Fier Thermal Power Plant Albania (Shutdown) is located at Fier, Fier, Albania. Location coordinates are: Latitude= 40.7009, Longitude= 19.5507.
infrastructure is of TYPE Oil Power Plant with a design capacity of 186 MWe. and the last in . It is operated by Korporata Elektroenergjitike Shqiptare (KESH).

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pound
MM=million
Identifiers for Oil

Country
GEO Assigned Select Currency
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification for data in this
and Impact Rating Identification
Number page
Number

Fier Thermal
Power Plant
Decommissioned 42696 Lek
Albania
(Shutdown)
Location

Heat Supply
Design Firm Capacity
Latitude: Longitude: This location is: Capacity Type of Plant
Capacity (MWe) (MWe) nbr
(MWth)

Sub-critical
40.7009 19.5507 Exact 186
Steam Turbine
Configuration
Short Power Plant of
Type of Fuel Primary Secondary Location
Description Used For Boiler/Turbine/
Gen

Shutdown April Fier, Fier,


Fuel Oil Base Load
2007 Albania
Description

Water
Electric Power Name of Withdrawal Cogen Mode:
Name/operator
Grid Connected SubStation Source of Oil Source of Water Rate at Full Steam Supplied
PPA(years)
To Connected To Power To
(cum/hour)

Korporata
Elektroenergjitike
National grid
Shqiptare
(KESH)
(Tonnes/hour) Environmental Capital Cost of and/or In US SOx Control
In Year (YYYY) If other, specify:
Description Issues Plant Dollars Device Type
Particulates(PM Date
NOx Control
If other, specify: ) Control Device If other, specify: nit # Capacity (MWe) Commissioned
Device Type
Type (yyyy-mm-dd)

1 12
2 12
3 25
4 25
5 25
6 60
Unit Information

Decommission Diesel Engine / Diesel Engine /


Turbine Turbine Generator Generator
Date (yyyy-mm- Boiler Boiler
Manufacturer Model/Type Manufacturer Model/Type
dd) Manufacturer Model/Type

2007-04 Chinese Chinese


2007-05 Chinese Chinese
2007-06 Chinese Chinese
2007-07 Chinese Chinese
2007-08 Chinese Chinese
2007-09 CKD Skoda Czech
Environmental Issues Past and Future Major U

Chimney Height Unit Efficiency


Issue 1 Description Upgrade 1
(m) (%)
Past and Future Major Upgrades Owner and Operator Information

Type of Construction/E
Cost Year Owner 1 % Share
Ownership PC Contractor
perator Information Comments

Operating Regulatory Project


Comment 1
Company Authority Financed By

Korporata
Elektroenergjitike
Shqiptare
(KESH)
References

http://www.narucpartnerships.org/Documents/Generation%20sources
%20and%20power%20sector%20infrastructure%20development%20in
%20Albania_Nashi_Eng.pdf and
http://en.wikipedia.org/wiki/Fier_Power_Station
http://seebusinessguides.com/alb_energy.html
ID

Notes
Abstract

TEC Vlora CCGT Power Plant Albania is located at 6 km NW of Vlore, Vlore, Albania. Location coordinates are: Latitude= 40.4874, Longitude= 19.434.
infrastructure is of TYPE Gas Power Plant with a design capacity of 97 MWe. It has 1 unit(s). The first unit was commissioned in 2011. It is operated by Korpo
Elektroenergjitike Shqiptare (KESH).

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pound
MM=million
Identifiers for Gas

Country
GEO Assigned Select Currency
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification for data in this
and Impact Rating Identification
Number page
Number

TEC Vlora
CCGT Power Operating Fully 42697 Lek
Plant Albania
Location

Heat Supply
Design Firm Capacity
Latitude: Longitude: This location is: Capacity Type of Plant
Capacity (MWe) (MWe) nbr
(MWth)

Combined Cycle
40.4874 19.434 Approximate 97
Gas Turbine
Configuration
Short Power Plant of
Type of Fuel Primary Secondary Location
Description Used For Boiler/Turbine/
Gen

6 km NW of
One 1+1+1
Distillate Oil Base Load Vlore, Vlore,
CCGT block
Albania
Description

Water
Electric Power Name of Withdrawal Cogen Mode:
Name/operator
Grid Connected SubStation Source of Oil Source of Water Rate at Full Steam Supplied
PPA(years)
To Connected To Power To
(cum/hour)

Korporata
Elektroenergjitike
National grid
Shqiptare
(KESH)
(Tonnes/hour) Environmental Capital Cost of and/or In US SOx Control
In Year (YYYY) If other, specify:
Description Issues Plant Dollars Device Type

200000000 2009
Particulates(PM Date
NOx Control
If other, specify: ) Control Device If other, specify: nit # Capacity (MWe) Commissioned
Device Type
Type (yyyy-mm-dd)

1 97 2011-11
Unit Information

Decommission
Turbine Turbine Generator Generator Boiler/HRSG Boiler/HRSG
Date (yyyy-mm-
Manufacturer Model/Type Manufacturer Model/Type Manufacturer Model/Type
dd)

Ansaldo Italy GT-1 V64.3A Ansaldo Italy Nooter


Environmental Issues Past and Future Major U

Chimney Height Unit Efficiency


Issue 1 Description Upgrade 1
(m) (%)
Past and Future Major Upgrades Owner and Operator Information

Type of Construction/E
Cost Year Owner 1 % Share
Ownership PC Contractor

Ansaldo, Maire
Tecnimont
perator Information Comments

Operating Regulatory Project


Comment 1
Company Authority Financed By

Korporata World Bank, the


Elektroenergjitike EBRD, and the
Shqiptare European
(KESH) Investment Bank
References

http://www.kesh.com.al/content.aspx?id=4&idd=28
http://www.industcards.com/cc-europe.htm
http://http://www.kesh.com.al/ (Annual report 2010)
ID

Notes
Abstract

Bitola Coal Power Plant Macedonia is located at Novaci, Bitola, Macedonia. Location coordinates are: Latitude= 41.058, Longitude= 21.4832. This infrastructu
of TYPE Coal Power Plant with a design capacity of 675 MWe. It has 3 unit(s). The first unit was commissioned in 1982 and the last in 1988. It is operated by M
and Power Company Bitola.

Oslomej Coal Power Plant Macedonia is located at Oslomej, Kicevo, Macedonia. Location coordinates are: Latitude= 41.5824, Longitude= 21.0006.
infrastructure is of TYPE Coal Power Plant with a design capacity of 125 MWe. It has 1 unit(s). The first unit was commissioned in 1980. It is operated by M
and Power Complex Oslomej.

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pound
MM=million
Identifiers for Coal

Country
GEO Assigned Select Currency
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification for data in this
and Impact Rating Identification
Number page
Number

Bitola Coal
Power Plant Operating Fully 42700 Denar
Macedonia

Oslomej Coal
Power Plant Operating Fully 42701 Denar
Macedonia
Location

Heat Supply
Design Firm Capacity
Latitude: Longitude: This location is: Capacity Type of Plant
Capacity (MWe) (MWe) nbr
(MWth)

Sub-critical
41,058 21,4832 Exact 675
Thermal

Sub-critical
41.5824 21.0006 Exact 125
Thermal
Configuration
Short Power Plant of
Type of Fuel Primary Secondary Location
Description Used For Boiler/Turbine/
Gen

produces about
Novaci, Bitola,
70% of national Coal Lignite Base Load
Macedonia
total

Oslomej, Kicevo,
Coal Lignite Base Load
Macedonia
Des

Water
Electric Power Name of Onsite Storage Withdrawal Onsite Storage
Name/operator
Grid Connected SubStation Source of Coal Capacity Rate at Full Capacity
PPA(years)
To Connected To (Tonnes) Power (Tonnes)
(cum/hour)

Adjacent
Nationa Grid Suvodol Lignite
mine

AD Elektrani na Adjacent
Nationa Grid Makedonia Oslomej-Zapad
(ELEM) Coal Mine
Description

Kilometers to
Name of Major Type of Cooling Source of Source of
Coal Mines Rate (cum/day) Rate (cum/day)
Mines System Cooling Water Makeup Water
(Average)

3 Heller cooling
towers
Water
Withdrawal Cogen Mode:
Environmental Capital Cost of and/or In US
Rate at Full Steam Supplied (Tonnes/hour) Description
Issues Plant Dollars
Power To
(cum/hour)
Particulates(PM
Mercury Control SOx Control NOx Control
In Year (YYYY) If other, specify: If other, specify: ) Control Device
Device Device Type Device Type
Type
Unit Informatio

Date Decommission
Boiler
If other, specify: nit # Capacity (MWe) Commissioned Date (yyyy-mm- Boiler Manufacturer
Model/Type
(yyyy-mm-dd) dd)

1 225 1982 Podoloski Russia P-65 700t/h

2 225 1984 Podoloski Russia P-65 700t/h

3 225 1988 Podoloski Russia P-65 700t/h

1 125 1980 Rafako Poland OB-380


Unit Information

Turbine Chimney Height Unit Efficiency


Turbine Manufacturer Generator Manufacturer Generator Model/Type
Model/Type (m) (%)

LMZ Russia K-210-130-3 Electrosila Russia TBB-200-2A

LMZ Russia K-210-130-3 Electrosila Russia TBB-200-2A

LMZ Russia K-210-130-3 Electrosila Russia TBB-200-2A

Zamech, Poland 13K-125 Zamech, Poland TGH-120


Environmental Issues Past and Future Major Upgrades

Issue 1 Description Upgrade 1 Cost

Reconstruction increased capacity


from 210 to 225 Mwe

Power Machines Russia to overhaul


and modernize the plant for Euro
55.9 million
jor Upgrades Owner and Operator Information

Type of Construction/E Operating


Year Owner 1 % Share
Ownership PC Contractor Company

1994 - 1994 Elektroproject,


AD Elektrani na Makedonia Mine and Power
Pelagonija-
(ELEM) Company Bitola
2009 - Skopje

Mine and Power


AD Elektrani na Makedonia
Complex
(ELEM)
Oslomej
mation

Regulatory Project
Authority Financed By
Comments

Comment 1

Suvodol is an open-pit mine equipped with three coal extraction systems (excavator,conveyer, spreader). The caloric value is about 7000-8000 kJ/kg.
generating unit consumes about 2 million tonnes of lignite per year.

Uses coal with an average calorie amount of 7600 kJ/kg


References

http://www.elem.com.mk/index.php?
option=com_content&view=article&id=121&Itemid=151&lang=en
http://www.industcards.com/st-coal-kosovo-macedonia.htm
http://www.elem.com.mk/index.php?
option=com_content&view=article&id=198&Itemid=166&lang=en (Annual Reports)

http://www.elem.com.mk/index.php?
option=com_content&view=article&id=122&Itemid=151&lang=en
http://www.industcards.com/st-coal-kosovo-macedonia.htm
http://www.elem.com.mk/index.php?
option=com_content&view=article&id=198&Itemid=166&lang=en (Annual Reports)
ID

Notes
Abstract

Negotino Thermal Power Plant Macedonia is located at Negotino, Macedonia. Location coordinates are: Latitude= 41.49205, Longitude= 22.09354.
infrastructure is of TYPE Oil Power Plant with a design capacity of 210 MWe. It has 1 unit(s). The first unit was commissioned in 1978.

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pound
MM=million
Identifiers for Oil

Country
GEO Assigned Select Currency
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification for data in this
and Impact Rating Identification
Number page
Number

Negotino Thermal
Power Plant Decommissioned 42702 Denar
Macedonia
Location

Heat Supply
Design Firm Capacity
Latitude: Longitude: This location is: Capacity Type of Plant
Capacity (MWe) (MWe) nbr
(MWth)

Sub-critical
41.49205 22.09354 210
Steam Turbine
Configuration
Short Power Plant of
Type of Fuel Primary Secondary Location
Description Used For Boiler/Turbine/
Gen

Needs Intermediate/Pea Negotino,


Heavy Fuel Oil
Rehabilitation k Load Macedonia
Description

Water
Electric Power Name of Withdrawal Cogen Mode:
Name/operator
Grid Connected SubStation Source of Oil Source of Water Rate at Full Steam Supplied
PPA(years)
To Connected To Power To
(cum/hour)

National grid
(Tonnes/hour) Environmental Capital Cost of and/or In US SOx Control
In Year (YYYY) If other, specify:
Description Issues Plant Dollars Device Type
Particulates(PM Date
NOx Control
If other, specify: ) Control Device If other, specify: Unit # Capacity (MWe) Commissioned
Device Type
Type (yyyy-mm-dd)

1 210 1978
Unit Information

Decommission Diesel Engine / Diesel Engine /


Turbine Turbine Generator Generator
Date (yyyy-mm- Boiler Boiler
Manufacturer Model/Type Manufacturer Model/Type
dd) Manufacturer Model/Type

2008
Environmental Issues Past and Future Major U

Chimney Height Unit Efficiency


Issue 1 Description Upgrade 1
(m) (%)
Past and Future Major Upgrades Owner and Operator Information

Type of Construction/E
Cost Year Owner 1 % Share
Ownership PC Contractor
perator Information Comments

Operating Regulatory Project


Comment 1
Company Authority Financed By

Plant not economically competitive to operate on fuel oil


References

http://www.ero-ks.org/GIS/Final_Appendix_8.pdf
ID

Notes
Abstract

TE-TO AD Skopje Thermal Power Plant Macedonia is located at Skopje, Macedonia. Location coordinates are: Latitude= 41.994474, Longitude= 21.452807. T
infrastructure is of TYPE Gas Turbine Combined Cycle Power Plant with a design capacity of 227 MWe. Power plant have 1 gas turbine with 1 HRSG and Ste
turbine with district heating system.

Kogel Sever Thermal Power Plant Macedonia is located at Skopje, Macedonia. Location coordinates are: Latitude= 42.008892, Longitude= 21.466676. This
infrastructure is of Reciprocating gas engines with a design capacity of 30 MWe. Power plant have 10 gas engines.

ELEM Energetika Thermal Power Plant Macedonia is located at Skopje, Macedonia. Location coordinates are: Latitude= 42.019346, Longitude= 21.465973. T
infrastructure is of Reciprocating gas engines with a design capacity of 30 MWe. Power plant have 10 gas engines with .

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pound
MM=million
Identifiers for Gas

Country
GEO Assigned Select Currency
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification for data in this
and Impact Rating Identification
Number page
Number

TE-TO AD
Operating Fully Denars
Skopje CCPP

Kogel Sever Operating Fully Denars

ELEM
Operating Fully Denars
Energetika
Location

Heat Supply
Design Firm Capacity
Latitude: Longitude: This location is: Capacity Type of Plant
Capacity (MWe) (MWe) nbr
(MWth)

Combined Cycle Gas


41,994474 21,452807 Exact 227 160
Turbine

30.41 13.58 Gas Engines

25 96 Sub-critical thermal
Configuration
Power Plant Used of
Short Description Type of Fuel Primary Secondary Location
For Boiler/Turbine/
Gen

Intermediate/Peak Skopje,
Natural Gas One 1+1+1
Load Macedonia

Total steam
Intermediate/Peak Skopje,
production 20 t/h Natural Gas 10 Gas engines
Load Macedonia
(12,96 Mwh)

Propane/Heavy Intermediate/Peak Skopje,


Natural Gas 3+2+2
Fuel Oil Load Macedonia
Description

Water
Electric Power Name of Withdrawal Cogen Mode:
Name/operator
Grid Connected SubStation Source of Oil Source of Water Rate at Full Steam Supplied
PPA(years)
To Connected To Power To
(cum/hour)

National Grid

Natural gas
National Grid
(from Russia)
(Tonnes/hour) Environmental Capital Cost of and/or In US SOx Control
In Year (YYYY) If other, specify:
Description Issues Plant Dollars Device Type
Particulates(PM Date
NOx Control
If other, specify: ) Control Device If other, specify: nit # Capacity (MWe) Commissioned
Device Type
Type (yyyy-mm-dd)

1 180.703

2 76
1 3.014 2011
2 3.014 2011
3 3.014 2011
4 3.014 2011
5 3.014 2011
6 3.014 2011
7 3.014 2011
8 3.014 2011
9 3.014 2011
10 3.014 2011

1 12.5 1967

2 12.5 1967
Unit Information

Decommission
Generator Generator
Date (yyyy-mm- Turbine Manufacturer Turbine Model/Type
Manufacturer Model/Type
dd)

Alstom GT13E2 MXL - 2002 Alstom 50WY21Z-095

Alstom Power Sp.z.o.o. Poland 8CK76 Alstom 50WX18Z-059


Jenbacher JMS 620 GS-N.LC Jenbacher
Jenbacher JMS 620 GS-N.LC Jenbacher
Jenbacher JMS 620 GS-N.LC Jenbacher
Jenbacher JMS 620 GS-N.LC Jenbacher
Jenbacher JMS 620 GS-N.LC Jenbacher
Jenbacher JMS 620 GS-N.LC Jenbacher
Jenbacher JMS 620 GS-N.LC Jenbacher
Jenbacher JMS 620 GS-N.LC Jenbacher
Jenbacher JMS 620 GS-N.LC Jenbacher
Jenbacher JMS 620 GS-N.LC Jenbacher

Jugoturbine Rade Koncar

Jugoturbine Rade Koncar


Environmental Issues

Boiler/HRSG Boiler/HRSG Chimney Height


Unit Efficiency (%) Issue 1
Manufacturer Model/Type (m)

Alstom India 60 36,4% (Total 82%)

43% (Total 80,5%)


43% (Total 80,5%)
43% (Total 80,5%)
43% (Total 80,5%)
43% (Total 80,5%)
43% (Total 80,5%)
43% (Total 80,5%)
43% (Total 80,5%)
43% (Total 80,5%)
43% (Total 80,5%)

TPK G32

TPK G32
nvironmental Issues Past and Future Major Upgrades

Description Upgrade 1 Cost Year


Owner and Operator Information

Type of Construction/E Operating Regulatory


Owner 1 % Share
Ownership PC Contractor Company Authority

TE-TO AD Skopje Private

Joint stock
Kogel Sever Doo Skopje
company

ELEM Pridruznica Energetika Government


Comments

Project
Comment 1
Financed By

From 1967 heavy fuel oil (mazut), in 2000 with Natural gas
References

http://www.moepp.gov.mk/wp-content/uploads/2014/10/Baranje%20za%20dobivanje%20%20A-Dozvo
ID

Notes
Abstract

Plomin Thermal Power Plant Croatia is located at Plomin luka 51, Istarska, Croatia. Location coordinates are: Latitude= 45.137, Longitude= 14.164.
infrastructure is of TYPE Coal Power Plant with a design capacity of 330 MWe. It has 2 unit(s). The first unit was commissioned in 1969 and the last in 2000.
operated by TE Plomin d.o.o..

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pound
MM=million
Identifiers for Coal

Country
GEO Assigned Select Currency
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification for data in this
and Impact Rating Identification
Number page
Number

Plomin Thermal
Power Plant Operating Fully 44820 Croatian Kuns
Croatia
Location

Heat Supply
Design Firm Capacity
Latitude: Longitude: This location is: Capacity Type of Plant
Capacity (MWe) (MWe) nbr
(MWth)

Sub-critical
45.137 14.164 Exact 330
Thermal
Configuration
Short Power Plant of
Type of Fuel Primary Secondary Location
Description Used For Boiler/Turbine/
Gen

Plomin luka 51,


Coal 2+2+2
Istarska, Croatia
Des

Water
Electric Power Name of Onsite Storage Withdrawal Onsite Storage
Name/operator
Grid Connected SubStation Source of Coal Capacity Rate at Full Capacity
PPA(years)
To Connected To (Tonnes) Power (Tonnes)
(cum/hour)

Longterm PPA
Imported via
National grid with Croatian
nearby coal port
Utility HEP
Description

Kilometers to
Name of Major Type of Cooling Source of Source of
Coal Mines Rate (cum/day) Rate (cum/day)
Mines System Cooling Water Makeup Water
(Average)

Seawater
Water
Withdrawal Cogen Mode:
Environmental Capital Cost of and/or In US
Rate at Full Steam Supplied (Tonnes/hour) Description
Issues Plant Dollars
Power To
(cum/hour)
Particulates(PM
Mercury Control SOx Control NOx Control
In Year (YYYY) If other, specify: If other, specify: ) Control Device
Device Device Type Device Type
Type
Unit Informatio

Date Decommission
Boiler
If other, specify: nit # Capacity (MWe) Commissioned Date (yyyy-mm- Boiler Manufacturer
Model/Type
(yyyy-mm-dd) dd)

1 120 1969 Sulzer

2 210 2000 Sulzer


Unit Information

Turbine Chimney Height Unit Efficiency


Turbine Manufacturer Generator Manufacturer Generator Model/Type
Model/Type (m) (%)

Zamach ST-1 Koncar 340

Jugo ST-2 Koncar 340


Environmental Issues Past and Future Major Upgrades

Issue 1 Description Upgrade 1 Cost


jor Upgrades Owner and Operator Information

Type of Construction/E Operating


Year Owner 1 % Share
Ownership PC Contractor Company

Hrvatska elektroprivreda 50%


(HEP) d.d. Joint Public
Private
TE Plomin d.o.o. 50%
mation

Regulatory Project
Authority Financed By
Comments

Comment 1
References

http://www.hep.hr/proizvodnja/en/basicdata/thermal/plomin.aspxhttp://www.rwe.com/web/cms/en/192
ID

Notes
Abstract

Jertovec CCGT Power Plant Croatia is located at Jertovec, Krapinsko-Zagorska, Croatia. Location coordinates are: Latitude= 46.0386, Longitude= 16.1814.
infrastructure is of TYPE Gas Power Plant with a design capacity of 78 MWe. It has 4 unit(s). The first unit was commissioned in 1975 and the last in 1956.
operated by Hrvatska elektroprivreda (HEP) d.d..

Osijek TE-TO CHP Power Plant Croatia is located at Martina Divalta 203, 31000 Osijek, Osjecko-Baranjska, Croatia. Location coordinates are: Latitude= 45.
Longitude= 18.7449. This infrastructure is of TYPE Gas Power Plant with a design capacity of 89 MWe. It has 3 unit(s). The first unit was commissioned in 1
and the last in 1985. It is operated by Hrvatska elektroprivreda (HEP) d.d..

Zagreb El-To CHP Power Plant Croatia is located at Grad Zagreb, Croatia. Location coordinates are: Latitude= 45.8069, Longitude= 15.9498. This infrastruc
is of TYPE Gas Power Plant with a design capacity of 86.8 MWe. It has 4 unit(s). The first unit was commissioned in 1970 and the last in 1998. It is operate
Hrvatska elektroprivreda (HEP) d.d..

Zagreb Te-To CHP Power Plant Croatia is located at Grad Zagreb, Croatia. Location coordinates are: Latitude= 45.7816, Longitude= 16.0169. This infrastruc
is of TYPE Gas Power Plant with a design capacity of 328 MWe. It has 6 unit(s). The first unit was commissioned in 1979 and the last in 2009. It is operate
Hrvatska elektroprivreda (HEP) d.d..

