CL OF ROADWAY

12.000 TO DUHURIA
(TOTAL LENGTH OF THE STRUCTURE) 56 THK WEARING COAT
20 MM EX GAP CL OF STRUCTURE
R.C.C Parapet
Y1
56THK. WEARING COAT R.C.C PARAPET x 3.500 FRL-9.152 TO CHANDBALI
2.000
R.C.C PARAPET
FRL- 9.553
2.5% -1.681% 500
Return Wall
0.500 0.500 150 thk. PCC
0.500
150x150
FLOW 1.5
FLOW HAUNCH
1.5 1.5 1
D/S 3000 600 THK.
U/S 1 1 2791 FILTER MIDEA
450 450
2.791
0.200 500
5000 0.200 1800 IL-6.206
INVERT INVERT
3000 3000 LEVEL-6.213 LEVEL-6.200
500 150
150 500 BASE SLAB

KEY PLAN
2000
2500
VIEW 2-2
2.000
GROUND IMPROVEMENT ZONE

150THK. C.C (M15)

SECTION 1-1 150THK. C.C (M15)


TABLE:
FRL
(m)
NUMBER OF SPAN
(n)
CLEAR SPAN
(a)
CLEAR HIGHT
(b)
OUTER WALL
(w1)
TOP SLAB
(ts)
BOTTM SLAB
(bs) 150 THK. FLAT STONE APRON
150 THK. FLAT STONE APRON
EMBEDDED IN 300 THK.
NOTES:-
9.533 1 3000 2791 450 500 500 EMBEDDED IN 300 THK. CONCRETE (M15) 1. ALL DIMENSIONS ARE IN MILLIMETRES, LEVELS & CHAINAGES ARE
CONCRETE (M15) IN METRES UNLESS OTHERWISE MENTIONED. NO PART OF THE
200
125 IL-6.660 200
DRAWING SHALL BE SCALED.
IL-6.648 125
0.750
300
300 450 2. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THE RELEVANT
450
HIGHWAY DRAWING FOR THE CHAINAGE.
100 450 0.750
750
450 150
150THK. PCC (M15)
100 THK. C.C (M15) 750 3. THE BACK FILLING ON BOTH SIDE OF THE STRUCTURES SHALL BE DONE
TO CHANDBALI 150
COMPACTED EARTH COMPACTED EARTH
425
2000
SIMULTANEOUSLY. THE MATERIAL FOR BACK FILLING SHALL CONFIRM TO

2500
0.200 12.000 PCC
750
3.000 3.000
Total Length of the Box 0.200
750 PCC
800
5.000 1.800
450 150 THK.
P.C.C M-15
550 1650 1300 AT THE OUTER WALLS OF THE STRUCTURE AND RETURN WALL WITH A
1500
150 THK.
P.C.C M-15
MAXIMUM DISTANCE OF 1.0m CENTRE TO CENTRE.
100 5. 600mm THK. FILTER MEDIA SHALL BE PROVIDED ON THE EARTH FACE
1850 TYPICAL CROSS SECTION OF
TYPICAL CROSS SECTION OF
CURTAIN WALL TYPE-I (D/S)
CURTAIN WALL TYPE-II (U/S) OF THE STRUCTURE. GRADATION OF THE MATERIAL SHALL BE AS PER
R.C.C Parapet R.C.C Parapet IRC: 78.
3.500 6. CLEAR COVER FOR REINFORCEMENT SHALL BE AS PER FOLLOWS
0.400 EARTH FACE = 75mm
0.400
FOUNDATION = 75mm
450 OATER SURFACE = 50mm
TOP SLAB = 50mm

CL OF BOX
CL OF BOX

20 MM EX JOINT 7. THE GRADE OF CONCRETE FOR DIFFERENT COMPONENTS ARE AS


FOLLOWS:
-2.5% -1.681% TAR PAPER BEARING APPROACH SLAB 300 mm thk. (a) BOX - M20
CL OF ROADWAY 150 TH. PCC (b) RETURN WALL - M20
400 (c) PARAPET - M15
400 (d) APPROACH SLAB - M30
Parapet Wall Parapet Wall 0.300
(e) LEVELLING COURSE - M15
FLOW FLOW 0.300
450 (f) PCC CONCRETE - M15
U/S D/S HUNCH 150x150
(g) CURTAIN WALL - M20
500
L.H.S R.H.S 0.300 8. ALL REINFORCEMENT SHALL BE OF GRADE Fe 500 CONFIRMING TO IS:1786.
HAUNCH DETAIL OF -X 9. THE GROUND IMPROVEMENT ZONE SHALL BE EXECUTED AS PER THE
300x300(TYP.)
DIRECTION OF THE ENGINEER IN ORDER TO IMPROVE THE SAFE BEARING
DETAIL OF - Y1 CAPACITY OF SOIL.
R.C.C Parapet R.C.C Parapet 10. THE DRAINAGE SPOUT SHALL BE PROVIDED AS PER SEPARATE DRAWING.
11. THE SAFE BEARING CAPACITY OF THE SOIL IS CONSIDERED AS 9 T/m .
12. THE STRUCTURE NUMBER SHALL BE CLEARLY MARKED AT EITHER END OF
THE STRUCTURE.

TO DUHURIA 13. ASPHALTIC PLUG TYPE EXPANSION JOINT SHALL BE PROVIDED AT EACH

PLAN

DWG. TITLE: SCALE:

RESPONSIBILITY FOR OR LIABILITY ARISING FROM THE


@ COPYRIGHT. THIS DOCUMENT IS THE PROPERTY OF
OWD AND ALL RIGHTS ARE RESERVED IN RESPECT OF
IT. THIS DOCUMENT MAY NOT BE REPRODUCED OR
DISCLOSED IN ANY MANNER WHATSOEVER, IN WHOLE

ANY
OR IN PART , WITHOUT THE PRIOR WRITTEN CONSENT
CLIENT:- SUPERIVISION CONTRACTOR:- PROJECT:-
0 50m
CONSULTANT:- Widening and Strengthening of existing WORKING DRAWING OF

DISCLAIMS

USE OF THIS DOCUMENT BY ANY THIRD PARTY.


M/s DPJ-NKC (JV) HORIZONTAL SCALE
LEA ASSOCIATES SOUTH ASIA PVT. LTD. Plot No. 63, Udyog Vihar, carriageway to 2-lane road from BOX CULVERT AT CH.69+371 0 5m
B-1, E-27, IInd FLOOR,MOHAN COOPERATIVE duhuria to chandbali (Km. 49/000 to (1/3x3/0)

EXPRESSLY
Phase-IV, Gurgaon-122016, VERTICAL SCALE
INDUSTRIAL ESTATE, MATHURA ROAD, Haryana
NEW DELHI-110044
Km. 99/000 of MDR & Km 45/000 to PREPARED DWG. No.: REV:
GOVERNMENT OF
Km. 51/500 of SH-9) under Odisha CHECKED

OWD
ODISHA INDIA Sheet 1 of 1
DDMMYY R0
REV DESCRIPTION CHECKED APPROVED WORKS DEPARTMENT State Roads Project APPROVED

OWD.
DATE
REVISIONS DATE 14/04/2015