PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ADF
ENGG CERT
MGB
ISSUED FOR 90% REVIEW
DESCRIPTION
DISCIPLINE
ENGINEER
VTN
ISSUED FOR 90 % REVIEW
12/16
DATE:
PROJECT
ENGINEER
MGB
12/16
DECEMBER 2016
DATE:
CERTIFIED
ADF
DATE:
CONSTRUCTION
AGENCY PREPARED BY:
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
TABLE OF CONTENTS
ADF
ENGG CERT
1 INTRODUCTION................................................................................................................4
MGB
2 REFERENCES...................................................................................................................5
ISSUED FOR 90% REVIEW
DATE:
5.5 Nozzles & Manways ............................................................................................................. 18
OPERATIONS
5.6 Piping ................................................................................................................................... 19
5.7 Instrumentation .................................................................................................................... 20
DATE:
5.8 Electrical .............................................................................................................................. 21
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
6.1 Pressure Testing .................................................................................................................. 24
8 TRAINING ........................................................................................................................24
14 APPENDIX-A ...................................................................................................................29
JO/EWO
15 APPENDIX-B ...................................................................................................................30
12/28/16
NO. DATE
REV
DISCIPLINE
ENGINEER
VTN
12/16
DATE:
PROJECT
ENGINEER
MGB
12/16
DATE:
CERTIFIED
ADF
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1 INTRODUCTION
This specification covers the minimum technical requirements for the design, engineering,
ADF
ENGG CERT
commissioning and performance guarantee of a Sales Gas Filtration System (SGFS) for the
new Cement Plant of Yamama Cement Company Ltd. This filtration system shall be installed
in the Yamama Gas Metering Station.
Yamama Gas Metering Station is composed of 20 main supply pipeline from Saudi
Aramco, EIV, Filtration System, Metering System, Gas Heating and Pressure Reducing
DESCRIPTION
Stations. The Filtration System shall be designed to remove particles greater than 1
micron from the sales gas stream.
The Yamama sales gas filtration facilities are required to remove the black powder from
sales gas delivered to YNP.
that the VENDORs design shall utilize a two-stage filtration system: The first stage can be
cyclonic to remove particles eight (8) microns and larger and the second stage can be
cartridge filtration to remove particles one (1) micron and larger. The frequency of
12/28/16
DATE
cartridge filter change shall be minimum six (6) months under design conditions. The
filtration system shall be designed considering the Process design parameters given in,
NO.
REV
Table T1 to T5 of section 5.1, and shall consist of two 100% capacity gas filtration units;
A
DATE:
12/16 The SGFS shall be equipped with a PLC system that shall be utilized to control and switch
PROJECT
ENGINEER
the filtration units as operating/ standby.
MGB
DATE:
12/16 These filters shall be located in Yamama Gas Metering Station. New sales gas filtration
CERTIFIED system shall be supplied by an approved Saudi Aramco Vendor. The Vendor shall be
ADF
responsible for the design, engineering, material procurement, fabrication, inspection,
DATE: transportation, site erection, testing & commissioning and performance guarantee of the
CONSTRUCTION
AGENCY
gas filtration system.
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
VENDOR means the company responsible for the design, fabrication, installation,
and testing of the new gas filtration system for which this specification is
applicable.
ADF
ENGG CERT
MGB
1.4.1 If any inconsistency or conflict exists between this specification, and other project
or SAUDI ARAMCO Engineering Standards, SAUDI ARAMCO Material System
Specifications, industry standards or drawings, the inconsistency shall be brought
ISSUED FOR 90% REVIEW
DISCIPLINE
ENGINEER
VTN
12/16
DATE:
PROJECT
2 REFERENCES
ENGINEER
MGB
12/16
The following Drawings, SAUDI ARAMCO Engineering Standards (SAES), SAUDI ARAMCO
DATE: Materials System Specification (SAMSS), Industry Codes and Standards referenced below
CERTIFIED
ADF shall form part of this specification:
DATE:
CONSTRUCTION
2.1 Drawings & Documents
AGENCY
DATE:
OPERATIONS
SK-A-YCC-002 Sht. 001 Piping and Instrument Diagram
SK-A-YCC-002 Sht. 002 Piping and Instrument Diagram
DATE:
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAES-A-202 Saudi Aramco Engineering Drawing Preparation
ADF
ENGG CERT
DATE:
12/16
SAES-J-003 Instrumentation - Basic Design Criteria
PROJECT
ENGINEER
MGB
SAES-J-004 Instrumentation Symbols and Identification
12/16
DATE:
CERTIFIED
ADF SAES-J-005 Instrumentation Drawings and Forms
DATE:
CONSTRUCTION SAES-J-200 Pressure
AGENCY
