ETAILED CRONOLOGICAL CONSTRUCTION ACTIVITIES
LOOR ARE: 580 SQ.M
HREE STOREY MIXED USED WITH PENTHOUSE
ACTIVITY
BUILDING PERMIT
MOBILIZATION
TEMPORARY FACILITIES
FABRICATION
FORMWORKS
REINFORCING REBARS
STEEL TRUSSES
SITE LAYOUT
CLEARING AND GRUBBING
EXCAVATION
DEWATERING ( IF NECESSARY)
SOIL POISONING
PLACEMENT OF REINFORCING BARS OF FOOTING FOUNDATION
INSTALLATION
STARTER BARS OF COLUMNS
REINFORCING BARS OF CONCRETE HOLLOW BLOCKS (CHB)
1ST FLOOR
CONCRETE POURING OF FOOTING
BACKFILL
COMPACTION OF STRUCTURAL BACKFILL
SOIL POISONING OF STRUCTURAL BACKFILL
INSTALLATION OF SHRINKAGE AND TEMPERATURE REBARS OF SLAB-ON-FILL
REINFORCING BARS FOR THE BEAM
FORMWORKS FOR SLAB ON FILL
PREPARATION OF FORMWORKS FOR COLUMNS
POURING OF CONCRETE OF SLAB-ON-FILL
POURING OF CONCRETE AT MID OF COLUMN HEIGHT
PREPARATION OF SHORINGS AND FORMWORKS FOR 1st FLOOR COLUMN AND 2ND FLOOR BEAM
INSTALLATION
REINFORCING BARS FOR GIRDER AND BEAMS
ELECTRICAL CONDUITS INSIDE THE COLUMNS (IF ANY)
PREPARATION OF FORMWORKS FOR BEAMS AND GIRDERS
PREPARATION OF SHORINGS AND FORMWORKS FOR 2ND FLOOR SUSPENDED SLAB
LAYING OF REINFORCING BARS FOR SUSPENDED SLAB AND OTHER ELECTRICAL ACCESSORIES
FORMSWORKS FOR 2ND FLOOR SUSPENDED SLAB
POURING OF REMAINING COLUMN HEIGHT, BEAMS, GIRDER AND SUSPENDED SLAB
2ND FLOOR
REBAR COLUMN AT SECOND FLOOR INSTALLATION
PREPARATION OF FORMS AND SHORING AT SECOND FLOOR COLUMNS, THIRD FLOOR BEAMS
INSTALLATION
REINFORCING BARS FOR GIRDER AND BEAMS
ELECTRICAL CONDUITS INSIDE THE COLUMNS (IF ANY)
PREPARATION OF FORMWORKS FOR BEAMS AND GIRDERS
PREPARATION OF SHORINGS AND FORMWORKS FOR 3RD FLOOR SUSPENDED SLAB
LAYING OF REINFORCING BARS FOR SUSPENDED SLAB AND OTHER ELECTRICAL ACCESSORIES
POURING OF CONCRETE COLUMN, BEAMS AND GIRDERS AT 2ND FLOOR
FORMSWORKS FOR 3RD FLOOR SUSPENDED SLAB
3RD FLOOR
REBAR COLUMN AT THIRD FLOOR INSTALLATION
PREPARATION OF FORMS AND SHORING AT 3RD FLOOR COLUMNS, ROOF DECK BEAMS
INSTALLATION
REINFORCING BARS FOR GIRDER AND BEAMS
ELECTRICAL CONDUITS INSIDE THE COLUMNS (IF ANY)
PREPARATION OF FORMWORKS FOR BEAMS AND GIRDERS
PREPARATION OF SHORINGS AND FORMWORKS FOR ROOF DECK SUSPENDED SLAB
LAYING OF REINFORCING BARS FOR SUSPENDED SLAB AND OTHER ELECTRICAL ACCESSORIES
POURING OF CONCRETE COLUMN, BEAMS AND GIRDERS AT 3RD FLOOR
