
56 Ele- Ere -155 BTG area Earth Mat Lot 1 761141.49 0.36 0.36 0.00 274010.9364 274010.94 0
57 Ele- Ere -156 Earthing of DM,WT,PT,Plant area Lot 1 102524.82 0.35 0.35 0.00 35883.687 35883.69 0
58 Ele- Ere -157 Earthing of Sea water intake Lot 1 65908.81 0.4 0.40 0.00 26363.524 26363.52 0
Total Amount Claimed 20203103.55 17107718.0056 16825062.64 282655.37

Instrumentation Running Account Bill No -004


Quantity Amount
Billing Break Qty Previous Present Previous Present
Sl.No Up No Description UoM Basic Rate Cumulative Qty Quantity Cumulative Amount Amount
1 CNI-ERE-06 WTP (Erection of Cable trays) Lot 1 150000 0.46 0.46 0 69000 69000 0
2 CNI-ERE-20 WTP (Erection of Field Instruments) Lot 1 1578000 0.24 0.24 0 378720 378720 0
Total Amount Claimed 1728000 0
HVAC Running Account Bill No -003
Quantity Amount
Qty Previous Present Previous Present
Billing Break
Qty Quantity Amount Amount
Sl.No Up No Description UoM Basic Rate Cumulative Cumulative
1 ACV-ERE-01 Erection of Ducts (STG Area) Lot 1 234887.5 0.3 0.3 0 70466.25 70466.25 0

Total Certified Amount for Electrical, Instrumentation & HVAC = 282655.37

Engineer Manager Vice President (Projects )


Electrical Running Account Bill No - 005
Name of the Project : 2 X 150MW Coastal Thermal Power Project.
Name of the Client : M/s. Meenakshi Energy Private Limited
Name of the EPC Contractor : M/s. Thermax Instrumentation Limited
Reference : LOI: CTP/10/DC/THX/01/2009-10/07 Dt : 10-08-2009