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pound
MM=million
Identifiers for Gas

Country
GEO Assigned Select Currency
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification for data in this
and Impact Rating Identification
Number page
Number

Jertovec CCGT
Power Plant Operating Fully 44825 Croatian Kuna
Croatia

Osijek TE-TO
CHP Power Operating Fully 44826 Croatian Kuna
Plant Croatia

Zagreb El-To
CHP Power Operating Fully 44824 Croatian Kuna
Plant Croatia

Zagreb Te-To
CHP Power Operating Fully 44823 Croatian Kuna
Plant Croatia
Location

Heat Supply
Design Firm Capacity
Latitude: Longitude: This location is: Capacity Type of Plant
Capacity (MWe) (MWe) nbr
(MWth)

Combined Cycle
46.0386 16.1814 Exact 78
Gas Turbine

OCGT and
45.542 18.7449 Exact 89 139
CCGT

Combined Cycle
45.8069 15.9498 Exact 86.8 439
Gas Turbine

Combined Cycle
45.7816 16.0169 Exact 328 740
Gas Turbine
Configuration
Short Power Plant of
Type of Fuel Primary Secondary Location
Description Used For Boiler/Turbine/
Gen

Jertovec,
Light Fuel Krapinsko- two 1+1+1
Natural Gas
Oil/Diesel Zagorska, CCGT blocks
Croatia

Martina Divalta
203, 31000 one 2+2+1
Natural Gas Fuel oil Osijek, Osjecko- CCGT. three
Baranjska, steam boilers
Croatia

Intermediate/Pea Grad Zagreb,


Natural Gas Fuel oil
k Load Croatia

One ST, one


2+2+1 CCGT,
Light Fuel Grad Zagreb,
Natural Gas Base Load one 1+1+1
Oil/Diesel Croatia
CCGT, four hot
water boilers
Description

Water
Electric Power Name of Withdrawal Cogen Mode:
Name/operator
Grid Connected SubStation Source of Oil Source of Water Rate at Full Steam Supplied
PPA(years)
To Connected To Power To
(cum/hour)

Hrvatska
National Grid Elektroprivreda
(HEP)

Hrvatska
National Grid Elektroprivreda
(HEP)

Industry,
National Grid Commercial and
Residential

Adjacent
National Grid Seva River
substation
(Tonnes/hour) Environmental Capital Cost of and/or In US SOx Control
In Year (YYYY) If other, specify:
Description Issues Plant Dollars Device Type

50

160
Particulates(PM Date
NOx Control
If other, specify: ) Control Device If other, specify: nit # Capacity (MWe) Commissioned
Device Type
Type (yyyy-mm-dd)

1 27.5 1975
2 10.5 1956
3 27.5 1975
4 10.5 1956
1 25 1976
2 25 1976

3 45 1985

1 11 1970
2 30 1980
3 23.9 1998
4 23.9 1998
1 120 1979
2 71 2003
3 71 2003
4 66 2003
5 75 2009
6 37 2009
Unit Information

Decommission
Turbine Turbine Generator Generator Boiler/HRSG Boiler/HRSG
Date (yyyy-mm-
Manufacturer Model/Type Manufacturer Model/Type Manufacturer Model/Type
dd)

GT-1
ST-1
GT-1
ST-1
GT-1
GT-2

ST-1

ST-1
ST-2
GT-1
GT-2
ST-1
GT-1
GT-2
ST-2
GT-3
ST-3
Environmental Issues Past and Future Major U

Chimney Height Unit Efficiency


Issue 1 Description Upgrade 1
(m) (%)

All units refurbished


Past and Future Major Upgrades Owner and Operator Information

Type of Construction/E
Cost Year Owner 1 % Share
Ownership PC Contractor

Hrvatska
2012 - 2013 elektroprivreda
(HEP) d.d.

Hrvatska
elektroprivreda Government
(HEP) d.d.

Hrvatska
elektroprivreda Government
(HEP) d.d.

Hrvatska
Elektroprojekt,
elektroprivreda Government
Parsons E&C
(HEP) d.d.
perator Information Comments

Operating Regulatory Project


Comment 1
Company Authority Financed By

Hrvatska
elektroprivreda The GT can operate in open mode
(HEP) d.d.

Hrvatska
elektroprivreda The GT can operate in open mode
(HEP) d.d.

Hrvatska
elektroprivreda
(HEP) d.d.

Hrvatska
elektroprivreda
(HEP) d.d.
References

http://www.hep.hr/proizvodnja/en/basicdata/thermal/jertovec.aspx

http://www.hep.hr/proizvodnja/en/basicdata/thermal/osijek.aspx

http://www.hep.hr/proizvodnja/en/basicdata/ther
mal/elto.aspx
http://www.industcards.com/st-other-croatia.htm
http://www.izvoznookno.si/Dokumenti/EU27-
projects%20background.pdf

http://www.hep.hr/proizvodnja/en/basicdata/ther
mal/teto.aspx
http://www.industcards.com/st-other-croatia.htm
ID

Notes
Abstract

Rijeka Thermal Power Plant Croatia is located at Southeast of Rijeka, Primorsko-Goranska, Croatia. Location coordinates are: Latitude= 45.2862, Longitu
14.5207. This infrastructure is of TYPE Oil Power Plant with a design capacity of 320 MWe. It has 1 unit(s). The first unit was commissioned in 1978. It is oper
by Hrvatska elektroprivreda (HEP) d.d..

Sisak Thermal Power Plant Croatia is located at Ulica brae Bobetko 40, 44010 Sisak, Sisacko-Moslavacka, Croatia. Location coordinates are: Latitude= 45.4
Longitude= 16.4144. This infrastructure is of TYPE Oil Power Plant with a design capacity of 420 MWe. It has 2 unit(s). The first unit was commissioned in 1
and the last in 1976. It is operated by HEP Proizvodnja d.o.o..

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pound
MM=million
Identifiers for Oil

Country
GEO Assigned Select Currency
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification for data in this
and Impact Rating Identification
Number page
Number

Rijeka Thermal
Power Plant Operating fully 44822 Croatian Kuna
Croatia

Sisak Thermal
Power Plant Operating fully 44821 Croatian Kuna
Croatia
Location

Heat Supply
Design Firm Capacity
Latitude: Longitude: This location is: Capacity Type of Plant
Capacity (MWe) (MWe) nbr
(MWth)

Sub-critical
45.2862 14.5207 Exact 320
Steam Turbine

Sub-critical
45.4538 16.4144 Exact 420
Steam Turbine
Configuration
Short Power Plant of
Type of Fuel Primary Secondary Location
Description Used For Boiler/Turbine/
Gen

Southeast of
Rijeka,
Peaking Load
Heavy Fuel Oil Primorsko-
and Backup
Goranska,
Croatia
Ulica brae
Bobetko 40,
44010 Sisak,
Oil Natural Gas
Sisacko-
Moslavacka,
Croatia
Description

Water
Electric Power Name of Withdrawal Cogen Mode:
Name/operator
Grid Connected SubStation Source of Oil Source of Water Rate at Full Steam Supplied
PPA(years)
To Connected To Power To
(cum/hour)

National Grid

National Grid Sava River


(Tonnes/hour) Environmental Capital Cost of and/or In US SOx Control
In Year (YYYY) If other, specify:
Description Issues Plant Dollars Device Type
Particulates(PM Date
NOx Control
If other, specify: ) Control Device If other, specify: Unit # Capacity (MWe) Commissioned
Device Type
Type (yyyy-mm-dd)

1 320 1978

1 210 1970

2 210 1976
Unit Information

Decommission Diesel Engine / Diesel Engine /


Turbine Turbine Generator Generator
Date (yyyy-mm- Boiler Boiler
Manufacturer Model/Type Manufacturer Model/Type
dd) Manufacturer Model/Type

Waagner-Biro Ansaldo ST-1 Ansaldo

Podoloski LMZ Russia ST-1 Kharkov

Podoloski LMZ Russia ST-2 Kharkov


Environmental Issues Past and Future Major U

Chimney Height Unit Efficiency


Issue 1 Description Upgrade 1
(m) (%)

250
Past and Future Major Upgrades Owner and Operator Information

Type of Construction/E
Cost Year Owner 1 % Share
Ownership PC Contractor

Hrvatska
elektroprivreda Government Ansaldo
(HEP) d.d.

Hrvatska elektroprivreda (HEP) d.d. Government


perator Information Comments

Operating Regulatory Project


Comment 1
Company Authority Financed By

Hrvatska
elektroprivreda
(HEP) d.d.

HEP Proizvodnja A 240MW (160+80) CCGT unit is under construction by


d.o.o. Technopromexport
References

http://www.hep.hr/proizvodnja/en/basicdata/thermal/rijeka.aspx
http://www.industcards.com/st-other-croatia.htm
http://en.wikipedia.org/wiki/TE_Rijeka

xhttp://www.hep.hr/proizvodnja/en/basicdata/thermal/sisak.aspx
http://www.industcards.com/st-other-croatia.htm
http://www.power-m.ru/es/press/news.aspx?news=2281
ID

Notes
Abstract

Ljubljana (TE-TOL) Coal CHPP Slovenia is located at Osrednjeslovenska, Slovenia. Location coordinates are: Latitude= 46.058, Longitude= 14.5451.
infrastructure is of TYPE Coal Power Plant with a design capacity of 124 MWe. It has 3 unit(s). The first unit was commissioned in 1966 and the last in 1984.
operated by Termoelektrarna Toplarna Ljubljana, d.o.o..

Sostanj (TES) Coal Power Plant Slovenia is located at Cesta Lole Ribarja 18, 3310, Sostanj, Slovenia. Location coordinates are: Latitude= 46.3723, Longitu
15.0534. This infrastructure is of TYPE Coal Power Plant with a design capacity of 695 MWe. It has 7 unit(s). The first unit was commissioned in 1956 and the
in 2008. It is operated by Termoelektrarna Sostanj d.o.o..

Trbovlje (TES) Coal Power Plant Slovenia is located at Trbovjle, Zasavska. Location coordinates are: Latitude= 46.1258, Longitude= 15.06114. This infrastruc
is of TYPE Coal Power Plant with a design capacity of 125 MWe. It has 1 unit(s). The first unit was commissioned in 1966. It is operated by Termoelektra
Trbovlje, d.o.o..

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pound
MM=million
Identifiers for Coal

Country
GEO Assigned Select Currency
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification for data in this
and Impact Rating Identification
Number page
Number

Ljubljana (TE-
TOL) Coal CHPP Operating fully 41126 Euro
Slovenia

Sostanj (TES)
Coal Power Operating fully 41125 Euro
Plant Slovenia

Trbovlje (TES)
Coal Power Operating fully 41124 Euro
Plant Slovenia
Location

Heat Supply
Design Firm Capacity
Latitude: Longitude: This location is: Capacity Type of Plant
Capacity (MWe) (MWe) nbr
(MWth)

Sub-critical
46.058 14.5451 Exact 124 340
Thermal

Sub-critical
46.3723 15.0534 Exact 695
Thermal

Sub-critical
46.1258 15.06114 Exact 125
Thermal
Configuration
Short Power Plant of
Type of Fuel Primary Secondary Location
Description Used For Boiler/Turbine/
Gen

Coal

Cesta Lole
Ribarja 18, 3310,
Coal Lignite Natural Gas
Sostanj,
Slovenia

Trbovjle,
Lignite Natural Gas
Zasavska
Des

Water
Electric Power Name of Onsite Storage Withdrawal Onsite Storage
Name/operator
Grid Connected SubStation Source of Coal Capacity Rate at Full Capacity
PPA(years)
To Connected To (Tonnes) Power (Tonnes)
(cum/hour)

Imported Coal
from Indonesia

Lignite from
National Grid
Velenje

Zasavje Coal
Mines
Description

Kilometers to
Name of Major Type of Cooling Source of Source of
Coal Mines Rate (cum/day) Rate (cum/day)
Mines System Cooling Water Makeup Water
(Average)

Adjacent canal

Premogovnik Sostansko
Velenje Jezero

Sava River
Water
Withdrawal Cogen Mode:
Environmental Capital Cost of and/or In US
Rate at Full Steam Supplied (Tonnes/hour) Description
Issues Plant Dollars
Power To
(cum/hour)
Particulates(PM
Mercury Control SOx Control NOx Control
In Year (YYYY) If other, specify: If other, specify: ) Control Device
Device Device Type Device Type
Type
Unit Informatio

Date Decommission
Boiler
If other, specify: Unit # Capacity (MWe) Commissioned Date (yyyy-mm- Boiler Manufacturer
Model/Type
(yyyy-mm-dd) dd)

1 42 1966

2 32 1966

3 50 1966

1 1956 3/31/2010
2 1956 2008
3 1960
4 1973
5 1/27/1978
6 2008
7 2008

1 125 1966 Rafako


Unit Information

Turbine Chimney Height Unit Efficiency


Turbine Manufacturer Generator Manufacturer Generator Model/Type
Model/Type (m) (%)

ST-1
ST-2
ST-3
ST-4
ST-5

Zamech Dolmel 360


Environmental Issues Past and Future Major Upgrades

Issue 1 Description Upgrade 1 Cost

modernized in 1999 and upgraded


by 2014 to increase efficiency and
fire biofuel
jor Upgrades Owner and Operator Information

Type of Construction/E Operating


Year Owner 1 % Share
Ownership PC Contractor Company

64,57 %
Government Slovenian
Termoelektrarna
Government Toplarna
Ljubljana, d.o.o.
City of Ljubljana
35,43 %

Termoelektrarna Sostanj Joint Stock Termoelektrarna


d.o.o. (TES) Company Sostanj d.o.o.

Termoelektrarna Trbovlje, Joint Stock Termoelektrarna


d.o.o. Company Trbovlje, d.o.o.
mation

Regulatory Project
Authority Financed By
Comments

Comment 1

Annual average from 1996-2007 is Heat 1095 GWh; Electricity 400 GWh; Coal consumption: 480000 tons

Since 2002 use Indonesian coal with high calorific value and very low sulfur content (less than 0.2%) and ash (1-3%). Use 8% woodchips since 2008

Average annual electricity production ranges between 3500 and 3800 GWh. Average annual production of thermal energy for district heating Salek Valley is
- 450 GWh. For such an annual production of electricity and thermal energy is consumed between 3.5 and 4.2 million tons of coal and about 60 MMSCM of na
gas.

A high efficiency 600 MWe unit will replace existing units and become operation in 2014

The plant also has 2 gas units of 42 MWe (units 6 and 7)

Average annual consumption of coal in the period 2003 to 2010 amounted to 4,100 thousand tonnes

The steam unit was modernized in 1999 and the site also hosts two 32-MW combustion turbines
References

http://www.te-tol.si/

http://prtr.ec.europa.eu/FacilityLevels.aspx

http://www.industcards.com/st-coal-slovenia.htm

http://www.te-sostanj.si/
http://prtr.ec.europa.eu/FacilityLevels.aspx
http://www.te-sostanj.si/en/presentation/tes-in-slovenia

http://www.tet.si http://www.tet.si/si/elektricna-energija/proizvodni-rezultati/
http://www.industcards.com/st-coal-slovenia.htm
http://www.tet.si/si/o-podjetju/razvojni-projekti/
http://prtr.ec.europa.eu/FacilityLevels.aspx
ID

Notes
Abstract

Gacko Coal CHP Power Plant Bosnia and Herzegovina is located at Gacko, Srpska, Bosnia and Herzegovina. Location coordinates are: Latitude= 43.1
Longitude= 18.5128. This infrastructure is of TYPE Coal Power Plant with a design capacity of 300 MWe. It has 1 unit(s). The first unit was commissioned in 1
It is operated by Elektroprivreda Republike Srpske.

Kakanj CHP Power Plant Bosnia and Herzegovina is located at Kakanj, Federation of Bosnia and Herzegovina, Bosnia and Herzegovina. Location coordin
are: Latitude= 44.08988, Longitude= 18.11426. This infrastructure is of TYPE Coal Power Plant with a design capacity of 450 MWe. It has 7 unit(s). The first
was commissioned in 1956 and the last in 1988. It is operated by JP Elektroprivreda BiH.

Tuzla CHP Power Plant Bosnia and Herzegovina is located at Tuzla, Federation of Bosnia and Herzegovina, Bosnia and Herzegovina. Location coordinates
Latitude= 44.5215, Longitude= 18.6056. This infrastructure is of TYPE Coal Power Plant with a design capacity of 730 MWe. It has 6 unit(s). The first unit
commissioned in 1963 and the last in 1978. It is operated by JP Elektroprivreda BiH.

Ugljevik CHP Coal Power Plant Bosnia and Herzegovina is located at Ugljevik, Srpska, Bosnia and Herzegovina. Location coordinates are: Latitude= 44.6
Longitude= 18.9671. This infrastructure is of TYPE Coal Power Plant with a design capacity of 300 MWe. It has 1 unit(s). The first unit was commissioned in 1
It is operated by Elektroprivreda Republike Srpske.

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pound
MM=million
Identifiers for Coal

Country
GEO Assigned
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification
and Impact Rating Identification
Number
Number

Gacko Coal CHP Power Plant Bosnia


Operating fully 44793
and Herzegovina

Kakanj CHP Power Plant Bosnia and


Operating fully 44792
Herzegovina

Tuzla CHP Power Plant Bosnia and


Operating fully 44791
Herzegovina

Ugljevik CHP Coal Power Plant Bosnia


Operating fully 44794
and Herzegovina
Location

Select Currency Heat Supply


Design Firm Capacity
for data in this Latitude: Longitude: This location is: Capacity
Capacity (MWe) (MWe) nbr
page (MWth)

Convertible Marks 43.1724 18.5128 Exact 300 276

Convertible Marks 44.08988 18.11426 Exact 450 398

Convertible Marks 44.5215 18.6056 Exact 730

Convertible Marks 44.6829 18.9671 Exact 300 279


Short Power Plant
Type of Plant Type of Fuel Primary Secondary
Description Used For

Super-critical
Coal Lignite Base Load
Thermal

Sub-critical
Coal Brown Base Load
Thermal

Sub-critical
Coal Lignite Base Load
Thermal

Super-critical
Coal Lignite Base Load
Thermal
Configuration
Electric Power
of
Location Grid Connected
Boiler/Turbine/
To
Gen

Gacko, Srpska, Bosnia and Herzegovina National Grid

Kakanj, Federation of Bosnia and Herzegovina, Bosnia and Herzegovina National Grid

Tuzla, Federation of Bosnia and Herzegovina, Bosnia and Herzegovina National Grid

Ugljevik, Srpska, Bosnia and Herzegovina National Grid


Description

Water
Name of Onsite Storage Withdrawal Onsite Storage Kilometers to
Name/operator
SubStation Source of Coal Capacity Rate at Full Capacity Coal Mines
PPA(years)
Connected To (Tonnes) Power (Tonnes) (Average)
(cum/hour)

Adjacent
opencast lignite 2
mine Gracanica

Central Bosnia
coal basin

coal basin Kreka


- Banovii

Adjacent
opencast and
underground 5
lignite mine
Ugljevik
Water
Withdrawal
Name of Major Type of Cooling Source of Source of
Rate (cum/day) Rate (cum/day) Rate at Full
Mines System Cooling Water Makeup Water
Power
(cum/hour)

Gracanica

Bosna River Bosna River

Ugljevik Cooling Tower Ugljevik River Ugljevik River


Cogen Mode:
Environmental Capital Cost of and/or In US
Steam Supplied (Tonnes/hour) Description In Year (YYYY)
Issues Plant Dollars
To

Industry,
towns of Tuzla
Commercial and
and Lukavac
Residential
Particulates(PM
Mercury Control SOx Control NOx Control
If other, specify: If other, specify: ) Control Device If other, specify:
Device Device Type Device Type
Type
Unit Information

Date Decommission
Boiler
Unit # Capacity (MWe) Commissioned Date (yyyy-mm- Boiler Manufacturer
Model/Type
(yyyy-mm-dd) dd)

1 300 1983 Podoloski

1 32 1956 1997
2 32 1956 1997
3 32 1960 1997
4 32 1960 1997
5 110 1969 Timace
6 110 1977 Timace
7 230 1988 Timace
1 32 1963 2005
2 32 1964 2005
3 100 1966
4 200 1971
5 200 1974
6 230 1978

1 300 1985 Podolski


Unit Information

Turbine Chimney Height Unit Efficiency


Turbine Manufacturer Generator Manufacturer Generator Model/Type
Model/Type (m) (%)

LMZ Russia ST-1 Electrosila 160

ST-1
ST-2
ST-3
ST-4
Skoda ST-5 Koncar
Skoda ST-6 Koncar
Skoda ST-7 Koncar 300
ST-1
ST-2
ST-3 100
ST-4 165
ST-5 165
ST-6 165

LMZ Russia ST-1 Electrosila 310


Environmental Issues Past and Future Major Upgrades

Issue 1 Description Upgrade 1 Cost

Reconstruction and modernization of


Units 5 and 6 (110 MW), Partial
reconstruction of Unit 7 (230 MW)

Rehabilitation and modernization of


Unit 3 (100 MW) and Unit 4 (200
MW) Revitalization of Unit 5 (200
MW) Revitalization Unit 6 (200 to
230) MW
jor Upgrades Owner and Operator Information

Type of Construction/E Operating


Year Owner 1 % Share
Ownership PC Contractor Company

Elektroprivreda
Elektroprivreda Republike Tehnograd,
100% Government Republike
Srpske Termoelektro
Srpske

JP
JP Elektroprivreda BiH Elektroprivreda
BiH

JP
JP Elektroprivreda BiH Elektroprivreda
BiH

Elektroprivreda
Elektroprivreda Republike
100% 100 Republike
Srpske
Srpske
mation

Regulatory Project
Authority Financed By
Comments

Comment 1

burns about 1.8mn tpy of lignite

In Dec 2006, CEZ signed an agreement to invest up to 1.5bn in a 51% stake in a new company to build a second unit at Gacko and complete mine upgrade
expansion

Annual generation of electricity about 2300 GWh and Annual coal consumption - about 1.8 million tons

Annual generation about 3100 GWh and coal consumption about 3.3 million tons of coal

Average annual production 1560 GWh


References

http://www.ers.ba/index.php?
option=com_content&view=article&id=7%3Arite-gacko&Itemid=26&lang=ba
http://www.energy-community.org/pls/portal/docs/85835.PDF
http://www.industcards.com/st-coal-bosnia-montenegro.htm

http://www.elektroprivreda.ba/eng/page/tpp-kakanj
http://www.energy-community.org/pls/portal/docs/85835.PDF
http://www.industcards.com/st-coal-bosnia-montenegro.htm
http://en.wikipedia.org/wiki/Thermal_Power_Station_Kakanj,_Catici

http://www.elektroprivreda.ba/eng/page/tpp-tuzlahttp://www.energy-community.org/pls/portal/docs/85835.PDFhttp://uk.reuters.com/article/2

http://www.ers.ba/index.php?
option=com_content&view=article&id=47%3Ariteugljevik&Itemid=78&lang=
ba
http://www.energy-community.org/pls/portal/docs/85835.PDF
http://www.industcards.com/st-coal-bosnia-montenegro.htm
http://en.wikipedia.org/wiki/List_of_power_stations_in_Bosnia-Herzegovina
ID

Notes
Abstract

Pljevlja Coal Power Plant Montenegro is located at Pljevlja, Pljevlja, Montenegro. Location coordinates are: Latitude= 43.3342, Longitude= 19.3271.
infrastructure is of TYPE Coal Power Plant with a design capacity of 218.5 MWe. It has 1 unit(s). The first unit was commissioned in 1982. It is operated
Elektroprivreda Crne Gore AD Niksic (EPCG).

