Beruflich Dokumente
Kultur Dokumente
12.000 TO DUHURIA
(TOTAL LENGTH OF THE STRUCTURE) 56 THK WEARING COAT
20 MM EX GAP CL OF STRUCTURE
R.C.C Parapet
Y1
56THK. WEARING COAT R.C.C PARAPET x 3.500 FRL-9.152 TO CHANDBALI
2.000
R.C.C PARAPET
FRL- 9.553
2.5% -1.681% 500
Return Wall
0.500 0.500 150 thk. PCC
0.500
150x150
FLOW 1.5
FLOW HAUNCH
1.5 1.5 1
D/S 3000 600 THK.
U/S 1 1 2791 FILTER MIDEA
450 450
2.791
0.200 500
5000 0.200 1800 IL-6.206
INVERT INVERT
3000 3000 LEVEL-6.213 LEVEL-6.200
500 150
150 500 BASE SLAB
KEY PLAN
2000
2500
VIEW 2-2
2.000
GROUND IMPROVEMENT ZONE
2500
0.200 12.000 PCC
750
3.000 3.000
Total Length of the Box 0.200
750 PCC
800
5.000 1.800
450 150 THK.
P.C.C M-15
550 1650 1300 AT THE OUTER WALLS OF THE STRUCTURE AND RETURN WALL WITH A
1500
150 THK.
P.C.C M-15
MAXIMUM DISTANCE OF 1.0m CENTRE TO CENTRE.
100 5. 600mm THK. FILTER MEDIA SHALL BE PROVIDED ON THE EARTH FACE
1850 TYPICAL CROSS SECTION OF
TYPICAL CROSS SECTION OF
CURTAIN WALL TYPE-I (D/S)
CURTAIN WALL TYPE-II (U/S) OF THE STRUCTURE. GRADATION OF THE MATERIAL SHALL BE AS PER
R.C.C Parapet R.C.C Parapet IRC: 78.
3.500 6. CLEAR COVER FOR REINFORCEMENT SHALL BE AS PER FOLLOWS
0.400 EARTH FACE = 75mm
0.400
FOUNDATION = 75mm
450 OATER SURFACE = 50mm
TOP SLAB = 50mm
CL OF BOX
CL OF BOX
TO DUHURIA 13. ASPHALTIC PLUG TYPE EXPANSION JOINT SHALL BE PROVIDED AT EACH
PLAN
ANY
OR IN PART , WITHOUT THE PRIOR WRITTEN CONSENT
CLIENT:- SUPERIVISION CONTRACTOR:- PROJECT:-
0 50m
CONSULTANT:- Widening and Strengthening of existing WORKING DRAWING OF
DISCLAIMS
EXPRESSLY
Phase-IV, Gurgaon-122016, VERTICAL SCALE
INDUSTRIAL ESTATE, MATHURA ROAD, Haryana
NEW DELHI-110044
Km. 99/000 of MDR & Km 45/000 to PREPARED DWG. No.: REV:
GOVERNMENT OF
Km. 51/500 of SH-9) under Odisha CHECKED
OWD
ODISHA INDIA Sheet 1 of 1
DDMMYY R0
REV DESCRIPTION CHECKED APPROVED WORKS DEPARTMENT State Roads Project APPROVED
OWD.
DATE
REVISIONS DATE 14/04/2015
OF