Billing Break Quantity Amount


Qty
Sl.No Up No Description UoM Basic Rate Cumulative Previous Present Cumulative Previous Present
1 Ele- Ere -01 Structure Erection Lot 1 1093598.08 0.91 0.91 0.00 996639.360276 996639.36 0
2 Ele- Ere -02 Moose - Stringing Lot 1 683498.8 0.89 0.89 0.00 608313.932 608313.93 0
3 Ele- Ere -03 Shield wire Lot 1 97542.69 1 1.00 0.00 97542.69 97542.69 0
4 Ele- Ere -04 Equipment erection Lot 1 976425.68 0.855 0.86 0.00 834843.9564 834843.96 0
5 Ele- Ere -05 Earthing Lot 1 1757568.35 0.69 0.53 0.16 1212722.1615 931511.23 281210.936
6 Ele- Ere -06 Cable tray in SWYRD Lot 1 128888.35 0.86 0.86 0.00 110843.981 110843.98 0
7 Ele- Ere -07 Cable tray support FAB.AND Erection Lot 1 117171.22 1 1.00 0.00 117171.22 117171.22 0
8 Ele- Ere -08 Cable laying - Control Lot 1 336867.27 1 0.60 0.40 336867.27 202120.36 134746.908
9 Ele- Ere -09 Cable laying - Power Lot 1 164039.71 0.5 0.50 0.00 82019.855 82019.86 0
10 Ele- Ere -10 PVC pipe laying Lot 1 58585.61 0.5 0.50 0.00 29292.805 29292.81 0
11 Ele- Ere -11 Control &Relay panel Lot 1 7323203.01 1 1.00 0.00 7323203.01 7323203.01 0
12 Ele- Ere -12 PLCC Lot 1 34174.94 1 1.00 0.00 34174.94 34174.94 0
13 Ele- Ere -13 Battery and Battery charger 48V DC Lot 1 24410.67 1 0.00 1.00 24410.67 0.00 24410.67
13 Ele- Ere -14 Battery and Battery charger 220V DC Lot 1 24410.67 1 1.00 0.00 24410.67 24410.67 0
14 Ele- Ere -15 ACDB Lot 1 24410.67 1 1.00 0.00 24410.67 24410.67 0
15 Ele- Ere -16 DCDB Lot 1 24410.67 1 1.00 0.00 24410.67 24410.67 0
16 Ele- Ere -18 GCB Lot 1 97642.69 0.8 0.80 0.00 78114.152 78114.15 0
17 Ele- Ere -19 Genrator T/F ,180MVA, Lot 1 2929280.58 1 0.80 0.20 2929280.58 2343424.46 585856.116
18 Ele- Ere -20 Station T/F, 20MVA Lot 1 488213.43 1 1.00 0.00 488213.43 488213.43 0
19 Ele- Ere -21 UAT T/F 40MVA Lot 1 683498.8 1 1.00 0.00 683498.8 683498.80 0
20 Ele- Ere -22 Station Service T/F 2.5 MVA Lot 1 39057.07 1 1.00 0.00 39057.07 39057.07 0
21 Ele- Ere -23 Unit Service T/F 1.6 MVA Lot 1 29292.81 1 1.00 0.00 29292.81 29292.81 0
22 Ele- Ere -24 DM plant T/F, 2MVA Lot 1 39057.07 1 1.00 0.00 39057.07 39057.07 0
23 Ele- Ere -25 Intake T/F, 250KVA Lot 1 29292.81 1 1.00 0.00 29292.81 29292.81 0
24 Ele- Ere -26 CW pump house 2.5MVA,6.6/0.415 kv Lot 1 39057.07 1 1.00 0.00 39057.07 39057.07 0
25 Ele- Ere -31 Control &Relay panel for GT&UAT Lot 1 14648.8 0.71 0.00 0.71 10400.648 0.00 10400.648
25 Ele- Ere -32 Station Board switchgear Lot 1 156228.3 1 1.00 0.00 156228.3 156228.30 0
26 Ele- Ere -33 Unit Board-1A Lot 1 61514.69 1 1.00 0.00 61514.69 61514.69 0
27 Ele- Ere -34 Unit Board-1B Lot 1 57120.97 1 1.00 0.00 57120.97 57120.97 0
28 Ele- Ere -35 Unit Board-2A Lot 1 61514.69 1 1.00 0.00 61514.69 61514.69 0
29 Ele- Ere -36 Unit Board-2B Lot 1 57120.97 1 1.00 0.00 57120.97 57120.97 0
30 Ele- Ere -37 Sea water Intake Lot 1 53312.91 1 1.00 0.00 53312.91 53312.91 0
31 Ele- Ere -39 6.6KV station board unit switchgear Lot 1 24410.67 1 1.00 0.00 24410.67 24410.67 0
32 Ele- Ere -40 Station Switchgear Lot 1 28316.38 1 1.00 0.00 28316.38 28316.38 0
33 Ele- Ere -41 Boiler MCC Lot 1 27339.95 1 1.00 0.00 27339.95 27339.95 0
34 Ele- Ere -42 415 Turbine MCC Lot 1 24410.67 1 0.00 1.00 24410.67 0.00 24410.67
35 Ele- Ere -43 415V Turbine DB Lot 1 27826.17 1 0.00 1.00 27826.17 0.00 27826.17
34 Ele- Ere -45 415V, CW MCC Lot 1 9764.27 1 1.00 0.00 9764.27 9764.27 0
35 Ele- Ere -46 415V,DM plant PMCC Lot 1 24410.67 1 1.00 0.00 24410.67 24410.67 0
36 Ele- Ere -47 415V,DM plant MCC Lot 1 29292.81 1 1.00 0.00 29292.81 29292.81 0
37 Ele- Ere -48 415V,FW plant MCC Lot 1 13669.98 1 1.00 0.00 13669.98 13669.98 0
38 Ele- Ere -49 415V,PW plant MCC Lot 1 13669.98 1 1.00 0.00 13669.98 13669.98 0
39 Ele- Ere -50 Intake water switchgear PMCC Lot 1 17087.47 1 1.00 0.00 17087.47 17087.47 0
40 Ele- Ere -56 415V ACDB Lot 1 13659.98 1 1.00 0.00 13659.98 13659.98 0
41 Ele- Ere -61 220V DCDB Station Lot 1 1952.85 0.8 0.80 0.00 1562.28 1562.28 0
42 Ele- Ere -62 220V Unit #1 Lot 1 2441.07 1 1.00 0.00 2441.07 2441.07 0
43 Ele- Ere -63 220V Unit #2 Lot 1 2441.07 1 1.00 0.00 2441.07 2441.07 0
44 Ele- Ere -65 220V DCDB Lot 1 2441.07 1 1.00 0.00 2441.07 2441.07 0
45 Ele- Ere -66 110V DCDB Intake Lot 1 2441.07 1 0.00 1.00 2441.07 0.00 2441.07
46 Ele- Ere -68 UPS DB intake Lot 1 2441.07 1 0.00 1.00 2441.07 0.00 2441.07
Ele- Ere -72 220V,860AH Lead acid battery for station load Lot 1 58585.61 1 0.00 1.00 58585.61 0.00 58585.61
45 Ele- Ere -73 110V DC Lead acid battery & charger Lot 1 19526.54 1 1.00 0.00 19526.54 19526.54 0
46 Ele- Ere -75 UPS STG Lot 1 19526.54 1 0.00 1.00 19526.54 0.00 19526.54
47 Ele- Ere -76 UPS Intake Lot 1 19526.54 1 0.00 1.00 19526.54 0.00 19526.54
48 Ele- Ere -77 UPS DM plant Lot 1 19526.54 1 0.00 1.00 19526.54 0.00 19526.54
46 Ele- Ere -81 Erection of SPBD for ST Lot 1 58585.61 0.75 0.75 0.00 43939.2075 43939.21 0
47 Ele- Ere -82 Erection of SPBD for U1A Lot 1 39057.07 0.5 0.50 0.00 19528.535 19528.54 0
48 Ele- Ere -83 Erection of SPBD for U1B Lot 1 39057.07 0.5 0.50 0.00 19528.535 19528.54 0
49 Ele- Ere -92 Cable tray for TG area and cable cellar room(Strl Steel) Lot 1 19430.89 0.95 0.50 0.45 18459.3455 9715.45 8743.9005
50 Ele- Ere -101 Cable tray for intake Pump House(Strl Steel) Lot 1 2216.34 0.95 0.60 0.35 2105.523 1329.80 775.719
51 Ele- Ere -102 Cable tray for Boiler Area(Strl Steel) Lot 1 12693.55 0 0.00 0.00 0 0.00 0
51 Ele- Ere -104 Cable tray for DM tank And PT tank area(Strl Steel) Lot 1 9764.37 0.55 0.55 0.00 5370.4035 5370.40 0
52 Ele- Ere -110 Cable tray for TG area and cable cellar room Lot 1 268517.39 0.9 0.40 0.50 241665.651 107406.96 134258.695
53 Ele- Ere -119 Cable tray for intake Pump House Lot 1 21363.75 0.9 0.60 0.30 19227.375 12818.25 6409.125
54 Ele- Ere -120 Cable tray for Boiler Area Lot 1 156150.18 0 0.00 0.00 0 0.00 0
54 Ele- Ere -122 Cable tray for DM tank And PT tank area Lot 1 79383.5 0.55 0.55 0.00 43660.925 43660.93 0
55 Ele- Ere -139 DM Plant cable laying Lot 1 839727.1 0.74 0.74 0.00 621398.054 621398.05 0
56 Ele- Ere -155 BTG area Earth Mat Lot 1 761141.49 0.36 0.36 0.00 274010.9364 274010.94 0
57 Ele- Ere -156 Earthing of DM,WT,PT,Plant area Lot 1 102524.82 0.35 0.35 0.00 35883.687 35883.69 0
58 Ele- Ere -157 Earthing of Sea water intake Lot 1 65908.81 0.4 0.40 0.00 26363.524 26363.52 0
Total Amount Claimed 20585290.96 18468814.9331 17107718.01 1361096.928