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAES-M-001 Structural Design Criteria for Non-Building Structures
ADF
ENGG CERT
SAES-P-111 Grounding
SAES-P-123 Lighting
DATE:
12/16 32-SAMSS-004 Manufacture of Pressure Vessels
PROJECT
ENGINEER
MGB 09-SAMSS-069 Qualification Requirements for Epoxy Coatings for Atmospheric
DATE:
12/16 Service
CERTIFIED
ADF
04-SAMSS-050 Gate Valves, Through Conduit Type, API SPEC 6D
DATE:
CONSTRUCTION
04-SAMSS-051 Ball Valves, API SPEC 6D
AGENCY
DATE:
09-SAMSS-071 Qualification Requirements for Inorganic Zinc Primer (APCS-17A)
OPERATIONS and (APCS-17B)
12-SAMSS-007 Fabrication of Structural and Miscellaneous Steel
DATE:
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
34-SAMSS-831 Instrumentation for Packaged Units
ADF
ENGG CERT
DISCIPLINE
ENGINEER
VTN
SAEP-302 Instructions for Obtaining a Waiver of a Mandatory Saudi Aramco
12/16 Engineering Requirement
DATE:
PROJECT SAEP-334 Retrieval, Certification and Submittal of Saudi Aramco Engineering and
ENGINEER
MGB Vendor Drawings
DATE:
12/16 SAEP-349 Advanced Process Control (APC) Systems
CERTIFIED
ADF
SAEP-358 Management of Technologically Enhanced Naturally Occurring
DATE:
Radioactive Material (NORM)
CONSTRUCTION
AGENCY
SAEP-3101 Equipment and Spare Parts Data Requirements for Contractor
Procured Equipment
DATE:
OPERATIONS
2.5 Saudi Aramco General Instructions
DATE:
G.I. 2.100 Work Permit System
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.6 Saudi Aramco Inspection Requirements
DATE:
12/16 175-043600 Inspection Requirements for Valves
CERTIFIED
ADF
2.1 Saudi Aramco Standard and Library Drawings
DATE:
CONSTRUCTION
AGENCY
AA-036322 Anchor Bolt Details
DATE:
AB-036386 Hardness Testing for Welding Procedure Qualifications
OPERATIONS
AE-036451 Pre-heat Levels for Welding Carbon Steel
DATE:
DD-950003 Manway Cover Detail for Pressure Vessel and Column
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
AD-036673 W.N. and Blind Flanges Large Size Class 600# R.F.
OF THIS DRAWING IS COVERED, FOR ALL
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AD-036981 Tolerances for Pressure Vessel
DATE:
12/16 ASME Sec. V Non-Destructive Examination
CERTIFIED
ADF
ASME Sec. VIII Division 1 Boiler & Pressure Vessel Code
DATE:
CONSTRUCTION
AGENCY
ASME 16.5 Pipe Flanges and Flange Fittings
DATE:
ASME 16.47 Large Diameter Steel Flanges
OPERATIONS
ASME SA-20 Specification for General Requirements for Steel Plates for Pressure
DATE:
Vessels
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
ASME Sec IIC Specification for Welding Rods, Electrodes and Filler Metals
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ASME B16.20 Metallic Gaskets for Pipe Flanges, Ring-Joint, Spiral-Wound and
Jacketed
ADF
ENGG CERT
ASCE 40262 Wind Loads and Anchor Bolt Design for Petrochemical Facilities
ISSUED FOR 90% REVIEW
PIP-STF05520 Details for Pipe Railing for Walking and Working Surfaces
12/28/16
DATE
3.2 After CONTRACTOR issues a contract to VENDOR for this portion of the work,
VENDOR shall immediately arrange to take on-stream samples of the black powder in
DATE:
BY:
the gas stream of EWRGD-1 pipeline at the take-off point for the design of the filtration
system. CONTRACTOR is advised that Saudi Aramco shall be taking on-stream black
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
powder measurements at the tie-in location (i.e, at the new scraper launcher area
OF THIS DRAWING IS COVERED, FOR ALL
located approximately @ KM 41 from the East West Pipeline Pump Station-3) and at
(DCC) NO. _____________________
the outlet of the new filtration system (located at the YNP Fuel Connection Facilities
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
area). The data (black powder loading and particle size distribution from these two
locations will be used to verify the design basis. The samples shall be analyzed by
VENDOR for particle size distribution for solids loading to confirm the design of SGFS
ADF
ENGG CERT
is adequate for the filter life of 6 months between filter changes (if the exercise has
MGB
already been done for the Aramco Filtration System design the same is to be
considered for this Yamama Filtration System design also).
3.3 VENDOR shall design, provide materials, fabricate and install the gas filtration system
that shall include, but not limited to, the following:
ISSUED FOR 90% REVIEW
3.3.1 Two (2) 100% capacity filtration streams (one operational and another standby).
The filtration process shall consist of two stages connected in series.
DESCRIPTION
3.3.1.1 cyclonic filtration vessel to remove particle sizes 8 microns and larger
3.3.1.2 cartridge filtration vessel to remove particles sizes 1 micron and larger
3.3.2 The new filtration vessels shall be complete with nozzles, manholes with davits,
bolts, gaskets, blinds, internals, cleats, lifting lugs, supports and other accessories.
3.3.3 Interconnecting piping (including filter inlet and outlet header and piping connecting
JO/EWO
the headers to the filters), valves, instruments, access and task lighting, structural
supports, access platforms, ladders, crossovers and accessories required for the
complete filtration systems. VENDOR and CONTRACTOR shall provide the plot
12/28/16
DATE
plan requirements for the layout and vessel sizes of the SGFS proposed by
VENDOR.
