Session Objectives
Course: Civil Engineering
UNIT III
23
Updating of network from the date of failure of monitoring.
24
26
Ready to implement monitoring and controlling for real life project.
27
3.1 Resource allocation
It is a process and strategy involving a company deciding where scarce resources should
be used in the production of goods or services. A resource can be considered any factor of
production, which is something used to product goods or services. Resources include such things
as labor, real estate, machinery, tools and equipment, technology, and natural resources as well as
financial resources such as money. The network analysis for PERT/CPM, carried out so far is
valid only if the availability of resources are not available in unlimited quantities. Availability of
manpower may be restricted. Availability of funds, credits, capital investment and heavy
equipment may be restricted. In some cases there may be space limitations, which prevent more
than one or two technicians working simultaneously. Large fluctuations in their demand may
cause problems in project execution Planning should be done in such a manner that resources are
utilized in more or less uniform manner. This can be achieved by following two approaches.
If the duration of completion of the project is the constraints, then resource smoothing
should be applied without changing the total project duration. The periods of minimum demand
for resources are located and the activities are shifted according to the float availability and
requirement of resources. Thus the intelligent utilization of floats can smoothen the demand of
resources to the maximum possible extent. This type of resource allocation is called Resource
smoothing.
1. List out resources which will be required for execution of the various activities and identify
the ones which considered important.
2. Resource profiles are prepared by carrying out resources aggregation exercise and cumulative
resource requirement for each unit are plotted in form of histograms.
3. The periods of peak and low demands are identified and an attempt is made to lower the peaks
and to fill up the troughs.
1. Lower the peak requirement of the resources by staggering the resource input on critical non
critical activities. If necessary, sub critical and critical activities can also be tackled to bring peak
demands below the specified levels. Thus, the completion of work may be delayed due to
resource constraints.
2. Either increase the duration of critical activities or place some of the concurrent activities in
series to reduce the peak demands of the scare resources. This will increase the duration of the
project.
3. Re arrange the activities in descending order of the magnitude of the positive float, as
resources can be conveniently diverted from the activities which possess large amount of float.
Lower the high peaks of the resource demand by utilizing the free floats of the activities. Then
non-critical should be rescheduled to the extent required by utilizing having the highest float.
Critical activities can be tackled, if necessary.
3.2 Network Crashing
The use of CPM network is not limited to estimation of project duration or calculation
of critical duration. In a project there may arise situations wherein it would be desirable to
cut down the total project time. This naturally leads to cost considerations. Also; the cost will
increase as the time duration increases. But if the project is to be completed at an early date,
then it requires deployment of more resources which again increases the cost.
Crashing is the process of attempting to shorten project activities and in turn the overall
project by assigning additional resources.
Crashing a project often introduces unanticipated problems and the solution to one
problem often creates other problems.
In simple terms might involve increasing the resources to do something 8 people to dig a
ditch instead of 4 people (or labor shovels)
Or human resources could be replaced by technology Dig the ditch with a machine.
Changes in production function might increase project risk as well as cost
Direct costs of project depend on the completion time. But, the variation is not linear.
Normally, there is an optimum duration for a project for which he direct cost is a minimum.
During this time, the resources are optimally used. This duration of the project is usually called
normal duration.
Direct cost of the project depends on completion time. But, the variation is not linear.
Normally there is an optimum duration for a project for which direct cost is a minimum. During
this time, the resources are optimally used. This duration of the project is usually called normal
duration. The duration of the project can be reduced below the normal duration. But, it increase
the direct cost due to deployment of additional resources. A typical direct cost-time curve curve
is shown.It can be seen that the direct costs increase if either time is increased or decreases
beyond normal duration.
Direct cost
Cost
Crash Normal
Time
1. There is a point on the curve where the cost is a minimum corresponding to an optimum
duration (Normal duration).
2. The direct cost increases on either side of normal duration but at a steady rate on the higher
side of normal duration.
3. There is point beyond which the project duration cannot be reduced irrespective of the
increase in direct cost. This duration is called the crash duration and corresponding cost is known
as crash cost.
In addition to cost of buying resources and cost of operations involved, every project
incurs some indirect costs in term of overheads, administrative expenses, depreciation, loss of
project, loss of revenue profit, pentalty.These indirect costs increase with duration. The loss in
profit, penalty incurred etc. come under outage loss. A combination of these costs when drawn
against time a curve.
Cost
Time
The direct and indirect project cost added together constitutes the cost the total project
cost. The direct costs do not a linear relationship with time. As a result, a combination of
indirect and direct time. It can be seen that total project cost is a minimum for certain
duration. The corresponding duration is called optimum duration for the minimum cost. Also
the optimum duration for the minimum costs.
Normal Time: Normal time is the standard time that an estimator would usually allow for an
activity.
Crash time: This is the direct cost required to complete the activity in normal time duration.
Crash cost: This is the direct cost corresponding to the completion of the activity within
crash time.
Cost slope: the direct cost curve as already seen is a curve. But this curve can be
approximated by a straight line or more than one straight line, depending upon the flatness of
the curve. the slope of this straight line is the cost slope.
Figure3. Costs of
Projects
When shortening a projects duration, select the least expensive way to do it.
3.3 Updating
The process of incurring change, and replanting or rescheduling is called updating. The
conventional approach to updating is the complete re-computation of all data. The three basic
changes that make updating necessary are as under.