Total Certified Amount for Electrical = 1361096.93

Engineer Manager Vice President (Projects )


Electrica
Name of the Project : 2 X 150MW Coastal Thermal Power Pro
Name of the Client : M/s. Meenakshi Energy Private Limited
Name of the EPC Contractor : M/s. Thermax Instrumentation
Reference : LOI: CTP/10/DC/THX/01/2009-10/07 Dt : 10-08-200

Billing Break
Sl.No Up No
1 Ele- Ere -01
2 Ele- Ere -02
3 Ele- Ere -03
4 Ele- Ere -04
5 Ele- Ere -05
6 Ele- Ere -06
7 Ele- Ere -07
8 Ele- Ere -08
9 Ele- Ere -09
10 Ele- Ere -10
11 Ele- Ere -11
12 Ele- Ere -12
13 Ele- Ere -13
14 Ele- Ere -14
15 Ele- Ere -15
16 Ele- Ere -16
17 Ele- Ere -18
18 Ele- Ere -19
19 Ele- Ere -20
20 Ele- Ere -21
21 Ele- Ere -22
22 Ele- Ere -23
23 Ele- Ere -24
24 Ele- Ere -25
25 Ele- Ere -26
26 Ele- Ere -30
27 Ele- Ere -31
28 Ele- Ere -32
29 Ele- Ere -33
30 Ele- Ere -34
31 Ele- Ere -35
32 Ele- Ere -36
33 Ele- Ere -37
34 Ele- Ere -39
35 Ele- Ere -40
36 Ele- Ere -41
37 Ele- Ere -42
38 Ele- Ere -43
39 Ele- Ere -45
40 Ele- Ere -46
41 Ele- Ere -47
42 Ele- Ere -48
43 Ele- Ere -49
44 Ele- Ere -50
45 Ele- Ere -56
46 Ele- Ere -61
47 Ele- Ere -62
48 Ele- Ere -63
49 Ele- Ere -65
50 Ele- Ere -66
51 Ele- Ere -68
52 Ele- Ere -72
53 Ele- Ere -73
54 Ele- Ere -75
55 Ele- Ere -76
56 Ele- Ere -77
57 Ele- Ere -81
58 Ele- Ere -82
59 Ele- Ere -83
60 Ele- Ere -92
61 Ele- Ere -101
62 Ele-ERE-93
63 Ele- Ere -102
64 Ele- Ere -98
65 Ele- Ere -104
66 Ele- Ere -105
67 Ele- Ere -107
68 Ele- Ere -110
69 Ele- Ere -111
70 Ele- Ere -119
71 Ele- Ere -120
72 Ele- Ere -122
73 Ele- Ere -116
74 Ele- Ere -123
75 Ele- Ere -139
76 Ele- Ere -125
77 Ele- Ere -155
78 Ele- Ere -156
79 Ele- Ere -157

Total Certified Amount for Electrical =


Engineer
Electrical Running Account Bill N
the Project : 2 X 150MW Coastal Thermal Power Project.
the Client : M/s. Meenakshi Energy Private Limited
the EPC Contractor : M/s. Thermax Instrumentation Limited
e : LOI: CTP/10/DC/THX/01/2009-10/07 Dt : 10-08-2009

Qty
Description UoM
Structure Erection Lot 1
Moose - Stringing Lot 1
Shield wire Lot 1
Equipment erection Lot 1
Earthing Lot 1
Cable tray in SWYRD Lot 1
Cable tray support FAB.AND Erection Lot 1
Cable laying - Control Lot 1
Cable laying - Power Lot 1
PVC pipe laying Lot 1
Control &Relay panel Lot 1
PLCC Lot 1
Battery and Battery charger 48V DC Lot 1
Battery and Battery charger 220V DC Lot 1
ACDB Lot 1
DCDB Lot 1
GCB Lot 1
Genrator T/F ,180MVA, Lot 1
Station T/F, 20MVA Lot 1
UAT T/F 40MVA Lot 1
Station Service T/F 2.5 MVA Lot 1
Unit Service T/F 1.6 MVA Lot 1
DM plant T/F, 2MVA Lot 1
Intake T/F, 250KVA Lot 1
CW pump house 2.5MVA,6.6/0.415 kv Lot 1
NGR panels for ST & UAT Lot 1
Control &Relay panel for GT&UAT Lot 1
Station Board switchgear Lot 1
Unit Board-1A Lot 1
Unit Board-1B Lot 1
Unit Board-2A Lot 1
Unit Board-2B Lot 1
Sea water Intake Lot 1
6.6KV station board unit switchgear Lot 1
Station Switchgear Lot 1
Boiler MCC Lot 1
415 Turbine MCC Lot 1
415V Turbine DB Lot 1
415V, CW MCC Lot 1
415V,DM plant PMCC Lot 1
415V,DM plant MCC Lot 1
415V,FW plant MCC Lot 1
415V,PW plant MCC Lot 1
Intake water switchgear PMCC Lot 1
415V ACDB Lot 1
220V DCDB Station Lot 1
220V Unit #1 Lot 1
220V Unit #2 Lot 1
220V DCDB Lot 1
110V DCDB Intake Lot 1
UPS DB intake Lot 1
220V,860AH Lead acid battery for station load Lot 1
110V DC Lead acid battery & charger Lot 1
UPS STG Lot 1
UPS Intake Lot 1
UPS DM plant Lot 1
Erection of SPBD for ST Lot 1
Erection of SPBD for U1A Lot 1
Erection of SPBD for U1B Lot 1
Cable tray for TG area and cable cellar room(Strl Steel) Lot 1
Cable tray for intake Pump House(Strl Steel) Lot 1
Cable tray for TG bld A-B bay(Strl Steel) Lot 1
Cable tray for Boiler Area(Strl Steel) Lot 1
Cable tray for ACW pump house(Strl Steel) Lot 1
Cable tray for DM plant And PT tank area(Strl Steel) Lot 1
Cable tray forCW area and MCC room(Strl Steel) Lot 1
Cable tray foTransformer yard(Strl Steel) Lot 1
Cable tray for TG area and cable cellar room Lot 1
Cable tray for TG bld A-B bay Lot 1
Cable tray for intake Pump House Lot 1
Cable tray for Boiler Area Lot 1
Cable tray for DM plant And PT tank area Lot 1
Cable tray for ACW pump house Lot 1
Cable tray forCW area and MCC room Lot 1
DM Plant cable laying Lot 1
Cable tray foTransformer yard Lot 1
BTG area Earth Mat Lot 1
Earthing of DM,WT,PT,Plant area Lot 1
Earthing of Sea water intake Lot 1
Total Amount Claimed