NO.
REV
DISCIPLINE
ENGINEER
VTN
3.3.4 The filter elements shall be removable type on a fixed tube sheet.
12/16
DATE:
PROJECT
ENGINEER
3.4 VENDOR shall submit a complete design package including, calculations, drawings and
MGB specifications for all parts of the filtration units including process & utilities, piping,
DATE:
12/16 mechanical, electrical, instrumentation, and civil/ structural details.
CERTIFIED
ADF
3.5 VENDORs proposed design shall consider ease of fabrication, transportation to site,
DATE: erection on site, operation and maintenance especially black powder removal from
CONSTRUCTION
AGENCY
cyclones and removal and installation of filtration cartridges.
DATE: 3.6 VENDOR shall provide control and monitoring philosophy, logic diagrams, ILD, ISS,
OPERATIONS SIS, PFD, and P&ID drawings and all design documents per SAEP-334 which are
required to implement the filtration system control and monitoring from XXX-PLC-XXXX
DATE: as well as monitoring and control as mentioned under section 3.1. VENDOR shall
conduct site verification to support the control and monitoring philosophy of the filtration
CONTROL NUMBER
VERIFICATION
system and, as minimum, to utilize XXX-PLC-XXXX (Filtration System PLC) and its
EDSD
3.7 VENDOR shall prepare and submit the Operation and Maintenance Manuals for
REVISIONCERTIFICATION
Manuals shall include the procedure of unloading, removal, storing and transporting of
A
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4 OPERATION & CONTROL REQUIREMENTS
The SGFS shall be designed for unattended operation when filtering the sales gas in
automatic mode and manned operation after switching from inline to offline for cleaning &
maintenance. YNP CCR shall receive status and alarm data from the SGFS XXX-PLC-
XXXX (Filtration System PLC) installed in Metering Building. YNP CCR shall have high
Filter DP monitoring facility and control & monitoring facilities of the MOVs via data sent
from the filtration system XXX-PLC-XXXX.
ISSUED FOR 90% REVIEW
YNP CCR shall also receive the following main information from SGFS:
DESCRIPTION
The control system shall manage the switch over from the active to the standby
filtration unit or to the SGFS bypass valve to ensure continuity of the gas flow to the YNP
12/28/16
DATE
Pressure Reducing Station-1. However, all switch over can be done manually also.
NO.
REV
No condition other than a switchover condition shall affect the active filtration unit while in
DISCIPLINE
ENGINEER
operation. In addition to high differential pressure across the filter and high level of powder
VTN in the bottom of the filter vessel, another switch over condition shall be the loss of control
DATE:
12/16
(loss of limit switch signal) of the inlet or outlet MOV on the active filtration unit or
PROJECT
ENGINEER activation of manual switchover.
MGB
DATE:
12/16 The HMI located inside the Local Control Building, shall display live information on the
CERTIFIED status of the SGFS and its main components, a journal of alarms, and historical trends for
ADF
the main parameters.
DATE:
CONSTRUCTION
AGENCY When a filtration unit has been removed from the stream for maintenance, this unit cannot
be placed on standby ready for use until the required maintenance is complete and the
DATE: operator confirms it is available from the HMI.
OPERATIONS
The SGFS can also be controlled either in Semi-Automatic or in Manual mode by the
DATE: Operations team. The Semi-Automatic mode is used for initial pressurization of each filter
train before they are put in Automatic mode and for the maintenance operations on one
CONTROL NUMBER
VERIFICATION
filter train whilst the other train is onstream and keeps being controlled by the PLC in
EDSD
HMI that will follow the logic imposed by the PLC. Any discrepancy will result in an alarm
REVISIONCERTIFICATION
In addition, the filter system shall have a soft emergency trip button located on the filter
(DCC) NO. _____________________
system safe location Human Machine Interface (HMI) panel which Loss Prevention
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Department of Saudi Aramco considers to comply with the requirements of SAES-B-058
for shutting down and isolating the sales gas filter systems. VENDOR shall participate in
HAZOP study to determine if it is recommended to automatically depressurize the filter
ADF
ENGG CERT
vessels in the event the trip button is activated. Required conditions to put one filtration
MGB
All motor operated valves (MOV) are in closed position except the filter outlet MOV
ISSUED FOR 90% REVIEW
bypass valve.
DESCRIPTION
When one filtration unit is on-stream, the second filtration unit will be assigned the
stand by status. The status of each filtration unit is shown on the HMI.
Maintenance operations shall be carried out manually. Manual mode shall be possible
either from HMI under the control of XXX-PLC-XXXX (Filtration System PLC) or by
switching an MOV to local mode from the local control panel located on the MOV actuator.
JO/EWO
From the HMI the operator shall be able to actuate one MOV at a time.
12/28/16
DATE
5 DESIGN REQUIREMENTS
NO.
REV
DISCIPLINE
ENGINEER
Design requirements of the SGFS shall include the process and mechanical design of the
VTN complete filtration system.
