SET A 29. The government agency created under PD No.

269 whose
Test 1: Matching type additional mandate includes preparing electric cooperatives in
operating and competing under deregulated electricity market.
1. The process of apportioning the total demand of the grid 30. An alert issued by the system operator when the contingency
through the issuance of dispatch instructions to the scheduled reserve is zero.
generating units and the generating units providing ancillary
services in order to achieve the operational requirements.
2. A generating unit within an embedded generating plant.
3. A voltage level exceeding 230kV up to 765 kV.
4. The independent, quasi judicial regulatory body created Choices for Test 1
pursuant to RA 9136 which is mandated to promote competition,
encourage market development, ensure customer choice and Demand/ Load/ Control Center/ SCADA/ Blue alert/ Red Alert/ Yellow
enforce Philippine Grid Code and Philippine Distribution Code. Alert/ Central Dispatch/ Contingency Reserve/ Demand forecast/
5. A facility, consisting of one or more Generating Units, where Load forecast/ Dispatch/ Demand Control/ Embedded Generating
electric Energy is produced from some other form of Energy by Unit/ Embedded Generating Plant/ Extra High Voltage/ High
means of a suitable apparatus. Voltage/ Medium Voltage/ ERC/ PRC/ NPC/ SPUG/ Generating Plant/
6. The electrical safety code that establishes basic materials quality Generating Unit/ Generation Company/ Grid/ Grid Owner/ Grid
and electrical work standards for the safe use of electricity for light, Impact Studies/ Interruption/ Isolation/ Load Factor/ Demand Factor/
heat, power and other purposes. Utilization Factor/ Low Voltage/ PEC/ NEC/ IEC Standard/ Power
7. The ratio of active power to apparent power. Factor/ Power Quality/ Pitch Factor/ Distribution Factor/ PSALM/
8. The government owned and controlled corporation created Protective Device/ System/ Circuit breaker/ Load/ LOLP/ Island Grid/
pursuant to section 49 of the act, which took ownership of all Large Customer/ Leverage Ratio/ Large Generator/ Voltage sag/
existing NPC generation assets, liabilities and all other disposable Under Voltage/ TRANSCO/ NPC/ NEA/ PSALM
assets.
9. A protective relay or a group of protective relays and/or logic
elements designed to perform a specified protection function. TEST 2:
10. Refers to the grid or distribution system or any user system.
Also a group of components connected or associated in a fixed 31. In case the system frequency momentarily rises to 62.4 Hz or
configuration to perform a specified function. falls to 57.6 Hz, all the generating units shall remain in synchronism
11. The high voltage backbone System of interconnected with the grid for at least __________ seconds to allow the system
transmission lines, substations, and related facilities for the operator to undertake measures to correct the situation.
purpose of conveyance of bulk power. A. 2 B. 3 C. 4 D. 5
12. The loss of service to a customer or a group of customers or
other facilities. 32. The long duration voltage variations (undervoltage) at any
13. The electrical separation of a part or component from the rest connection point during normal conditions shall be less than _______
of the electrical system to ensure safety when that part or % of the nominal voltage.
component is to be maintained. A. 80 B. 85 C. 90 D. 95
14. The ratio of the total energy delivered during a given period to
the product of the maximum demand and the number of hours 33. For a 500 kV voltage level, the allowed total harmonic distortion
during the same period. shall not exceed ___________.
15. A voltage level not exceeding 1000 Volts. A. 1.5% B. 2.0% C. 2.5% D. 3.0%
16. The active Power and/ or Reactive Power at a given instant or
averaged over a specified interval of time, that is actually delivered 34. The maximum negative sequence unbalance factor at the
or is expected to be delivered by an electrical equipment. connection point of any user shall not exceed ____ during normal
17. A facility used for monitoring and controlling the operation of operating conditions.
the grid, distribution system, or a user system. A. 3.0% B. 2.0% C. 1.5% D. 1.0%
18. A notice issued by the system operator when a tropical
disturbance is expected to make a landfall within 24 hours. 35. The maximum zero sequence unbalance factor at the
19. The process of issuing direct instructions to the electric power connection point of any user shall not exceed ____ during normal
industry participants by the system operator to achieve an operating conditions.
economic operation while maintaining Power quality, Stability and A. 3.0% B. 2.0% C. 1.5% D. 1.0%
the reliability and security of the grid.
20. The projected demand and active energy related to a 36. The voltage fluctuation at any connection point with a
connection point in the grid. fluctuating demand shall not exceed _____ of the nominal voltage
21. An entity that consumes electrical power. for every step change, which may occur repetitively.
22. A customer with a demand of 1MW , or the threshold value A. 3.0% B. 2.0% C. 1.5% D. 1.0%
specified by the ERC.
23. A generation company whose generating facility at the 37. For systems below 115 kV, the short term maximum flicker
Connection point has an aggregate capacity in excess of 20MW. severity shall not exceed _________.
24. A voltage level exceeding 1 kV up to 34.5 kV. A. 0.4 unit B. 0.6 unit C. 0.8 unit D. 1.0 unit
25. The quality of voltage including its frequency and resulting
current that are measured in the grid. 38. At nominal voltages of 115 kV and above, the grid shall be
26. A short duration voltage variation where the rms value of the effectively grounded with an earth fault factor of less than ________.
voltage decreases between 10% to 90% of the nominal value. A. 1.4 B. 1.5 C. 1.6 D. 1.7
27. A notice issued by the system operator when the contingency
reserve is less than the capacity of the largest synchronized 39. In grid code, PDP means
generating unit. A. power development plan
28. The corporation that assumed authority and responsibility of B. power development program
planning, maintaining, constructing, and centrally operating the C. power develop plan