FORMSWORKS FOR ROOF DECK SUSPENDED SLAB
PENTHOUSE
REBAR COLUMN AT THE PENTHOUSE INSTALLATION
PREPARATION OF FORMS AND SHORING AT PENTHOUSE COLUMNS, ROOF BEAMS
INSTALLATION
REINFORCING BARS FOR GIRDER AND BEAMS
ELECTRICAL CONDUITS INSIDE THE COLUMNS (IF ANY)
PREPARATION OF FORMWORKS FOR BEAMS AND GIRDERS
INSTALLATION OF REINFORCING BARS AT ROOF BEAMS
POURING OF CONCRETE COLUMN,ROOF BEAMS AND GIRDERS AT THE PENTHOUSE,
INSTALLATION OF TRUSSES
CHB LAYING AT GROUND FLOOR TO PENTHOUSE
PLASTERING OF CHB EXTERIOR AND INTERIOR WALLS
INSTALLATION OF PURLINS. SAG-RODS AND BRACING
ROOF SHEETS INSTALLATION
INSTALLATION OF DOORS, WINDOWS, AND OTHER ARCHITECTURAL AND SANITARY FIXTURES
TILE AND CEILING WORKS
PAINTING WORKS
TESTING OF COMMISIONING OF ELECTRICAL CONDUITS
PUNCHLISTING
RECTIFICATION OF PUNCHLIST
ACCEPTANCE
OCCUPANCY PERMIT
DEMOBILIZATION
TOTAL DURATION IN DAYS
DURATION (DAY(S))
FASTEST SLOWEST NORMAL AVE.
2 5 4 5
4 5 3 5
5 7 6 7
4 6 5 6
2 4 3 4
2 3 2 3
3 6 5 6
1 2 2 2
1 2 2 2
3 6 5 6
4 8 6 7
3 7 5 6
1 2 3 2
1 2 2 2
1 2 2 2
4 8 7 8
4 8 7 8
3 5 4 5
3 5 4 5
5 10 8 9
4 8 6 7
2 4 3 4
5 10 8 9
2 4 3 4
1 2 3 2
7 14 10 13
2 4 3 4
6 10 8 9
2 4 3 4
2 4 3 4
5 10 8 9
2 4 3 4
1 2 3 2
7 14 10 13
5 10 8 9
2 4 3 4
2 4 3 4
1 2 3 2
5 10 8 9
2 4 3 4
1 2 3 2
7 14 10 13
5 10 8 9
2 4 3 4
2 4 3 4
1 2 3 2
5 10 8 9
2 4 3 4
3 8 7 7
3 8 7 7
5 7 6 7
4 7 5 7
4 7 5 7
2 5 4 5
2 5 4 5
4 7 6 7
4 7 5 7
3 4 3 4
2 2 2 2
3 5 4 5
3 5 4 5
7 7 7 7
4 7 6 7
4 5 4 5
361 TOTAL WEEKS 52
MANPOWER
1 laborer
6 laborer
4 carpenter and 4 helper, 2 laborer
6 laborer
4 laborer
4 laborer
4 laborer
4 laborer
8 laborer
6 laborer
2 carpeneter and 2 helper
1 carpeneter and 1 helper
4 laborer
4 laborer
1 carpeneter and 1 helper
1 electrician, 4 laborer
4 laborer
1 carpeneter and 1 helper
1 electrician, 4 laborer
4 laborer
1 carpeneter and 1 helper
1 electrician, 4 laborer
4 laborer
1 carpeneter and 1 helper
1 electrician, 4 laborer
W-1 Awning Window 5.00 set 2500.00 12500.00 3,750.00 1,250.00 17,500.00
W-2 Casement Window 2.00 set 2500.00 5000.00 1,500.00 500.00 7,000.00
W-3 2 Panel and Fixed Sliding Window 2.00 set 5000.00 10000.00 3,000.00 1,000.00 14,000.00
W-4 2 Panel Sliding Window 2.00 set 5000.00 10000.00 3,000.00 1,000.00 14,000.00