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pound
MM=million
Identifiers for Coal

Country
GEO Assigned Select Currency
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification for data in this
and Impact Rating Identification
Number page
Number

Pljevlja Coal
Power Plant Operating Fully 42685 Euro
Montenegro
Location

Heat Supply
Design Firm Capacity
Latitude: Longitude: This location is: Capacity Type of Plant
Capacity (MWe) (MWe) nbr
(MWth)

Sub-critical
43.3342 19.3271 Exact 218.5
Thermal
Configuration
Short Power Plant of
Type of Fuel Primary Secondary Location
Description Used For Boiler/Turbine/
Gen

Russian design Coal Sub- Pljevlja, Pljevlja,


Base Load
and built bituminous Montenegro
Des

Water
Electric Power Name of Onsite Storage Withdrawal Onsite Storage
Name/operator
Grid Connected SubStation Source of Coal Capacity Rate at Full Capacity
PPA(years)
To Connected To (Tonnes) Power (Tonnes)
(cum/hour)

Elektroprivreda
Crne Gore AD
Niksic (EPCG)
Description

Kilometers to
Name of Major Type of Cooling Source of Source of
Coal Mines Rate (cum/day) Rate (cum/day)
Mines System Cooling Water Makeup Water
(Average)

Otilovici
Reservoir of 18
3 Million cum 8 km
away on river
Cehotina
Water
Withdrawal Cogen Mode:
Environmental Capital Cost of and/or In US
Rate at Full Steam Supplied (Tonnes/hour) Description
Issues Plant Dollars
Power To
(cum/hour)
Particulates(PM
Mercury Control SOx Control NOx Control
In Year (YYYY) If other, specify: If other, specify: ) Control Device
Device Device Type Device Type
Type
Unit Informatio

Date Decommission
Boiler
If other, specify: Unit # Capacity (MWe) Commissioned Date (yyyy-mm- Boiler Manufacturer
Model/Type
(yyyy-mm-dd) dd)

1 210 10/21/1982 Podoloski


Unit Information

Turbine Chimney Height Unit Efficiency


Turbine Manufacturer Generator Manufacturer Generator Model/Type
Model/Type (m) (%)

LMZ Electrosila Russia 250


Environmental Issues Past and Future Major Upgrades

Issue 1 Description Upgrade 1 Cost

Refurbishment of plant and


reconstruction of turbine
jor Upgrades Owner and Operator Information

Type of Construction/E Operating


Year Owner 1 % Share
Ownership PC Contractor Company

Elektroprivreda
2009 - 2010 Crne Gore AD
Niksic (EPCG)
mation

Regulatory Project
Authority Financed By
Comments

Comment 1

Uses a Heller cooling tower


References

http://www.epcg.co.me/en01_04_02_03.html
http://en.wikipedia.org/wiki/Pljevlja_Power_Station and
http://www.industcards.com/st-coal-bosnia-montenegro.htm
http://www.ifandp.com/article/004802.html
ID

Notes
Abstract

Kosovo A Coal Power Plant Kosovo is located at Pristina, Kosovo. Location coordinates are: Latitude= 42.67675, Longitude= 21.0867. This infrastructure
TYPE Coal Power Plant with a design capacity of 800 MWe. It has 5 unit(s). The first unit was commissioned in 1962 and the last in 1975. It is operated
Korporata Elektroenergjetike e Kosoves (KEK).

Kosovo B Coal Power Plant Kosovo is located at Kastriot, Pristina, Kosovo. Location coordinates are: Latitude= 42.69374, Longitude= 21.05695.
infrastructure is of TYPE Coal Power Plant with a design capacity of 678 MWe. It has 2 unit(s). The first unit was commissioned in 1983 and the last in 1984.
operated by Korporata Elektroenergjetike e Kosoves (KEK).

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pound
MM=million
Identifiers for Coal

Country
GEO Assigned Select Currency
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification for data in this
and Impact Rating Identification
Number page
Number

Loe Efficiency
Kosovo A Coal
Operating and High
Power Plant 42698 Euro
Partially Environmental
Kosovo
Impact

Kosovo B Coal
Power Plant Operating Fully 42699 Euro
Kosovo
Location

Heat Supply
Design Firm Capacity
Latitude: Longitude: This location is: Capacity Type of Plant
Capacity (MWe) (MWe) nbr
(MWth)

Sub-critical
42.67675 21.0867 Exact 800 230
Thermal

Sub-critical
42.69374 21.05695 Exact 678 500
Thermal
Configuration
Short Power Plant of
Type of Fuel Primary Secondary Location
Description Used For Boiler/Turbine/
Gen

Damaged in war
years and
Coal Lignite Base Load Pristina, Kosovo
neglected over
time

Damaged in war
years and Kastriot, Pristina,
Coal Lignite Base Load
neglected until Kosovo
refurbishment
Electric Power Name of
Name/operator
Grid Connected SubStation Source of Coal
PPA(years)
To Connected To

Adjacent Sibovc Lignite Field (Mirash (1958) and Bardh (1969) open-pit
National Grid
mines in Kosovo Basin)

Korporata
Elektroenergjetik Adjacent Sibovc Lignite Field (Mirash (1958) and Bardh (1969) open-pit
National Grid
e e Kosoves mines in Kosovo Basin)
(KEK)
Description

Water
Onsite Storage Withdrawal Onsite Storage Kilometers to
Name of Major Type of Cooling Source of
Capacity Rate at Full Capacity Coal Mines
Mines System Cooling Water
(Tonnes) Power (Tonnes) (Average)
(cum/hour)

3
Water
Withdrawal Cogen Mode:
Source of
Rate (cum/day) Rate (cum/day) Rate at Full Steam Supplied (Tonnes/hour) Description
Makeup Water
Power To
(cum/hour)
Environmental Capital Cost of and/or In US Mercury Control SOx Control
In Year (YYYY) If other, specify:
Issues Plant Dollars Device Device Type
Particulates(PM Date
NOx Control
If other, specify: ) Control Device If other, specify: nit # Capacity (MWe) Commissioned
Device Type
Type (yyyy-mm-dd)

1 65 1962-10
2 125 5/20/1965
3 200 4/18/1970
4 200 5/15/1971
5 210 7/8/1975

1 339 9/10/1983

2 339 7/14/1984
Unit Information

Decommission
Boiler Turbine
Date (yyyy-mm- Boiler Manufacturer Turbine Manufacturer Generator Manufacturer
Model/Type Model/Type
dd)

Babcock 220 t/h Westinghouse Westinghouse


SAD 364 t/h GE GE
Poljska 560 t/h LMZ Russia Electrosila
Poljska 560 t/h LMZ Russia Electrosila
Poljska 560 t/h LMZ Russia Electrosila

Stein 1000 t/h Alstom ST-1 Alstom

Stein 1000 t/h Alstom ST-2 Alstom


Environmental Issues

Chimney Height Unit Efficiency


Generator Model/Type Issue 1 Description
(m) (%)

182

182
Past and Future Major Upgrades Owner an

Upgrade 1 Cost Year Owner 1

RWE lead consotium (Alstom,


Innogy, Mitsui Babcock ) refurbished 2002 - 2003
the plant
Owner and Operator Information

Type of Construction/E Operating Regulatory Project


% Share
Ownership PC Contractor Company Authority Financed By

Korporata
Elektroenergjetik
e e Kosoves
(KEK)

Korporata
Elektroenergjetik
Government
e e Kosoves
(KEK)
Comments

Comment 1

Units 1 and 2 are currently decommissioned and the full plant is set to be decommissioned in 2014

generated energy from Kosova B is about 3650GWh per year


References

http://enrin.grida.no/htmls/kosovo/SoE/energy.htm
http://kek-energy.com/en/gjenerimi.asp
http://www.industcards.com/st-coal-kosovo-macedonia.htm
http://www.eps.rs/Eng/Article.aspx?lista=Sitemap&id=70

http://kek-energy.com/en/gjenerimi.asp
http://enrin.grida.no/htmls/kosovo/SoE/energy.htm
http://www.industcards.com/st-coal-kosovo-macedonia.htm
http://www.eps.rs/Eng/Article.aspx?lista=Sitemap&id=70
ID

Notes
Abstract

Aghios Dimitrios Coal Power Plant Greece is located at near Agios Dimitrios, Kozani, Greece. Location coordinates are: Latitude= 40.3933, Longitude= 21.9
This infrastructure is of TYPE Coal Power Plant with a design capacity of 1595 MWe. It has 5 unit(s). The first unit was commissioned in 1984 and the last in 1
It is operated by Public Power Corp (DEH).

Aminteo (Amyntaio) Coal Power Plant Greece is located at near Amyntaio, Florina, Western Macedonia, Greece. Location coordinates are: Latitude= 40.6
Longitude= 21.6838. This infrastructure is of TYPE Coal Power Plant with a design capacity of 600 MWe. It has 2 unit(s). The first unit was commissioned in 1
and the last in 1988. It is operated by Public Power Corp (DEH).

Florina Coal Power Plant Greece is located at Meliti, Ahlada, Florina, Western Macedonia, Greece. Location coordinates are: Latitude= 40.8114, Longitu
21.6014. This infrastructure is of TYPE Coal Power Plant with a design capacity of 330 MWe. It has 1 unit(s). The first unit was commissioned in 2003.
operated by Public Power Corp (DEH).

Kardia Coal Power Plant Greece is located at Kozani, West Macedonia, Kozani, Greece. Location coordinates are: Latitude= 40.4105, Longitude= 21.7851.
infrastructure is of TYPE Coal Power Plant with a design capacity of 1250 MWe. It has 4 unit(s). The first unit was commissioned in 1975 and the last in 1981.
operated by Public Power Corp (DEH).

Megalopoli Coal Power Plant Greece is located at near Megalopoli, Arcadia, Peloponnese, Greece. Location coordinates are: Latitude= 37.418, Longitu
22.1083. This infrastructure is of TYPE Coal Power Plant with a design capacity of 850 MWe. It has 4 unit(s). The first unit was commissioned in 1970 and the
in 1991. It is operated by Public Power Corp (DEH).

Ptolemais Coal Power Plant Greece is located at Kozani, West Macedonia, Kozani, Greece. Location coordinates are: Latitude= 40.4807, Longitude= 21.7
This infrastructure is of TYPE Coal Power Plant with a design capacity of 550 MWe. It has 4 unit(s). The first unit was commissioned in 1959 and the last in 1
It is operated by Public Power Corp (DEH).

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pound
MM=million
Identifiers for Coal

Country
GEO Assigned
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification
and Impact Rating Identification
Number
Number

Aghios Dimitrios Coal Power Plant


Operating fully 42762
Greece

Aminteo (Amyntaio) Coal Power Plant


Operating fully 42763
Greece

Florina Coal Power Plant Greece Operating fully 42765

Kardia Coal Power Plant Greece Operating fully 42766

Megalopoli Coal Power Plant Greece Operating fully 42764

Ptolemais Coal Power Plant Greece Operating fully 42767


Location

Select Currency Heat Supply


Design Firm Capacity
for data in this Latitude: Longitude: This location is: Capacity
Capacity (MWe) (MWe) nbr
page (MWth)

Euro 40.3933 21.9249 Exact 1595 70

Euro 40.6191 21.6838 Exact 600

Euro 40.8114 21.6014 Exact 330

Euro 40.4105 21.7851 Exact 1250

Euro 37.418 22.1083 Exact 850

Euro 40,4807 21,7282 Exact 550


Short Power Plant
Type of Plant Type of Fuel Primary Secondary
Description Used For

Sub-critical
Coal lignite Base load
Thermal

Sub-critical
Coal lignite Base load
Thermal

Super-critical
Coal lignite Base load
Thermal

Sub-critical
Coal lignite Base load
Thermal

Ranked as a
Sub-critical Coal lignite and
highly polluting Base load
Thermal bituminous
plant

Sub-critical
Coal lignite Base load
Thermal
Configuration
Electric Power
of
Location Grid Connected
Boiler/Turbine/
To
Gen

near Agios Dimitrios, Kozani, Greece National grid

near Amyntaio, Florina, Western Macedonia, Greece National grid

Meliti, Ahlada, Florina, Western Macedonia, Greece National grid

Kozani, West Macedonia, Kozani, Greece National grid

near Megalopoli, Arcadia, Peloponnese, Greece National grid

Kozani, West Macedonia, Kozani, Greece National grid


Description

Water
Name of Onsite Storage Withdrawal Onsite Storage
Name/operator
SubStation Source of Coal Capacity Rate at Full Capacity
PPA(years)
Connected To (Tonnes) Power (Tonnes)
(cum/hour)

by Conveyor from Western Macedonia Lignite


Mines

Public Power By conveyor from adjacent Amyntaio Lignite


Corp (DEH) Mine

Public Power
Adjacent Florina Lignite mines
Corp (DEH)

Public Power
Corp (DEH)

Adjacent Lignite/coal mines

Public Power
Adjacent Ptolemais-Amyntaio coal basin
Corp (DEH)
ription

Kilometers to
Name of Major Type of Cooling Source of Source of
Coal Mines Rate (cum/day) Rate (cum/day)
Mines System Cooling Water Makeup Water
(Average)

Western
Macedonia
11
Lignite Mines
owned by DEH

3.5

Florina Lignite
mines

Megalopoli,
5 Thoknia and Alpheus River
Kyparissia Mines

Ptolemais coal
1
Mine
Water
Withdrawal Cogen Mode:
Environmental Capital Cost of and/or In US
Rate at Full Steam Supplied (Tonnes/hour) Description
Issues Plant Dollars
Power To
(cum/hour)

Listed as one of
high polluting
power plants

district heating
for 45% of the
Utility Company
town of
Ptolemais
Mercury Control SOx Control NOx Control
In Year (YYYY) If other, specify: If other, specify:
Device Device Type Device Type

Wet Lime Flue supplied by


Gas ALSTOM Power
Desulfurization Environmental
Unit Control Systems
Date Decommission
Particulates(PM) Control Device
If other, specify: Unit # Capacity (MWe) Commissioned Date (yyyy-mm-
Type
(yyyy-mm-dd) dd)

1 300 1984
2 300 1984
Electrostatic Precipitator 3 310 1984
4 310 1984
5 365 1997

1 300 1987

2 300 1988

1 330 10/2/2003

1 300 1975
2 300 1975
Electrostatic Precipitator
3 325 1981
4 325 1981
1 125 1970
2 125 1970
3 300 1991
4 300 1991
1 70 1959 2010-06-18
2 125 1965
3 125 1965
4 300 1973
Unit Information

Boiler Turbine
Boiler Manufacturer Turbine Manufacturer Generator Manufacturer
Model/Type Model/Type

A.E.E./Waagner-Biro Ansaldo Ansaldo

Stein LMZ Russia Electrosila Russia

Stein LMZ Russia Electrosila Russia

Ganzrock ABB, Asea Brown Boveri ABB, Asea Brown Boveri

Stein Alsthom Alsthom


Stein Alsthom Alsthom
TE Ganz-Rock Hungary LMZ Russia Teploenergo
TE Ganz-Rock Hungary LMZ Russia Teploenergo
Vereinigte Kesselwerke AEG AEG
Vereinigte Kesselwerke AEG AEG
Vereinigte Kesselwerke Siemens Siemens
Vereinigte Kesselwerke Siemens Siemens
Brown Boveri and Cie (BBC)
Brown Boveri and Cie (BBC)
Environmental Issues

Chimney Height Unit Efficiency


Generator Model/Type Issue 1 Description
(m) (%)

174
174
174
174
174

200

200
Past and Future Major Upgrades Owner an

Upgrade 1 Cost Year Owner 1

Public Power Corp (DEH)

Public Power Corp (DEH)

Public Power Corp (DEH)

Public Power Corp (DEH)

Public Power Corp (DEH)

Public Power Corp (DEH)


Owner and Operator Information

Type of Construction/E Operating Regulatory Project


% Share
Ownership PC Contractor Company Authority Financed By

Public Power
Government Alsaldo (unit 5)
Corp (DEH)

Public Power
Government
Corp (DEH)

Public Power
Government Alstom
Corp (DEH)

Public Power
Corp (DEH)

Public Power
Government
Corp (DEH)

Public Power
Government
Corp (DEH)
Comments

Comment 1

3 chimneys of 174m height


References

http://www.dei.gr/Default.aspx?id=146&nt=123&lang=2
http://www.industcards.com/st-coal-greece.htm
http://en.wikipedia.org/wiki/Agios_Dimitrios_Power_Station

http://www.dei.gr/Default.aspx?id=146&nt=123&lang=2
http://www.industcards.com/st-coal-greece.htm
http://en.wikipedia.org/wiki/Amyntaio_Power_Station

http://www.dei.gr/Default.aspx?id=146&nt=123&lang=2
http://www.industcards.com/st-coal-greece.htm
http://www.scdhec.gov/environment/baq/docs/SanteeCooper/Comments/psd_
SELC_attachment16.pdf

http://www.dei.gr/Default.aspx?id=146&nt=123&lang=2
http://www.industcards.com/st-coal-greece.htm

http://www.dei.gr/Default.aspx?id=146&nt=123&lang=2
http://www.industcards.com/st-coal-greece.htm
http://en.wikipedia.org/wiki/Megalopoli_Power_Plant

http://www.dei.gr/Default.aspx?id=146&nt=123&lang=2
http://www.industcards.com/st-coal-greece.htm
http://www.turbinetec.com/Download_GE_Layer.html
ID

10
10

11

12

13

Notes
Abstract

Aglos Georgios Thermal Power Plant Greece is located at Keratsini, Attica, Greece. Location coordinates are: Latitude= 37.9539, Longitude= 23.61037.
infrastructure is of TYPE Gas Power Plant with a design capacity of 360 MWe. It has 2 unit(s). The first unit was commissioned in 1968 and the last in 1971.
operated by Public Power Corp (DEH).

Distomo CCGT Heat and Power Plant Greece is located at Agios Nikolaos, Boeotia, Greece. Location coordinates are: Latitude= 38.3585, Longitude= 22.6
This infrastructure is of TYPE Gas Power Plant with a design capacity of 316 MWe. It has 3 unit(s). The first unit was commissioned in 2007 and the last in 2
It is operated by Mytilineos Group.

Heron-I OCGT Power Plant Greece is located at 4 km south of the city of Thiva on old Thiva Elefsina National Road, Boeotia, Greece. Location coordinates
Latitude= 38.2801, Longitude= 23.3264. This infrastructure is of TYPE Gas Power Plant with a design capacity of 148 MWe. It has 3 unit(s). The first unit
commissioned in 2004 and the last in 2004. It is operated by Heron Thermoelectric S.A..

Heron-II CCGT Power Plant Greece is located at 4 km south of the city of Thiva on old Thiva Elefsina National Road, Boeotia, Greece. Location coordin
are: Latitude= 38.2792, Longitude= 23.3299. This infrastructure is of TYPE Gas Power Plant with a design capacity of 435 MWe. It has 2 unit(s). The first unit
commissioned in 2010 and the last in 2010. It is operated by Heron Thermoelectric S.A..

Komotini CCGT Power Plant Greece is located at Komotini, Rodopi, Greece. Location coordinates are: Latitude= 41.0645, Longitude= 25.4895.
infrastructure is of TYPE Gas Power Plant with a design capacity of 485 MWe. It has 3 unit(s). The first unit was commissioned in 2001 and the last in 2002.
operated by Public Power Corp (DEH).

Korinthos Power CCGT Power Plant Greece is located at Motor Oil Refinery, Agioi Theodori, Corinth, Greece. Location coordinates are: Latitude= 37.9
Longitude= 23.0694. This infrastructure is of TYPE Gas Power Plant with a design capacity of 437 MWe. It has 2 unit(s). The first unit was commissioned in 2
and the last in 2011. It is operated by Korinthos Power SA.

Lavario Megalo CCGT Power Plant Greece is located at Lavrio, Attica Region, Greece. Location coordinates are: Latitude= 37.7464, Longitude= 24.065.
infrastructure is of TYPE Gas Power Plant with a design capacity of 570 MWe. It has 4 unit(s). The first unit was commissioned in 1997 and the last in 1999.
operated by Public Power Corp (DEH).

Lavario Thermal Power Plant Greece is located at Lavrio, Attica Region, Greece. Location coordinates are: Latitude= 37.7464, Longitude= 24.067.
infrastructure is of TYPE Gas Power Plant with a design capacity of 450 MWe. It has 2 unit(s). The first unit was commissioned in 1972 and the last in 1973.
operated by Public Power Corp (DEH).

Lavario-V CCGT Power Plant Greece is located at Lavrio, Attica Region, Greece. Location coordinates are: Latitude= 37.745, Longitude= 24.068.
infrastructure is of TYPE Gas Power Plant with a design capacity of 378 MWe. It has 2 unit(s). The first unit was commissioned in 2006 and the last in 2006.
operated by Public Power Corp (DEH).

Megalopolis V CCPP Power Plant Greece is located at Megalopolis, Greece. Location coordinates are: Latitude= 37.41415, Longitude= 22.06626.
infrastructure is of TYPE Gas Power Plant with a design capacity of 811 MWe. It has 3 unit(s). The first unit was commissioned in 2016 and the last in 2016.
operated by Public Power Corporation.

Protergia CCGT Power Plant Greece is located at Agios Nikolaos, Boeotia, Greece. Location coordinates are: Latitude= 38.3585, Longitude= 22.6883.
infrastructure is of TYPE Gas Power Plant with a design capacity of 430 MWe. It has 2 unit(s). The first unit was commissioned in 2011 and the last in 2011.
operated by Mytilineos Group.
Protergia CCGT Power Plant Greece is located at Agios Nikolaos, Boeotia, Greece. Location coordinates are: Latitude= 38.3585, Longitude= 22.6883.
infrastructure is of TYPE Gas Power Plant with a design capacity of 430 MWe. It has 2 unit(s). The first unit was commissioned in 2011 and the last in 2011.
operated by Mytilineos Group.

