Planilha Oramentria - Exerccio Aula

Item Discriminao Quantidade Unidade Custo Unitrio


.03.03 Concreto 400.00 m 300.00
.03.02 Armao 8,700.00 kg 12.00
.02.04 Concreto 250.00 m 300.00
.04.01 Alvenaria 1,000.00 m 48.00
.06.03 Janelas 50.00 cj 800.00
.07.05 Revestimentos de piso 1,000.00 m 28.00
.07.04 Frro 1,000.00 m 26.00
.01.02 Instalaes Provisrias 1.00 VB 25,200.00
.02.02 Escavao Mecnica Estacas 600.00 m 30.00
.05.01 hidro-sanitrias 1.00 VB 16,000.00
.05.02 eltricas 1.00 VB 16,000.00
.05.03 complementares 1.00 VB 16,000.00
.03.01 Frmas 2,000.00 m 7.80
.02.01 Sondagens e estudos tcnicos 1.00 VB 15,000.00
.06.02 Portas 50.00 cj 300.00
.07.02 Reboco 500.00 m 26.00
.01.01 Terraplanagem 800.00 m 15.00
.02.03 Armao 1,000.00 kg 12.00
.06.01 Batentes 100.00 cj 90.00
.07.03 Gesso-cola 300.00 m 20.00
.07.06 Cermica de parede 200.00 m 25.00
.01.03 Locao 400.00 m 7.00
.07.01 Chapisco 500.00 m 4.00
Custo Total % % Acumulado Classificao
120,000.00 18.75 18.75
104,400.00 16.31 35.06
75,000.00 11.72 46.78
48,000.00 7.50 54.28
40,000.00 6.25 60.53 Chart Title
28,000.00 4.38 64.91 120.00
26,000.00 4.06 68.97
25,200.00 3.94 72.91 100.00

18,000.00 2.81 75.72


80.00
16,000.00 2.50 78.22
16,000.00 2.50 80.72 60.00
16,000.00 2.50 83.22
15,600.00 2.44 85.66 40.00
15,000.00 2.34 88.00
20.00
15,000.00 2.34 90.34
13,000.00 2.03 92.38 0.00
12,000.00 1.88 94.25 0 5 10
12,000.00 1.88 96.13
9,000.00 1.41 97.53
6,000.00 0.94 98.47
5,000.00 0.78 99.25
2,800.00 0.44 99.69
2,000.00 0.31 100.00
640,000.00 100.00
Chart Title

10 15 20 25
COMPOSIO DE CUSTO UNITRIO

SERVIO: CHAPISCO
UNIDADE: M

ITEM DISCRIMINAO UNID. QUANT.


.1 CIMENTO COMUM - CPII (SC.50KG) KG 1.40
.2 AREIA LAVADA FINA M 0.02
.3 PEDREIRO H 0.14
.4 SERVENTE H 0.09

MATERIAS
MAO DE OBRA
ENC. SOCIAIS (126%)
TOTAL (R$/UN.)
P. UNIT. P. TOTAL
0.48 0.67
70.00 1.40
4.32 0.60
2.75 0.25

2.07
MAO DE OBRA 0.85
ENC. SOCIAIS (126%) 1.07
OTAL (R$/UN.) 4.00
COMPOSIO DE CUSTO UNITRIO

SERVIO: REBOCO
UNIDADE: M

ITEM DISCRIMINAO UNID. QUANT.


.1 ARGAMASSA MULTIPLO-USO (SC.50KG) KG 33.08
.2 PEDREIRO H 0.82
.3 SERVENTE H 0.44
.4 MONT. E DESM. ANDAIME (SERV.) H 0.06

MATERIAS
MAO DE OBRA
ENC. SOCIAIS (126%)
TOTAL (R$/UN.)
P. UNIT. P. TOTAL
0.45 14.89
4.32 3.54
2.75 1.21
2.75 0.17

14.89
MAO DE OBRA 4.92
ENC. SOCIAIS (126%) 6.20
OTAL (R$/UN.) 26.00
COMPOSIO DE CUSTO UNITRIO

SERVIO: REVESTIMENTO CERMICO - PISO


UNIDADE: M

ITEM DISCRIMINAO UNID. QUANT.