fied Amount for Electrical =


Manager
unning Account Bill No - 006
.

ited

Quantity Amount

Basic Rate Cumulative Previous Present Cumulative


1093598.08 0.91 0.91 0.00 996639.360276
683498.8 0.89 0.89 0.00 608313.932
97542.69 1.00 1.00 0.00 97542.69
976425.68 0.86 0.86 0.00 834843.9564
1757568.35 0.69 0.69 0.00 1212722.1615
128888.35 0.86 0.86 0.00 110843.981
117171.22 1.00 1.00 0.00 117171.22
336867.27 1.00 1.00 0.00 336867.27
164039.71 0.50 0.50 0.00 82019.855
58585.61 0.50 0.50 0.00 29292.805
7323203.01 1.00 1.00 0.00 7323203.01
34174.94 1.00 1.00 0.00 34174.94
24410.67 1.00 1.00 0.00 24410.67
24410.67 1.00 1.00 0.00 24410.67
24410.67 1.00 1.00 0.00 24410.67
24410.67 1.00 1.00 0.00 24410.67
97642.69 0.80 0.80 0.00 78114.152
2929280.58 1.00 1.00 0.00 2929280.58
488213.43 1.00 1.00 0.00 488213.43
683498.8 1.00 1.00 0.00 683498.8
39057.07 1.00 1.00 0.00 39057.07
29292.81 1.00 1.00 0.00 29292.81
39057.07 1.00 1.00 0.00 39057.07
29292.81 1.00 1.00 0.00 29292.81
39057.07 1.00 1.00 0.00 39057.07
58585.51 0.70 0.00 0.70 41009.857
14648.8 0.71 0.71 0.00 10400.648
156228.3 1.00 1.00 0.00 156228.3
61514.69 1.00 1.00 0.00 61514.69
57120.97 1.00 1.00 0.00 57120.97
61514.69 1.00 1.00 0.00 61514.69
57120.97 1.00 1.00 0.00 57120.97
53312.91 1.00 1.00 0.00 53312.91
24410.67 1.00 1.00 0.00 24410.67
28316.38 1.00 1.00 0.00 28316.38
27339.95 1.00 1.00 0.00 27339.95
24410.67 1.00 1.00 0.00 24410.67
27826.17 1.00 1.00 0.00 27826.17
9764.27 1.00 1.00 0.00 9764.27
24410.67 1.00 1.00 0.00 24410.67
29292.81 1.00 1.00 0.00 29292.81
13669.98 1.00 1.00 0.00 13669.98
13669.98 1.00 1.00 0.00 13669.98
17087.47 1.00 1.00 0.00 17087.47
13659.98 1.00 1.00 0.00 13659.98
1952.85 0.80 0.80 0.00 1562.28
2441.07 1.00 1.00 0.00 2441.07
2441.07 1.00 1.00 0.00 2441.07
2441.07 1.00 1.00 0.00 2441.07
2441.07 1.00 1.00 0.00 2441.07
2441.07 1.00 1.00 0.00 2441.07
58585.61 1.00 1.00 0.00 58585.61
19526.54 1.00 1.00 0.00 19526.54
19526.54 1.00 1.00 0.00 19526.54
19526.54 1.00 1.00 0.00 19526.54
19526.54 1.00 1.00 0.00 19526.54
58585.61 0.75 0.75 0.00 43939.2075
39057.07 0.50 0.50 0.00 19528.535
39057.07 0.50 0.50 0.00 19528.535
19430.89 0.95 0.95 0.00 18459.3455
2216.34 0.95 0.95 0.00 2105.523
7954.52 0.50 0.00 0.50 3977.26
12693.55 0.00 0.00 0.00 0
1952.85 0.70 0.00 0.70 1366.995
9764.27 0.55 0.55 0.00 5370.3485
9764.27 0.30 0.00 0.30 2929.281
1214.43 0.50 0.00 0.50 607.215
268517.39 0.90 0.90 0.00 241665.651
77137.72 0.50 0.00 0.50 38568.86
21363.75 0.90 0.90 0.00 19227.375
156150.18 0.00 0.00 0.00 0
79383.5 0.55 0.55 0.00 43660.925
12595.91 0.70 0.00 0.70 8817.137
87578.42 0.30 0.00 0.30 26273.526
839727.1 0.74 0.74 0.00 621398.054
11717.12 0.50 0.00 0.50 5858.56
761141.49 0.36 0.36 0.00 274010.9364
102524.82 0.35 0.35 0.00 35883.687
65908.81 0.40 0.40 0.00 26363.524
20853791.61 18598223.5691
Vice President (Proj
Amount

