There are 2 key elements in all the successful projects I have been part of.
They had exceptional individuals who are also exceptional team players
The communication and collaboration is really good.
While there is little that project management software can do when it comes to first point, the second
point can be addressed by using right tools and visualizations. In this installment and the part 5 and 6
of this series, we will learn some excel based visualizations / charts that can help you to communicate
about the project status and progress to your team and stake holders.
Project milestones can be shown in a simple time line chart in excel. While the chart doesnt look
complicated, it can provide good amount of information on project progress in a simple and
understandable chart.
simplest format for milestone data is Date and the milestone. But since our chart requires the
milestone to be displayed at a certain height on the chart, we will add the third column height.
PS: the height column can be easily calculated using formulas. I leave it to your imagination.
2. Once you have the data in the above format, we will add 2 more helper columns named
DUMMY and Milestone. The Dummy column is used to create the timeline (where Y axis value is
zero). The milestone column is a more cleaned up version of milestones (see how it is showing #NA
4. To this chart, we will add one more data series Height column.
5. Now select the height data series and change the chart type to a bar chart. Also set
the height series to be plotted on secondary axis. Learn more about combining 2 chart
types and adding secondary axis in excel.
6. We will also set the horizontal / axis labels for the height series as the milestones. We
need to do this so that when we set the data labels for the height series, we will see the milestone
instead of month.
8. Now, we will add data labels to the height series. Set the label type as category
9. We will also add error bars to the height series (the bar chart). We will configure the error
bar in such a way that they are shown 100% on the negative side only.
10. After doing this, the chart should look like this:
1. Removing fill color / line from height series by setting them to None / transparent.
12. That is all, we now have a cool looking project milestone chart ready. Now go and achieve a
milestone.