.1 ARGAMASSA AC1 (SC.20KG) KG 10.55
.2 CERMICA 30x30 M 1.03
.3 ESPAADOR 3MM UN. 3.00
.4 PEDREIRO H 0.60
.5 SERVENTE H 0.55

MATERIAS
MAO DE OBRA
ENC. SOCIAIS (126%)
TOTAL (R$/UN.)
P. UNIT. P. TOTAL
0.50 5.28
13.00 13.39
0.02 0.06
4.32 2.59
2.75 1.51

18.73
MAO DE OBRA 4.10
ENC. SOCIAIS (126%) 5.17
OTAL (R$/UN.) 28.00
COMPOSIO DE CUSTO UNITRIO

SERVIO: REVESTIMENTO CERMICO - PAREDE


UNIDADE: M

ITEM DISCRIMINAO UNID. QUANT.


.1 ARGAMASSA AC1 (SC.20KG) KG 6.58
.2 REVESTIMENTO - CERMICA 25x34 M 1.05
.3 ESPAADOR 3MM UN. 2.10
.4 PEDREIRO H 0.61
.5 SERVENTE H 0.50

MATERIAS
MAO DE OBRA
ENC. SOCIAIS (126%)
TOTAL (R$/UN.)
P. UNIT. P. TOTAL
0.50 3.29
12.00 12.60
0.02 0.04
4.32 2.64
2.75 1.38

15.93
MAO DE OBRA 4.01
ENC. SOCIAIS (126%) 5.05
OTAL (R$/UN.) 25.00
COMPOSIO DE CUSTO UNITRIO
COTAO DE INSUMOS

ITEM DISCRIMINAO UNID.


.1 AREIA LAVADA FINA M
.2 ARGAMASSA AC1 (SACO C/ 20KG) KG
.3 ARGAMASSA MULTIPLO USO (SACO C/ 50KG) KG
.4 CERMICA 25X34 M
.5 CERMICA 30x30 M
.6 CIMENTO COMUM (SC.50 KILOS CPII) KG
.7 ESPAADOR 3MM UN.
.8 PEDREIRO H
.9 SERVENTE H
R$ cotado
70.00
0.50
0.45
12.00
13.00
0.48
0.02
4.32
2.75
DEMONSTRATIVO DE ENCARGOS SOCIAIS

ITEM

A1
A2
A4
A5
A6
A7
A8
A9
A10
A11

B1
B2
B3
B4
B5
B6

C1
C2
C3

D1
D2
D3
DEMONSTRATIVO DE ENCARGOS SOCIAIS

GRUPOS

GRUPO A
INSS
FGTS
Sesi
Senai
Adicional Senai
Incra
Seguro contra os acidente de trabalho (INSS)
Sebrae
Seconci - Servio Social da Indstria da Construo e do Mobilirio
Salrio Educao
TOTAL DO GRUPO A (%)

GRUPO B
Repouso semanal
Auxlio enfermidade
Faltas justificadas e outros
Licena paternidade
13 salrio
Acidente de trabalho
TOTAL DO GRUPO B (%)

GRUPO C
Indenizao adicional por demisso sem justa causa
Aviso prvio
Frias
TOTAL DO GRUPO C (%)

GRUPO D
Reincidncia de A sobre B
FGTS sobre o 13 salrio
Reincidncia de FGTS sobre aviso prvio
TOTAL DO GRUPO D (%)

TOTAL GERAL (%)


OCIAIS

INCIDNCIA (%)
horista

20.00%
8.50%
1.50%
1.00%
0.00%
0.20%
3.00%
0.60%
1.00%
2.50%
38.30%

22.90%
0.95%
2.25%
0.42%
10.57%
2.27%
39.36%

4.74%
12.51%
14.06%
31.31%

15.07%
0.90%
1.06%
17.04%

126.00%
BDI - BONIFICAES E DESPESAS INDIRETAS

DEMONSTRATIVO DE BDI - BONIFICAES E DESPESAS INDIRETAS (%)


A - DESPESAS INDIRETAS
A.1 GARANTIA 0.75%
A.2 RISCO 1.27%
A A.3 DESPESAS FINANCEIRAS 1.47%
A.4 ADMINISTRAO CENTRAL 2.83%
SUBTOTAL A 6.32%
B - TRIBUTOS
B.1 COFINS 3.00%
B B.2 PIS 0.65%
BDI

B.3 ISS 5.00%


SUBTOTAL B 8.65%
C - BONIFICAO
C C.1 LUCRO 7.87%
SUBTOTAL C 7.87%
Frmula de clculo do BDI:
BDI ={(1+A%+C%)/(1-B%)} - 1
BDI = 25.00%