configuration
created by Virendra Shukla on Jan 8, 2015 10:57 AM, last modified by Virendra Shukla on Jan
12, 2015 5:51 AM
Version 2
Tweet
You can use configuration, if you use the Project System to manufacture products with different features
or options.
The transaction to create a variant class is CL01 . Create a class with class type as 300.
Click on the create option and fill the required details as per the requirement >> Save.
2) Create Characteristics (CT04)
Now the class z_color is created. Next step is to create characteristics for this class. Navigate to the
transaction CT04.
This class and characteristics will be used in the standard network in order to make it configurable. Create
a standard network and create activities for variant configuration . Here we use standard network
10000071 with 3 different activities.
5 ) Object dependencies (CN01)
Now to configure the activity with the characteristics. Select the activity > Extras > object dependency >
editor > selection condition.
As the activity RED should come to use when we select the option Red . The following code should be
written to make object dependency.
Similarly, complete the object dependency with other activities changing the option to BLUE, GREEN for
BLUE activity and Green activity respectively.
After object dependency, configuration profile for standard network should be created from transaction
CU41.
Steps :
Transaction CU42
Now the standard network can be used for variant configuration in project system .
7) Create an operative network from standard network (not part of the document)
Create an operative network from the standard network (using transaction CN21) and check the
configuration change.
Here I have created an operative network 917424. Currently network has activity RED as i have selected
the variant RED while creating a operative network.
Lets change the configuration and check the result . To change the configuration follow the steps
Select the network > Extras > Configuration > characteristics value assignment.
Select the option Blue form the list and click on back button.
Activity RED is deleted from the list and is replaced by Blue activity.
Comments
7 Comments
good work
Like (1)
o
Virendra Shukla Jan 9, 2015 6:41 PM (in response to ambarish macha)
Thank you !!
Like (1)
Like (1)
Opps ... i missed the screenshot for the dependency code .. i will surely update
thanks
Like (0)
Virendra Shukla Jan 12, 2015 5:51 AM (in response to Vasilios Iliadis)
Screenshot added
Like (0)
Hello Sir,
what is the business process of variant configuration of project.
please help....
Like (0)
Virendra Shukla Jan 12, 2015 5:47 AM (in response to Sameer Singh)
Hi ,
Like (1)
Actions
Login Register
Follow SCN
Site Index
Contact Us
SAP Help Portal
Privacy
Terms of Use
Legal Dis