Previous Present
996639.36 0
608313.93 0
97542.69 0
834843.96 0
1212722.16 0
110843.98 0
117171.22 0
336867.27 0
82019.86 0
29292.81 0
7323203.01 0
34174.94 0
24410.67 0
24410.67 0
24410.67 0
24410.67 0
78114.15 0
2929280.58 0
488213.43 0
683498.80 0
39057.07 0
29292.81 0
39057.07 0
29292.81 0
39057.07 0
0.00 41009.857
10400.65 0
156228.30 0
61514.69 0
57120.97 0
61514.69 0
57120.97 0
53312.91 0
24410.67 0
28316.38 0
27339.95 0
24410.67 0
27826.17 0
9764.27 0
24410.67 0
29292.81 0
13669.98 0
13669.98 0
17087.47 0
13659.98 0
1562.28 0
2441.07 0
2441.07 0
2441.07 0
2441.07 0
2441.07 0
58585.61 0
19526.54 0
19526.54 0
19526.54 0
19526.54 0
43939.21 0
19528.54 0
19528.54 0
18459.35 0
2105.52 0
0.00 3977.26
0.00 0
0.00 1366.995
5370.35 0
0.00 2929.281
0.00 607.215
241665.65 0
0.00 38568.86
19227.38 0
0.00 0
43660.93 0
0.00 8817.137
0.00 26273.526
621398.05 0
0.00 5858.56
274010.94 0
35883.69 0
26363.52 0
18468814.88 129408.691

129408.69
Vice President (Projects )
Electrical Running Account Bill No - 007
Name of the Project : 2 X 150MW Coastal Thermal Power Project.
Name of the Client : M/s. Meenakshi Energy Private Limited
Name of the EPC Contractor : M/s. Thermax Instrumentation Limited
Reference : LOI: CTP/10/DC/THX/01/2009-10/07 Dt : 10-08-2009

