Beruflich Dokumente
Kultur Dokumente
Egypt
Ministry of Electricity & Energy (MEE)
New & Renewable Energy Authority (NREA)
25 Kw wind turbine with wooden blades placed on tubular tower of 15m height
Ministry of Electricity & Energy (MEE)
New & Renewable Energy Authority (NREA)
Ministry of Electricity & Energy (MEE)
New & Renewable Energy Authority (NREA)
5.9 15 77.9 7
* Capacity factor = Generated electricity \(Installed capacity x No. of hours of the year)
** Availability factor =(No. of hours of the year - No. of outage hours)\ No. of hours of the year
Ministry of Electricity & Energy (MEE)
New & Renewable Energy Authority (NREA)
Zafarana projects
Zafarana (1
(1) Danida
30 Mw 50
50xx600Kw
600Kw Nordex Since April 2001
Zafarana (2
(2) KFW
33 Mw 55
55xx600Kw
600Kw Nordex Since may 2001
Zafarana (3
(3) Danida
30 Mw 46
46xx660Kw
660Kw Vestas Since Nov 2003
Zafarana (4
(4) KFW
47 Mw 71
71xx660Kw
660Kw Nordex Since June2004
June2004
Ministry of Electricity & Energy (MEE)
New & Renewable Energy Authority (NREA)
Zafarana (5
(5) Spain
85 Mw 100x
100x850Kw
850Kw Gamesa Since Sep 2006
Zafarana (6
(6) KFW
80 Mw 94
94xx850
850Kw
Kw Gamesa Since March 2008
Zafarana (7
(7) JICA
120 Mw 142x
142x850Kw
850Kw Gamesa Since Feb 2008
Zafarana (8
(8) Danida
120 Mw 142x
142x850Kw
850Kw Gamesa under construction
Ministry of Electricity & Energy (MEE)
New & Renewable Energy Authority (NREA)
** Availability factor =(No. of hours of the year - No. of outage hours)\ No. of hours of the year
Ministry of Electricity & Energy (MEE)
New & Renewable Energy Authority (NREA)
B- Gabal El-
El-Zeit.
Statistics