Thermie Serres CHP Power Plant Greece is located at Serres, Serres, Kentriki Makedonia, Greece. Location coordinates are: Latitude= 41.0634, Longitu
23.5184. This infrastructure is of TYPE Gas Power Plant with a design capacity of 16 MWe. It has 4 unit(s). The first unit was commissioned in 2007 and the la
2007. It is operated by Serres Thermi SA.

Thessaloniki CCGT Power Plant Greece is located at Thessaloniki, Greece. Location coordinates are: Latitude= 40.6872, Longitude= 22.885. This infrastructu
of TYPE Gas Power Plant with a design capacity of 400 MWe. It has 2 unit(s). The first unit was commissioned in 2005 and the last in 2005. It is operate
Elpedison.

Thisvi CCGT Power Plant Greece is located at Industrial Estate, Thisvi, Boeotia, Greece. Location coordinates are: Latitude= 38.2369, Longitude= 22.949.
infrastructure is of TYPE Gas Power Plant with a design capacity of 420 MWe. It has 2 unit(s). The first unit was commissioned in 2010 and the last in 2010.
operated by Elpedison.

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pound
MM=million
Identifiers for Gas

Country
GEO Assigned
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification
and Impact Rating Identification
Number
Number

Aglos Georgios Thermal Power


Operating Fully 42768
Plant Greece

Distomo CCGT Heat and Power


Operating Fully 42784
Plant Greece

Heron-I OCGT Power Plant


Operating Fully 42771
Greece

Heron-II CCGT Power Plant


Operating Fully 42770
Greece

Komotini CCGT Power Plant


Operating Fully 42769
Greece

Korinthos Power CCGT Power


Operating Fully 42786
Plant Greece

Lavario Megalo CCGT Power


Operating Fully 42775
Plant Greece

Lavario Thermal Power Plant


Operating Fully 42777
Greece

Lavario-V CCGT Power Plant


Operating Fully 42774
Greece

Megalopolis V CCPP Power Plant Built and in Test


46122
Greece Stage

Protergia CCGT Power Plant


Operating Fully 42785
Greece
Protergia CCGT Power Plant
Operating Fully 42785
Greece

Thermie Serres CHP Power Plant


Operating Fully 42780
Greece

Thessaloniki CCGT Power Plant


Operating Fully 42772
Greece

Thisvi CCGT Power Plant Greece Operating Fully 42773


Location

Select Currency Heat Supply


Design Firm Capacity
for data in this Latitude: Longitude: This location is: Capacity
Capacity (MWe) (MWe) nbr
page (MWth)

Euro 37.9539 23.61037 Exact 360

Euro 38.3585 22.6894 Exact 316 252

Euro 38.2801 23.3264 Exact 148

Euro 38.2792 23.3299 Exact 435

Euro 41,0645 25,4895 Exact 485

Euro 37.9168 23.0694 Approximate 437

Euro 37.7464 24.065 Exact 570

Euro 37.7464 24.067 Exact 450

Euro 37.745 24.068 Exact 378

Euro 37.41415 22.06626 Exact 811

Euro 38.3585 22.6883 Exact 430


Euro 38.3585 22.6883 Exact 430

Euro 41,0634 23,5184 Exact 16 91.5

Euro 40.6872 22.885 Exact 400

Euro 38.2369 22.949 Exact 420


Short Power Plant
Type of Plant Type of Fuel Primary Secondary
Description Used For

Sub-critical Thermal Natural Gas Fuel Oil Base Load

Power and Heat Combined Cycle Gas


Natural Gas Cogeneration
Turbine

Light Fuel Peaking Load


Open Cycle Gas Turbine Natural Gas
Oil/Diesel and Backup

Combined Cycle Gas Turbine Natural Gas Base Load

Combined Cycle Gas Turbine Natural Gas Base Load

Combined Cycle Gas Turbine Natural Gas Base Load

Light Fuel
Combined Cycle Gas Turbine Natural Gas Base Load
Oil/Diesel

Intermediate/Pea
Sub-critical Thermal Natural Gas Fuel Oil
k Load

Combined Cycle Gas Turbine Natural Gas Base Load

Combined Cycle Gas Turbine Natural Gas

Combined Cycle Gas Turbine Natural Gas Base Load


Combined Cycle Gas Turbine Natural Gas Base Load

Gas Engines Heat and Power Natural Gas Base Load

Light Fuel
Combined Cycle Gas Turbine Natural Gas Base Load
Oil/Diesel

Light Fuel
Combined Cycle Gas Turbine Natural Gas Base Load
Oil/Diesel
Description

Electric Power
Configuration of
Location Grid Connected
Boiler/Turbine/Gen
To

Keratsini, Attica, Greece National Grid

Agios Nikolaos, Boeotia, Greece One 2+2+1 CCGT Block National Grid

4 km south of the city of Thiva on old Thiva Elefsina National Road, Boeotia,
National Grid
Greece

4 km south of the city of Thiva on old Thiva Elefsina National Road, Boeotia,
National Grid
Greece

Komotini, Rodopi, Greece One 2+2+1 CCGT Block National Grid

One 1+1+1 Single Shaft CCGT


Motor Oil Refinery, Agioi Theodori, Corinth, Greece National Grid
block

Lavrio, Attica Region, Greece One 3+3+1 CCGT Block National Grid

Lavrio, Attica Region, Greece 2 Steam Turbines National Grid

One 1+1+1 Single Shaft CCGT


Lavrio, Attica Region, Greece National Grid
block

Megalopolis, Greece One 2+2+1 CCGT block National Grid

One 1+1+1 Single Shaft CCGT


Agios Nikolaos, Boeotia, Greece National Grid
block
One 1+1+1 Single Shaft CCGT
Agios Nikolaos, Boeotia, Greece National Grid
block

Serres, Serres, Kentriki Makedonia, Greece four TCG2032V16 gas-engines Regional grid

Thessaloniki, Greece One 1+1+1 CCGT block National Grid

Industrial Estate, Thisvi, Boeotia, Greece One 1+1+1 CCGT block National Grid
Description

Water
Name of Withdrawal Cogen Mode:
Name/operator (Tonnes/hour)
SubStation Source of Fuel Source of Water Rate at Full Steam Supplied
PPA(years) Description
Connected To Power To
(cum/hour)

Public Power
Corp (DEH)

Aluminium of
Seawater Industry
Greece (AOG)

Public Power 150 and 400 kV


Corp (DEH) lines

150 and 400 kV


lines

Public Power Gas imported


Corp (DEH) from Russia

Seawater

national gas grid


Public Power which is owned
Corp (DEH) and operate by
DEPA

Public Power
Corp (DEH)

national gas grid


Public Power which is owned
Seawater
Corp (DEH) and operate by
DEPA

Seawater
Seawater

Heat to the city


of Serres

Public Power
Corp (DEH)

national gas grid


400 kV line from
which is owned
on-site Mornos channel
and operate by
switchyard
DEPA
Environmental Capital Cost of and/or In US SOx Control NOx Control
In Year (YYYY) If other, specify:
Issues Plant Dollars Device Type Device Type

Low Nox Burner

Water Injection

Low Nox Burner

300000000 Low Nox Burner

285000000 2011 Low Nox Burner

Low Nox Burner

Low Nox Burner


Low Nox Burner

42000000 2007

250000000 Low Nox Burner

275000000 2010 Low Nox Burner


Particulates(PM Date Decommission
If other, specify: ) Control Device If other, specify: Unit # Capacity (MWe) Commissioned Date (yyyy-mm-
Type (yyyy-mm-dd) dd)

1 160 1968

2 200 1971

1 105 2007-06

2 105 2007-06

3 106 2007-06

1 49.3 2004

2 49.3 2004

3 49.3 2004

1 290 2010

2 145 2010

1 165 2001

2 165 2001
3 160 2002

1 290 2011

2 147 2011

1 127 1997
2 127 1997
3 127 1997
4 190 1999

1 150 1972

2 300 1973

1 256 2006-04

2 128 2006-04

1 270 2016
2 270 2016
3 271 2016

1 285 2011
2 145 2011

1 4 2007
2 4 2007
3 4 200
4 4 2007

1 254 2005-12

2 146 2005-12

1 275 9/12/2010

2 145 9/12/2010
Unit Information

Generator
Turbine Manufacturer Turbine Model/Type Generator Model/Type
Manufacturer

Ansaldo Ansaldo

GE GT-1 9001E

GE GT-2 9001E

ST-1

GE GT-1 LM6000 PC-Sprint GE

GE GT-2 LM6000 P GE

GE GT-3 LM6000 PC-Sprint GE

GE GT-1 PG9371FB GE

GE ST-1 HEATTM A15 GE

ABB, Asea Brown Boveri GT-1 GT13E2 Ansaldo Italy

ABB, Asea Brown Boveri GT-2 GT13E2 Ansaldo Italy


ABB, Asea Brown Boveri ST-1 Ansaldo Italy

GE GT-1 9001FB GE

GE ST-1 GE

Alstom GT-1 9001E Alstom


Alstom GT-2 9001E Alstom
Alstom GT-3 9001E Alstom
Alstom ST-1 Alstom

AEG Alstom

AEG Alstom

GE GT-1 109FA GE

GE ST-1 GE

GE GT-1 PG9371FB GE 330H


GE GT-2 PG9371FB GE 330H
GE ST-1 D11 GE 330H

GE GT-1 9001FB GE
GE ST-1 GE

Deutz TCG2032V16 engines Deutz


Deutz TCG2032V16 engines Deutz
Deutz TCG2032V16 engines Deutz
Deutz TCG2032V16 engines Deutz

GE GT-1 9001FA Alstom

Franco Tosi ST-1

Ansaldo Energia Italy GT-1 94.3A4 Ansaldo Italy TRY-L56

Ansaldo Italy ST-1 RHTCSF 43 Ansaldo Italy WY21Z-092 air cooled generator
Environmental Issues

Boiler/HRSG Boiler/HRSG Chimney Height Unit Efficiency


Issue 1 Description
Manufacturer Model/Type (m) (%)

Babcock Power
Limited

Alstom

Alstom

38%

38%

38%
Doosan Heavy
Industries

Ansaldo Italy

Ansaldo Italy

57%

Vereinigte
Kesselwerke

Stein

Alstom

NEM
NEM
CMI

Nooter Erickson
Past and Future Major Upgrades

Upgrade 1 Cost Year


Owner and Operator Information

Type of Construction/E Operating Regulatory


Owner 1 % Share
Ownership PC Contractor Company Authority

Public Power
Public Power Corp (DEH) Government
Corp (DEH)

Mytilineos Group IPP Metka Mytilineos Group

GDF Suez 50% Heron


Private Terna Thermoelectric
TEK S.A.

GDF Suez 50% Terna - Heron


Private Empresarios Thermoelectric
GEK-Terna 50% Agrupados S.A.

ABB, Ansaldo, Public Power


Public Power Corp (DEH) Government
AEGEK Corp (DEH)

65%
Mytilineos Holdings S.A.
Korinthos Power
Private Metka
SA
Motor Oil (Hellas) Corinth Refineries S.A.
65%

Public Power
Public Power Corp (DEH) Government Alstom, Metka
Corp (DEH)

Public Power
Public Power Corp (DEH) Government
Corp (DEH)

Metka,
Empresarios
Public Power
Public Power Corp (DEH) Government Agrupados, Expo
Corp (DEH)
Power Systems
Ltd

MEKTA S.A. 10% TERNA, MEKTA,


Public Power Public Power
Empresariosa
Corporation. PPC. Corporation
TERNA S.A. 90% Grupados

Mytilineos Group IPP Metka Mytilineos Group


Mytilineos Group IPP Metka Mytilineos Group

Serres Thermi
Serres Thermi SA
SA

Hellenic Petroleum 37,9%

Edison Spa 37,9% GE, VA TECH,


IPP AEGEK, Foster Elpedison
Ellaktor HE&D 22,7% Wheeler Italiana

Helcor
Hellenic S.A.
Petroleum 1.5%
37,9%
Edison Spa 37,9%
IPP Alsaldo, Aktor Elpedison
Ellaktor HE&D 22,7%
Helcor S.A. 1,5%
Comments

Project
Comment 1
Financed By

Electricity is normally exported to the national grid in a back-up role.


The CHP plant can supply electricity to the AOG site for use in
aluminum production

Complete basic and detail engineering services by Empresarios


Agrupados

Uses a Heller cooling tower

Basic and Detail Engineering by Empresarios Agrupados.

Basic and Detail Engineering by Empresarios Agrupados.

Basic and Detail engineering services by Empresarios Agrupados

Plant located next to Distomo CCGT Power Plant and Aluminium of


Greece Plant
Plant located next to Distomo CCGT Power Plant and Aluminium of
Greece Plant
References

http://www.dei.gr/Default.aspx?id=146&nt=123&lang=2
http://www.industcards.com/st-other-greece.htm

http://www.mytilineos.gr/site/en-US/home/groups_activities/epc_projects/default.aspx?
tab=metka
http://www.industcards.com/cc-greece.htm

http://www.heron.gr/index.php/en/2008-12-11-10-16-35/2008-12-11-10-19-26/-1
http://www.industcards.com/cc-greece.htm

http://www.heron.gr/index.php/en/2008-12-11-10-16-35/2008-12-11-10-19-26/-2
http://www.industcards.com/cc-greece.htm
http://www.empresariosagrupados.es/projects/thiva-greece/?lang=en

http://www.dei.gr/Default.aspx?id=146&nt=123&lang=2
http://www.industcards.com/cc-greece.htm

http://www.mytilineos.gr/uploads/nea/2009/metka_27.04.2009_korinthospower_eng.pdf
http://www.industcards.com/cc-greece.htm
http://haipp.gr/en/content/our-members
http://www.empresariosagrupados.es/projects/central-termica-de-ciclo-combinado-
korinthos/

http://www.dei.gr/Default.aspx?id=146&nt=123&lang=2

http://www.industcards.com/cc-greece.htm

http://www.dei.gr/Default.aspx?id=146&nt=123&lang=2

http://www.industcards.com/st-other-greece.htm

http://www.dei.gr/Default.aspx?id=146&nt=123&lang=2
http://www.industcards.com/cc-greece.htm
http://www.empresariosagrupados.es/projects/lavrion-v-greece/?lang=en

http://www.empresariosagrupados.es/projects/megalopolis-greece/?lang=en
http://www.metka.com/en/activity-sectors/projects/ahs-megalopolhs-monada-v-
syndyasmenou-kyklou-811-mw

http://www.mytilineos.gr/site/en-US/home/groups_activities/epc_projects/default.aspx?
tab=metka
http://www.industcards.com/cc-greece.htm
http://www.mytilineos.gr/site/en-US/home/groups_activities/epc_projects/default.aspx?
tab=metka
http://www.industcards.com/cc-greece.htm

http://www.industcards.com/ic-greece.htm

http://thermieserres.gr/

http://www.elpedison.gr/en/the-group/business-activities/energy-production/the-power-
plants/ and http://www.elpedison.gr/en/the-group/thegroup-structure/

http://www.industcards.com/cc-greece.htm
http://www.elpedison.gr/en/the-group/business-activities/energy-production/the-power-
plants/ and http://www.elpedison.gr/en/the-group/thegroup-structure/
http://www.industcards.com/cc-greece.htm
http://www.iene.gr/energyB2B/articlefiles/hlektrismos/tzouros.pdf
ID

Notes
Abstract

Aliveri Thermal Power Plant Greece is located at Aliveri, Euboea, Greece. Location coordinates are: Latitude= 38.3896, Longitude= 24.0524. This infrastructu
of TYPE Oil Power Plant with a design capacity of 380 MWe. It has 4 unit(s). The first unit was commissioned in 1953 and the last in 1969. It is operated by Pu
Power Corp (DEH).

Atherinolakkos IC Power Plant Greece is located at Atherinolakkos, Lasithi, Crete, Greece. Location coordinates are: Latitude= 35.0038, Longitude= 26.1397.
infrastructure is of TYPE Oil Power Plant with a design capacity of 102 MWe. It has 2 unit(s). The first unit was commissioned in 2004 and the last in 2004.
operated by Public Power Corp (DEH).

Chania Power Plant Crete Greece is located at Khania, Greece. Location coordinates are: Latitude= 35.488, Longitude= 24.0384. This infrastructure is of T
Oil Power Plant with a design capacity of 118 MWe. It has 6 unit(s). The first unit was commissioned in 1969 and the last in 1998. It is operated by DEI Pu
Power Corporation.

Chios Extension Power Plant Greece is located at Chios (Khios) Island, Greece. Location coordinates are: Latitude= 38.331, Longitude= 26.154.
infrastructure is of TYPE Oil Power Plant with a design capacity of 14.8 MWe. It has 1 unit(s). The first unit was commissioned in 2008. It is operated by Pu
Power Corp (DEH).

Linoperamata Power Plant Crete Greece is located at Linoperamata, Crete. Location coordinates are: Latitude= 35.34, Longitude= 25.0523. This infrastructu
of TYPE Oil Power Plant with a design capacity of 193 MWe. . It is operated by DEI Public Power Corporation.

Soroni Rodos Power Plant Greece is located at Soroni, Rodos. Location coordinates are: Latitude= 36.37887, Longitude= 28.01857. This infrastructure
TYPE Oil Power Plant with a design capacity of 84 MWe. and the last in . It is operated by DEI Public Power Corporation.

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pound
MM=million
Identifiers for Oil

Country
GEO Assigned Select Currency
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification for data in this
and Impact Rating Identification
Number page
Number

Aliveri Thermal
Power Plant Operating Fully 42776 Euro
Greece

Atherinolakkos
IC Power Plant Operating Fully 42778 Euro
Greece

High Efficiency
Chania Power
and Medium Worth
Plant Crete Operating Fully 45687 Euro
Enviromental Duplicating
Greece
Impact

Chios Extension
Power Plant Operating Fully 42779 Euro
Greece

Medium
Linoperamata efficiency and
Power Plant Operating Fully Medium 45686 Euro
Crete Greece Enviromental
Impact

High Efficiency
Soroni Rodos
and Medium
Power Plant Operating Fully 45688 Euro
Enviromental
Greece
Impact
Location

Heat Supply
Design Firm Capacity
Latitude: Longitude: This location is: Capacity Type of Plant
Capacity (MWe) (MWe) nbr
(MWth)

Sub-critical
38,3896 24.0524 Exact 380
Steam Turbine

35.0038 26.1397 Exact 102 Oil Engine

35.488 24.0384 Exact 118 Gas Turbine

38.331 26.154 Exact 14.8 Oil Engine

35,34 25,0523 Exact 193 Gas Turbine

36.37887 28.01857 Exact 84 Gas Turbine


Configuration
Short Power Plant of
Type of Fuel Primary Secondary Location
Description Used For Boiler/Turbine/
Gen

Aliveri, Euboea,
Heavy Fuel Oil Peaking Load
Greece

Atherinolakkos,
2 12K90M-C
Heavy Fuel Oil Lasithi, Crete,
engines
Greece

Diesel Oil

Chios (Khios)
Heavy Oil Base Load One IC engine
Island, Greece

Base/Intermediat Linoperamata,
Heavy Fuel Oil
e Load Crete

Base/Intermediat
Heavy Fuel Oil Soroni, Rodos
e Load
Description

Water
Electric Power Name of Withdrawal Cogen Mode:
Name/operator
Grid Connected SubStation Source of Oil Source of Water Rate at Full Steam Supplied
PPA(years)
To Connected To Power To
(cum/hour)

Public Power
National Grid
Corp (DEH)

Regional Grid

DEI Public
Regional Grid Power
Corporation

Regional Grid

DEI Public
Regional Grid Power
Corporation

DEI Public
Regional Grid Power
Corporation
(Tonnes/hour) Environmental Capital Cost of and/or In US SOx Control
In Year (YYYY) If other, specify:
Description Issues Plant Dollars Device Type
Particulates(PM Date
NOx Control
If other, specify: ) Control Device If other, specify: Unit # Capacity (MWe) Commissioned
Device Type
Type (yyyy-mm-dd)

1 40 1953
2 40 1953
3 150 1969
4 150 1969

1 51 2004

2 51 2004

1 16 1969
2 45 1992
3 45 1992
4 45 1992
5 59 5/1/1998
6 59 8/1/1998

1 14.8 2008

1 28
2 28
3 28
Unit Information

Decommission Diesel Engine /


Diesel Engine / Boiler Turbine
Date (yyyy-mm- Boiler Turbine Manufacturer
Manufacturer Model/Type
dd) Model/Type

Babcock and Wilcox AEG


Babcock and Wilcox AEG
Stein Alsthom
Stein Alsthom

Mitsui MAN B&W 12K90M-C

Mitsui MAN B&W 12K90M-C

BBC, Brown Boveri & Cie. GT-1 GT11L


ABB Asea Brown Boveri GT-2 GT8B
ABB Asea Brown Boveri GT-3 GT8B
ABB Asea Brown Boveri ST-1
Ansaldo Energia GT-4
Ansaldo Energia GT-5

HSD Engine Co Korea


9K60MC-S-C
(License MAN B&W)
Environmental Issues

Generator Chimney Height Unit Efficiency


Generator Manufacturer Issue 1
Model/Type (m) (%)

AEG
AEG
Alsthom
Alsthom

Mitsui MAN B&W

Mitsui MAN B&W

ABB Asea Brown Boveri


ABB Asea Brown Boveri
ABB Asea Brown Boveri
Ansaldo Energia
Ansaldo Energia

HSD Engine Co
nvironmental Issues Past and Future Major Upgrades

Description Upgrade 1 Cost Year


Owner and Operator Information

Type of Construction/E Operating Regulatory Project


Owner 1 % Share
Ownership PC Contractor Company Authority Financed By

Public Power Public Power


Government
Corp (DEH) Corp (DEH)

Public Power BWSC, Mitsui, Public Power


Corp (DEH) Athena Corp (DEH)

DEI Public DEI Public


Power Power
Corporation Corporation

Public Power Public Power


Government MAN B&W
Corp (DEH) Corp (DEH)

DEI Public DEI Public


Power Power
Corporation Corporation

DEI Public DEI Public


Power Metka S.A. Power
Corporation Corporation
Comments

Comment 1

The original plant was lignite-fired. It was converted to oil


References

http://www.dei.gr/Default.aspx?id=146&nt=123&lang=2
http://www.industcards.com/st-other-greece.htm

http://www.industcards.com/ic-greece.htm

Turbinetec

http://www.industcards.com/ic-greece.htm
ID

Notes
Abstract

Kostolac-A Coal Power Plant Serbia is located at Kostolac, Viminacium, Branicevo, Serbia. Location coordinates are: Latitude= 44.7229, Longitude= 21.1
This infrastructure is of TYPE Coal Power Plant with a design capacity of 310 MWe. It has 2 unit(s). The first unit was commissioned in 1967 and the last in 1
It is operated by Elektroprivreda Srbije (EPS).

