Sie sind auf Seite 1von 4

Customer : CSN Manual : AMM

Type : A330.* Selected applicability : 106-106


Rev. Date : Jan 01, 2017
20-28-00-912-805-A - Electrical Bonding of Electrical Connectors

** ON A/C ALL

TASK 20-28-00-912-805-A
Electrical Bonding of Electrical Connectors

WARNING: USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS ONLY
WITH A GOOD FLOW OF AIR THROUGH THE WORK AREA.
THESE MATERIALS ARE POISONOUS AND FLAMMABLE AND SKIN IRRITANTS.
OBEY THE MANUFACTURERS INSTRUCTIONS.
PUT ON PROTECTIVE CLOTHING.
DO NOT GET THEM IN YOUR MOUTH.
DO NOT SMOKE.
DO NOT BREATHE THE GAS.
GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.

1. Reason for the Job


This procedure gives the bonding principles applicable to electrical connectors.
2 Job Set-up Information
A. Consumable Materials

REFERENCE DESIGNATION
(Material No. 03FAB1) Mineral Oil base Grease-- Vaseline or Petrolatum -
(Material No. 04TMB2) Varnish-- Electrical Bonding Structure
(Material No. 06AAA1) Polysulfide Sealant-General Purpose Brushable -
(Material No. 06ABA1) Polysulfide Sealant-Fuel Tank Brushable -
(Material No. 06HAA1) Coating Sealant-Fuel Tank Brushable -
(Material No. 08BAA9) Non Aqueous Cleaner-General - -
(Material No. 14SBA1) Textile-Lint free Cotton -

B. Referenced Information

REFERENCE DESIGNATION
20-28-00-869-801-A Table of the Maximum Permitted Resistance Values
Bonding of Electrical Connectors SHEET 1

Print Date: March 16, 2017 Page 1 of 4


AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : CSN Manual : AMM
Type : A330.* Selected applicability : 106-106
Rev. Date : Jan 01, 2017
20-28-00-912-805-A - Electrical Bonding of Electrical Connectors

STRUCTURE
OR
EQUIPMENT
STRUCTURE
OR
EQUIPMENT

CLEANED AREA IS EQUAL CLEANED AREA EQUAL


TO THE FLANGE PLUS TO A CIRCLE WHOSE
3 TO 5mm (0.12 TO 0.24in.) DIAMETER IS EQUAL
ON THE PERIPHERY TO THE DIMENSION
ACROSS 2 OPPOSITES
ANGLES OF A JAM NUT
PLUS 3 TO 5mm
(0.12 TO 0.24in.)

F_MM_202800_2_CAM0_01_00

Figure 20-28-00-991-01800-00-A / SHEET 1/1 - Bonding of Electrical Connectors


** ON A/C ALL

Print Date: March 16, 2017 Page 2 of 4


AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : CSN Manual : AMM
Type : A330.* Selected applicability : 106-106
Rev. Date : Jan 01, 2017
20-28-00-912-805-A - Electrical Bonding of Electrical Connectors

3. Job Set-up
Subtask 20-28-00-110-058-A
A. Cleaning of Contact Areas
(1) Remove all signs of grease or oil with a lint-free cloth Textile-Lint free Cotton - (Material No. 14SBA1)
made moist with Non Aqueous Cleaner-General - - (Material No. 08BAA9).
Subtask 20-28-00-120-054-A
B. Removal of the Surface Protection from the Bonding Area
(1) Remove the surface protection from the contact area. The surface you thus clean to bare metal must
be larger than the contact area of the connector by 3 mm (0.1181 in.) to 5 mm (0.1969 in.).

NOTE: For contacts between corrosion-resistant steel and cadmium-plated steel, titanium and cadmi-
um-plated steel or conductive metals, it is not necessary to remove the surface protection.

Subtask 20-28-00-110-059-A
C. Cleaning of Contact Areas
(1) Remove all contamination with a lint-free cloth Textile-Lint free Cotton - (Material No. 14SBA1) made
moist with Non Aqueous Cleaner-General - - (Material No. 08BAA9).
Subtask 20-28-00-916-052-A
D. Temporary Protection of the Bare Metal Areas
(1) If you cannot do the bonding in less than 4 hours, apply a thin layer of Mineral Oil base Grease--
Vaseline or Petrolatum - (Material No. 03FAB1) on the bare metal areas.
(2) Remove this material with a lint-free cloth Textile-Lint free Cotton - (Material No. 14SBA1) made moist
with Non Aqueous Cleaner-General - - (Material No. 08BAA9) before you do the bonding.

NOTE: The protection of the surface with Mineral Oil base Grease-- Vaseline or Petrolatum
- (Material No. 03FAB1) is only necessary if the connection is not made in less than 4 hours.

4. Procedure
Subtask 20-28-00-912-064-A
A. Bonding of Electrical Connectors in the Fuselage
(1) Install the connector with its fasteners on the structure or equipment.
(2) Apply Varnish-- Electrical Bonding Structure (Material No. 04TMB2) or Polysulfide Sealant-General
Purpose Brushable - (Material No. 06AAA1) on the bare metal areas.
Make sure that you put the material fully on the bare metal areas.
(3) Make sure that the resistance (ohmic) is correct (Ref. AMM TASK 20-28-00-869-801) .
Subtask 20-28-00-912-065-A
B. Bonding of Electrical Connectors in the Wings
(Ref. Fig. Bonding of Electrical Connectors SHEET 1)
(1) Install the connector with its fasteners on the structure or equipment.
(2) Make sure that the resistance (ohmic) is correct (Ref. AMM TASK 20-28-00-869-801) .
(3) Apply Coating Sealant-Fuel Tank Brushable - (Material No. 06HAA1) on the bare metal areas and the
fasteners.
Make sure that you put the material fully on the bare metal areas.
Subtask 20-28-00-912-071-A

Print Date: March 16, 2017 Page 3 of 4


AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
Customer : CSN Manual : AMM
Type : A330.* Selected applicability : 106-106
Rev. Date : Jan 01, 2017
20-28-00-912-805-A - Electrical Bonding of Electrical Connectors

C. Bonding of Electrical Connectors in the Fuel and Surge Tanks.


(1) Install the connector with its fasteners on the structure or equipment.
(2) Make sure that the resistance (ohmic) is correct (Ref. AMM TASK 20-28-00-869-801) .
(3) Apply Polysulfide Sealant-Fuel Tank Brushable - (Material No. 06ABA1) on the bare metal areas and
the fasteners.
Make sure that you put the material fully on the bare metals areas.
5. Close-up
Subtask 20-28-00-942-054-A
A. Make sure that the work area is clean and clear of tools and other items.

End of document

Print Date: March 16, 2017 Page 4 of 4


AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

Das könnte Ihnen auch gefallen