Mike is a Fabrication-In-Charge in a new construction company, the owner of
a company is one of the major stake holder in a big construction company, the owner break a ties to the company he had a share, he do that in order to build its own company. The one of the share he get after it ties it connection to the company is the formworks department he demand to get the formworks department of the company he ties. He buy a lot to build a company office and he put the formworks material on that lot, because of that the goods and repair material is mix on that lot, so the owner had a dilemma on how he fix that problem and to make the production faster on the formworks department. His department is responsible to supply the formworks material on the construction project that the company had. His department head assign him to make a plan regarding on that problem and to maximized the time efficiency of the sub-contractor who repair and fabricate the material, in order to caught up to the demand of material on the project site, and to avoid the problem regarding of cheating of labourer on the sub-contractor who is on the contract of Pakyawan, that who repair a material that didnt need to repair and to clear the path that goes inside to the fabrication site/building. One of the major big problem that the entrance and exit block by the material that are need to repair, paint and the good material to the fabrication site. Manuel, Michael Brian D. Analytical Problem Solving
PROBLEM: The slowing of production, untidy and no segregation of material on the
fabrication site.
OBJECTIVES: To increase the production of material and to have a properly
segregation of each material.
PROJECT STEPS:
At day one, do the meeting on the sub-contractor owner and the
labourer, that we dont have a night shift on the repair and fabricating material, in order to avoid cheating of labourer, who repairs a material that does not need to repair. Ask the sub-contractor owner to increase their manpower. And reprimand the labourer that if they get a material on the X1, X2 and X3 they need to transmit the material, fast as they can, so the material cannot block the pathway. And also ask the At day one, present a request to the department head to add a tower crane at the X1 in order to reach the material that comes from the X1. Also suggest to the head that we need to have a three group of admin which is for clearing, for the segregation of material at the X1, X2 and X3 and for the transportation of finish goods to the central warehouse. At 1st week create a policy, then submit the policy to the company owner and if the owner approved it then present the policy to the Project Manager (PM) on the project that all material that comes from the project site must be segregate already, in order to increase the production and in order the fabrication site become tidy. At 1st week create a future site plan which has a properly designation/place area of the material, that comes from the site and the goods material that already go to the central warehouse. At 1st 2nd week segregate first the A and H-frame for repair and goods area. Then if they get a good item then they immediately transfer it to the central warehouse. In order to have a large space for entrance. At 3rd week they need to clear the area at X3, in order to put the new tower crane at X3. At 4th 15th week they need to segregate the material at X1 and X3. And need to transfer the goods materials that get on the X1 and X3.
RISK OF THE PLAN:
The plan needs a more cost because we need to add a more
manpower and more machines that help to clear the area.