12/16
DATE:
PROJECT
ENGINEER
5.1 Process Design
MGB a. The proposed Sales Gas Filtration System design (cyclone in series with cartridge
DATE:
12/16 filters) shall be based on the process conditions specified below.
CERTIFIED
ADF
b. Table T1 below provides sales gas compositions while Tables T2, T3, T4 & T5
DATE: provide process parameters and design conditions.
CONSTRUCTION
AGENCY
Table T1: Sales Gas Composition (Volume %)
DATE:
OPERATIONS Butane
Molecular
Methane Ethane Propane & Nitrogen HHV
Weight
DATE: others
CONTROL NUMBER
17.61
mol % mol % mol % mol % mol % BTU/SCF
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Table T3: Black Powder Properties
Composition Hardness
ADF
ENGG CERT
By vendor By vendor
MGB
SAES-A-007
Impact at MDMT As per ASME Sec VIII
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
D-001
(DCC) NO. _____________________
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Notes:
1. Vendor to calculate the operating viscosity based on gas composition and
ADF
ENGG CERT
process parameters.
MGB
cartridges that meets the design objectives. Vendor to furnish the pressure drop
DESCRIPTION
at which the duty/ standby filter change-over will be effected as per his design.
4. Cartridge sizes shall be standardized for interchangeability, minimum inventory
and spare parts management.
5. Tag number is temporary. Final number will be assigned during review of
VENDOR drawings.
JO/EWO
VENDORs design of the SGFS shall incorporate the operating and maintenance
requirements below:
NO.
REV
DISCIPLINE
ENGINEER
a) The processes of filter replacement and black powder removal shall be quick, easy
VTN and safe.
12/16
DATE:
PROJECT
ENGINEER
b) Maintenance frequency shall be as long as possible. However, the minimum filter
MGB cartridge life shall be 6 months for replacing with new ones. VENDOR shall provide
DATE:
12/16 estimates for cartridge filter life based upon measured "Black Powder" loading levels
CERTIFIED determined during sampling of both normal flow conditions and during pipeline
ADF
scraping operations. VENDOR shall develop an algorithm and program into XXX-
DATE: PLC-000X (Filtration System PLC) to calculate remaining filter life based on actual
CONSTRUCTION
AGENCY
black powder loading conditions to date for a specific set of filters.
DATE: c) The SGFS shall provide for change-over of filter vessels based on conditions
OPERATIONS stipulated in paragraph 3.1 above. Replacement of filter cartridges and the removal
of black powder from vessels shall be performed manually.
DATE:
d) The instrumentation, event sequencing and change-over of filters will be monitored
CONTROL NUMBER
VERIFICATION
e) It is planned to use vacuum trucks for normal black powder removal from the cyclone
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
f) Water spray of black powder, nitrogen or air purge (during powder removal by
OF THIS DRAWING IS COVERED, FOR ALL
vacuum truck and during filter replacement) shall take place to ensure zero (0) LEL
(DCC) NO. _____________________
conditions. VENDOR shall supply all required attachments and connections inside
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and outside the filter vessels to easily perform these tasks. provide connection on
vent to flare line (sales gas depressurization) to check HC/O2 content using a
portable O2 HC device All interface points shall be at the filtration system edge with
ADF
ENGG CERT
safe access and clearance for utility tankers and vehicles. The amount, flow rate and
MGB
b) Independent utility lines will be supplied for each filter vessel and shall be terminated
DESCRIPTION
close to filtration system by CONTRACTOR (i.e. utilities for each vessel shall not
have a common header system serving both headers). VENDOR shall specify the
quantities of nitrogen, air and water and pressure required for complete filter
replacement and black powder removal processes.
c) Standby filtration unit shall be kept at line pressure with sales gas to ensure they are
ready for change-over.
PLC) & HMI SGFS. Signal exchange table between HMI and PLC for interfacing with
YNP CCR for the controls & monitoring as mentioned under section 3.1 shall be
provided by VENDOR, after receipt of pre-alarms status of black powder high level
12/28/16
DATE
and/or high filter differential pressure from XXX-PLC-XXXX (Filtration System PLC).
NO.
REV
e) The PLC controller, back-up operator interface HMI, HMI server, local control panel
DISCIPLINE
ENGINEER will be housed in a Metering Building fully equipped with DC and AC power systems
VTN
and UPS with 8 hours battery back-up.
12/16
DATE:
PROJECT
ENGINEER 5.3 Material Selection
MGB
12/16
DATE: Metallic materials required for filters, piping and structural steels on the system shall be in
CERTIFIED
ADF
accordance with the applicable data sheets and SA material specifications
DATE:
a) The filter vessels shall be designed, fabricated, tested and inspected in accordance
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Boiler and Pressure Vessel Code Section VIII Division I or Division II and this
OF THIS DRAWING IS COVERED, FOR ALL
Functional Specification.
(DCC) NO. _____________________
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
installation, operation and maintenance.
c) The cyclone portion shall be supplied with a collection chamber to allow discharge of
ADF
ENGG CERT
the separated and accumulated black powder particles. The cyclone portion shall be
designed with required valves and instruments for quick, safe and easy removal of
MGB
d) The filtration portion shall be equipped with a fixed tube sheet mounted with high
capacity removable filter media cartridges with graded pore structure depth to trap
contaminant particles 1 micron and larger. Waste volume shall be minimized by
ISSUED FOR 90% REVIEW
using fully disposable media. Metallic parts shall be permanent (not disposable). The
contaminant loading downstream of filter system shall not exceed 1 micron particles.