Kostolac-B Coal Power Plant Serbia is located at Kostolac, Viminacium, Branicevo, Serbia. Location coordinates are: Latitude= 44.7307, Longitude= 21.2
This infrastructure is of TYPE Coal Power Plant with a design capacity of 697 MWe. It has 2 unit(s). The first unit was commissioned in 1987 and the last in 1
It is operated by Elektroprivreda Srbije (EPS).

Morava Coal Power Plant Serbia is located at Svilajnac, Pomoravlje, Serbia. Location coordinates are: Latitude= 44.2248, Longitude= 21.1627. This infrastruc
is of TYPE Coal Power Plant with a design capacity of 115 MWe. It has 1 unit(s). The first unit was commissioned in 1969. It is operated by Elektroprivreda S
(EPS).

Nikola Tesla A Coal Power Plant Serbia is located at Obrenovac, Belgrade, Serbia. Location coordinates are: Latitude= 44.6707, Longitude= 20.1592.
infrastructure is of TYPE Coal Power Plant with a design capacity of 1564 MWe. It has 6 unit(s). The first unit was commissioned in 1970 and the last in 1979.
operated by Elektroprivreda Srbije (EPS).

Nikola Tesla B Coal Power Plant Serbia is located at Vorbis, Ushce, Belgrade, Serbia. Location coordinates are: Latitude= 44.6553, Longitude= 20.0052.
infrastructure is of TYPE Coal Power Plant with a design capacity of 1240 MWe. It has 2 unit(s). The first unit was commissioned in 1983 and the last in 1985.
operated by Elektroprivreda Srbije (EPS).

TE Kolubara Coal Power Plant Serbia is located at Veliki Crljeni, Belgrade, Serbia. Location coordinates are: Latitude= 44.4806, Longitude= 20.2934.
infrastructure is of TYPE Coal Power Plant with a design capacity of 270 MWe. It has 5 unit(s). The first unit was commissioned in 1956 and the last in 1979.
operated by Elektroprivreda Srbije (EPS).

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pound
MM=million
Identifiers for Coal

Country
GEO Assigned
Plant Efficiency and Plant Overall Assigned
Name Status of Plant Identification
Impact Rating Identification
Number
Number

Kostolac-A Coal Power Plant


Operating Fully 44116
Serbia

Kostolac-B Coal Power Plant


Operating Fully 44117
Serbia

Morava Coal Power Plant


Operating Fully 44115
Serbia

Nikola Tesla A Coal Power Plant


Operating Fully 44113
Serbia

Nikola Tesla B Coal Power


Operating Fully 44114
Plant Serbia

Medium Efficiency and


TE Kolubara Coal Power Plant
Operating Fully Medium Enviromental Enviromentally 381 43987
Serbia
Impact
Location

Select Currency Heat Supply


Design Firm Capacity
for data in this Latitude: Longitude: This location is: Capacity
Capacity (MWe) (MWe) nbr
page (MWth)

Serbian dinar 44.7229 21.1717 Exact 310 281

Serbian dinar 44.7307 21.2104 Exact 697 640

Serbian dinar 44.2248 21.1627 Exact 115 108

Serbian dinar 44.6707 20.1592 Exact 1564 1502

Serbian dinar 44.6553 20.0052 Exact 1240 1160

Serbian dinar 44.4806 20.2934 Exact 270


Short Power Plant
Type of Plant Type of Fuel Primary Secondary Location
Description Used For

Kostolac,
Sub-critical Viminacium,
Coal Lignite Base Load
Thermal Branicevo,
Serbia

Kostolac,
Sub-critical Viminacium,
Coal Lignite Base Load
Thermal Branicevo,
Serbia

Svilajnac,
Sub-critical
Coal Lignite Base Load Pomoravlje,
Thermal
Serbia

Sub-critical Obrenovac,
Coal Lignite Base Load
Thermal Belgrade, Serbia

Sub-critical Vorbis, Ushce,


Coal Lignite Base Load
Thermal Belgrade, Serbia

Sub-critical Veliki Crljeni,


Coal Lignite Base Load
Thermal Belgrade, Serbia
Water
Configuration
Electric Power Name of Onsite Storage Withdrawal
of Name/operator
Grid Connected SubStation Source of Coal Capacity Rate at Full
Boiler/Turbine/ PPA(years)
To Connected To (Tonnes) Power
Gen
(cum/hour)

Elektrostok Drmno mines by


National Grid
Beagrad conveyor

Elektrostok Drmno mines by


National Grid
Beagrad conveyor

Elektrostok
National Grid
Beagrad

lignite mined from


National Grid the Kolubara basin
by rail

lignite mined from


Two 1+1+1 Elektrostok
National Grid the Kolubara basin
blocks Beagrad
by rail

Kolubara lignite
National Grid 110 kV
mines
Description

Onsite Storage Kilometers to


Name of Major Type of Cooling Source of Source of
Capacity Coal Mines Rate (cum/day)
Mines System Cooling Water Makeup Water
(Tonnes) (Average)

Drmno,
Once through
5 Cirikovac, Danube River Danube River
wet cooling
Klenovnik mines

Drmno,
Once through
1 Cirikovac, Danube River Danube River
wet cooling
Klenovnik mines

Velika Morava Velika Morava


River River

Once through
30 Kolubara Sava River Sava River
wet cooling

Once through
30 Kolubara Sava River Sava River
wet cooling
Water
Withdrawal Cogen Mode:
Environmental Capital Cost of
Rate (cum/day) Rate at Full Steam Supplied (Tonnes/hour) Description
Issues Plant
Power To
(cum/hour)

Industry,
cities of Kostolac
Commercial and
and Pozarevac
Residential

Heat for
Obrenovac
and/or In US Mercury Control SOx Control NOx Control
In Year (YYYY) If other, specify: If other, specify:
Dollars Device Device Type Device Type
U

Particulates(PM Date Decommission


) Control Device If other, specify: Unit # Capacity (MWe) Commissioned Date (yyyy-mm- Boiler Manufacturer
Type (yyyy-mm-dd) dd)

1 100 1967

2 210 1980

1 348.5 1987 SES (Timace)

2 348.5 1991 SES (Timace)

1 115 1969 Ratiborz Poland

1 200 3/27/1970 SES


2 200 1970 SES
3 305 1976 SES
4 286.5 1978 SES
5 286.5 1979 SES
6 286.5 1979 SES

1 620 1983-03-11 Rafako-Sulzer

2 620 1985 Rafako-Sulzer

1 32 10/20/1956 Steinmuller
2 32 1957 Steinmuller
3 64 1961 Steinmuller
4 32 1961 Steinmuller
5 110 1979 Steinmuller
Unit Information

Boiler
Turbine Manufacturer Turbine Model/Type Generator Manufacturer Generator Model/Type
Model/Type

1000 t/h Zamech Elblag ABB-Dolmel

1000 t/h Zamech Elblag ABB-Dolmel

380 t/h Zamech Elblag R. Koncar

650 t/h LMZ Russia Electrosila


650 t/h LMZ Russia Electrosila
920 t/h CEM (BBC) CEM (BBC)
920 t/h CEM (BBC) CEM (BBC)
920 t/h CEM (BBC) CEM (BBC)
920 t/h CEM (BBC) CEM (BBC)

1824 t/h AA CEM (BBC) Brown Boveri and Cie (BBC)

1824 t/h AA CEM (BBC) Brown Boveri and Cie (BBC)

110 t/h Siemens Siemens


110 t/h Siemens Siemens
110 t/h Siemens Siemens
110 t/h Siemens Siemens
110 t/h Siemens Siemens
Environmental Issues Past and Future Major

Chimney Height Unit Efficiency


Issue 1 Description Upgrade 1
(m) (%)

295

295

150
150
220
220
220
220
ast and Future Major Upgrades Owner and Operator Informati

Type of
Cost Year Owner 1 % Share
Ownership

Elektroprivreda Srbije
Government
(EPS)

Elektroprivreda Srbije
Government
(EPS)

Elektroprivreda Srbije
Government
(EPS)

Elektroprivreda Srbije
(EPS)

Elektroprivreda Srbije
G
(EPS)

Elektroprivreda Srbije
(EPS)
and Operator Information

Construction/E Operating Regulatory Project


PC Contractor Company Authority Financed By

Elektroprivreda
Srbije (EPS)

Elektroprivreda
Elektroproject
Srbije (EPS)

Elektroprivreda
Elektroproject
Srbije (EPS)

Elektroprivreda
Srbije (EPS)

Elektroprivreda
Elektroproject
Srbije (EPS)

Elektroprivreda
Srbije (EPS)
Comments

Comment 1

An agreement has been signed in 2010 for the redevelopment of the Kostolac Power Plant

The two units are operating at 90 and 191MW capacity

Average annual generation is 341GWh.


Plant output helps supply Jagodina, Cuprija, Paracin, Petrovac, Bor and Majdanpek

Average annual generation is 1150GWh. Supplies power to Belgrade


References

http://www.eps.rs/Eng/Article.aspx?lista=Sitemap&id=70
http://www.reneuer.com/upload/RENEUER-Legislation-059.pdf
http://en.wikipedia.org/wiki/TPP_Nikola_Tesla
http://www.industcards.com/st-coal-serbia.htm
http://www.sourcewatch.org/index.php/TPP_Kostolac_Power_Station

http://www.eps.rs/Eng/Article.aspx?lista=Sitemap&id=70
http://www.reneuer.com/upload/RENEUER-Legislation-059.pdf
http://en.wikipedia.org/wiki/TPP_Nikola_Tesla
http://www.industcards.com/st-coal-serbia.htm

http://www.eps.rs/Eng/Article.aspx?lista=Sitemap&id=70
http://www.reneuer.com/upload/RENEUER-Legislation-059.pdf
http://en.wikipedia.org/wiki/TPP_Nikola_Tesla
http://www.industcards.com/st-coal-serbia.htm

http://www.eps.rs/Pages/Article.aspx?lista=Sitemap&id=85
http://www.reneuer.com/upload/RENEUER-Legislation-059.pdf
http://en.wikipedia.org/wiki/TPP_Nikola_Tesla

http://www.eps.rs/Eng/Article.aspx?lista=Sitemap&id=70
http://www.reneuer.com/upload/RENEUER-Legislation-059.pdf
http://en.wikipedia.org/wiki/TPP_Nikola_Tesla

http://www.eps.rs/Eng/Article.aspx?lista=Sitemap&id=70
http://www.sourcewatch.org/index.php/Serbia_and_coal
http://www.industcards.com/st-coal-serbia.htm
ID

Notes
Abstract

Novi Sad CHP Power Plant Serbia is located at Novi Sad, South Backa, Vojvodina, Serbia. Location coordinates are: Latitude= 45.2681, Longitude= 19.8
This infrastructure is of TYPE Oil Power Plant with a design capacity of 230 MWe. It has 2 unit(s). The first unit was commissioned in 1981 and the last in 198
is operated by Elektroprivreda Srbije (EPS).

Sremska Mitrovica CHP Power Plant Serbia is located at Sremska Mitrovica, Srem, Serbia. Location coordinates are: Latitude= 44.9611, Longitude= 19.6
This infrastructure is of TYPE Oil Power Plant with a design capacity of 45 MWe. It has 3 unit(s). The first unit was commissioned in 1963 and the last in 1979.
operated by Elektroprivreda Srbije (EPS).

Zrenjanin CHP Power Plant Serbia is located at Zrenjanin, Central Banat, Vojvodina, Serbia. Location coordinates are: Latitude= 45.3572, Longitude= 20.4
This infrastructure is of TYPE Oil Power Plant with a design capacity of 120 MWe. It has 1 unit(s). The first unit was commissioned in 1989. It is operated
Elektroprivreda Srbije (EPS).

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pound
MM=million
Identifiers for Oil

Country
Plant Efficiency Plant Overall Assigned
Name Status of Plant
and Impact Rating Identification
Number

Novi Sad CHP Power Plant Serbia Operating Fully

Sremska Mitrovica CHP Power Plant Serbia Operating Fully

Zrenjanin CHP Power Plant Serbia Operating Fully


Location

GEO Assigned Select Currency


Design Firm Capacity
Identification for data in this Latitude: Longitude: This location is:
Capacity (MWe) (MWe) nbr
Number page

44118 Serbian Dinar 45.2681 19.8849 Exact 230

44120 Serbian Dinar 44.9611 19.6543 Exact 45

44119 Serbian Dinar 45.3572 20.4158 Exact 120


Heat Supply
Short Power Plant
Capacity Type of Plant Type of Fuel Primary Secondary
Description Used For
(MWth)

Cogeneration
Power and Heat Fuel Oil Heavy Natural gas
Steam Turbine

Cogeneration
Power and Heat Natural gas Heavy Fuel Oul Base Load
Steam Turbine

Cogeneration
140 Power and Heat Natural gas Heavy Fuel Oul Base Load
Steam Turbine
Description

Configuration
Electric Power Name of
of Name/operator
Location Grid Connected SubStation Source of Oil Source of Water
Boiler/Turbine/ PPA(years)
To Connected To
Gen

Novi Sad, South Fuel oil and


Backa, Elektrostok natural gas
National grid Danube River
Vojvodina, Beagrad provided by
Serbia pipelines

Sremska
Elektrostok
Mitrovica, Srem, National grid
Beagrad
Serbia

Zrenjanin,
Fuel oil and
Central Banat, Elektrostok
National grid natural gas by Begej River
Vojvodina, Beagrad
pipeline
Serbia
Water
Withdrawal Cogen Mode:
(Tonnes/hour) Environmental Capital Cost of and/or In US
Rate at Full Steam Supplied In Year (YYYY)
Description Issues Plant Dollars
Power To
(cum/hour)

Industry,
Commercial and
Residential

Industry,
Commercial and Zrenjanin
Residential
Particulates(PM
SOx Control NOx Control
If other, specify: If other, specify: ) Control Device If other, specify: Unit #
Device Type Device Type
Type

1
Unit Information

Date Decommission Diesel Engine /


Diesel Engine / Boiler Turbine
Capacity (MWe) Commissioned Date (yyyy-mm- Boiler
Manufacturer Manufacturer
(yyyy-mm-dd) dd) Model/Type

120 1981 Taganrog (SSSR) 2x 420 t/h UTMZ

110 1984 Taganrog (SSSR) 500 t/h UTMZ

11 1963 Steinmuller 40 t/h Fives Cail Lille

5 1963 Mitsubishi 80 t/h Blohm Voss

29 1979 Dj. Djakovic 80 t/h Mitsubishi

120 1989 SES 2x330 t/h Skoda


formation Environmental Issu

Generator Generator Chimney Height Unit Efficiency


Turbine Model/Type Issue 1
Manufacturer Model/Type (m) (%)

R. Koncar

R. Koncar

PT 120/51-10,885-0,63-014 R. Koncar
nvironmental Issues Past and Future Major Upgrades

Description Upgrade 1 Cost Year


Owner and Operator Information

Type of Construction/E Regulatory


Owner 1 % Share Operating Company
Ownership PC Contractor Authority

Elektroprivreda Srbije
Elektroprivreda Srbije (EPS) Government
(EPS)

Elektroprivreda Srbije
Elektroprivreda Srbije (EPS) Government
(EPS)

Elektroprivreda Srbije
Elektroprivreda Srbije (EPS) Government
(EPS)
Comments

Project
Comment 1
Financed By
References

http://www.eps.rs/Eng/Article.aspx?lista=Sitemap&id=70
http://www.reneuer.com/upload/RENEUER-Legislation-059.pdf
http://www.industcards.com/st-other-eur-s.htm

http://www.eps.rs/Eng/Article.aspx?lista=Sitemap&id=70
http://www.reneuer.com/upload/RENEUER-Legislation-059.pdf
http://panonske.rs/lat/branches/tpp-hp-sremska-mitrovica/

http://www.eps.rs/Eng/Article.aspx?lista=Sitemap&id=70
http://www.reneuer.com/upload/RENEUER-Legislation-059.pdf
http://www.panonske.rs/en/branches/tpp-hp-zrenjanin/
ID

Notes
Abstract

Bobov Dol Coal Power Plant Bulgaria is located at S of Bobov Dol, Kyustendil, Bulgaria. Location coordinates are: Latitude= 42.285556, Longitude= 23.032
This infrastructure is of TYPE Coal Power Plant with a design capacity of 630 MWe. It has 3 unit(s). The first unit was commissioned in 1973 and the last in 19

Maritsa 3 Coal Power Plant Bulgaria is located at Dimitrovgrad, Haskovo, Bulgaria. Location coordinates are: Latitude= 42.0524, Longitude= 25.62377.
infrastructure is of TYPE Coal Power Plant with a design capacity of 120 MWe. It has 1 unit(s). The first unit was commissioned in 1971.

Maritsa Iztok-1 Coal Power Plant Bulgaria is located at Galabovo, Stara Zagora, Bulgaria. Location coordinates are: Latitude= 42.1573, Longitude= 25.9
This infrastructure is of TYPE Coal Power Plant with a design capacity of 670 MWe. It has 2 unit(s). The first unit was commissioned in 2011 and the last in 2
It is operated by Natsionalna Elektricheska Kompania EAD (NEK).

Maritsa Iztok-2 Coal Power Plant Bulgaria is located at Radetski, Stara Zagora, Bulgaria. Location coordinates are: Latitude= 42.255, Longitude= 26.135.
infrastructure is of TYPE Coal Power Plant with a design capacity of 1450 MWe. It has 8 unit(s). The first unit was commissioned in 1966 and the last in 1995.
operated by Maritsa East-2 TPP plc.

Maritsa Iztok-3 Coal Power Plant Bulgaria is located at Galabovo, Stara Zagora, Bulgaria. Location coordinates are: Latitude= 42.1444, Longitude= 26.0033.
infrastructure is of TYPE Coal Power Plant with a design capacity of 840 MWe. and the last in . It is operated by Energiina Kompaniya Maritsa Iztok 3 AD.

Varna Coal Power Plant Bulgaria is located at Ezerovo, Varna, Bulgaria. Location coordinates are: Latitude= 43.196, Longitude= 27.7644. This infrastructure
TYPE Coal Power Plant with a design capacity of 1260 MWe. It has 6 unit(s). The first unit was commissioned in 1968 and the last in 1979. It is operated by C
Czech Republic.

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pound
MM=million
Identifiers for Coal

Country
GEO Assigned
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification
and Impact Rating Identification
Number
Number

Bobov Dol Coal Power Plant Bulgaria Operating Fully 42180

Maritsa 3 Coal Power Plant Bulgaria Operating Fully 42181

Maritsa Iztok-1 Coal Power Plant


Operating Fully 42177
Bulgaria

Maritsa Iztok-2 Coal Power Plant


Operating Fully 42178
Bulgaria

Maritsa Iztok-3 Coal Power Plant


Operating Fully 42179
Bulgaria

Varna Coal Power Plant Bulgaria Operating Fully 42183


Location

Select Currency Heat Supply


Design Firm Capacity
for data in this Latitude: Longitude: This location is: Capacity
Capacity (MWe) (MWe) nbr
page (MWth)

Bulgarian Lev 42.285556 23.032778 Exact 630

Bulgarian Lev 42.0524 25.62377 Exact 120

Bulgarian Lev 42.1573 25.9084 Exact 670

Bulgarian Lev 42.255 26.135 Exact 1450

Bulgarian Lev 42.1444 26.0033 Exact 840

Bulgarian Lev 43.196 27.7644 Exact 1260


Short Power Plant
Type of Plant Type of Fuel Primary Secondary
Description Used For

Sub-critical
Coal Base Load
Thermal

Sub-critical
Coal Fuel Oil Base Load
Thermal

Sub-critical
Lignite Base Load
Thermal

Super-critical
Lignite Base Load
Thermal

Sub-critical
Lignite Base Load
Thermal

Sub-critical
Anthracite coal Base Load
Thermal
Configuration
Electric Power
of
Location Grid Connected
Boiler/Turbine/
To
Gen

S of Bobov Dol, Kyustendil, Bulgaria National Grid

Dimitrovgrad, Haskovo, Bulgaria National Grid

Galabovo, Stara Zagora, Bulgaria National Grid

Radetski, Stara Zagora, Bulgaria National Grid

Galabovo, Stara Zagora, Bulgaria National Grid

Ezerovo, Varna, Bulgaria National Grid


Descript

Name of
Name/operator PPA(years) SubStation Source of Coal
Connected To

By Rail from Bobov Dol Coal Mines 10 km to the


Natsionalna Elektricheska Kompania (NEK)
North

Natsionalna Elektricheska Kompania (NEK) Maritza East Mines

Adjacent lignite mines of Martisa Iztok mining


Natsionalna Elektricheska Kompania (NEK)
complex by railway

Adjacent lignite mines of Mini Martisa Iztok (MMI)


Natsionalna Elektricheska Kompania (NEK)
mining complex by railway

Adjacent lignite mines of Mini Martisa Iztok (MMI)


Natsionalna Elektricheska Kompania (NEK)
mining complex by railway

Anthracite coal imported mainly from the Ukraine


and Russia via attached coal ports
Description

Water
Onsite Storage Withdrawal Onsite Storage Kilometers to
Name of Major Type of Cooling Source of
Capacity Rate at Full Capacity Coal Mines
Mines System Cooling Water
(Tonnes) Power (Tonnes) (Average)
(cum/hour)

Maritsa River

Rozov Kladenets
Reservoir

Ovcharista Lake

Lake Varna
Water
Withdrawal Cogen Mode:
Source of
Rate (cum/day) Rate (cum/day) Rate at Full Steam Supplied (Tonnes/hour) Description
Makeup Water
Power To
(cum/hour)

Lake Varna
Environmental Capital Cost of and/or In US Mercury Control SOx Control
In Year (YYYY) If other, specify:
Issues Plant Dollars Device Device Type

Wet Lime Flue


wet FGD system will
gas
1740000000 2011 achieve 98% sulphur
Desulfurization
dioxide removal
Unit

Wet Lime Flue


gas for units FGD Units 5-6
Desulfurization are under construction
Unit

Wet Lime Flue


gas
Desulfurization
Unit
NOx Control Particulates(PM) Control Device
If other, specify: If other, specify: Unit # Capacity (MWe)
Device Type Type

1 210
2 210
3 210

Electrostatic Precipitator ELWO Poland 1 120

advanced lignite- 1 335


firing pulverised
Low Nox Burner Electrostatic Precipitator
coal boilers with
low NOx burners
2 335

1 150
2 150
3 150
4 150
Electrostatic Precipitator dust removal is 96%
5 210
6 230
7 215
8 215
1 210
2 210
3 210
4 210
1 210
2 210
3 210
4 210
5 210
6 210
Unit Information

Date Decommission
Boiler
Commissioned Date (yyyy-mm- Boiler Manufacturer Turbine Manufacturer
Model/Type
(yyyy-mm-dd) dd)

1973 Rafako Poland LMZ Russia


1974 Rafako Poland LMZ Russia
1975 Rafako Poland LMZ Russia

1971 Rafako Czech RA-380V ZAMECH Elblonk

6/3/2011 Alstom Alstom

6/3/2011 Alstom Alstom

11/10/1966 Podoloski Russia HTGZ (Kharkovsky)


