Site GLDC25
Project NSN 2016 - MLMT
Nng 12/2016
Single Site Verification Check List
1 |Page
1.General site information
2. R
Site Name GLDC25 Technology UMTS
Longitude 107.79066 Latitude 13.77125 F
Drive Test Date 26/11/2016 Drive Tester Trnh Minh Dng Cluster Gia Lai
Data
2.1 UMTS
2 |Page
Figure 1: Site Location and test routes
There are some missing route areas because the road cant go. Detail as below:
3 |Page
Area 1:
4 |Page
Area 2
5 |Page
6 |Page
4. CQT summary
4.1UMTS
Idle Mode
LAC: 31411 LAC: 31411 LAC: 31411
2 The LAC/RAC is correctly defined (SIB 1)
7 |Page
5.Serving cell coverage:
5.1 UMTS (RSCP, MS3 lap 1)
5.1.1 Sector A
8 |Page
5.1.2 Sector B
9 |Page
5.1.3 Sector C
10 |Page
6.DT KPI summary:
6.1 UMTS
100%
6 PDP context Number PDP Context Accept / Number MS2 lap1
activation SR PDP Context Request * 100
11 |Page
8 PS upload Mbps MS6 lap 2
1.62
throughput
12 |Page
7.DT KPI in details:
Figure 5: RSCP.
13 |Page
7.2 EcIo (MS3 lap 1)
Figure 6: EcIo.
14 |Page
7.3 RSCP (MS5 lap 2)
Figure 7: RSCP.
15 |Page
7.4 EcIo (MS5 lap 2)
Figure 8: EcIo.
16 |Page
7.5 Pilot Pollution- Poss No Of AS Member>= 4, Assumed Reporting Range = 5 (dB) (MS3 lap
1)
17 |Page
7.6 3G PS DL throughput (MS2 lap 1)
18 |Page
7.7 3G PS UL throughput (MS6 lap 2)
19 |Page
8.Existing issues
20 |Page
8.1 Description issue no.1