2. Rescheduling activities
If all activities are progressing well accordingly to plan and schedule, then there is no
need for updating. But, practically speaking, due to delays the duration of undefined activities
are revised and thus the network diagram is redrawn.
3.3.1 The major reasons for the changes made in project plan are:
1. Due to the unforeseen difficulties, natural calamities and changed condition at the site of
project.
2. To develop better and more detailed plans based on additional knowledge of the job.
The major changes in the rescheduling occur due to the following reason.
The following information is necessary to update the plan at an intermediate stage of execution
of a project
1. Original network
2. Progress report
3. Calculated charts.
4. New information and knowledge which will affect the duration in the future.
3.3.3 Methods of Updating
4. By calculations.
Planning nd Yes or
scheduling No
Project Network action
Comparaing
Directions to be with original
issued one.Is it
satifactory?
Exectute the
Report Progress
Project
Record and
assess Progress
Completion
3.4.1 Benefits
Balance resource capacity.
Plan, schedule, and control complex projects.
Allocate best resources and track progress.
Monitor and visualize project performance versus plan.
Conduct what-if analysis and analyze alternative project plan.
Internationally Reputed.
It is Web based Project Management gives the project team anywhere, anytime access to
the projects they are assigned to work on.
A 100% Web-based user interface covers the full project management lifecycle from
project initiation through to project closeout.
It gives the creation of Work Breakdown Structure (WBS) and activities, documenting
and managing project risks and issues, managing status updates, and reporting on key
performance indicators like earned value.
By using Primavera Project Management, organizations can ensure that the project team
members are communicating with each other, whether it is regarding activity status
updates, scope changes, revisions to documents, or issue(s) resolution.
The method by which activity durations and the relationships between activities are used
to mathematically calculate a schedule for the entire project. CPM focuses attention on the
critical path of activities that affect the completion date for the project or an intermediate
deadline.
Early dates, the earliest possible dates each activity can start and finish, and late dates, the
latest possible dates each activity can start and finish without delaying the project finish or an
intermediate deadline (constraint) are also calculated.
PERT
The program evaluation and review technique (PERT) uses the same ideas as CPM; but
(EPS)
instead of using just the most likely time estimate, it uses a probabilisticEnterprise
estimate of time for
Project
Structure
completion of an activity
(OBS)
Organisational
Breakdown
Structures
4. Defining OBS (Organizational breakdown structure).
5. Defining Resources.
9. Schedule project.
The Enterprise Project Structure (EPS) forms the hierarchical structure of your database
of projects.
Each EPS node (or folder) can be subdivided into multiple levels to represent the work
that needs to be done in your organization. The number of levels and their structure depend on
the scope of your projects and how you want to summarize data.
3.4.6 WBS (Work Breakdown Structure)
Civil Works
Roads &
Buildings
Drains
Equipment
Ware House
Fdns
Foundation
Superstructure
Finishing
Works
Admin Building
Mech. Works
Tanks Piping
Fire Water
Tank
Diesel Tank
Resources include the personnel and equipment that perform work on activities across all
projects. Resources are generally reused between activities and/or projects
Create and assign calendars to each resource and each activity. These calendars define the
available work-hours in each calendar day. We can also specify national holidays, your
organization's holidays, project-specific work/non-workdays, and resource vacation days.
Calendar assignments are used for activity scheduling, tracking, and resource leveling.
3.5.3 Updating Progress
To update the progress of the individual activity, the following inputs are to be given in
the activity detail form.
developing plans
tracking progress
managing budgets
analyzing workloads
It is a project management software program, developed and sold by Microsoft, which is
designed to assist a project manager in developing a plan, assigning resources to tasks, tracking
progress, managing the budget, and analyzing workloads.
3.6.3 Features
Limitation - MS Project presumes additional physical raw materials are always available
without limit
Define a project
a) Calendar:
b) WBS:
The WBS is structured in levels of work detail, beginning with the deliverable itself, and
is then separated into identifiable work elements.
Each WBS element may contain more detailed WBS levels, activities, or both.
When creating a project, the project manager typically develops the WBS first, assigns
documents to each WBS element.
c) Linking of activities:
Resources are:
1. Work Resource
2. Material Resource
3. Cost Resource
Figure7. Status Bar
e) Resource Sheet
f) Resource Allocation
1) Study of various resource allocation
techniques?
2) When we need to update Projects and what
are causes of it?
3) Various softwares used for monitoring of
project.
Dictation of Notes
Que.1 what are objectives of resource leveling? Explain the procedure of carryout resource
leveling.
Que.2 Explain the term Rescheduling and updating. Explain under which conditions updating
is carried out. Also write the procedure for updating the network.
Que.3 Define cost slope and what do you understand by crashing of network?
Que. 4The following table gives the duration and cost data for various activities of construction
project. Indirect cost is Rs. 500 per day.
1. Draw CPM network. Calculate project duration, highlight critical path. Calculate normal
cost of the project.
2. Calculate optimum duration and optimum cost of the project by stage by stage
compression.
Que. 5 Manpower requirement for various Activities of a project are given below:
Activity (i-j) Duration (Days) Number of Men required
1-2 7 12
2-3 7 7
2-4 8 12
2-5 7 8
3-5 12 8
4-5 8 6
5-6 9 6
Que. 6 Write down advantages and limitations of MSP & Primavera.
Que. 7 Write down the steps involved in MSP & Primavera for scheduling of the project?