DESCRIPTION
e) Provision shall be made for water soaking of the black powder inside the vessels.
The nozzles shall be positioned such that they shall soak particles to avoid exposure
of Black Powder to air (cyclone sump and filter elements).
f) All vent valves on the vessels and interconnecting piping shall be connected to a
common header and routed to the filtration system limit. MOV vent valves shall be
equipped with safety interlocks to prevent valves from opening while there is
JO/EWO
h) The period between filter cartridge changes due to clogging must be as long as
practically possible but shall not be less than six (6) months. The filter elements shall
NO.
REV
DISCIPLINE be designed with a minimum 2 year service life if the maximum differential design
ENGINEER
VTN pressure is not reached.
12/16
DATE:
PROJECT i) VENDOR shall design lifting attachments. VENDOR shall also provide detailed
ENGINEER
MGB
transportation, lifting and on site erection procedures. VENDOR shall provide data
12/16 sheets, process and mechanical design calculations for review and approval.
DATE:
CERTIFIED
VENDOR design calculations shall prove structural integrity of the vessel and its
ADF supports.
DATE: 5.5 Nozzles & Manways
CONSTRUCTION
AGENCY
a) Adequate maintenance access shall be provided for filter system layout to ensure
access to vessel internal parts, valves, relief valves, gauges etc.
DATE:
OPERATIONS
b) The vessels shall be provided with circular manways to facilitate inspection,
maintenance, and installation and removal of the vessel internals. The manways
DATE:
shall be fabricated per ASME Section VIII D1 and 32-SAMSS-004.
CONTROL NUMBER
VERIFICATION
DATE:
d) Manways and inspection openings shall be Blind Flange with Davit type. All
BY:
removable internals shall be able to pass through the manway. VENDOR shall
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
design the filter replacement operation where confined space entries into the vessels
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
e) Minimum clear ways width of walking surfaces and access/egress of personnel for
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
operation/maintenance purposes need to be as per SAES-B-054, section 4
requirements.
ADF
ENGG CERT
f) All nozzles shall be flanged. Threaded, socket welded, seal welded connections shall
not be used.
MGB
g) Nozzles and manways shall be attached by welding completely through the total
thickness of the shell/ head including any reinforcement.
i) Flanges shall be weld neck RFSF per ASME B16.5 for flanges up to 24 NPS and
ASME B16.47A for flanges above 24 NPS. Flanges larger than 26 shall comply
with SAUDI ARAMCO Standard drawing AD-036673, sheet 1, rev 16.
k) Inlet and outlet valves to the SGFS shall be designed with spectacle blinds.
5.6 Piping
JO/EWO
b) All pipe, pipe fittings and valve materials shall be suitable for sales gas service.
NO.
REV
DISCIPLINE
c) All valves shall be in accordance with SAES-L-108 and applicable 04-SAMSS. The
ENGINEER
VTN
sizes of valves shall be specified by VENDOR based on final filtration system piping
12/16 sizes.
DATE:
PROJECT
ENGINEER d) Trim for all Valves upstream of cyclone shall be of AISI 410 Stainless Steel.
MGB
12/16
DATE: e) Utility piping shall be sloped back towards the filtration system edge interface points.
CERTIFIED
ADF If sloping is not possible drain connections shall be supplied.
DATE:
CONSTRUCTION
f) The minimum drain size for the cyclone filter vessel shall be 8-inch. Single drain full
AGENCY bore ball valve shall be provided in the cyclone filter drain line.
DATE:
g) Installation of drain, vent, or sample connection valves shall be in accordance with
OPERATIONS
Standard Drawing AC-036045.
DATE: h) All vent lines on inlet piping, outlet piping and vessels shall be connected to the
CONTROL NUMBER
i) Inlet and outlet piping shall be properly supported including the flanged connection
DATE:
between inlet piping and outlet piping connected to the filter vessels to prevent
BY:
binding of the flange connections for spectacle blinds when the filter vessels are out
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
of service.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
j) Vendor shall consider in his design the external forces and moments at inlet and
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
outlet flanges as given in ATTACHMENT- I.
ADF
ENGG CERT
5.7 Instrumentation
MGB
a) VENDOR shall provide the SGFS with complete instrumentation devices required to
operate the online and standby filter vessels manually including:
b) All MOVs and instruments shall be provided with signal cabling up to and including
instrument explosion proof junction boxes. VENDOR shall provide power cables and
NO.
REV
DISCIPLINE
conduits to the MOVs and will terminate them at the edge of filtration system .