Quantity

Qty
Billing Break
Sl.No Up No Description UoM Basic Rate Cumulative Previous
1 Ele- Ere -01 Structure Erection Lot 1 1093598.08 0.91 0.91
2 Ele- Ere -02 Moose - Stringing Lot 1 683498.8 0.97 0.89
3 Ele- Ere -03 Shield wire Lot 1 97542.69 1.00 1.00
4 Ele- Ere -04 Equipment erection Lot 1 976425.68 0.98 0.86
5 Ele- Ere -05 Earthing Lot 1 1757568.35 1.00 0.69
6 Ele- Ere -06 Cable tray in SWYRD Lot 1 128888.35 0.86 0.86
7 Ele- Ere -07 Cable tray support FAB.AND Erection Lot 1 117171.22 1.00 1.00
8 Ele- Ere -08 Cable laying - Control Lot 1 336867.27 1.00 1.00
9 Ele- Ere -09 Cable laying - Power Lot 1 164039.71 1.00 0.50
10 Ele- Ere -10 PVC pipe laying Lot 1 58585.61 1.00 0.50
11 Ele- Ere -11 Control &Relay panel Lot 1 7323203.01 1.00 1.00
12 Ele- Ere -12 PLCC Lot 1 34174.94 1.00 1.00
13 Ele- Ere -13 Battery and Battery charger 48V DC Lot 1 24410.67 1.00 1.00
14 Ele- Ere -14 Battery and Battery charger 220V DC Lot 1 24410.67 1.00 1.00
15 Ele- Ere -15 ACDB Lot 1 24410.67 1.00 1.00
16 Ele- Ere -16 DCDB Lot 1 24410.67 1.00 1.00
17 Ele- Ere -17 illumination Lot 1 97642.69 0.00 0.00
18 Ele- Ere -18 GCB Lot 1 97642.69 0.80 0.80
19 Ele- Ere -19 Genrator T/F ,180MVA, Lot 1 2929280.58 1.00 1.00
20 Ele- Ere -20 Station T/F, 20MVA Lot 1 488213.43 1.00 1.00
21 Ele- Ere -21 UAT T/F 40MVA Lot 1 683498.8 1.00 1.00
22 Ele- Ere -22 Station Service T/F 2.5 MVA Lot 1 39057.07 1.00 1.00
23 Ele- Ere -23 Unit Service T/F 1.6 MVA Lot 1 29292.81 1.00 1.00
24 Ele- Ere -24 DM plant T/F, 2MVA Lot 1 39057.07 1.00 1.00
25 Ele- Ere -25 Intake T/F, 250KVA Lot 1 29292.81 1.00 1.00
26 Ele- Ere -26 CW pump house 2.5MVA,6.6/0.415 kv Lot 1 39057.07 1.00 1.00
27 Ele- Ere -27 CHP control room 2.5MVA,6.6./0.433kv,ONAN type Lot 1 39057.07 0.00 0.00
28 Ele- Ere -28 ESP 2MVA,6.6/0.415KV Lot 1 39057.07 0.70 0.00
29 Ele- Ere -29 NPB 630KVA,6.6/0.433KV,ONAN type Lot 1 14646.4 0.00 0.00
30 Ele- Ere -30 NGR panels for ST & UAT Lot 1 58585.51 1.00 0.70
31 Ele- Ere -31 Control &Relay panel for GT&UAT Lot 1 14648.8 0.71 0.71
32 Ele- Ere -32 Station Board switchgear Lot 1 156228.3 1.00 1.00
33 Ele- Ere -33 Unit Board-1A Lot 1 61514.69 1.00 1.00
34 Ele- Ere -34 Unit Board-1B Lot 1 57120.97 1.00 1.00
35 Ele- Ere -35 Unit Board-2A Lot 1 61514.69 1.00 1.00
36 Ele- Ere -36 Unit Board-2B Lot 1 57120.97 1.00 1.00
37 Ele- Ere -37 Sea water Intake Lot 1 53312.91 1.00 1.00
38 Ele- Ere -38 CHP-control room Lot 1 41400.5 0.00 0.00
39 Ele- Ere -39 415V unit switchgear Lot 1 24410.67 1.00 1.00
40 Ele- Ere -40 Station Switchgear Lot 1 28316.38 1.00 1.00
41 Ele- Ere -41 Boiler MCC Lot 1 27339.95 1.00 1.00
42 Ele- Ere -42 415 Turbine MCC Lot 1 24410.67 1.00 1.00
43 Ele- Ere -43 415V Turbine DB Lot 1 27826.17 1.00 1.00
44 Ele- Ere -44 415V ESP MCC Lot 1 6834.99 0.80 0.00
45 Ele- Ere -45 415V, CW MCC Lot 1 9764.27 1.00 1.00
46 Ele- Ere -46 415V,DM plant PMCC Lot 1 24410.67 1.00 1.00
47 Ele- Ere -47 415V,DM plant MCC Lot 1 29292.81 1.00 1.00
48 Ele- Ere -48 415V,FW plant MCC Lot 1 13669.98 1.00 1.00
49 Ele- Ere -49 415V,PW plant MCC Lot 1 13669.98 1.00 1.00
50 Ele- Ere -50 Intake water switchgear PMCC Lot 1 17087.47 1.00 1.00
51 Ele- Ere -51 coal handling switchgear Lot 1 9764.27 0.00 0.00
52 Ele- Ere -52 ash handling switchgear Lot 1 9764.27 0.00 0.00
53 Ele- Ere -53 DG cum Emergency swgr Lot 1 21491.39 1.00 0.00
54 Ele- Ere -54 lime handling MCC Lot 1 7811.41 0.00 0.00
55 Ele- Ere -55 AC cum Ventilation MCC Lot 1 27339.96 0.00 0.00
56 Ele- Ere -56 415V ACDB(SWITCHYARD) Lot 1 13659.98 1.00 1.00
57 Ele- Ere -57 415V ACDB(TG building) Lot 1 21481.39 1.00 0.00
58 Ele- Ere -58 ADMIN DB Lot 1 1952.85 0.00 0.00
59 Ele- Ere -59 415V workshop DB Lot 1 1952.85 0.00 0.00
60 Ele- Ere -60 415V canteen DB Lot 1 1952.85 0.00 0.00
61 Ele- Ere -61 220V DCDB Station Lot 1 1952.85 1.00 0.80
62 Ele- Ere -62 220V DCDB Unit #1 Lot 1 2441.07 1.00 1.00
63 Ele- Ere -63 220V DCDB Unit #2 Lot 1 2441.07 1.00 1.00
64 Ele- Ere -64 220V DCDB CHP Lot 1 2441.07 0.00 0.00
65 Ele- Ere -65 220V DCDB SWYD Lot 1 2441.07 1.00 1.00
66 Ele- Ere -66 110V DCDB Intake Lot 1 2441.07 1.00 1.00
67 Ele- Ere -67 UPS DB STG Lot 1 2441.07 1.00 0.00
68 Ele- Ere -68 UPS DB intake Lot 1 2441.07 1.00 1.00
69 Ele- Ere -69 UPS DB DM PLANT Lot 1 2441.07 0.00 0.00
70 Ele- Ere -70 UPS DB CHP Lot 1 2441.07 0.00 0.00
71 Ele- Ere -71 UPS DB AHP Lot 1 2441.07 0.00 0.00
72 Ele- Ere -72 220V,860AH Lead acid battery for station load Lot 1 58585.61 1.00 1.00
73 Ele- Ere -73 110V DC Lead acid battery & charger Lot 1 19526.54 1.00 1.00
74 Ele- Ere -74 220v DC,640AH for CHP Lot 1 24410.67 0.00 0.00
75 Ele- Ere -75 UPS STG Lot 1 19528.54 1.00 1.00
76 Ele- Ere -76 UPS Intake Lot 1 19528.54 1.00 1.00
77 Ele- Ere -77 UPS DM plant Lot 1 19528.54 1.00 1.00
78 Ele- Ere -78 UPS CHP Lot 1 19528.54 0.00 0.00
79 Ele- Ere -79 UPS AHP Lot 1 19528.54 0.00 0.00
80 Ele- Ere -80 Erection of IPBD Lot 1 97642.69 0.40 0.00
81 Ele- Ere -81 Erection of SPBD for ST Lot 1 58585.61 0.75 0.75
82 Ele- Ere -82 Erection of SPBD for U1A Lot 1 39057.07 0.50 0.50
83 Ele- Ere -83 Erection of SPBD for U1B Lot 1 39057.07 0.50 0.50
84 Ele- Ere -84 NSPBD for SST Lot 1 39057.07 1.00 0.00
85 Ele- Ere -85 NSPBD for UST Lot 1 39057.07 0.50 0.00
86 Ele- Ere -86 NSPBD for DM PLANT Lot 1 39057.07 1.00 0.00
87 Ele- Ere -87 NSPBD for ESP Lot 1 39057.07 0.00 0.00
88 Ele- Ere -88 NSPBD for CHP Lot 1 39057.07 0.00 0.00
89 Ele- Ere -89 NSPBD for CWP Lot 1 39057.07 1.00 0.00