11/10/1966 Podoloski Russia HTGZ (Kharkovsky)
11/10/1966 Podoloski Russia HTGZ (Kharkovsky)
11/24/1968 Podoloski Russia HTGZ (Kharkovsky)
1975 Podoloski Russia LMZ Russia
1976 Podoloski Russia LMZ Russia
1978 Podoloski Russia LMZ Russia
11/28/1995 Podoloski Russia LMZ Russia
Podoloski Russia LMZ Russia
Podoloski Russia LMZ Russia
Podoloski Russia LMZ Russia
Podoloski Russia LMZ Russia
1968 Taganrog Russia LMZ Russia
1968 Taganrog Russia LMZ Russia
1969 Taganrog Russia LMZ Russia
1977 Taganrog Russia LMZ Russia
1978 Taganrog Russia LMZ Russia
1979 Taganrog Russia LMZ Russia
Environmental Issues

Turbine Chimney Height Unit Efficiency


Generator Manufacturer Generator Model/Type Issue 1
Model/Type (m) (%)

Electrosila Russia 200


Electrosila Russia 200
Electrosila Russia 200

TK-120 Dolmel TGH-120

Alstom

Alstom

HTGZ (Kharkovsky) 325


HTGZ (Kharkovsky) 325
HTGZ (Kharkovsky) 325
HTGZ (Kharkovsky) 325
Electrosila Russia 325
Electrosila Russia 325
Electrosila Russia 325
Electrosila Russia 325
Electrosila Russia 325
Electrosila Russia 325
Electrosila Russia 325
Electrosila Russia 325
Electrosila Russia
Electrosila Russia
Electrosila Russia
Electrosila Russia
Electrosila Russia
Electrosila Russia
nvironmental Issues Past and Future Major Upgrades

Description Upgrade 1 Cost Year

Rehabilitation of units 1 to 6 and


construction of FGD plants for them

Installation of FGD units 2007 - 2008


Owner and Operator Information

Type of Construction/E Operating Regulatory


Owner 1 % Share
Ownership PC Contractor Company Authority

AES Corporation Natsionalna


Elektricheska
Joint Venture Alstom
Natsionalna Elektricheska Kompania Kompania EAD
EAD (NEK) (NEK)

Maritsa East-2
of Bulgarian Energy Holding EAD Government
TPP plc

Enel Italy Energiina


73%
Kompaniya
Joint Venture
Natsionalna Elektricheska Kompania Maritsa Iztok 3
27%
(NEK) AD

CEZ Group Czech (acquired on 2 CEZ Czech


100% Private
October 2006) Republic
Project
Financed By
Comments

Comment 1

A firm controlled by Hristo Kovachk acquired the plant in 2008. Plans to build two new units

There was an old 500 MW plant at this location

New plant is equipped with ALSTOM advanced lignite-firing pulverised coal boilers using state-of-the-art low NOx burners

Mitsui, contracted in a consortium with Toshiba to rehabilitate the four generating units 1-4 of Maritsa Iztok 2 thermal power plant largely funded by Japan Ban
International Cooperation

construction of FGDs for units 5 and 6 at total budget of 86 mln. Euro. The Italian-Chinese consortium Idreco-Insigma selected

Rehab/Replacement by Toshiba of turbines and generators of units 1, 3, 4, the capacities increased from 150 MW to 177 MW. A new generator of unit
nominal capacity 165 MW was put into operation. Turbine of unite 6 was increased from 210 to 230 MW

Enel is planning to invest in a new 700-800 MW coal-fired power plant next to the existing Maritsa Iztok-3 plant. Expected cost 900 million

Enel has a commitment to ehabilitate and upgrade and to acquire de-sulphurising sections. The 580 million euro project is financed by ten banks in Eu
including four in Bulgaria.

2 CCGT units of 440MW are being planned with possible schedule for 2013
References

http://en.wikipedia.org/wiki/Bobov_Dol_Power_Plant and
http://www.industcards.com/st-coal-bulgaria.htm

http://tec-marica3.com/?act=show_page&category_id=4
http://tec-marica3.com/?act=show_page&category_id=1 and http://tec-
marica3.com/?act=show_page&category_id=2
http://en.wikipedia.org/wiki/Maritsa_3_Power_Plant
http://tec-marica3.com/modules/download.php?file_id=89

http://en.wikipedia.org/wiki/Maritsa_Iztok_Complex

http://www.alstom.com/power/news-and-events/press-releases/ALSTOM-to-supply-670-
MW-Clean-Power-Station-in-Bulgaria-20060925/

http://www.tpp2.com/userfiles/File/MI_otchet_za_net.pdf
http://www.industcards.com/st-coal-bulgaria.htm and http://www.tpp2.com/page/about-
us.html
http://sofiaecho.com/2005/04/10/645111_clash-on-maritsa-iztok-2

http://en.wikipedia.org/wiki/Maritsa_Iztok_Complex

http://www.cez.bg/bg/za-nas/kompaniite-v-balgariya/tets-varna.html

http://en.wikipedia.org/wiki/Varna_Power_Plant

http://www.industcards.com/st-coal-bulgaria.htm

http://www.cez.cz/en/investors/financial-reports/annual-reports.html
ID

6
6

10
Notes
Abstract

CET Bacau CHPP Romania is located at Chimiei nr. 6, 600286, Bacau, Romania. Location coordinates are: Latitude= 46.531, Longitude= 26.938. T
infrastructure is of TYPE Coal Power Plant with a design capacity of 74.25 MWe. It has 2 unit(s). The first unit was commissioned in 1998 and the last in 2
operated by SC CET SA Bacau.

CET Brasov CHPP Romania is located at Timis Triaj nr.6, 500240, Brasov, Romania. Location coordinates are: Latitude= 45.6623, Longitude= 25.646
infrastructure is of TYPE Coal Power Plant with a design capacity of 100 MWe. It has 2 unit(s). The first unit was commissioned in 1990 and the last in 19
operated by SC CENTRALA ELECTRICA DE TERMOFICARE BRASOV SA.

CET Govora Coal CHPP Romania is located at INDUSTRIILOR, NR.1, 240050, RAMNICU VALCEA, Romania. Location coordinates are: Latitude= 45
Longitude= 24.29. This infrastructure is of TYPE Coal Power Plant with a design capacity of 200 MWe. It has 4 unit(s). The first unit was commissioned
and the last in 1987. It is operated by CET GOVORA SA.

Craiova II Coal Power Station Romania is located at Craiova, Dolj, Romania. Location coordinates are: Latitude= 44.345, Longitude= 23.8156. This infras
is of TYPE Coal Power Plant with a design capacity of 300 MWe. It has 2 unit(s). The first unit was commissioned in 1987 and the last in 1988. It is oper
SC Craiova Energetic Complex SA.

Isalnita Coal Power Plant Romania is located at Isalnita, Dolj County, Romania. Location coordinates are: Latitude= 44.3886, Longitude= 23.718. T
infrastructure is of TYPE Coal Power Plant with a design capacity of 630 MWe. and the last in 1988. It is operated by SC Complexul Energetic (CE) Crai

Mintia-Deva Power Station Romania is located at 7 km from Deva, Hunedoara, Romania. Location coordinates are: Latitude= 45.9134, Longitude= 22.82
infrastructure is of TYPE Coal Power Plant with a design capacity of 1285 MWe. It has 6 unit(s). The first unit was commissioned in 1970 and the last in 1
operated by Electrocentrale Deva SA.
Mintia-Deva Power Station Romania is located at 7 km from Deva, Hunedoara, Romania. Location coordinates are: Latitude= 45.9134, Longitude= 22.82
infrastructure is of TYPE Coal Power Plant with a design capacity of 1285 MWe. It has 6 unit(s). The first unit was commissioned in 1970 and the last in 1
operated by Electrocentrale Deva SA.

Paroseni CHPP Coal Power Station Romania is located at Nr. 20, 336200, Jiu Paroseni, Hunedoara, Romania. Location coordinates are: Latitude= 45.
Longitude= 23.261. This infrastructure is of TYPE Coal Power Plant with a design capacity of 300 MWe. It has 4 unit(s). The first unit was commissioned
and the last in 1964. It is operated by SC TERMOELECTRICA SA BUCURESTI.

Romag-Termo CHPP Romania is located at Calea Tg.Jiului, km5, 227297, Drobeta Turnu Severin, Romania. Location coordinates are: Latitude= 44.6
Longitude= 22.6883. This infrastructure is of TYPE Coal Power Plant with a design capacity of 225 MWe. It has 5 unit(s). The first unit was commissioned
and the last in 1988. It is operated by RAAN - Regia Autonoma Pentru Activitati Nucleare.

Rovinari Coal Power Station Romania is located at Rovinari, Near Targu Jiu, Gorj, Romania. Location coordinates are: Latitude= 44.9068, Longitude= 2
This infrastructure is of TYPE Coal Power Plant with a design capacity of 1320 MWe. It has 6 unit(s). The first unit was commissioned in 1972 and the last
It is operated by Complexul Energy Rovinari S.A..

Turceni Coal Power Station Romania is located at Turceni, half way between the cities of Craiova and Targu Jiu, Gorj, Romania. Location coordinates
Latitude= 44.6698, Longitude= 23.4077. This infrastructure is of TYPE Coal Power Plant with a design capacity of 2310 MWe. It has 7 unit(s). The first u
commissioned in 1978 and the last in 1987. It is operated by Complexul Energy Turceni S.A..
* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pounds, MM=million
Identifiers for Coal

Country
GEO Assigned Select Currency
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification for data in this
and Impact Rating Identification
Number page
Number

CET Bacau
Operating fully 41141 New Leu
CHPP Romania

CET Brasov
Operating fully 41142 New Leu
CHPP Romania

CET Govora
Coal CHPP Operating fully 41143 New Leu
Romania

Craiova II Coal
Power Station Operating fully 40971 New Leu
Romania

Isalnita Coal
Power Plant Operating fully 40970 New Leu
Romania

Mintia-Deva
Power Station Operating fully 40969 New Leu
Romania
Mintia-Deva
Power Station Operating fully 40969 New Leu
Romania

Paroseni CHPP
Coal Power Operating fully 40988 New Leu
Station Romania

Romag-Termo
Operating fully 41144 New Leu
CHPP Romania

Rovinari Coal
Power Station Operating fully 40968 New Leu
Romania

Turceni Coal
Power Station Operating fully 40967 New Leu
Romania
Location

Heat Supply
Design Firm Capacity
Latitude: Longitude: This location is: Capacity Type of Plant
Capacity (MWe) (MWe) nbr
(MWth)

Sub-critical
46,531 26,938 Exact 74.25
Thermal

Sub-critical
45,662 25,646 Exact 100
Thermal

Sub-critical
45.04 24.29 Exact 200
Thermal

Sub-critical
44,345 23,816 Exact 300
Thermal

Sub-critical
44,389 23,718 Exact 630
Thermal

Sub-critical
45,913 22,825 Exact 1285
Thermal
Sub-critical
45,913 22,825 Exact 1285
Thermal

Sub-critical
45,365 23,261 Exact 300
Thermal

Sub-critical
44,675 22,688 Exact 225
Thermal

Sub-critical
44,907 23,138 Exact 1320
Thermal

Sub-critical
44,670 23,408 Exact 2310 1605
Thermal
Configuration
Short Power Plant of
Type of Fuel Primary Secondary Location
Description Used For Boiler/Turbine/
Gen

Chimiei nr. 6,
Lignite Natural Gas 600286, Bacau,
Romania

Timis Triaj nr.6,


Lignite Fuel Oil 500240, Brasov,
Romania

INDUSTRIILOR,
five boilers of
NR.1, 240050,
420 t/h and four
Lignite Natural Gas RAMNICU
turbines of 50
VALCEA,
Mwe
Romania

Craiova, Dolj,
Lignite Natural Gas
Romania

Isalnita, Dolj
Lignite Natural Gas
County, Romania

7 km from Deva,
Sub-bituminous Natural Gas Hunedoara,
Romania
7 km from Deva,
Sub-bituminous Natural Gas Hunedoara,
Romania

Nr. 20, 336200,


Sub-bituminous Jiu Paroseni,
coal Hunedoara,
Romania

Calea Tg.Jiului,
km5, 227297,
Lignite Fuel Oil
Drobeta Turnu
Severin, Romania

Rovinari, Near
Lignite Natural Gas Targu Jiu, Gorj,
Romania

Turceni, half way


between the cities
Lignite Fuel Oil of Craiova and
Targu Jiu, Gorj,
Romania
D

Water
Electric Power Name of Onsite Storage Withdrawal Onsite Storage
Name/operator
Grid Connected SubStation Source of Coal Capacity Rate at Full Capacity
PPA(years)
To Connected To (Tonnes) Power (Tonnes)
(cum/hour)

Municipal grid

National Grid

Prigoria open-pit
National Grid mining and
SNLO

Valea Jiului
basins with
National Grid Minita
15392 kJ/kg by
Railways
Valea Jiului
basins with
National Grid Minita
15392 kJ/kg by
Railways

Hard coal mines


from the Jiu
Valley by self
discharging
railway wagons.

110 kV CET
National Grid
Drobeta

Adjacent Coal
Mines

Associated Jilt
four 400kV lines Openpit coal
connecting to mine and
Tantareni Tehomir
Substation underground
mine
Description

Kilometers to
Name of Major Type of Cooling Source of Source of
Coal Mines Rate (cum/day) Rate (cum/day)
Mines System Cooling Water Makeup Water
(Average)

Olt River

River Jiu

River Mures
River Mures

River Jiu

River Jiu

River Jiu
Water
Withdrawal Cogen Mode:
Environmental Capital Cost of and/or In US
Rate at Full Steam Supplied (Tonnes/hour) Description
Issues Plant Dollars
Power To
(cum/hour)
Particulates(PM
Mercury Control SOx Control NOx Control
In Year (YYYY) If other, specify: If other, specify: ) Control Device
Device Device Type Device Type
Type
Unit Informat

Date Decommission
Boiler
If other, specify: Unit # Capacity (MWe) Commissioned Date (yyyy-mm- Boiler Manufacturer
Model/Type
(yyyy-mm-dd) dd)

1 60 1998 Vulcan

2 14.25 2008

1 50 1990 ICAL

2 50 1995 ICPET

1 50 1975 Vulcan Bucuresti

2 50 1977 Vulcan Bucuresti

3 50 1986 Vulcan Bucuresti

4 50 1987 Vulcan Bucuresti

1 150 1987 ICPET

2 150 1988 ICPET

1 50

2 50

3 50

4 55

5 100

6 100

7 315 1987 MAN

8 315 1988 MAN

1 210 1970 Pp-660/140-P 55

2 210 1971 Pp-660/140-P 55

3 210 1971 Pp-660/140-P 55


4 210 1972 Pp-660/140-P 55

5 210 1977 Pp-660/140-P 55

6 235 1980 Pp-660/140-P 55

1 50 1955

2 50 1957

3 50 1959

4 150 1964

1 50 1986 ICPET

2 50 1986 ICPET

3 50 1986 ICPET

4 50 1986 ICPET

5 25 1988 ICPET

1 200 1972 SES Tlmace Slovakia

2 200 1973 SES Tlmace Slovakia

ICPET-Generatoare Abur
3 330 1976
S.A.

ICPET-Generatoare Abur
4 330 1977
S.A.

ICPET-Generatoare Abur
5 330 1977
S.A.

ICPET-Generatoare Abur
6 330 1979
S.A.

1 330 1978 Babcock

2 330 1979 Babcock

3 330 1980 Babcock

4 330 1981 Babcock

5 330 1983 Babcock

6 330 1985 Babcock

7 330 1987 Babcock


Unit Information

Turbine Chimney Height Unit Efficiency


Turbine Manufacturer Generator Manufacturer Generator Model/Type
Model/Type (m) (%)

General Turbo SA ST-1 DSL-type General Turbo SA


TH 60-2
Bucharest 50-1 Bucharest

TURBOMACH-
GT-1 T 130 LEROY SOMER
SWITZERLAND

IMBG IMBG 280

IMBG IMBG 280

UMG Resita UMG Resita

UMG Resita UMG Resita

IMGB Bucurest IMGB Bucurest

IMGB Bucurest IMGB Bucurest

IMBG IMBG

IMBG IMBG

Rateau Alstom

Rateau Alstom

K-200-130 TVV-200-2

K-200-131 TVV-200-2

K-200-132 TVV-200-2
K-200-133 TVV-200-2

K-200-134 TVV-200-2

K-200-135 TVV-200-2

IMBG DSL 50 IMBG

IMBG DSL 50 IMBG

IMBG DSL 50 IMBG

IMBG DKUL 50 IMBG

IMBG SC 25 IMBG

Skoda

Skoda

Rateau-Schneider Alstom

Rateau-Schneider Alstom

Rateau-Schneider Alstom

Rateau-Schneider Alstom

Rateau-Schneider Alstom

Rateau-Schneider Alstom

Rateau-Schneider Alstom
Environmental Issues Past and Future Major Upgrades

Issue 1 Description Upgrade 1 Cost


Modernization and Rehabilitation of
Unit 4 finished in April 2002

Modernization and Rehabilitation of


Unit 5 finished in April 2006
jor Upgrades Owner and Operator Information

Type of Construction/E Operating


Year Owner 1 % Share
Ownership PC Contractor Company

Government SC CET SA
City of Bacau
Municipal Bacau

SC CENTRALA
Government ELECTRICA DE
City of Brasov Alsando
Municipal TERMOFICARE
BRASOV SA

CET GOVORA
S.C. CET GOVORA S.A. IPP
SA

SC Craiova
Thermoelectrica S.A. Government Energetic
Complex SA

Government
SC Complexul
(Ministry of
Thermoelectrica S.A. Energetic (CE)
Economy and
Craiova SA
Commerce)

Electrocentrale
Thermoelectrica S.A. Government
Deva SA
Electrocentrale
Thermoelectrica S.A. Government
Deva SA

Government SC
(Ministry of TERMOELECTR
Thermoelectrica S.A.
Economy and ICA SA
Commerce) BUCURESTI

RAAN - Regia
RAAN - Regia Autonoma Autonoma
Government
Pentru Activitati Nucleare Pentru Activitati
Nucleare

Complexul
SC Termoelectrica S.A. Government Energy Rovinari
S.A.

Complexul
SC Termoelectrica S.A. Government Energy Turceni
S.A.
mation

Regulatory Project
Authority Financed By

AGENTIA
NATIONALA
PENTRU
PROTECTIA
MEDIULUI

AGENTIA
NATIONALA
PENTRU
PROTECTIA
MEDIULUI

AGENTIA
NATIONALA
PENTRU
PROTECTIA
MEDIULUI

AGENTIA
NATIONALA
PENTRU
PROTECTIA
MEDIULUI

AGENTIA
NATIONALA
PENTRU
PROTECTIA
MEDIULUI

AGENTIA
NATIONALA
PENTRU
PROTECTIA
MEDIULUI
AGENTIA
NATIONALA
PENTRU
PROTECTIA
MEDIULUI

AGENTIA
NATIONALA
PENTRU
PROTECTIA
MEDIULUI

AGENTIA
NATIONALA
PENTRU
PROTECTIA
MEDIULUI

AGENTIA
NATIONALA
PENTRU
PROTECTIA
MEDIULUI
Comments

Comment 1

Direct access to railroad and storing abilities for 500000 tonnes coal

Plans for a third unit of 150 MW at cost of US$225 Million.

Units 1-6 have been decommisioned. Plans for adding a 500 MW supercritical unit

A consortium of Alstom, Sumitomo and IHI Corporation is commissioned to upgrade the 315 MW group to 345 MW each at a total cost of US$ 315 m

This plant equilibrates power balance in central and western areas of the country and is an important interconnection point with West European power
UCTE
This plant equilibrates power balance in central and western areas of the country and is an important interconnection point with West European power
UCTE

Unit 4 approved to get a FGD unit in Nov 2009. All 4 units have russian BTG

The coal storage capacity is 90000 tonnes

This CHP plant supplies electricity to the RAAN heavy-water plant.

Plans to add a new 500 MW supercritical unit at a total cost of US$ 600 million. This unit will replace the decommisioned units 1 and 2

fitting of several sulphur filters at the existing power units at a total cost of US$ 250 million

The eighth unit of 330 MWe has not been built

Collaboration with ABB-Babcock to modernize units 4 and 5 and add FGD units
References

http://www.cetbacau.ro/prezentare/date-tehnice/producerea-energiei-electrice.html

http://prtr.ec.europa.eu/FacilityLevels.aspx

http://www.industcards.com/st-coal-romania.htm

http://prtr.ec.europa.eu/FacilityLevels.aspx

http://www.industcards.com/st-coal-romania.htm

http://www.cetbv.ro/date-tehnice/capacitati-de-productie-cet-brasov.htm

http://www.cetbv.ro/date-tehnice/statistici-cet-brasov.htm

http://www.cet-govora.ro/cet_engleza/index.php

http://www.cet-govora.ro/cet_engleza/index.php?pid=7

http://prtr.ec.europa.eu/FacilityLevels.aspx

http://www.industcards.com/st-coal-romania.htm

http://en.wikipedia.org/wiki/Craiova_II_Power_Station

http://www.industcards.com/st-coal-romania.htm

http://prtr.ec.europa.eu/FacilityLevels.aspx

http://en.wikipedia.org/wiki/List_of_power_stations_in_Romaniahttp://www.9am.ro/stiri-revista-presei/2005-06-23/mec-vrea-14-milioane-de-euro-in-plus-pe

http://www.termodeva.ro/index.php/about-us/http://www.termodeva.ro/index.php/welcome/http://prtr.ec.europa.eu/FacilityLevels.aspx
http://www.termodeva.ro/index.php/about-us/http://www.termodeva.ro/index.php/welcome/http://prtr.ec.europa.eu/FacilityLevels.aspx

http://en.wikipedia.org/wiki/List_of_power_stations_in_Romania

http://www.eib.org/projects/pipeline/2009/20090514.htm

http://www.minind.ro/International/printable/ER1/ER1.318.06.pdf

http://prtr.ec.europa.eu/FacilityLevels.aspx

http://www.raan.ro/en/index.html

http://prtr.ec.europa.eu/FacilityLevels.aspx

http://www.industcards.com/st-coal-romania.htm

http://www.cerovinari.ro/

http://en.wikipedia.org/wiki/List_of_power_stations_in_Romania

http://en.wikipedia.org/wiki/Rovinari_Power_Station

http://www.industcards.com/st-coal-romania.htm

http://prtr.ec.europa.eu/FacilityLevels.aspx

http://www.eturceni.ro/date_gen.htm#

http://en.wikipedia.org/wiki/List_of_power_stations_in_Romania

http://en.wikipedia.org/wiki/Turceni_Power_Station

http://www.industcards.com/st-coal-romania.htm

http://pdf.usaid.gov/pdf_docs/PNADG294.pdf

http://prtr.ec.europa.eu/FacilityLevels.aspx
ID

3
Notes
Abstract

CET Bucharest-Progresu CHPP Power Plant Romania is located at Pogoanele, nr. 1A, 75449, Bucharest, Romania. Location coordinates are: Latitude= 44.3
Longitude= 26.1073. This infrastructure is of TYPE Gas Power Plant with a design capacity of 200 MWe. It has 4 unit(s). The first unit was commissioned in 19
and the last in 1994. It is operated by SC ELECTROCENTRALE BUCURESTI SA.

