Location
At the location that constitutes a block conceived the entire length of the building,
which is interwoven with the existing residential buildings, existing buildings were made
in 1980 together with the street that serves the building, it is planned to be knocked down
in the preliminary design and to abolish road cars and to replaceit with street for
pedestrians and cyclists.
Function
The function and purpose of the building is to provide housing a large percentage of
people in its tracts and has administrative and caterer role, which is located on the ground
floor. Tracts are located in every third floor which allows better usage and space and
lower costs in the construction because it is not lost space in the corridors, residents enter
the building apartments facing the two sides of the city that provides better illumination
of the apartment and at the same time view of the river and the street. Apartments are
imagined in different sizes from 40 to 150 square meters. Apartment of 150 square meters
located on the corners of the building facing the three sides of the city and water as the
luxury apartments of this project. Administrative and catering part of the facility, which is
located in a supply block with shops and markets for various purposes, in the central part
of the complex building of the administration of restaurants. In the basement of the
complex there is a garage and a storage unit that serves the residents
car parking space and a storage room also there is also room for
heating and electricity. The underground building through a path that
extends the entire length of the block (220 meters), which connects the
two sides of the block, the street is set in the cellar in order not to
compromise the integrity of the outside of the building.Building consists of
a basement, ground floor and ten floors the most suitable for housing.
The basic concept of the design:
the location is the instances of existing facilities which can be easily exploited for
stvaanje new. The very geometry is the primary form of the atrium, while the secondary
notion of playfulness achieved curves typical prismatic units. In this case is not used a
multitude of forms, all the princes cubic. According street have something closed-city
faade with pronounced entrances and expression in the manner of distributing holes,
while inside the character of the house opposite, with many openings. The diversity of the
variations of material is supported by the need for people to feel the basic features of
individual buildings. Parterre decorated building is such that it allows pedestrians and
cyclists to pass through the entire block and leads them towards the river where there are
places for recreation and walk.
0.2. CONSTRUCTION
Construction of the building is a not ordinary the building is construct with a diagrid
structure system of load-bearing stell beams and pillars which is connected in shape of
diamond d = 30:30 cm diagrid structure supports the roof and hold tracts in place the
wight is transferred on . Over them were set reinforce concrete plates d = 12cm.
The building is based on the deep fundation made out of reinforce concrete MB30
mark thickness of concrete is 20 cm and under the pillars 60 cm thick. The core of the
building where the tracts are padded and eternal reinforced concrete which are formed as
a reinforced concrete skeleton. The core is surrounded by elevator core to the fire escape
stairway the core is completly made of reinforced concrete 20 cm thick. Diagrid structure
is hidden behind the double curtain wall, which makes the facade.
0.3. MATERIALS
Roof
The roof covering is made of layers of waterproofing materials that make green
roof, which has not only a role to reduce the heating of the building and its energy
consumption but at the same time the residents of the building can grow plants on it. This
type of roof is a new branch of architecture today, which is increasingly used as a
finishing roof.
Before installing the waterproofing d = 10 mm of welded bitumen sheets are
placed all elements of galvanized sheet metal so that it carefully seal all horizontal and
vertical joints. This project is anticipated to be vented roof for better insulation, in this
regard cover is set to double layer strips and planks with air space between them. Be sure
to properly carry out the supply and exhaust air with sufficient circulation for each field
as well as protect the building. Roof drainage is predicted through the gutters located at
the corners of the house.
Facade
Walls
The exterior walls are provided by a double curtain wall izakoji of reinforced concrete
skeleton poles 40cm thick internal partition walls are made of hollow brick block
thickness of 20 and 10 cm wide, built in lime mortar, bilaterally and roughly plastered,
smoothed and painted dispersion. Exterior walls plastered only on the inside. The toilets
and kitchen, kitchenette and cafeteria walls are clad with ceramic tiles to the ceiling and
to the height of hanging kitchen cabinets.
0.4. INSTALLATIONS
Plumbing and sewage system, mechanical and electrical installation are given
specific descriptions in this project.
It is necessary to pay attention to the arrangement of the heat convector in the context of
landscaping, detailed in the phase of mechanical instalacija.zgrada has its thermal springs,
which are located below and to the boiler room. Because of the large building height of
10 storeys with ground floor and basement introduce you special retardants at instalavija
for verticals.