high voltage transmission system. D. power develop program
40. In grid code, WESM stands for 24. A protective relay or a group of protective relays and/or logic
A. Wholesale electricity stock market elements designed to perform a specified protection function.
B. Wholesale electricity spot merchandise 25. Refers to the grid or distribution system or any user system.
C. Wholesale electricity stock merchandise Also a group of components connected or associated in a fixed
D. Wholesale electricity spot market configuration to perform a specified function.
26. The high voltage backbone System of interconnected
transmission lines, substations, and related facilities for the
purpose of conveyance of bulk power.
27. The loss of service to a customer or a group of customers or
other facilities.
28. The electrical separation of a part or component from the rest
of the electrical system to ensure safety when that part or
component is to be maintained.
SET B 29. The ratio of the total energy delivered during a given period to
Test 1: Matching type the product of the maximum demand and the number of hours
during the same period.
1. The active Power and/ or Reactive Power at a given instant or 30. A voltage level not exceeding 1000 Volts.
averaged over a specified interval of time, that is actually delivered
or is expected to be delivered by an electrical equipment.
2. A facility used for monitoring and controlling the operation of the
grid, distribution system, or a user system.
3. A notice issued by the system operator when a tropical Choices for Test 1
disturbance is expected to make a landfall within 24 hours.
4. The process of issuing direct instructions to the electric power Demand/ Load/ Control Center/ SCADA/ Blue alert/ Red Alert/ Yellow
industry participants by the system operator to achieve an Alert/ Central Dispatch/ Contingency Reserve/ Demand forecast/
economic operation while maintaining Power quality, Stability and Load forecast/ Dispatch/ Demand Control/ Embedded Generating
the reliability and security of the grid. Unit/ Embedded Generating Plant/ Extra High Voltage/ High
5. The projected demand and active energy related to a connection Voltage/ Medium Voltage/ ERC/ PRC/ NPC/ SPUG/ Generating Plant/
point in the grid. Generating Unit/ Generation Company/ Grid/ Grid Owner/ Grid
6. An entity that consumes electrical power. Impact Studies/ Interruption/ Isolation/ Load Factor/ Demand Factor/
7. A customer with a demand of 1MW , or the threshold value Utilization Factor/ Low Voltage/ PEC/ NEC/ IEC Standard/ Power
specified by the ERC. Factor/ Power Quality/ Pitch Factor/ Distribution Factor/ PSALM/
8. A generation company whose generating facility at the Protective Device/ System/ Circuit breaker/ Load/ LOLP/ Island Grid/
Connection point has an aggregate capacity in excess of 20MW. Large Customer/ Leverage Ratio/ Large Generator/ Voltage sag/
9. A voltage level exceeding 1 kV up to 34.5 kV. Under Voltage/ TRANSCO/ NPC/ NEA/ PSALM
10. The quality of voltage including its frequency and resulting
current that are measured in the grid.
11. A short duration voltage variation where the rms value of the TEST 2:
voltage decreases between 10% to 90% of the nominal value.
12. A notice issued by the system operator when the contingency 31. The voltage fluctuation at any connection point with a
reserve is less than the capacity of the largest synchronized fluctuating demand shall not exceed _____ of the nominal voltage
generating unit. for every step change, which may occur repetitively.
13. The corporation that assumed authority and responsibility of A. 3.0% B. 2.0% C. 1.5% D. 1.0%
planning, maintaining, constructing, and centrally operating the
high voltage transmission system. 32. For systems below 115 kV, the short term maximum flicker
14. The government agency created under PD No. 269 whose severity shall not exceed _________.
additional mandate includes preparing electric cooperatives in A. 0.4 unit B. 0.6 unit C. 0.8 unit D. 1.0 unit
operating and competing under deregulated electricity market.
15. An alert issued by the system operator when the contingency 33. At nominal voltages of 115 kV and above, the grid shall be
reserve is zero. effectively grounded with an earth fault factor of less than ________.
16. The process of apportioning the total demand of the grid A. 1.4 B. 1.5 C. 1.6 D. 1.7
through the issuance of dispatch instructions to the scheduled
generating units and the generating units providing ancillary 34. In grid code, PDP means
services in order to achieve the operational requirements. A. power development plan
17. A generating unit within an embedded generating plant. B. power development program
18. A voltage level exceeding 230kV up to 765 kV. C. power develop plan
19. The independent, quasi judicial regulatory body created D. power develop program
pursuant to RA 9136 which is mandated to promote competition,
encourage market development, ensure customer choice and 34. In grid code, WESM stands for
enforce Philippine Grid Code and Philippine Distribution Code. A. Wholesale electricity stock market
20. A facility, consisting of one or more Generating Units, where B. Wholesale electricity spot merchandise
electric Energy is produced from some other form of Energy by C. Wholesale electricity stock merchandise
means of a suitable apparatus. D. NONE OF THE ABOVE
21. The electrical safety code that establishes basic materials
quality and electrical work standards for the safe use of electricity 36. In case the system frequency momentarily rises to 62.4 Hz or
for light, heat, power and other purposes. falls to 57.6 Hz, all the generating units shall remain in synchronism
22. The ratio of active power to apparent power. with the grid for at least __________ seconds to allow the system
23. The government owned and controlled corporation created operator to undertake measures to correct the situation.
pursuant to section 49 of the act, which took ownership of all A. 2 B. 3 C. 4 D. 5
existing NPC generation assets, liabilities and all other disposable
assets.
37. The long duration voltage variations (undervoltage) at any
connection point during normal conditions shall be less than _______
% of the nominal voltage.
A. 80 B. 85 C. 90 D. 95