Iernut-Ludus (Mures) Power Station Romania is located at Lernut, Mures County, Romania. Location coordinates are: Latitude= 46.4677, Longitude= 24.183
This infrastructure is of TYPE Gas Power Plant with a design capacity of 800 MWe. It has 6 unit(s). The first unit was commissioned in 1963 and the last in 19
It is operated by S.C. Electrocentrale Bucuresti S.A..

Petrom Brazi CCGT Power Plant Romania is located at Petrobrazi Refinery, Ploiesti, Prahova, Romania. Location coordinates are: Latitude= 44.8802, Longitu
25.9988. This infrastructure is of TYPE Gas Power Plant with a design capacity of 860 MWe. It has 3 unit(s). The first unit was commissioned in 2011 and the
in 2011. It is operated by Petrom Power.
* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pound
MM=million
Identifiers for Gas

Country
GEO Assigned Select Currency
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification for data in this
and Impact Rating Identification
Number page
Number

CET Bucharest-
Progresu CHPP
Operating Fully 41136 New Leu
Power Plant
Romania

Iernut-Ludus
(Mures) Power Operating Fully 40973 New Leu
Station Romania

Petrom Brazi
CCGT Power Operating Fully 42206 New Leu
Plant Romania
Location

Heat Supply
Design Firm Capacity
Latitude: Longitude: This location is: Capacity Type of Plant
Capacity (MWe) (MWe) nbr
(MWth)

Sub-critical
44,372 26,107 Exact 200
Thermal

Sub-critical
46,468 24,183 Exact 800
Thermal

Combined Cycle
44,880 25,999 Exact 860
Gas Turbine
Configuration
Short Power Plant of
Type of Fuel Primary Secondary Location
Description Used For Boiler/Turbine/
Gen

Pogoanele, nr.
1A, 75449,
Natural Gas Fuel Oil
Bucharest,
Romania

Lernut, Mures
Natural Gas
County, Romania

Petrobrazi
expect 6.7 TWh Refinery, Ploiesti,
Natural Gas Base Load
per year Prahova,
Romania
Description

Water
Electric Power Name of Withdrawal Cogen Mode:
Name/operator
Grid Connected SubStation Source of Fule Source of Water Rate at Full Steam Supplied
PPA(years)
To Connected To Power To
(cum/hour)

National Grid River Mures

pipeline from
from an
underground
Brazi Vest
National Grid storage facility at
substation
Butimanu in
Dambovita
County
(Tonnes/hour) Environmental Capital Cost of and/or In US SOx Control
In Year (YYYY) If other, specify:
Description Issues Plant Dollars Device Type
Particulates(PM Date
NOx Control
If other, specify: ) Control Device If other, specify: nit # Capacity (MWe) Commissioned
Device Type
Type (yyyy-mm-dd)

1 50 1987

2 50 1988

3 50 1989

4 50 1994

1 100 1963

2 100 1964

3 100 1964

4 100 1966

5 200 1966
6 200 1967

1 310 2011

2 310 2011

3 305 2011
Unit Information

Decommission
Turbine Turbine Generator Generator Boiler/HRSG Boiler/HRSG
Date (yyyy-mm-
Manufacturer Model/Type Manufacturer Model/Type Manufacturer Model/Type
dd)

TMZ
Electrosila
(Turbomotornyj Taganrog
Russia
Zavod)

TMZ
Electrosila
(Turbomotornyj Taganrog
Russia
Zavod)

TMZ
Electrosila
(Turbomotornyj Taganrog
Russia
Zavod)

TMZ
Electrosila
(Turbomotornyj Taganrog
Russia
Zavod)

Skoda Skoda Podolosk


Skoda Skoda Podolosk

GE GT-1 7FB GE

GE GT-1 7FB GE

GE GT-1 7FB GE
Environmental Issues Past and Future Major U

Chimney Height Unit Efficiency


Issue 1 Description Upgrade 1
(m) (%)
Past and Future Major Upgrades Owner and Operator Information

Type of Construction/E
Cost Year Owner 1 % Share
Ownership PC Contractor

SC
ELECTROCENT
RALE
BUCURESTI SA

S.C.
Electrocentrale
Bucuresti S.A. Public joint-stock
(subsidiary of company
Termoelectrica
S.A.)

Metka Greece,
GR Energy,
Petrom CPP and IPP
Empresarios
Agrupados
perator Information Comments

Operating Regulatory Project


Comment 1
Company Authority Financed By

AGENTIA
SC
NATIONALA
ELECTROCENT
PENTRU
RALE
PROTECTIA
BUCURESTI SA
MEDIULUI

Units 2 and 3 are under decommissioning


S.C.
Electrocentrale
2007: contract signed with Austrian company Verbund for seventh unit
Bucuresti S.A.
of 400 MW at a total cost of US$ 375 million

Supply power to Petrobrazi Refinery and rest sell on the market. Basic
Petrom Power
and Detail Engineering by Empresarios Agrupados
References

http://www.elcen.ro/

http://prtr.ec.europa.eu/FacilityLevels.aspx

http://www.elcen.ro/http://prtr.ec.europa.eu/FacilityLevels.aspxhttp://en.wikipedia.org/wiki/Ludus-Iernut_Power_Stationhttp://www.industcards.com/st-other-rom

http://www.wall-street.ro/articol/Companii/43553/GE-Energy-construieste-termocentrala-de-
860-MW-pentru-Petrom.html

http://en.wikipedia.org/wiki/Petrom_Brazi_Power_Station

http://www.petrom.com/portal/01/petromcom/!
ut/p/c5/04_SB8K8xLLM9MSSzPy8xBz9CP0os3hfA0sPN89Qo1BHE08vAze3oDAvAwgAyk
diyrtbesDk8ev288jPTdUPTs3TL8iNKAcA3Xu5bQ!!/dl3/d3/L0lJSklrQSEhL3dMTUFCa0FFa
k5BIS80Qm40UklBd1FBISEvNl9NMDlIRklVMlVBNElKMEZGRDRKMDAwMDAwMC83X00
wOUhGSVUyVUE0SUowRkZVTUgxMDAwMDAwL0hvbWU!/

http://www.petrom.com/SecurityServlet/secure?
cid=1234540819219&lang=en&swa_site=wps.vp.petromcom&swa_nav=Business+Units||
Gas%2C+Power+%26+Chemicals||BD+Power||EBRD+documents||&swa_pid=
%5BObjectIDImpl+%276_M09HFIU2UA4IJ0FFP7S0000000%27%2C+CONTENT_NODE
%2C+VP%3A+6491%2C+%5BDomain%3A+rel%5D%2C+DB%3A+5B19-
16A4F8A4175E1139C17BF97000000000%5D&swa_lang=en

http://www.empresariosagrupados.es/projects/brazi-romania/
ID

6
6

Notes
Abstract

Brazi (Dalkia Termo Prahova) Thermal CHPP Power Plant Romania is located at Trandafirilor nr.71, 107084, Brazi, Romania. Location coordinates are: Latitud
44.8833, Longitude= 26.00888. This infrastructure is of TYPE Oil Power Plant with a design capacity of 610 MWe. It has 10 unit(s). The first unit was
commissioned in 1961 and the last in 1986. It is operated by SC DALKIA TERMO PRAHOVA SRL.

Bucharest Grozavesti CHPP Power Station Romania is located at Splaiul Independentei nr. 229, 77208, Bucharest, Romania. Location coordinates are: Latitu
44.4404, Longitude= 26.06333. This infrastructure is of TYPE Oil Power Plant with a design capacity of 100 MWe. It has 2 unit(s). The first unit was commissio
in 1964 and the last in 1964. It is operated by SC Electrocentrale Bucuresti SA.

Bucharest South CHPP Power Station Romania is located at Releului , nr. 2B, 74569, Bucharest, Romania. Location coordinates are: Latitude= 44.4046,
Longitude= 26.1523. This infrastructure is of TYPE Oil Power Plant with a design capacity of 550 MWe. It has 6 unit(s). The first unit was commissioned in 19
and the last in 1975. It is operated by S.C. Electrocentrale Bucuresti S.A..

CET Bucuresti West CHPP Romania is located at Bd. Timisoara nr. 106, 77208, Bucharest, Romania. Location coordinates are: Latitude= 44.4233, Longitud
25.979. This infrastructure is of TYPE Oil Power Plant with a design capacity of 250 MWe. It has 2 unit(s). The first unit was commissioned in 1975 and the las
1975. It is operated by SC ELECTROCENTRALE BUCURESTI SA.

CET Constanta CHPP Power Plant Romania is located at Bulevardul Aurel Vlaicu nr. 123, 900075, Constanta, Romania. Location coordinates are: Latitude
44.1585, Longitude= 28.607. This infrastructure is of TYPE Oil Power Plant with a design capacity of 100 MWe. It has 2 unit(s). The first unit was commissione
1970 and the last in 1971. It is operated by SC ELECTROCENTRALE BUCURESTI SUC. CONSTANTA.

Galati Thermal Power Station Romania is located at Soseaua Smardan nr. 3, 800700, Galati, Romania. Location coordinates are: Latitude= 45.436, Longitud
27.9814. This infrastructure is of TYPE Oil Power Plant with a design capacity of 535 MWe. and the last in . It is operated by SC Electrocentrale Galati SA.
Galati Thermal Power Station Romania is located at Soseaua Smardan nr. 3, 800700, Galati, Romania. Location coordinates are: Latitude= 45.436, Longitud
27.9814. This infrastructure is of TYPE Oil Power Plant with a design capacity of 535 MWe. and the last in . It is operated by SC Electrocentrale Galati SA.

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pound
MM=million
Identifiers for Oil

Country
GEO Assigned Select Currency
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification for data in this
and Impact Rating Identification
Number page
Number

Brazi (Dalkia
Termo Prahova)
Operating
Thermal CHPP 41145 New Leu
partially
Power Plant
Romania

Bucharest
Grozavesti CHPP
Operating fully 41135 New Leu
Power Station
Romania

Bucharest South
CHPP Power Operating fully 40972 New Leu
Station Romania

CET Bucuresti
West CHPP Operating fully 41134 Kwacha
Romania

CET Constanta
CHPP Power Operating fully 41137 New Leu
Plant Romania

Galati Thermal
Power Station Operating fully 40974 New Leu
Romania
Galati Thermal
Power Station Operating fully 40974 New Leu
Romania
Location

Heat Supply
Design Firm Capacity
Latitude: Longitude: This location is: Capacity Type of Plant
Capacity (MWe) (MWe) nbr
(MWth)

Sub-critical
44,883 26,009 610 576
steam turbine

Sub-critical
44,440 26,063 Exact 100
steam turbine

Cogeneration
44,405 26,152 Exact 550 Power and Heat
Steam Turbine

Sub-critical
44,423 25,979 Exact 250
steam turbine

Sub-critical
44,159 28,607 Exact 100
steam turbine

Sub-critical
45,436 27,981 Exact 535
steam turbine
Sub-critical
45,436 27,981 Exact 535
steam turbine
Configuration
Short Power Plant of
Type of Fuel Primary Secondary Location
Description Used For Boiler/Turbine/
Gen

Trandafirilor
Fuel Oil Natural Gas nr.71, 107084,
Brazi, Romania

Splaiul
Independentei
Oil Natural Gas nr. 229, 77208,
Bucharest,
Romania

Releului , nr. 2B,


74569,
Heavy Oil Natural Gas
Bucharest,
Romania

Bd. Timisoara nr.


106, 77208,
Fuel Oil Natural Gas
Bucharest,
Romania

Bulevardul Aurel
Vlaicu nr. 123,
Fuel Oil Natural Gas 900075,
Constanta,
Romania

Soseaua
Smardan nr. 3,
Heavy Oil Natural Gas
800700, Galati,
Romania
Soseaua
Smardan nr. 3,
Heavy Oil Natural Gas
800700, Galati,
Romania
Description

Water
Electric Power Name of Withdrawal Cogen Mode:
Name/operator
Grid Connected SubStation Source of Oil Source of Water Rate at Full Steam Supplied
PPA(years)
To Connected To Power To
(cum/hour)

Industry,
National Grid Commercial and
Residential

National Grid

River Danube
River Danube
(Tonnes/hour) Environmental Capital Cost of and/or In US SOx Control
In Year (YYYY) If other, specify:
Description Issues Plant Dollars Device Type
Particulates(PM Date
NOx Control
If other, specify: ) Control Device If other, specify: Unit # Capacity (MWe) Commissioned
Device Type
Type (yyyy-mm-dd)

1 50 1961
2 50 1961
3 50 1961
4 50 1961
5 50 1961
6 50 1961
7 105
8 105
9 200 1986
10 200 1986

1 50 1964

2 50 1964

1 50 1965

2 50 1966

3 100 1967

4 100 1967

5 125 1975
6 125 1975

1 125 1975

2 125 1975

1 50 1970

2 50 1971

1 60
2 60
3 100
4 105
5 105
6 105
Unit Information

Decommission Diesel Engine / Diesel Engine /


Turbine Turbine Generator Generator
Date (yyyy-mm- Boiler Boiler
Manufacturer Model/Type Manufacturer Model/Type
dd) Manufacturer Model/Type

Turbomotornyj
Taganrog Zavod Electrosila
Yekaterinburg

Timace Skoda Skoda

Taganrog LMZ Russia Electrosila Russia

Taganrog LMZ Russia Electrosila Russia

Taganrog LMZ Russia Electrosila Russia

Taganrog LMZ Russia Electrosila Russia

Tlmace Skoda Skoda


Tlmace Skoda Skoda
Environmental Issues Past and Future Major U

Chimney Height Unit Efficiency


Issue 1 Description Upgrade 1
(m) (%)
Past and Future Major Upgrades Owner and Operator Information

Type of Construction/E
Cost Year Owner 1 % Share
Ownership PC Contractor

SC DALKIA
TERMO
PRAHOVA SRL

SC
Electrocentrale
Bucuresti SA

S.C.
Public joint-stock
Electrocentrale
company
Bucuresti S.A.

SC
ELECTROCENT
RALE
BUCURESTI SA

SC
AGENTIA
ELECTROCENT
NATIONALA
RALE Public joint-stock
PENTRU
BUCURESTI company
PROTECTIA
SUC.
MEDIULUI
CONSTANTA

Thermoelectrica
100
S.A.
Thermoelectrica
100
S.A.
perator Information Comments

Operating Regulatory Project


Comment 1
Company Authority Financed By

AGENTIA
SC DALKIA NATIONALA
TERMO PENTRU Heat Output = 475 MW thermal
PRAHOVA SRL PROTECTIA
MEDIULUI

AGENTIA
SC NATIONALA
Electrocentrale PENTRU
Bucuresti SA PROTECTIA
MEDIULUI

AGENTIA
S.C. NATIONALA Modernization of Units 3 and 4 of 100 MW each. Targets: 8% reduction
Electrocentrale PENTRU of electricity generation costs (3 USD/MWh); Emissions reduction by
Bucuresti S.A. PROTECTIA installing low NOx burners.
MEDIULUI

AGENTIA
SC
NATIONALA
ELECTROCENT
PENTRU
RALE
PROTECTIA
BUCURESTI SA
MEDIULUI

SC
ELECTROCENT
RALE
BUCURESTI
SUC.
CONSTANTA

AGENTIA
SC NATIONALA
Electrocentrale PENTRU
Galati SA PROTECTIA
MEDIULUI
AGENTIA
SC NATIONALA
Electrocentrale PENTRU
Galati SA PROTECTIA
MEDIULUI
References

http://www.dalkia.ro/ro/despre-dalkia/filiale.html

http://prtr.ec.europa.eu/FacilityLevels.aspx

http://www.energie-gratis.ro/termocentrale.php

http://www.elcen.ro/

http://prtr.ec.europa.eu/FacilityLevels.aspx

http://www.industcards.com/st-other-romania.htm

http://en.wikipedia.org/wiki/List_of_power_stations_in_Romania

http://www.elcen.ro/

http://www.industcards.com/st-other-romania.htm

http://prtr.ec.europa.eu/FacilityLevels.aspx

http://www.elcen.ro/

http://prtr.ec.europa.eu/FacilityLevels.aspx

http://www.elcen.ro/

http://prtr.ec.europa.eu/FacilityLevels.aspx

http://en.wikipedia.org/wiki/Gala%C5%A3i_Power_Station

http://www.cez.cz/en/investors/inside-information/1167.html

http://prtr.ec.europa.eu/FacilityLevels.aspx
http://en.wikipedia.org/wiki/Gala%C5%A3i_Power_Station

http://www.cez.cz/en/investors/inside-information/1167.html

http://prtr.ec.europa.eu/FacilityLevels.aspx
ID

Notes
Abstract

Matra Coal Power Plant Hungary is located at Visonta, East of Gyongyos, Heves, Hungary. Location coordinates are: Latitude= 47.79027, Longitude= 20
This infrastructure is of TYPE Coal Power Plant with a design capacity of 950 MWe. It has 7 unit(s). The first unit was commissioned in 1978 and the last
operated by Matra Ermu Rt.

Oroszlany CHP Coal Power Plant Hungary is located at Oroszlany, Komarom-Esztergom, Hungary. Location coordinates are: Latitude= 47.5017, Longi
18.2701. This infrastructure is of TYPE Coal Power Plant with a design capacity of 240 MWe. It has 4 unit(s). The first unit was commissioned in 1961 and
in 1963. It is operated by Vertesi Eromu ZRt (formed in 1992 and owned by MVM Ztr).

Pannonpower (Pecs) Thermal Power Plant Hungary is located at Pecs, Pecs, Hungary. Location coordinates are: Latitude= 46.0641, Longitude= 18.263
infrastructure is of TYPE Coal Power Plant with a design capacity of 182.4 MWe. It has 4 unit(s). The first unit was commissioned in 1961 and the last in 1
operated by Pannon Thermal PP Ltd and Pannon Green.

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pounds, MM=million
* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 pounds, MM=million
Identifiers for Coal

Country
GEO Assigned Select Currency
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification for data in this
and Impact Rating Identification
Number page
Number

Matra Coal
Power Plant Operating Fully 42668 Forint
Hungary

Oroszlany CHP
Coal Power Operating Fully 42672 Forint
Plant Hungary

Pannonpower
(Pecs) Thermal
Operating Fully 42683 Forint
Power Plant
Hungary
Location

Heat Supply
Design Firm Capacity
Latitude: Longitude: This location is: Capacity Type of Plant
Capacity (MWe) (MWe) nbr
(MWth)

Sub-critical
47,790 20,064 Exact 950
Thermal

Cogeneration
47,502 18,270 Exact 240 84 Power and Heat
Steam Turbine

Sub-critical
46,064 18,263 Exact 182.4
Thermal
Configuration
Short Power Plant of
Type of Fuel Primary Secondary Location
Description Used For Boiler/Turbine/
Gen

Visonta, East of
Coal Lignite Base Load Gyongyos, Heves,
Hungary

Oroszlany,
Coal lignite and Komarom-
Base Load
Brown Coal Esztergom,
Hungary

Mixed Fuel -
Pecs, Pecs,
Gas, Coal and Natural Gas Biomass
Hungary
Biomass
D

Water
Electric Power Name of Onsite Storage Withdrawal Onsite Storage
Name/operator
Grid Connected SubStation Source of Coal Capacity Rate at Full Capacity
PPA(years)
To Connected To (Tonnes) Power (Tonnes)
(cum/hour)

Company owned
Lignite mines 3
National Grid 180000
km South and
East

Mines in the
Oroszlany and
National Grid Tatabanya
regions including
Markushegy

Pecs substation
National Grid
at 120kV
Description

Kilometers to
Name of Major Type of Cooling Source of Source of
Coal Mines Rate (cum/day) Rate (cum/day)
Mines System Cooling Water Makeup Water
(Average)

3
Water
Withdrawal Cogen Mode:
Environmental Capital Cost of and/or In US
Rate at Full Steam Supplied (Tonnes/hour) Description
Issues Plant Dollars
Power To
(cum/hour)
Particulates(PM
Mercury Control SOx Control NOx Control
In Year (YYYY) If other, specify: If other, specify: ) Control Device
Device Device Type Device Type
Type

Wet Lime Flue


Gas
Units 3-5
Desulfurization
Unit

Wet Lime Flue


Gas Lurgi FGD
Desulfurization scrubber
Unit
Unit Informat

Date Decommission
Boiler
If other, specify: Unit # Capacity (MWe) Commissioned Date (yyyy-mm- Boiler Manufacturer
Model/Type
(yyyy-mm-dd) dd)

1 100 1978

2 100 1978

3 220 1980

4 232 1980

5 232 1980

6 33

7 33

1 60 1961 Rafako Czech

2 60 1962 Rafako Czech

3 60 1962 Rafako Czech

4 60 1963 Rafako Czech

1 37.5 1961 Natural Gas

2 35 1961 Natural Gas

3 60 1965 Coal

4 49.9 1965 Biomass


Unit Information

Turbine Chimney Height Unit Efficiency


Turbine Manufacturer Generator Manufacturer Generator Model/Type
Model/Type (m) (%)

ST-1

ST-2

ST-3

ST-4

ST-5

Hitachi Japan GT-1

Hitachi Japan GT-2

Skoda Czech Ganz

Skoda Czech Ganz

Skoda Czech Ganz

Skoda Czech Ganz

Lang ST-1 Ganz

Lang ST-2 Ganz

Lang ST-3 Ganz

Lang ST-4 Ganz


Environmental Issues Past and Future Major Upgrades

Issue 1 Description Upgrade 1 Cost

Refurbishing of boilers and life


extension work. Addition of FGD
units

1. Refurbishment of all 4 units

2. Istallation of wet limestone-


gypsum flue gas desulphurization
Lurgi technology
jor Upgrades Owner and Operator Information

Type of Construction/E Operating


Year Owner 1 % Share
Ownership PC Contractor Company

1. RWE (acquired in 1995)


1. 51%
2. Energie Baden-
1998-2002 2. 21.7% Matra Ermu Rt
Wurttemberg (EnBW)
3. 25.5%
3. MVM Hungary

Vertesi Eromu
1. 1990-1990
ZRt (formed in
MVM Ztr.
1992 and owned
2. 2002-2004
by MVM Ztr)

Pannon Power Holding Zrt Pannon Thermal


(owned by Dalkia Energia PP Ltd and
Zrt) Pannon Green
mation

Regulatory Project
Authority Financed By
Comments

Comment 1

Units 1, 2 4 & 5 have Heller-type dry cooling systems while Unit-3 uses conventional natural draft towers

Two wet lime FGD units are integrated into the interior of the two dry-cooling towers and fed by a common duct collecting flue gases from the 3x232

Sales of power benefit from having regional electricity distributors Elmu and Emasz, both controlled by RWE-EnBW

The two gas turbines use topping gas

This thermal plant started out as 2x35 (1961) and 2x60 (1965) coal fired.