90 Ele- Ere -90 DG set with AMF panel Lot 1 117171.22 0.90 0.00
91 Ele- Ere -91 structural steel for cable tray &base frame fabrication Lot 1 0 0.00 0.00
92 Ele- Ere -92 Cable tray for TG area and cable cellar room(Strl Steel) Lot 1 19430.89 0.95 0.95
93 Ele-ERE-93 Cable tray for TG bld A-B bay(Strl Steel) Lot 1 7954.52 0.50 0.50
94 Ele- Ere -94 cable tray-power house mazzanine floor Lot 1 3704.01 0.00 0.00
95 Ele- Ere -95 cable tray for operating floor Lot 1 910.82 0.00 0.00
96 Ele- Ere -96 cable tray for derating floor Lot 1 1552.28 0.00 0.00
97 Ele- Ere -97 cable tray for non plant building Lot 1 390.57 0.00 0.00
98 Ele- Ere -98 Cable tray for ACW pump house(Strl Steel) Lot 1 1952.85 0.70 0.70
99 Ele- Ere -99 cable tray in DG room Lot 1 1092.89 0.00 0.00
100 Ele- Ere -100 cable tray at FO pump house Lot 1 1396 0.00 0.00
101 Ele- Ere -101 Cable tray for intake Pump House(Strl Steel) Lot 1 2216.34 0.95 0.95
102 Ele- Ere -102 Cable tray for Boiler Area(Strl Steel) Lot 1 12693.55 0.50 0.00
103 Ele- Ere -103 cable tray for ESP Lot 1 3905.71 0.00 0
104 Ele- Ere -104 Cable tray for DM plant And PT tank area(Strl Steel) Lot 1 9764.27 0.55 0.55
105 Ele- Ere -105 Cable tray forCW area and MCC room(Strl Steel) Lot 1 9764.27 0.30 0.30
106 Ele- Ere -106 Cable tray forCHP (Strl Steel) Lot 1 58585.61 0.00 0.00
107 Ele- Ere -107 Cable tray foTransformer yard(Strl Steel) Lot 1 1214.43 0.50 0.50
108 Ele- Ere -108 cable tray for AHP and compressor room Lot 1 1305.51 0.00 0.00
109 Ele- Ere -109 cable tray for out door area Lot 1 57440 0.00 0.00
110 Ele- Ere -110 Cable tray for TG area and cable cellar room(tray) Lot 1 268517.39 0.90 0.90
111 Ele- Ere -111 Cable tray for TG bld A-B bay Lot 1 77137.72 0.50 0.50
112 Ele- Ere -112 cable tray-power house mazzanine floor Lot 1 37104.22 0.00 0.00
113 Ele- Ere -113 cable tray for operating floor Lot 1 8787.84 0.00 0.00
114 Ele- Ere -114 cable tray for derating floor Lot 1 11717.12 0.00 0.00
115 Ele- Ere -115 cable tray for non plant building Lot 1 2434.23 0.00 0.00
116 Ele- Ere -116 Cable tray for ACW pump house Lot 1 12595.91 0.70 0.70
117 Ele- Ere -117 cable tray in DG room Lot 1 10545.41 0.00 0.00
118 Ele- Ere -118 cable tray at FO pump house Lot 1 13474.89 0.00 0.00
119 Ele- Ere -119 Cable tray for intake Pump House Lot 1 21363.75 0.90 0.90
120 Ele- Ere -120 Cable tray for Boiler Area Lot 1 156150.18 0.50 0.00
121 Ele- Ere -121 cable tray for ESP Lot 1 23727.17 0.00 0.00
122 Ele- Ere -122 Cable tray for DM plant And PT tank area Lot 1 79383.5 0.55 0.55
123 Ele- Ere -123 Cable tray forCW area and MCC room Lot 1 87578.42 0.30 0.30
124 Ele- Ere -124 Cable tray for CHP AREA &MCC Lot 1 414493.2 0.00 0.00
125 Ele- Ere -125 Cable tray foTransformer yard Lot 1 11717.12 0.50 0.50
126 Ele- Ere -126 cable tray for AHP and compressor room Lot 1 12595.91 0.00 0.00
127 Ele- Ere -127 cable tray for out door area Lot 1 453745 0.00 0.00
128 Ele- Ere -128 HT cable intake Lot 1 585855.12 0.00 0.00
129 Ele- Ere -129 HT CABLE DM PLANT Lot 1 781141.49 0.00 0.00
130 Ele- Ere -130 HT CABLE CHP Lot 1 292928.06 0.00 0.00
131 Ele- Ere -131 HT CABLE STG-1 Lot 1 195285.37 0.00 0.00
132 Ele- Ere -132 HT CABLE STG-2 Lot 1 195285.37 0.00 0.00
133 Ele- Ere -133 LT CABLE INTAKE Lot 1 373483.27 0.00 0.00
134 Ele- Ere -134 LT CABLE BOILER-1 Lot 1 466927.32 0.00 0.00
135 Ele- Ere -135 LT CABLE BOILER-2 Lot 1 466927.32 0.00 0.00
136 Ele- Ere -136 LT ESP-1 &ESP-2 Lot 1 292928.06 0.00 0.00
137 Ele- Ere -137 LT-STG-1 Lot 1 560469.02 0.00 0.00
138 Ele- Ere -138 LT STG-2 Lot 1 560469.02 0.00 0.00
139 Ele- Ere -139 LT DM PLANT Lot 1 839727.1 0.00 0.00
140 Ele- Ere -140 LT CHP Lot 1 839727.1 0.00 0.00
141 Ele- Ere -141 LT-CWP Lot 1 488927.32 0.00 0
142 Ele- Ere -142 LT AHP Lot 1 97642.69 0.00 0
143 Ele- Ere -143 LT CABLE NON PLANT BULG Lot 1 130047.36 0.00 0
144 Ele- Ere -144 EARTHING power house o mtr-unit-1 Lot 1 58585.61 0.00 0
145 Ele- Ere -145 EARTHING power house 4 mtr-unit-1 Lot 1 56632.76 0.00 0
146 Ele- Ere -146 EARTHING power house 10 mtr-unit-1 Lot 1 58585.61 0.00 0
147 Ele- Ere -147 EARTHING power house15 mtr-unit-1 Lot 1 58585.61 0.00 0
148 Ele- Ere -148 EARTHING power house 22 mtr-unit-1 Lot 1 58585.61 0.00 0
149 Ele- Ere -149 earthing boiler Lot 1 122053.35 0.00 0
150 Ele- Ere -150 earthing-circulating water area Lot 1 63711.85 0.00 0
151 Ele- Ere -151 clarifid/fire water Lot 1 9764.27 0.00 0
152 Ele- Ere -152 esp/ahp/chp-unit1 Lot 1 9764.27 0.00 0
153 Ele- Ere -153 earthing of TG PEDESTAL-UNIT-1 Lot 1 9764.27 0.00 0
154 Ele- Ere -154 TRFR YARD-UNIT-1 Lot 1 9764.27 0.00 0
155 Ele- Ere -155 BTG area Earth Mat Lot 1 761141.49 0.36 0.36
156 Ele- Ere -156 Earthing of DM,WT,PT,Plant area Lot 1 102524.82 0.35 0.35
157 Ele- Ere -157 Earthing of Sea water intake Lot 1 65908.81 0.40 0.40
158 Ele- Ere -158 TEST PITS Lot 1 117171.22 0.00 0.00
159 Ele- Ere -159 NEUTRAL PITS Lot 1 244106.71 0.00 0.00
160 Ele- Ere -160 illumination STG Lot 2 65420.8 0.00 0.00
161 Ele- Ere -161 Boiler=1 Lot 3 73232.01 0.00 0.00
162 Ele- Ere -162 Boiler=2 Lot 4 73232.01 0.00 0.00
163 Ele- Ere -163 ESP Lot 5 59703.48 0.00 0.00
164 Ele- Ere -164 WTP Lot 6 73232.01 0.00 0.00
165 Ele- Ere -165 CHP Lot 7 34174.94 0.00 0.00
166 Ele- Ere -166 AHP Lot 8 19528.54 0.00 0.00
167 Ele- Ere -167 SEA WATER INTAKE Lot 9 48821.34 0.00 0.00
168 Ele- Ere -168 NON PLANT BLDG Lot 10 43939.21 0.00 0.00
169 Ele- Ere -169 Street lighting Lot 11 34174.84 0.00 0.00
30570263.87

