SHARP TANKS & STRUCTURAL
QUALITY ASSURANCE PLAN F
CLIENT : RELIANCE SIBUR ELASTOMERS PVT. LTD. RIL DOC. NO. : 10018-4D8JSR-MTS2001-TCB-D
PROJECT : BUTYL RUBBER IIR PROJECT - JAMNAGAR STS DOC. NO. : STS-RIL-BEC-QAP-1606-01-02
SR. QUANTUM OF
INSPECTION ACTIVITY & COMPONENT CHARACTERISTICS REFERENCE DOCUMENT
No. CHECK
MPT PROCEDURE
LPT PROCEDURE
RT PROCEDURE
PO, MR, APPLICABLE SPECS,
B UT PROCEDURE DOCUMENTED PROCEDURES 100%
APPROVED DRAWINGS, ASME SEC - V
PMI PROCEDURE
PWHT PROCEDURE
HYDROTEST PROCEDURE
1.2 BACK CHIP OF C'SEAM FOR SPHERE BACK CHIP TO SOUND METAL / WEDING 100% APPROVED DRG & SPECIFICATION
SHARP TANKS & STRUCTURAL
QUALITY ASSURANCE PLAN F
CLIENT : RELIANCE SIBUR ELASTOMERS PVT. LTD. RIL DOC. NO. : 10018-4D8JSR-MTS2001-TCB-D
PROJECT : BUTYL RUBBER IIR PROJECT - JAMNAGAR STS DOC. NO. : STS-RIL-BEC-QAP-1606-01-02
SR. QUANTUM OF
INSPECTION ACTIVITY & COMPONENT CHARACTERISTICS REFERENCE DOCUMENT
No. CHECK
2 NDT OF WELDS
AS PER
RADIOGRAPHY TEST RADIOGRAPHY OF BUTT JOINTS (AS PER ASME SEC VIII, DIV. - 2 & APPROVED
2.1 APPROVED
PR /APPROVED DRG.) DRG & PROCEDURE
DRG.
1. WELD EDGE, WELD BACK CHIP. ASME SEC V & APPROVED DRG &
2.2 PENETRANT TEST 100%
2. FINAL WELD PROCEDURE
3 FINAL INSPECTION
PROJECT : BUTYL RUBBER IIR PROJECT - JAMNAGAR STS DOC. NO. : STS-RIL-BEC-QAP-1606-01-02
SR. QUANTUM OF
INSPECTION ACTIVITY & COMPONENT CHARACTERISTICS REFERENCE DOCUMENT
No. CHECK
AS PER
ASME SEC VIII, DIV. - 2 & APPROVED
3.2 PWHT FOR SPHERE REVIEW OF HEAT TREATMENT CHART APPROVED
DRG, PWHT PROCEDURES
DRG
NOTES :
1) ALL BOUGHTOUT ITEMS SHALL BE PROCURED FROM RIL APPROVED VENDORS ONLY AND QAP WILL BE SUBMITTED FOR APPR
SHARP TANKS & STRUCTURAL
QUALITY ASSURANCE PLAN F
CLIENT : RELIANCE SIBUR ELASTOMERS PVT. LTD. RIL DOC. NO. : 10018-4D8JSR-MTS2001-TCB-D
PROJECT : BUTYL RUBBER IIR PROJECT - JAMNAGAR STS DOC. NO. : STS-RIL-BEC-QAP-1606-01-02
SR. QUANTUM OF
INSPECTION ACTIVITY & COMPONENT CHARACTERISTICS REFERENCE DOCUMENT
No. CHECK
2) CALIBRATION RECORDS OF MEASURING INSTRUMENT AND GAUGES SHALL BE MADE AVAILABLE TO INSPECTION AGENCY DU
STRUCTURALS PVT. LTD.
RANCE PLAN FOR SITE
8JSR-MTS2001-TCB-D-00-SYS621-A09-0002 REV. : 00 STS JOB NO. : 1606
INSPECTION
FORMAT OF
ACCEPTANCE STD. REMARKS
REPORTS
STS TPIA RIL
INSPECTION
FORMAT OF
ACCEPTANCE STD. REMARKS
REPORTS
STS TPIA RIL
ASME SEC V & APPROVED DRG INSPECTION REPORTS H W R W- FOR FINAL WELDS
INSPECTION
FORMAT OF
ACCEPTANCE STD. REMARKS
REPORTS
STS TPIA RIL
A - APPROVAL W - WITNESS