ENGINEER
VTN
12/16
c) The instrumentation devices will be monitored / controlled from a dedicated PLC/HMI
DATE:
PROJECT
server to be located in the new Local Control Building. All significant filtration system
ENGINEER data points shall be transmitted back to YNP CCR for remote monitoring of filter
MGB
12/16
status, DPI across filter and control of MOVs (refer section 3.1). The point of
DATE:
interface to YNP CCR is through the Engineering Workstation Server to be provided
CERTIFIED
ADF by Sales Gas Metering Vendor and to be installed in the same Local Control
Building. Hardware or software and system configuration required to communicate
DATE:
CONSTRUCTION XXX-PLC-XXXX (Filtration System PLC) with Engineering Workstation Server and
AGENCY
YNP CCR shall be vendor scope. Vendor shall also update the Engineering
Workstation to provide Graphic Displays for SGFS.
DATE:
OPERATIONS
d) Signals that will be sent to YNP CCR shall include:
DATE:
Status of control mode (local or remote)
CONTROL NUMBER
VERIFICATION
Status of each filter vessel and position and control of the MOVs
EDSD
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
On-stream duration since the last time that black powder was drained for each
filter vessel
ADF
ENGG CERT
On-stream duration since the last filter element was replaced for each filter
MGB
Predicted remaining on-stream duration until the next black powder drain for
each filter vessel (by the PLC)
Predicted remaining on-stream duration until next filter element replacement for
ISSUED FOR 90% REVIEW
e) VENDOR shall supply the HMI as part of filtration system for operation and
maintenance use during maintenance, filter replacement, cleaning and sequencing.
HMI shall be with 20-inch color touch screen display.
f) HMI Graphics
MOVs shall show green when open, red when closed and yellow when traveling.
Process lines shall be color coded GREEN when open and flowing and RED when
JO/EWO
The color of water lines shall be BLUE, air lines WHITE and NITROGEN lines
12/28/16
DATE
CYAN or PURPLE.
NO.
REV
Each vessel, MOV, and instrument shall be shown with their specific tag number
A
DISCIPLINE
ENGINEER
VTN
5.8 Electrical
12/16
DATE:
PROJECT
The VENDOR shall provide and install electrical distribution system for the filtration
ENGINEER system and associated works that includes, but not limited to:
MGB
12/16
DATE:
CERTIFIED
ADF Power for the various equipment and appurtenances will be provided at 480VAC, 60
Hz, 3 PH or 230VAC, 60 Hz, 1 PH.
DATE:
CONSTRUCTION
AGENCY
Vendor shall provide the following but not limited to the following:
DATE:
OPERATIONS
Grounding for, equipment, steel platforms as per SAES-P-111.
All electrical installation work shall be carried out in compliance with the latest
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
Vendor shall provide suitable termination cabinets in the filtration system for
terminating power required for MOVs instruments, equipment and appurtenances.
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The VENDOR shall provide and install required power cables, conduits, cable
glands and other accessories for the various filtration system instruments,
ADF
ENGG CERT
All electrical materials used with in the filtration system shall suitable for area
classification Class 1 Zone 2 T3.
Filter vessels are designated as Fire Hazardous equipment. Fire proofing shall meet the
requirements of SAES-B-006. Accordingly, VENDOR shall furnish fire hazardous
DESCRIPTION
a) The ladders, cages, platforms and stairs shall meet the requirements of SAES-B-
054, PIP-STF05501, PIP-STF05511, PIP-STF05520 and PIP-STF05530.
NO.
REV
DISCIPLINE
b) The minimum width of clear area on platforms shall be 760mm, except for the
ENGINEER
VTN
unobstructed width of platforms in front of manways which shall not be less than
12/16 900mm.
DATE:
PROJECT
ENGINEER c) Platforms and stairs shall be made of galvanized steel bar grating. The galvanized
MGB
12/16
steel bar grating shall have a non-slip design.
DATE:
CERTIFIED
ADF d) Vehicle barriers shall be provided at the corners of the filter system structure, in front
of the SGFS utility connections and the corners of the outside shelter for HMI-2 and
DATE:
CONSTRUCTION
other areas designated by Loss Prevention Department.
AGENCY
5.11 Structural
DATE:
a) The gas filtering system structural steelworks shall be designed in accordance with
OPERATIONS
SAES-M-001, Structural Design Criteria for Non Building structures and 12-SAMSS-
007, Fabrication of Structural & Miscellaneous steel.
DATE:
CONTROL NUMBER
b) The filtration system framework shall be designed for all applicable loads/load
VERIFICATION
and hydrostatic testing with the vessels full of water without imposing undue
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
d) Wind loads shall be as per SAES-A-112, ASCE-7, ASCE 40262 and SABP-M-006.
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Wind load on steel structure shall be for open frame structures.
e) Suitable lifting lugs shall be provided on the vessels. VENDOR shall design the base
ADF
ENGG CERT
system. VENDOR shall show the location of center of gravity on the framework for
total lifted weight of the system on the project design drawings. VENDOR shall
provide location of anchor points and loading detail for design of the foundation.
SAES-Q-005 and appendix D of ACI 318-2008. Anchor bolt type and details shall
conform to SAUDI ARAMCO Standard Drawing AB-036322 Sht. 001. All anchor bolt
patterns to be located within a minimum tolerance of 1.5mm (1/16) both directions
within each pattern.
h) VENDOR shall supervise the detail design of the foundation for the filtration system
based on support reactions for all possible load combinations as outlined in SAES-
M-001 including, but not limited to, when filter vessels are full of water during
hydrostatic testing, when filters are empty and when they are full of black powder.