W-5 2 Panel Sliding Window 7.00 set 5000.00 35000.00 10,500.00 3,500.00 49,000.00
XIV. SUB-TOTAL (XII) Php321,300.00
CARPENTRY WORKS
Ceiling Works
Carrying Channel 93.00 pcs 105.00 9765.00 2,929.50 976.50 13,671.00
Jea Maxx Angle 31.00 pcs 150.00 4650.00 1,395.00 465.00 6,510.00
Jea Maxx Furring 87.00 pcs 95.00 8265.00 2,479.50 826.50 11,571.00
Hardiflex 1.2X2.4X4mm 78.00 pcs 450.00 35100.00 10,530.00 3,510.00 49,140.00
Accessories 302.00 pcs 5.00 1510.00 453.00 151.00 2,114.00
Closets and Cabinetry 1.00 lot 68000.00 68000.00 34,000.00 6,800.00 108,800.00
SUB-TOTAL (XIII) Php191,806.00
TILEWORKS
First Floor
300mm x 300mm 195.00 pcs 35.00 6825.00 2,047.50 682.50 9,555.00
600mm x 600mm 460.00 pcs 120.00 55200.00 16,560.00 5,520.00 77,280.00
XV. Pebble Wash-out
Cement 30.00 bags 235.00 7050.00 2,115.00 705.00 9,870.00
Stone Pebbles 3.00 cu.m. 390.00 1170.00 351.00 117.00 1,638.00
Second Floor
300mm x 300mm 2228.00 pcs 35.00 77980.00 23,394.00 7,798.00 109,172.00
200mm x 200mm 320.00 pcs 120.00 38400.00 11,520.00 3,840.00 53,760.00
Pebble Wash-out
Cement 3.00 bags 235.00 705.00 211.50 70.50 987.00
XVI. Stone Pebbles 1.00 cu.m. 390.00 390.00 117.00 39.00 546.00
SUB-TOTAL (XIV) Php262,808.00
KITCHEN COUNTER
CHB 4"-100X200X400 60.00 pcs 10.00 600.00 180.00 60.00 840.00
Plastering & Mortar
Portland Cement 3.00 bags 235.00 705.00 211.50 70.50 987.00
XVII. White sand 0.22 cu.m 1100.00 242.00 72.60 24.20 338.80
RSB 10mmX6.0m 8.00 pcs 180.00 1440.00 432.00 144.00 2,016.00
XVIII. Granite Slab 7.46 sq.m. 2500.00 18637.50 5,591.25 1,863.75 26,092.50
SUB-TOTAL (XV) Php30,274.30
XIX. PAINTING WORKS
Interior Wall 16.00 gal 550.00 8800.00 4,400.00 880.00 14,080.00
XX. Exterior Walls 20.00 gal 500.00 10000.00 5,000.00 1,000.00 16,000.00
Ceiling works 7.00 gal 400.00 2800.00 1,400.00 280.00 4,480.00
Cabinet 2.00 gal 650.00 1300.00 650.00 130.00 2,080.00
C. SUB-TOTAL (XVI) Php36,640.00
ELECTRICAL WORKS
SUB-TOTAL (XVII) Php761,094.97
PLUMBING WORKS
SUB-TOTAL (XVIII) Php475,684.36
OVERHEAD COST
SUB-TOTAL (XIX) Php537,523.32
D. CONTINGENCY COST
SUB-TOTAL (XXX) Php1,075,046.65
SUB-TOTAL (B) Php7,681,928.73
POST- CONSTRUCTION COST
A. Cleaning and disposal of Construction debris 7700.00
B. Demobilization 20000.00
SUB-TOTAL (C) Php27,700.00