Total Certified Amount for Electrical =1289830.63


ty Amount

Present Cumulative Previous Present


0.00 996639.360 996639.360 0
0.08 662993.836 608313.932 54679.904
0.00 97542.690 97542.690 0
0.12 952015.038 834843.956 117171.0816
0.31 1757568.350 1212722.162 544846.1885
0.00 110843.981 110843.981 0
0.00 117171.220 117171.220 0
0.00 336867.270 336867.270 0
0.50 164039.710 82019.855 82019.855
0.50 58585.610 29292.805 29292.805
0.00 7323203.010 7323203.010 0
0.00 34174.940 34174.940 0
0.00 24410.670 24410.670 0
0.00 24410.670 24410.670 0
0.00 24410.670 24410.670 0
0.00 24410.670 24410.670 0
0.00 0.000 0.000 0
0.00 78114.152 78114.152 0
0.00 2929280.580 2929280.580 0
0.00 488213.430 488213.430 0
0.00 683498.800 683498.800 0
0.00 39057.070 39057.070 0
0.00 29292.810 29292.810 0
0.00 39057.070 39057.070 0
0.00 29292.810 29292.810 0
0.00 39057.070 39057.070 0
0.00 0.000 0.000 0
0.70 27339.949 0.000 27339.949
0.00 0.000 0.000 0
0.30 58585.510 41009.857 17575.653
0.00 10400.648 10400.648 0
0.00 156228.300 156228.300 0
0.00 61514.690 61514.690 0
0.00 57120.970 57120.970 0
0.00 61514.690 61514.690 0
0.00 57120.970 57120.970 0
0.00 53312.910 53312.910 0
0.00 0.000 0.000 0
0.00 24410.670 24410.670 0
0.00 28316.380 28316.380 0
0.00 27339.950 27339.950 0
0.00 24410.670 24410.670 0
0.00 27826.170 27826.170 0
0.80 5467.992 0.000 5467.992
0.00 9764.270 9764.270 0
0.00 24410.670 24410.670 0
0.00 29292.810 29292.810 0
0.00 13669.980 13669.980 0
0.00 13669.980 13669.980 0
0.00 17087.470 17087.470 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
1.00 21491.390 0.000 21491.39
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 13659.980 13659.980 0
1.00 21481.390 0.000 21481.39
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.20 1952.850 1562.280 390.57
0.00 2441.070 2441.070 0
0.00 2441.070 2441.070 0
0.00 0.000 0.000 0
0.00 2441.070 2441.070 0
0.00 2441.070 2441.070 0
1.00 2441.070 0.000 2441.07
0.00 2441.070 2441.070 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 58585.610 58585.610 0
0.00 19526.540 19526.540 0
0.00 0.000 0.000 0
0.00 19528.540 19528.540 0
0.00 19528.540 19528.540 0
0.00 19528.540 19528.540 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.40 39057.076 0.000 39057.076
0.00 43939.208 43939.208 0
0.00 19528.535 19528.535 0
0.00 19528.535 19528.535 0
1.00 39057.070 0.000 39057.07
0.50 19528.535 0.000 19528.535
1.00 39057.070 0.000 39057.07
0.00 0.000 0.000 0
0.00 0.000 0.000 0
1.00 39057.070 0.000 39057.07
0.90 105454.098 0.000 105454.098
0.00 0.000 0.000 0
0.00 18459.346 18459.346 0
0.00 3977.260 3977.260 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 1366.995 1366.995 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 2105.523 2105.523 0
0.50 6346.775 0.000 6346.775
0 0.000 0.000 0
0.00 5370.349 5370.349 0
0.00 2929.281 2929.281 0
0.00 0.000 0.000 0
0.00 607.215 607.215 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 241665.651 241665.651 0
0.00 38568.860 38568.860 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 8817.137 8817.137 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 19227.375 19227.375 0
0.50 78075.090 0.000 78075.09
0.00 0.000 0.000 0
0.00 43660.925 43660.925 0
0.00 26273.526 26273.526 0
0.00 0.000 0.000 0
0.00 5858.560 5858.560 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0 0.000 0.000 0
0 0.000 0.000 0
0 0.000 0.000 0
0 0.000 0.000 0
0 0.000 0.000 0
0 0.000 0.000 0
0 0.000 0.000 0
0 0.000 0.000 0
0 0.000 0.000 0
0 0.000 0.000 0
0 0.000 0.000 0
0 0.000 0.000 0
0 0.000 0.000 0
0 0.000 0.000 0
0.00 274010.936 274010.936 0
0.00 35883.687 35883.687 0
0.00 26363.524 26363.524 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
0.00 0.000 0.000 0
19266662.147 17976831.52 1289830.63