JO/EWO
DISCIPLINE
ENGINEER
VTN
a) Vendor shall comply fabrication requirements and PWHT in accordance with Saudi
12/16 Aramco standard 32-SAMSS-004. Welding requirements shall comply Saudi Aramco
DATE:
PROJECT
Engineering standard SAES-W-010, SAES-W-011 and SAES-W-012
ENGINEER
MGB
12/16
b) Fabrication shall not begin until the Contractor has received written approval from
DATE:
CERTIFIED
Company Representative of the detailed design and drawings, the Inspection and
ADF Test Plan (ITP) and WPS, PQR weld map, weld description sheet.
DATE:
CONSTRUCTION
c) All cold formed heads and toriconical transition sections shall be stress-relieved or
AGENCY
normalized before attachment to the shell.
DATE:
OPERATIONS
d) Hot-formed vessel sections shall be normalized and the normalizing treatment shall
be performed separately and not as part of the hot-forming process.
DATE: e) The qualification of welding procedures and qualification of welders and welding
CONTROL NUMBER
procedures, complete with qualification test records, shall be submitted for review
EDSD
fabrication as per requirements of SAES-W-010 clause 7.0 for WPS, PQR, weld map
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
f) Fabrication tolerances shall be in accordance with ASME Code and PIP VEFV1100.
(DCC) NO. _____________________
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
6 INSPECTION AND TESTING
a) After fabrication of the vessels and piping are completed and the vessel stress-
MGB
c) The minimum test water temperature and metal temperature shall be 17C.
d) After the final hydrostatic test, vessels shall be immediately drained, dried completely
and then sealed for internal corrosion protection.
VENDOR shall prepare the procedure for the Factory Acceptance Test (FAT) and Site
Acceptance Test (SAT) for the PLC (including control panel and local and remote HMIs), PLC
JO/EWO
software which shall be approved by Yamama Cement Company at least 30 days prior to the
schedule FAT or SAT dates. VENDOR shall clearly state his plan for performing Factory
Acceptance Test (FAT) and Site Acceptance Test (SAT) in his technical proposal his.
12/28/16
DATE
DISCIPLINE
ENGINEER
a) VENDOR shall guarantee the complete gas filtration system and accessories meet the
VTN
requirements of this specification.
12/16
DATE:
PROJECT
ENGINEER b) VENDOR shall conduct Site Acceptance Test (SAT) on completion of the commissioning
MGB of each system to prove the performance of the filtration system meets the requirements of
DATE:
12/16
this specification. VENDOR shall sample black powder upstream and downstream of each
CERTIFIED filter system for a period of one (1) month to ensure that VENDORs design meets the
ADF
performance criteria and projected filter life of 6 months before replacement.
DATE:
CONSTRUCTION
AGENCY
8 TRAINING
DATE:
OPERATIONS
Vendor shall prepare material and perform site training for an estimate 30 operations and
maintenance personnel.
DATE:
Training shall consists of reviewing the P&ID and logic diagrams, operation of the filter system
CONTROL NUMBER
VERIFICATION
instrument preventative maintenance schedules, etc), and PLC special training for Proponent
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.1 SURFACE PREPARATION AND PAINTING
Sharp edges including all welds, weld spatters and other projections anywhere on
MGB
the surface shall be ground smooth. Edges shall be with 1/8 minimum radius.
8.1.2 Painting
ISSUED FOR 90% REVIEW
Safety identification and colors shall comply with SAES-B-067. The water, steam,
air, and nitrogen lines shall be marked and color-coded as specified in SAES-L-
310.
ASME name plate stamping and other requirements for Vessels shall comply with
12/28/16
DATE
Vendor shall provide SS tags (showing Purchasers tag numbers) and name
NO.
REV
DISCIPLINE
plates attached to each piece of equipment including boxes, instruments and
ENGINEER
VTN
mechanical components as specified. All instruments shall have SS tags with full device
12/16
tag number engraved and affixed to the device.
DATE:
PROJECT
ENGINEER
MGB
9 DATA REQUIREMENT
12/16
DATE:
CERTIFIED 9.1.1 All documents required in SAUDI ARAMCO Non-Material Requirements (NMR)
ADF
forms and all documents and drawings listed below shall be provided for review
DATE: and approval by Yamama Cement Company.