38. For a 500 kV voltage level, the allowed total harmonic distortion
shall not exceed ___________.
A. 1.5% B. 2.0% C. 2.5% D. 3.0%

39. The maximum negative sequence unbalance factor at the


connection point of any user shall not exceed ____ during normal
operating conditions.
A. 3.0% B. 2.0% C. 1.5% D. 1.0%

40. The maximum zero sequence unbalance factor at the


connection point of any user shall not exceed ____ during normal
operating conditions.
A. 3.0% B. 2.0% C. 1.5% D. 1.0%

SET A

1. dispatch
2. Embedded Generating Unit SET B
3. Extra High Voltage
4. ERC 1. Demand
5. Generating Plant 2. Control Center
6. PEC 3. blue alert
7. power factor 4. Central Dispatch
8. PSALM 5. Demand forecast
9. Protective Device 6. Load
10. System 7. Large Customer
11. grid 8. Large Generator
12. Interruption 9. Medium Voltage
13. Isolation 10. Power Quality
14. Load Factor 11. voltage sag
15. Low Voltage 12. Yellow Alert
16. Demand 13. TRANSCO
17. Control Center 14. NEA
18. blue alert 15. Red Alert
19. Central Dispatch 16. dispatch
20. Demand forecast 17. Embedded Generating Unit
21. Load 18. Extra High Voltage
22. Large Customer 19. ERC
23. Large Generator 20. Generating Plant
24. Medium Voltage 21. PEC
25. Power Quality 22. power factor
26. voltage sag 23. PSALM
27. Yellow Alert 24. Protective Device
28. TRANSCO 25. System
29. NEA 26. grid
30. Red Alert 27. Interruption
28. Isolation
29. Load Factor
30. Low Voltage