SECTION 11
MISCELLANEOUS WORKS
11.1 INSTRUMENTATION
The Contractor is fully responsible for all installation, accuracy, monitoring and maintenance of these
instrument and survey points during the construction period.
The Contractor shall submit the drawings and method of installation for each item to the Engineer for
his approval at least thirty (30) days before the installation.
TS-11-1
Technical Specification of Miscellaneous Works
Benannain Weir and Appurtenance
Engineer, to datum level determined by precise survey leveling from a designated bench mark as
approved by the Engineer.
The Contractor shall submit the drawings and method of installation for each item to the Engineer for
his approval at least thirty (30) days before the installation.
TS-11-2
Technical Specification of Miscellaneous Works
Benannain Weir and Appurtenance
The maintenance equipment and tools shall be delivered in lockable cabinet(s) fitted internally so
that the tools may be safety stored in an orderly manner.
TS-11-3