The 2x35 MW units were converted to Gas fired in 2005 and Unit 4 of 60 MW units to Biomass in 2004 with capacity 49.9 MW
References

http://www.mert.hu/en/power-station and http://www.mert.hu/en/company-story

http://english.mvm.hu/engine.aspx?page=statistical_data

http://www.industcards.com/st-coal-hungary.htm

http://english.mvm.hu/engine.aspx?page=statistical_data (GWh from annual reports


2003-2008)

http://www.rwe.com/web/cms/mediablob/en/217484/data/217340/1/rwe-power-
international/downloads/www-rwepi-com-downloads/RWE-extended-the-life-of-
Hungarys-Matra-power-station.pdf

http://www.vert.hu/oroszlany.aspx

http://www.industcards.com/st-coal-hungary.htm

http://english.mvm.hu/engine.aspx?page=statistical_data (GWh from annual reports


2003-2008)

http://www.pannonpower.hu/tagvallalatok/pannonpower-holding-zrt/tevekenysegunk

http://www.industcards.com/biomass-europe.htm

http://english.mvm.hu/engine.aspx?page=statistical_data (GWh from annual reports


2003-2008)
ID

6
7

10

11

12

13

14

Notes
Abstract

AES Tisza II Thermal Power Plant Hungary is located at Tiszaujvaros, Borsod-Abauj-Zemplen, Hungary. Location coordinates are: Latitude= 48.9174, Lon
21.077. This infrastructure is of TYPE Gas Power Plant with a design capacity of 900 MWe. It has 4 unit(s). The first unit was commissioned in 1977 and t
1978. It is operated by AES TISZA ERM KFT..

BC (Borsodchem) CHP Power Plant Hungary is located at Kazincbarcika, BorsodChem Zrt, Borsod-Abauj-Zemplen, Hungary. Location coordinates are: L
48.2453, Longitude= 20.6476. This infrastructure is of TYPE Gas Power Plant with a design capacity of 47 MWe. It has 2 unit(s). The first unit was comm
in 2001 and the last in 2001. It is operated by Sinergy Ltd (for BC-Erm Kft).

Csepel CCGT Power Plant Hungary is located at On river Danube, Budapest, Hungary. Location coordinates are: Latitude= 47.428, Longitude= 19.052
infrastructure is of TYPE Gas Power Plant with a design capacity of 403 MWe. It has 3 unit(s). The first unit was commissioned in 2000 and the last in 20
operated by Atel Csepeli Vllalatcsoport.

Dunamenti II Thermal Power Plant Hungary is located at Szazhalombatta, Pest, Hungary. Location coordinates are: Latitude= 47.3283, Longitude= 18.91
infrastructure is of TYPE Gas Power Plant with a design capacity of 1290 MWe. It has 6 unit(s). The first unit was commissioned in 1974 and the last in 1
operated by Dunamenti Ltd.

E.ON Debrecen OCGT CHP Power Plant Hungary is located at Debrecen, Hajdu-Bihar, Hungary. Location coordinates are: Latitude= 47.5185, Longit
21.6329. This infrastructure is of TYPE Gas Power Plant with a design capacity of 95 MWe. It has 1 unit(s). The first unit was commissioned in 2001. It is
by Debreceni Kombinlt Ciklus Erm Kft. (DKCE).

E.ON Gonyu CCGT Power Plant Hungary is located at West of Gonyu, Gyor-Moson-Sopron, Hungary. Location coordinates are: Latitude= 47.7384, Lon
17.8033. This infrastructure is of TYPE Gas Power Plant with a design capacity of 433 MWe. It has 2 unit(s). The first unit was commissioned in 2011 and
in 2011. It is operated by E.ON Ermvek Kft.
E.ON Nyiregyhaza OCGT CHP Power Plant Hungary is located at Nyiregyhaza, Szabolcs-Szatmar-Bereg, Hungary. Location coordinates are: Latitude= 4
Longitude= 21.6988. This infrastructure is of TYPE Gas Power Plant with a design capacity of 49 MWe. It has 1 unit(s). The first unit was commissioned in
is operated by Nyregyhzi Kombinlt Ciklus Erm Kft.

Kelenfold CCGT CHP Power Plant Hungary is located at Hengermalom t 60, Budapest XI, Hungary. Location coordinates are: Latitude= 47.4624, Long
19.0563. This infrastructure is of TYPE Gas Power Plant with a design capacity of 196 MWe. It has 4 unit(s). The first unit was commissioned in 1995 and
in 2010. It is operated by Budapesti Eromu Rt (BERT) (Budapest Power Plant).

Kispest CCGT CHP Power Plant Hungary is located at Budapest XVIII., Nefelejcs u. 2., Hungary. Location coordinates are: Latitude= 47.4568, Longitu
19.1673. This infrastructure is of TYPE Gas Power Plant with a design capacity of 114 MWe. It has 2 unit(s). The first unit was commissioned in 2004 and
in 2004. It is operated by Budapesti Eromu Rt (BERT) (Budapest Power Plant).

Liter OCGT Power Plant Hungary is located at Liter, Veszprem, Hungary. Location coordinates are: Latitude= 47.1075, Longitude= 18.0143. This infrastru
of TYPE Gas Power Plant with a design capacity of 120 MWe. It has 1 unit(s). The first unit was commissioned in 1998. It is operated by MVM GTER

Lorenci OCGT Power Plant Hungary is located at 3021 Lrinci, Pf.: 10, Erm telep, Heves, Hungary. Location coordinates are: Latitude= 47.71644, Lon
19.67779. This infrastructure is of TYPE Gas Power Plant with a design capacity of 170 MWe. It has 1 unit(s). The first unit was commissioned in 2000
operated by MVM GTER Ztr..

Sajoszoged OCGT Power Plant Hungary is located at Borsod-Abauj-Zemplen, Hungary. Location coordinates are: Latitude= 47.9393, Longitude= 20.97
infrastructure is of TYPE Gas Power Plant with a design capacity of 120 MWe. It has 1 unit(s). The first unit was commissioned in 1998. It is operated b
GTER Ztr..

TVK CCGT CHP Power Plant Hungary is located at Tiszajvros, TVK Nyrt, Borsod-Abauj-Zemplen, Hungary. Location coordinates are: Latitude= 47.9
Longitude= 21.0236. This infrastructure is of TYPE Gas Power Plant with a design capacity of 33.4 MWe. It has 2 unit(s). The first unit was commissioned
and the last in 2004. It is operated by Sinergy Ltd (for TVK-Erm Kft.).
Ujpest CCGT CHP Power Plant Hungary is located at T u. 7., Budapest IV, Hungary. Location coordinates are: Latitude= 47.554, Longitude= 19.1023
infrastructure is of TYPE Gas Power Plant with a design capacity of 110 MWe. It has 2 unit(s). The first unit was commissioned in 2002 and the last in 20
operated by Budapesti Eromu Rt (BERT) (Budapest Power Plant).

* cum = cubic meters; MWe = Megawatts electric; 1 KWhr = 3412.3 Btu = 859.85 kilocalories; 1 Tonne = 2205 po
MM=million
Identifiers for Gas

Country
GEO Assigned Select Currency
Plant Efficiency Plant Overall Assigned
Name Status of Plant Identification for data in this
and Impact Rating Identification
Number page
Number

AES Tisza II
Thermal Power Operating Fully 42673 Forint
Plant Hungary

BC
(Borsodchem)
Operating Fully 42682 Forint
CHP Power
Plant Hungary

Csepel CCGT
Power Plant Operating Fully 42667 Forint
Hungary

Dunamenti II
Thermal Power Operating Fully 42674 Forint
Plant Hungary

E.ON Debrecen
OCGT CHP
Operating Fully 42669 Forint
Power Plant
Hungary

E.ON Gonyu
CCGT Power Operating Fully 42670 Forint
Plant Hungary
E.ON
Nyiregyhaza
OCGT CHP Operating Fully 42671 Forint
Power Plant
Hungary

Kelenfold CCGT
CHP Power Operating Fully 42678 Forint
Plant Hungary

Kispest CCGT
CHP Power Operating Fully 42680 Forint
Plant Hungary

Liter OCGT
Power Plant Operating Fully 42666 Forint
Hungary

Lorenci OCGT
Power Plant Operating Fully 42664 Forint
Hungary

Sajoszoged
OCGT Power Operating Fully 42665 Forint
Plant Hungary

TVK CCGT CHP


Power Plant Operating Fully 42681 Forint
Hungary
Ujpest CCGT
CHP Power Operating Fully 42679 Forint
Plant Hungary
Location

Heat Supply
Design Firm Capacity
Latitude: Longitude: This location is: Capacity Type of Plant
Capacity (MWe) (MWe) nbr
(MWth)

Sub-critical
48,917 21,077 Exact 900
Thermal

Power and Heat


48,245 20,648 Exact 47 Open Cycle Gas
Turbine

Combined Cycle
47,428 19,053 Exact 403
Gas Turbine

Sub-critical
47,328 18,917 Exact 1290 1000
Thermal

Open Cycle Gas


47,518 21,633 Exact 95 90
Turbine

Combined Cycle
47,738 17,803 Exact 433
Gas Turbine
Combined Cycle
47,957 21,699 Exact 49
Gas Turbine

Power and Heat


47,462 19,056 Exact 196 373 Open Cycle Gas
Turbine

Power and Heat


47,457 19,167 Exact 114 366 Open Cycle Gas
Turbine

Open Cycle Gas


47,107 18,014 Exact 120
Turbine

Open Cycle Gas


47,716 19,678 Exact 170
Turbine

Open Cycle Gas


47,939 20.97 Exact 120
Turbine

Power and Heat


47,914 21,023 Exact 33.4 Combined Cycle
Gas Turbine
Power and Heat
47,554 19,102 Exact 110 404 Combined Cycle
Gas Turbine
Configuration
Short Power Plant of
Type of Fuel Primary Secondary Location
Description Used For Boiler/Turbine/
Gen

Tiszaujvaros,
8x boilers of 670
Borsod-Abauj-
Natural Gas Fuel Oil Base Load t/h, 540 C, 168
Zemplen,
bar steam
Hungary
supplies the Kazincbarcika, It has 2 HRSG
adjacent BorsodChem Zrt, with
BorsodChem Natural Gas Fuel Oil Cogeneration Borsod-Abauj- supplemental
works with steam Zemplen, firing and two
and electricity Hungary reserve boiler

On river Danube,
One 2+2+1
Natural Gas Fuel Oil Budapest,
Block
Hungary

These are
labeled units F8- Szazhalombatta,
Natural Gas Fuel Oil Base Load
13 by the Pest, Hungary
company

Debrecen,
Intermediate/Pea One 1+1+1
Natural Gas Hajdu-Bihar,
k Load CCGT block
Hungary

West of Gonyu,
One 1+1+1
Natural Gas Gyor-Moson-
CCGT block
Sopron, Hungary
Nyiregyhaza,
Szabolcs-
Natural Gas Base Load
Szatmar-Bereg,
Hungary

Hengermalom t
Natural Gas Fuel Oil Cogeneration 60, Budapest XI,
Hungary

Budapest XVIII., 3 Steam boilers,


Natural Gas Fuel Oil Cogeneration Nefelejcs u. 2., 1 HRSG, 2 Hot
Hungary Water Boilers

Liter, Veszprem,
Natural Gas Fuel Oil Peaking load one OCGT
Hungary

3021 Lrinci, Pf.:


Natural Gas Fuel Oil Peaking load 10, Erm telep, one OCGT
Heves, Hungary

Borsod-Abauj-
Natural Gas Peaking load Zemplen, One OCGT
Hungary
Tiszajvros,
TVK Nyrt,
One 1+1+1
Natural Gas Cogeneration Borsod-Abauj-
CCGT block
Zemplen,
Hungary
T u. 7., 2 steam boilers,
Natural Gas Cogeneration Budapest IV, 1 HRSG, 2 hot
Hungary water boilers
Description

Water
Electric Power Name of Withdrawal Cogen Mode:
Name/operator
Grid Connected SubStation Source of Fuel Source of Water Rate at Full Steam Supplied
PPA(years)
To Connected To Power To
(cum/hour)

220kV substation
for Units 1-2 and 180 cum/h
National Grid a 400kV capacity water
substation for treatment plan
Units 3-4

Captive and Grid


Connected

National Grid Danube River 26000

Industry;
National Grid Danube River Szazhalombatta
Oil Refinery

E.ON Tiszntli
Regional Grid 120 kV
ramhlzati Zrt.

Adjacent Gonyu
National Grid Danube River
substation
Industry,
Commercial and
Regional Grid
Residential: City
of Nyiregyhaza

Residential
Complex: District
heating areas of
gas and oil by Ormezo,
National Grid Danube River
pipeline Gazdagret,
Lagymanyos
high pressure housing estate
natural gas and areas of
Buda Castle
Kbnya City
National Grid which arrives
Centre, Jzsef
through a
Attila housing
pipeline
Adjacent
400/132/35/20
National Grid
kV substation
Liter

National Grid Adjacent canal

Sajoszoged
National Grid 400/220/132 kV
substation

Chemical
company Tiszai
Vegyi Kombint
Residential:
Nyrt and MOL
district heating
National Grid Industrial Water areas of
Kposztsmegye
r, jpest City
(Tonnes/hour) Environmental Capital Cost of and/or In US SOx Control
In Year (YYYY) If other, specify:
Description Issues Plant Dollars Device Type

62000000 2001

17000000000 2000

573000000
11000000000

75000000 2004
Particulates(PM Date
NOx Control
If other, specify: ) Control Device If other, specify: nit # Capacity (MWe) Commissioned
Device Type
Type (yyyy-mm-dd)

1 225 1977
2 225 1977
3 225 1978
4 225 1978

1 23.5 2001
Low Nox Burner
2 23.5 2001

1 142.5 2000

2 142.5 2000

3 118 2000

1 215 1974

2 215 1974

3 215 1975

4 215 1975

5 215 1976

6 215 1976

1 95 2001

1 290 2011
Low Nox Burner

2 143 2011
Low Nox Burner 1 49 2007

1 136 1995
2 50 2006
3 5 2009
4 5 2010
1 70.1 2004
Low Nox Burner
2 44 2004

Low Nox Burner 1 120 1998

Low Nox Burner 1 170 2000

1 120 1998

1 23.6 2004
Low Nox Burner
2 9.8 2004
1 74 2002
2 36 2002
Unit Information

Decommission
Turbine Turbine Generator Generator Boiler/HRSG Boiler/HRSG
Date (yyyy-mm-
Manufacturer Model/Type Manufacturer Model/Type Manufacturer Model/Type
dd)

Lang Ganz Timace


Lang Ganz Timace
Lang Ganz Timace
Lang Ganz Timace

Siemens GT-1 SGT-600 Siemens

Siemens GT-2 SGT-600 Siemens

164 MVA at
AE
GE GT-1 MS99171E Elin 15.75 kV output
Energietechnik
voltage

164 MVA at
AE
GE GT-2 MS99171E Elin 15.75 kV output
Energietechnik
voltage

164 MVA at
GE ST-1 MS9001E Elin 15.75 kV output
voltage

Brown Boveri
ST-1
and Cie (BBC)

Brown Boveri
ST-2
and Cie (BBC)

Brown Boveri
ST-3
and Cie (BBC)

Brown Boveri
ST-4
and Cie (BBC)

Brown Boveri
ST-5
and Cie (BBC)

Brown Boveri
ST-6
and Cie (BBC)

GE GT-1 9001FA MAN DBEMA Energia

GT-1 SGT5-
Siemens Siemens SGEN 5-3000W STF
4000F

Siemens ST-1 SST5-5000 Siemens STF


Hitachi GT-1 H-25AX Siemens Aalborg

GE GT-1 9001E Elin


Alstom ST-1

GE GT-1 6FA
ST-1

Siemens GT-1 V94.2 Siemens

European Gas
GT-1 PG 9171E GEC-Alstom
Turbines EGT

GE GT-1 6FA
Alstom ST-1
Environmental Issues Past and Future Majo

Chimney Height Unit Efficiency


Issue 1 Description Upgrade 1
(m) (%)

250
Refurbishment of plant for life
250
extension and meeting
250 European standards
250

200

200

200

200

200

200

59

59
Past and Future Major Upgrades Owner and Operator Infor

Type of
Cost Year Owner 1 % Share
Ownership

AES Hungary

1. EMASZ Rt (RWE)

2. Magyar Olaj s Gzipari Nyrt CPP

3. BorsodChem Zrt

Alpiq Energy AG (acquired in


2002)

1. Electrabel SA
1. 50,3%
2. GDF SUEZ Energy Holding,
2. 24,5%
Hungary Ltd.
3. 25%
3. Hungarian Power Companies
4. 0,2%
4. Other

E.ON Hungaria Zrt.

E.ON Hungaria Zrt.


E.ON Hungaria Zrt.

EDF Group

EDF Group

MVM Ztr.

MVM Ztr.

MVM Ztr.

EMASZ Rt (RWE)
CPP
Tiszai Vegyi Kombinat Rt (TVR)

EDF Group
nd Operator Information

Construction/E Operating Regulatory Project


PC Contractor Company Authority Financed By

AES TISZA
ERM KFT.

Sinergy Ltd (for


Sinergy Ltd
BC-Erm Kft)

Atel Csepeli
VA Tech
Vllalatcsoport

Dunamenti Ltd

Debreceni
Kombinlt
Ciklus Erm
Kft. (DKCE)

E.ON Ermvek
Siemens
Kft
E.ON Energy Nyregyhzi
Projects, Kombinlt
Babcock-Hitachi Ciklus Erm
Europe Kft

Budapesti Eromu
Rt (BERT)
(Budapest Power
Plant)
Budapesti Eromu
Rt (BERT)
(Budapest Power
Plant)

MVM GTER Ztr.

MVM GTER Ztr.

MVM GTER Ztr. World Bank loan

Sinergy Ltd (for


TVK-Erm Kft.)
Budapesti Eromu
Rt (BERT)
(Budapest Power
Plant)
Comments

Comment 1

Fuel oil delivered to the plant through pipeline from the Tisza Refinery
of MOL Rt. Four storage tanks of 20000 cum each

In addition to the main plant items, the site also has a Water Treatment
Plant, four hot water boilers and one auxiliary steam boiler to supply
district heat

The distillate fuel oil is stored in two 8000 cum tanks and unloaded at
the adjacent jetty

Adjacent to Csepel I a renovated thermal power station dating from


1984

The GWh are for both the thermal and CCGT power plant
Along with electricity, the plant supplies about 910 TJ/yr of heat for the
city and process steam to a nearby Michelin tire plant

Onsite storage of fuel oil is 5000 cum. The plant has additional hot
water boilers available to operate in peak periods as needed

The 2x5 MW gas turbines are part of the TORNADO project for
summer cogeneration
In winter heating season the main equipment of PP is run typically at
high load and with optimum utilisation. Outside the heating season,
production is optimised over current contractual obligations and energy
market opportunities

The GT consumes 32 t/h of gas when in full operation

The Matravidek site (old 4x32 coal-fired plant retired in 1982-1986) was
bought by MVM from the Matra Power Plant Co in 1995

In winter heating season the main equipment of PP is run typically at


high load and with optimum utilisation. Outside the heating season,
production is optimised over current contractual obligations and energy
market opportunities
References

http://aes.hu/ (see under company > Business Units)

http://www.industcards.com/st-other-hungary.htm

http://english.mvm.hu/engine.aspx?page=statistical_data (GWh from annual reports 2003-


2008)

http://www.sinergy.hu/english/pages/bc_power_plant_kazincbarcika/http://www.industcards.com/cc-hungary.htm

http://csepel.alpiq.hu/en/what-we-offer/electricity-generation/electricity-generation.jsp

http://csepel.alpiq.hu/en/about-us/about-us.jsp and http://csepel.alpiq.hu/en/our-


installations/visit-our-plant/virutal-tour-csepel.jsp

http://www.industcards.com/cc-hungary.htm

http://english.mvm.hu/engine.aspx?page=statistical_data (GWh from annual reports 2003-


2008)

http://www.alpiq.com/what-we-offer/our-assets/thermal-power-plants/gas-fired-combined-
cycle-power-plants/csepel-thermal-power-station.jsp

http://www.gdfsuez-energia.hu/tarsasagunkrol/gdf-suez-magyarorszagon/dunamenti-eromu

http://www.industcards.com/st-other-hungary.htm

http://english.mvm.hu/engine.aspx?page=statistical_data (GWh from annual reports 2003-


2008)

http://www.turbinetec.com/Download_GE_Layer.html

http://www.gdfsuez-energia.hu/sajtoszoba/sajtoszoba-063

http://www.eon-
hungaria.com/en/corporate/eongroup/debrecenikombinaltciklusueromu/history

http://www.industcards.com/cc-hungary.htm

http://english.mvm.hu/engine.aspx?page=statistical_data (GWh from annual reports 2003-


2008)

http://www.eon-hungaria.com/en/corporate/e-on-eromuvek-kft http://www.eon-
hungaria.com/en/press/releases/2011/kozl110627

http://www.powermag.com/e-on-commissions-433-mw-hungary-ccgt/

http://www.industcards.com/cc-hungary.htm
http://www.eon-
hungaria.com/en/corporate/eongroup/nyiregyhazikombinaltciklusueromu/history and
http://www.eon-hungaria.com/en/corporate/eon/history

http://www.industcards.com/cc-hungary.htm

option=com_content&view=article&id=10&Itemid=13&lang=en

http://www.industcards.com/cc-hungary.htm

http://www.budapestieromu.hu/index.php?
option=com_content&view=article&id=18&Itemid=22&lang=en
option=com_content&view=article&id=12&Itemid=15&lang=en
http://www.budapestieromu.hu/index.php?
http://www.budapestieromu.hu/index.php?
option=com_content&view=article&id=14&Itemid=17&lang=en (BERT Annual Reports

http://www.mvm-gter.hu/gazturbinas-eromuvek

http://www.gter.hu/gazturbinas-eromuvekhttp://www.industcards.com/cc-hungary.htm

http://www.mvm-gter.hu/gazturbinas-eromuvek

http://www.industcards.com/cc-hungary.htm

http://www.sinergy.hu/english/pages/tvk_power_plant_tiszaujvaros/

http://www.industcards.com/cc-hungary.htm
option=com_content&view=article&id=11&Itemid=14&lang=en

http://www.budapestieromu.hu/index.php?
option=com_content&view=article&id=14&Itemid=17&lang=en (Bert Annual Reports 2005-

Das könnte Ihnen auch gefallen