CONSTRUCTION
AGENCY
9.1.2 CONTRACTOR and VENDOR shall be responsible for submittal of complete
DATE: documentation required for design, engineering, material procurement, fabrication,
OPERATIONS installation and testing of the filtration system which may require deliverables not
limited to the list below. All CAD drawings shall be in Autocad Format using SAUDI
DATE: ARAMCO drawing border frame including, but not limited to:
CONTROL NUMBER
VERIFICATION
9.1.3 Estimated filter system maintenance costs for one year assuming 1 draining and 1
EDSD
filter element replacement each filter unit (i.e. maintenance costs assuming both
filter units require draining and filter replacement over a one year period). Vendor
DATE:
BY:
shall provide details of the cost estimate broken down into labor description and
numbers, equipment description and numbers, number of days to drain each
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
consumables (Nitrogen & water), and spare parts used (gaskets, filter elements)
(DCC) NO. _____________________
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
9.1.4 P&ID (with Technical Proposal & Detail Design)
9.1.5 System Layout Drawing (with Technical Proposal & Detail Design)
ADF
ENGG CERT
9.1.6 System General Arrangement (with Technical Proposal & Detail Design)
MGB
9.1.9 Vessel Outline Drawing (with Technical Proposal & Detail Design)
DESCRIPTION
9.1.10 Vessel internals detail including filter clusters (with Technical Proposal & Detail
Design)
9.1.14 Vessel Calculations (basic with Technical Proposal & Detail Design)
JO/EWO
9.1.24 Structural calculations, which include base plate, anchor bolt size and numbers.
DATE: Calculations shall be submitted as hard copy and searchable pdf file. Electronic file
of structural analysis software shall be submitted (with Detail Design)
CONTROL NUMBER
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
9.1.29 For instrumentation design, should be per SAES-J-005, SAES-A-202, SAEP-334
(with Detail Design)
ADF
ENGG CERT
9.1.30 For electrical Design, should be per SAES-A-202, SAEP-334 and all basic
electrical design drawings and documents. (with Detail Design)
MGB
9.1.31 Filtration System layout drawing, piping plans and elevations, pipe stress analysis,
ASME pressure vessel calculations, quality plan, ITP and ladders& platform
drawings.
10 PREPARATION FOR SHIPMENT
ISSUED FOR 90% REVIEW
DESCRIPTION
Shipping preparation and packing requirements for filters and process piping shall comply with
32-SAMMS-004, section 19.
All Carbon Steel unmachined surfaces shall be painted and all machined surfaces coated with
a suitable rust preventative coating before shipment. No internal/ external painting or rust
preventative coating should be used on the stainless steel parts.
Spare parts and parts shipped loose shall be tagged with the vendors part numbers or item
numbers for easy identification.
The vendor shall protect his equipment during transportation, handling and storage against
outdoor conditions. Vendor shall provide and install all necessary bracing, supports, saddles
etc. to protect vessels from damage during loading, shipment and unloading. Preservatives for
JO/EWO
corrosion protection shall be used. The vendor shall clearly indicate on the shipping cases or
other packages the required storage conditions.
Vendor shall include along with the shipment of GOODS, signed release form (by COMPANY
12/28/16
DATE
authorized inspector).
NO.
REV
DISCIPLINE
ENGINEER 11 FIELD ERECTION
VTN
12/16
DATE:
PROJECT a) All components, including valves etc, shall be fit up preassembled (where possible) in
ENGINEER
MGB
the shop before shipping. The components may be disassembled for shipment by the
12/16 vendor. If disassembly is required, all components shall be labeled or marked by the
DATE:
CERTIFIED vendor for ease of reassembly on site. Vendor shall list these components and provide
ADF complete erection drawings which denote the piece number and location of each
DATE:
piece or section. The erection instructions shall be a clear step by step procedure
CONSTRUCTION reflecting the order of priority the pieces must be put together. The system shall be
AGENCY
provided in minimum number of (flanged) sections possible to minimize field welding.
DATE:
OPERATIONS b) Vendor shall design filtration system so that minimum site work and welding is
required. Vendor shall identify the site activities upfront in the project and provide field
execution plan for review and approval.
DATE:
CONTROL NUMBER
VERIFICATION
c) All components (including pipes, structural etc) of the package and auxiliaries will
EDSD
come with final paint (as required by Saudi Aramco standards and site conditions).
Field painting shall be limited to touch-up only, where damaged during transportation
DATE:
or erection.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
d) Vendor shall obtain all necessary permits per OWNERs site requirements including,
OF THIS DRAWING IS COVERED, FOR ALL
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
All necessary hot and cold work permits required for the work
Confined space entry permits.
ADF
ENGG CERT
e) Vendor shall be responsible for the mechanical completeness and turn over of the unit
MGB
in full compliance with the Standards, Codes, and Specifications listed in this
document.
During detail design, CONTRACTOR and VENDOR shall recommend a complete original
Spare Parts Data Package (SPDP) in accordance with SAUDI ARAMCO Engineering
DESCRIPTION
Procedure SAEP-3102.
13 NOZZLE LOADS
DISCIPLINE
ENGINEER
VTN
12/16
DATE:
PROJECT
ENGINEER
MGB
12/16
DATE:
CERTIFIED
ADF
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
14 APPENDIX-A
ADF
ENGG CERT
MGB
The VENDOR shall state in the following list all deviations to this document and Referenced
Standards, Specifications, Forms, Drawings and Codes. If no exception is taken to a specific
ISSUED FOR 90% REVIEW
document, then the VENDOR is deemed by the COMPANY to be in full compliance with that
Document
DESCRIPTION
DISCIPLINE
ENGINEER
VTN
12/16
DATE:
PROJECT
ENGINEER
MGB
12/16
DATE:
CERTIFIED
ADF
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
15 APPENDIX-B
ADF
ENGG CERT
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
FUNCTIONAL SPECIFICATION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION