IGV Stroke Checking Log Sheet

Jindal Power Limited(4x600MW),Tamnar


Fan:

Sl no Command Feedback in DCS Position in Field

10

11

12

13

BHEL JPL (Project) (JPL C&I)


heet
ited(4x600MW),Tamnar
Date:

Remark

JPL Commissioning
ID Fan Motor No Load Trial Log Sheet
Jindal Power Limited(4x600MW),Tamnar
Rated Current: Started at:
Starting Current: Stopped at:
No-load Current: CDT

Temp.C(DCS

MDE(micron-
Exiter Winding
Temp.(DCS)
Motor Brg.

Motor Brg.
Channel-1 RPM

Channel-2 RPM

Vibration

mm/sec)
(Local)C

Winding
Temp.
Channel-1

Channel-2

Temp.
Time(hrs)

Current
Current

)
Sl no

NDE

NDE
DE

DE
1 2 3 4 5 6 C H

8
JPL BHEL
Mechanical Erection: Erection:

Electrical Erection: Commissioning:

C&I Erection:

Quality:

Commissioning:
Remarks:
Vibration

V
MDE(micron-
mm/sec)

A
H
Vibration

V
MNDE(micro
n-mm/sec)

A
Mill Coupled Trial Log Sheet
Jindal Power Limited(4x600MW),Tamnar
Unit: Mill: Date:-

Rated current: Started at:

Starting current: Stopped at:

Vibration Motor
Temp. (Local)C

Motor(DCS) C

MDE(micron-
DE (mm/sec)
Gear Box Oil Level

Thrust Brg.
Brg. Temp.
Motor Brg.

Vibration

mm/sec)
Temp
Current(A)
Time(hrs)
Sl no

NDE

NDE
DE

DE H V A H V

3
1

BHEL
(Commissioning) JPL (Project) JPL (Commissioning
BHEL
(Commissioning) JPL (Project) JPL (Commissioning
Vibration
MDE(micron-
mm/sec)

(Commissioning)
(Commissioning)
Jindal Power Limited (4 X 600 MW)

FD Fan Load Trial Log Sheet

Unit: Fan:

Rated Current: Started at:

Starting Current: Stopped at:


Blade Pitch Position

Discharge Pressure
Current (Amp)

Air Flow (TPH)


Motor Brg. Temp. Motor Brg. Temp.
Time (Hrs)

Fan Brg. Temp. (Local) C Fan Brg. Temp. (DCS) C


(mmwc) (Local) C (DCS) C
Sl no

(%)

DE NDE DE NDE 1 2 3 1 2

8
9

10
Date:

Fan Vibration Motor Vibration DE Motor Vibration


. (DCS) C
(mm/sec) (mm/s) NDE (mm/s)

3 H V H V H V
Sl no

Unit:

8
7
6
5
4
3
2
1
Time(hrs)

Rated Current:

Starting Current:
Current(A)

BHEL
Blade Pitch Position%

Air Flow

DE
Motor Brg.
Temp. (Local)C
NDE

DE
Motor Brg.
Temp.(DCS) C
NDE

Fan Brg. Temp.


Fan:

2
(Local)C
Started at:

Stopped at:

JPL (Project)
1

Fan Brg. Temp.


2
(DCS)C

3
H
Jindal Power Limited(4x600MW),Tamnar
PA Fan Load Trial Log Sheet

Vibration Fan
V

(mm/sec)
A
H
Date:-

Vibration
MDE(micron-
mm/sec)
JPL (Commiss
BHEL JPL (Project) JPL (Commiss
Date:-
Vibration

V
MDE(micron-
mm/sec)

JPL (Commissioning)
H
Vibration

V
MNDE(micron-
mm/sec)

A
JPL (Commissioning)
Sl no

Unit:

8
7
6
5
4
3
2
1
Time(hrs)

Rated Current:
Starting current:
Current(A)

VFD%

BHEL
IGV%

RPM

Channel-1 Status

Channel-2 Status

DE Motor Brg.
Temp.
NDE (Local)C

DE
Fan:

Brg. Temp.
Motor(DCS) C
Started at:

NDE
Stopped at:

DE Fan Brg.
Temp.
NDE (Local)C

JPL (Project)
DE
Fan Brg.
Temp. (DCS)C
NDE
H

Vibration Fan
V
Jindal Power Limited(4x600MW),Tamnar

DE(mm/sec)
ID Fan Load Trial Log Sheet

A
H
Date:-

Vibration Fan
V

NDE(mm/sec)
A
H

Vibration
MDE(micron-
mm/sec)
JPL (Commissioning)
BHEL JPL (Project) JPL (Commissioning)
Vibration

V
MDE(micron-
mm/sec)

missioning)
A
H
Vibration

V
MNDE(micron-
mm/sec)

A
missioning)
SADC Log Sheet
Jindal Power Limited(4x600MW),Tamnar
Unit:

S. No. SADC Command/ Feedback

Command 0 25 50
1 Feedback in DCS
Position in Field
Command 0 25 50
2 Feedback in DCS
Position in Field
Command 0 25 50
3 Feedback in DCS
Position in Field
Command 0 25 50
4 Feedback in DCS
Position in Field
Command 0 25 50
5 Feedback in DCS
Position in Field
Command 0 25 50
6 Feedback in DCS
Position in Field
Command 0 25 50
7 Feedback in DCS
Position in Field
Command 0 25 50
8 Feedback in DCS
Position in Field
Command 0 25 50
9 Feedback in DCS
Position in Field
Command 0 25 50
10 Feedback in DCS
Position in Field
Command 0 25 50
11 Feedback in DCS
Position in Field
Command 0 25 50
12 Feedback in DCS
12
Position in Field
Command 0 25 50
13 Feedback in DCS
Position in Field
Command 0 25 50
14 Feedback in DCS
Position in Field
Command 0 25 50
15 Feedback in DCS
Position in Field
Command 0 25 50
16 Feedback in DCS
Position in Field
Command 0 25 50
17 Feedback in DCS
Position in Field
eet
0MW),Tamnar
Date:

nd/ Feedback Remarks

75 100

75 100

75 100

75 100

75 100

75 100

75 100

75 100

75 100

75 100

75 100

75 100
75 100

75 100

75 100

75 100

75 100
ID Fan Motor No Load Trial Log Sheet
Jindal Power Limited(4x600MW),Tamnar
Rated current: Started at:

Starting current: Stopped at:

No-load current: CDT

MDE(micron-
Channel-1 Status

Channel-2 Status

Motor(DCS)
Brg. Temp.
Motor Brg.

Vibration

mm/sec)
(Local)C

Temp.C
Winding
Temp.
Current(A)
Time(hrs)

C
Sl no

RPM

NDE

NDE
DE

DE
1 2 3 4 5 6 H

BHEL (Commissioning) JPL (Project) JPL (Commissionin


BHEL (Commissioning) JPL (Project) JPL (Commissionin
Vibration

V
MDE(micron-
mm/sec)

JPL (Commissioning)
H
Vibration

V
MNDE(micro
n-mm/sec)

A
JPL (Commissioning)
Jindal Power Limited (4 X 600 MW)

LT Motor Load Trial - Log Sheet

Equipment Name: Unit No:

Rated current: Started at:

Starting current: Stopped at:

Motor Brg. Temp. Pump Brg. Temp. Motor Vibration DE Motor Vibratio
Time Current Suction Dish. (Local) C (Local) C (mm/sec) (mm
S. No. Tank Lvl
(Hrs) (Amp) Pressure Pressure
DE NDE DE NDE H V A H

JPL NAME
Mechanical Erection:
Electrical Erection:
C&I Erection:
Quality:
Commissioning:

BHEL NAME
Erection:
Commissioning:

Remark
Limited (4 X 600 MW)

og Sheet Date:

Unit No:

Started at:

Stopped at:

Motor Vibration NDE Pump Vibration DE Pump Vibration NDE


(mm/sec) (mm/sec) (mm/sec)
V A H V A H V A

SIGN.

SIGN.
Jindal Power Limited (4 X 600 MW)

LT Motor No Load Trial - Log Sheet Date:

Equipment Name: Unit No:

Rated current: Started at:

Starting current: Stopped at:

CDT:

Motor Brg. Temp. (Local)


Time Current Vibration DE (mm/sec) Vibration NDE
S. No. Speed (RPM) C
(Hrs) (Amp)
DE NDE H V A H

JPL BHEL

Mechanical Erection: Erection:

Electrical Erection: Commissioning:

C&I Erection:

Quality:
Commissioning:

Remarks:
Date:

Unit No:

Started at:

Stopped at:

Vibration NDE (mm/sec)

V A
HT Motor No Load Tria
Jindal Power Limited(4x600
Rated current: Started at:

Starting current: Stopped at:

No-load current: CDT

Motor(DCS)
Brg. Temp.
Motor Brg.

(Local)C

Temp.C
Winding
Temp.
Current(A)
Time(hrs)

C
Sl no

NDE

NDE
DE

DE
1 2

BHEL (Commissioning) JPL (Project)


r No Load Trial Log Sheet
wer Limited(4x600MW),Tamnar

MDE(micron-

MNDE(micro
n-mm/sec)
Vibration

Vibration
mm/sec)
Temp.C
Winding

3 4 5 6 H V A H V

JPL (Commissioning)
Vibration
MNDE(micro
n-mm/sec)

A
Jindal Power Limited (4 X 600 MW)

HT Motor No Load Trial - Log Sheet

Equipment Name: Unit No:

Rated current: Started at: Stopped at:

Starting current: CDT:

Motor Brg. Temp. Motor Vibration DE


Time Current Speed Winding Temperature (C)
S. No. (DE/NDE) C (mm/sec)
(Hrs) (Amp) (RPM)
Local DCS 1 2 3 4 5 6 H V

JPL BHEL

Mechanical Erection: Erection:

Electrical Erection: Commissionin

C&I Erection:

Quality:
Commissioning:

Remarks:
Date:

DE Motor Vibration NDE


sec) (mm/sec)

A H V A

missioning:
Oil Flushing Log Sheet

Unit: 02 Date: 05.03.2013


Equipment: ID Fan-2B Recommended Lube Oil:
Lub Oil Tank Lub Oil Tank Pump In Pump Discharge Oil Filter O/L Oil DP across Duplex
Time
S. No. Level Temp Service Pressure Pressure Filter
(Hrs.) (%) (C) (A/B) (Kg/cm2) (Kg/cm2) (Kg/cm2)
Flushing started at 11:15 (Bearing By-Pass)
1 11:15 75 28 B 2.4 1.8 0.2
2 12:00 70 37 A 2.9 2 0.25
3 16:00 70 37 B 3 2.1 0.25
4 20:00 70 32 B 3.7 2.6 0.25
5 0:00 70 25 B 4.4 3.2 0.3
Date: 06.03.2013
6 4:00 68 22 B 5.2 3.2 0.35
7 8:00 68 23 B 4.6 3.4 0.4
8 9:00 65 30 A 2.6 2 0.2
9 12:00 65 41 A 2.6 1.8 0.22
10 13:00 65 44 B 2.5 1.7 0.2
11 16:00 70 38 B 3 2 0.25
11 19:00 70 34 B 3.2 2.2 0.22
12 20:00 70 33 A 3.3 2.4 0.25
13 0:00 68 28 A 3.5 2.6 0.25
Date: 07.03.2013
15 4:00 68 24 A 3.5 2.7 0.25
Lub Oil Tank Lub Oil Tank Pump In Pump Discharge Oil Filter O/L Oil DP across Duplex
Time
S. No. Level Temp Service Pressure Pressure Filter
(Hrs.) (%) (C) (A/B) (Kg/cm2) (Kg/cm2) (Kg/cm2)
16 8:00 68 24 A 3 2.3 0.25
17 9:00 68 30 B 2.7 2 0.24
18 13:00 68 45 B 2.5 1.7 0.22
19 17:00 65 36 B 3.2 2.2 0.2

18:00 Oil Sample Report Moist.-21 PPM & MI-47.6 PPM Found. Oil Flushing declared completed(By Pass Bearing).Clearance Given Through Bearin

Oil Flushing Through Bearing Date: 09.03


20 18:00 60 34 A 3.2 2.6 0.1
21 21:00 60 31 A 3.2 2.7 0.1
22 22:00 60 30 B 3.2 2.7 0.1
Date: 10.03.2013
23 1:00 60 25 B 3.6 3.2 0.1
24 4:00 60 24 B 4 3.4 0.1
25 8:00 60 22 B 2.8 2.2 0.1
28 9:00 60 25 A 2.4 2 0.1
29 12:00 70 35 A 2.2 1.8 0.1
30 16:00 70 41 A 2.2 1.8 0.1
31 20:00 70 35 B 2.3 2 0.1
32 22:00 70 32 B 2.3 2 0.1
Date: 11.03.2013
33 1:00 70 26 B 2.6 2.2 0.1
34 5:00 70 26 B 2.7 2.2 0.1
35 9:00 70 24 B 3 2 0.1
Lub Oil Tank Lub Oil Tank Pump In Pump Discharge Oil Filter O/L Oil DP across Duplex
Time
S. No. Level Temp Service Pressure Pressure Filter
(Hrs.) (%) (C) (A/B) (Kg/cm2) (Kg/cm2) (Kg/cm2)
36 10:00 75 30 A 2.8 2.4 0.1
37 14:00 75 42 A 2.6 2 0.1
38 16:00 75 39 A 2.4 2.2 0.1
39 17:00 70 39 B 2.4 2.3 0.1
40 23:00 70 35 B 2.5 2.2 0.1
Date: 12.03.2013
41 1:00 70 30 B 2.8 1.9 0.1
42 2:00 70 30 B 2.8 1.9 0.1
43 3:00 70 27 A 2.8 2.2 0.1
44 7:00 70 28 A 3 2.4 0.1
45 11:00 75 40 B 2.4 1.9 0.1
46 12:00 75 40 B 2.4 1.9 0.1
47 16:00 75 42 B 2.4 1.9 0.1
09:30 Oil Sample Report Moist.-16 PPM & MI-40.67 PPM Found.
ID FAN-2B FLUSHING(FINAL THROUGH BEARING) DECLARED COMPLETED ON 12.03.13 AT 16:00
Flushing Log Sheet

ate: 05.03.2013
commended Lube Oil:
Filter In
Remarks
Service
(A/B)
arted at 11:15 (Bearing By-Pass)
A
B Filter Cleaned
B Filter Cleaned
B
B
Date: 06.03.2013
B
B
A Filter Cleaned
B
A Filter Cleaned
A
A
A Filter Cleaned
A
Date: 07.03.2013
A
Filter In
Remarks
Service
(A/B)
A
B
B
B

declared completed(By Pass Bearing).Clearance Given Through Bearing

Date: 09.03.2013
B
B
B Filter Cleaned
Date: 10.03.2013
B
A
B
A Filter Cleaned
A
A
A
B
Date: 11.03.2013
B
B
B
Filter In
Remarks
Service
(A/B)
A Filter Cleaned
A
A
B Filter Cleaned
B
Date: 12.03.2013
B
A Filter Cleaned
A
A
A
B Filter Cleaned
B
ort Moist.-16 PPM & MI-40.67 PPM Found.
H BEARING) DECLARED COMPLETED ON 12.03.13 AT 16:00
Oil Flu

Unit:2
Equipment:FD FAN- 2B
Lube oil supply line - return line and control oil su
Lub Oil Tank Lub Oil Tank Pump In
Time
S. No. Level Temp Service
(Hrs.) (%) (C) (A/B)
1 17:00 70 27 A
2 20:00 70 36 A

3 21:00 70 37 B
4 0:00 70 37 B

5 1:00 70 36 B
6 5:00 70 32 B

7 6:00 65 32 B

8 9:00 70 32 A

9 13:00 70 37 A
10 17:00 70 40 A
11 18:00 70 40 A

12 19:00 70 40 B
13 23:00 70 38 B

14 3:00 70 36 B
15 7:00 70 35 B
16 9:00 70 33 B

17 10:00 70 29 A
18 14:00 68 38 A
12:30 Oil Sample Report M
19 18:00 67 40 A
18:00 Oil Sample Report Moist.-20 PPM & MI-45.1 PPM Found. Oil F
Lube oil supply line - equalising line and c
20 21:00 70 40 B

21 1:00 70 40 B
22 4:00 70 35 B
23 8:00 70 32 B
24 9:00 70 32 A
25 13:00 70 35 A
26 17:00 70 39 A
27 20:00 70 38 A

28 21:00 70 35 B

29 1:00 70 35 B
30 5:00 70 33 B
31 9:00 70 32 B

36 11:00 70 34 A
37 15:00 70 38 A

38 17:00 70 41 A
39 21:00 70 40 A

40 22:00 70 39 B

41 1:00 70 36 B
42 5:00 70 36 B

43 9:00 70 35 A
44 13:00 70 40 A
45 17:00 70 43 A
46 21:00 70 43 A

47 0:00 70 41 A

48 1:00 70 40 B

49 5:00 70 41 B
50 9:00 70 36 B
51 12:00 70 39 B
12:00 Oil Sample Report Moist.-18 PPM & MI-67 PPM Found. Oil F
Oil flushing
52 22:00 55 42 A

53 1:00 55 40 A
54 5:00 55 36 A

55 6:00 55 36 B

56 10:00 55 36 B
57 14:00 55 40 B
15:00 Oil Sample Report Moist.-26 PPM & MI-42 P
Oil Flushing Log Sheet

Date:05.03.2013
Recommended Lube Oil:
e - return line and control oil supply line- control oil return line and circuit taken in service
Pump Discharge Oil Filter O/L Oil
lube oil pressure lube oil flow
Pressure Pressure
(Kg/cm2) (Kg/cm2) (kg/cm2) LPM
14 13 2.3 4
10 10 4.5 5

10 10 4.5 5
10 10 4.9 5.5

10 10 5 5.2
10 11 5.5 5.4

11 11 5.5 5.4

11 10 5.1 7

9 9 4.2 6
9 9 4.6 4.3
9 9 4.6 4.3

8.9 9 4.4 4.4


10 9 4.5 4.2

10 10 5 4.2
11 10 5.4 4.4
11 11 5.6 6.5

10 10.5 5.7 7
9 9 3.8 6.6
12:30 Oil Sample Report Moist.-26 PPM & MI-25.47 PPM Found.
9 9 4.3 5
-20 PPM & MI-45.1 PPM Found. Oil Flushing declared completed(By Pass Bearing).Clearance Given Through Be
il supply line - equalising line and control line- leak off line and circuit taken in service
9 9 4.6 4
Date:08
9 9 4.6 4
11 11 5.5 4.1
11 11 5.7 4.1
11 10 5.8 7.5
10 9.5 4.2 6.5
9 9 3.8 6
9 9 3.8 6

10 10 4.4 6.4

10 9 4.4 6.4
10 10 4.8 6.4
10 10 4.8 6.9

10 10 4.4 6.5
9 9 3.8 6.7

9 9 4.1 4.5
9 9 4.3 5

10 10 5.2 5.2

10 10 4.8 6
10 10 4.4 5.5

9 9 4.4 5
10 9 4.4 5
10 10 5 5
9 10 5.1 5

9 10 5.2 5

10 9 4.5 4.5

10 9 4.7 4.5
10 10 4.8 6
10 10 4.6 5.5
t.-18 PPM & MI-67 PPM Found. Oil Flushing declared completed(By Pass Bearing).Clearance Given Through Bea
Oil flushing started through bearing
12 12 5.1 6

12 12 5.2 5.5
12 12 4.6 5.5

13 12 4.6 5.5

12 13 4.9 5.5
12 12 4.7 5.5
mple Report Moist.-26 PPM & MI-42 PPM Found. Oil Flushing declared completed through bearing.
cuit taken in service
DP across Duplex Filter In
Remarks
Filter Service
(Kg/cm2) (A/B)
1 A
1 A

1 A pump changeover
1 A
Date:06.03.2013
1 A
1 A

1 B filter changeover

Pump Changeover &


1 A Filter Cleaned.

1 B Filter Cleaned.
0.5 B
0.5 B

0.5 B Pump Changeover


0.5 B
Date:07.03.2013
0.5 B
0.5 B
0.5 B

Pump Changeover &


0.7 A Filter Cleaned.
0.7 A

0.5 A
Clearance Given Through Bearing
n service
0.5 B
Date:08.03.2013
0.5 B
0.5 B
0.5 B
cooler and filter
1 A changeover
0.5 A
0.5 A
0.5 A

0.8 A pump changeover


Date:09.03.2013
1 A
1 A
6.5 A

pump and filter


0.5 B changeover
1 B

1 A filter changeover
1 A

1 A pump changeover
Date:10.03.2013
0.5 B filter changeover
0.5 B

pump and filter


0.5 A changeover
0.5 A
0.5 A
0.5 A
Date:11.03.2013
0.5 A

pump and filter


0.5 B
changeover

0.5 B
0.5 B
0.5 B
earance Given Through Bearing

0.1 B
Date:12.03.2013
0.1 A filter changeover
0.1 A

pump and filter


0.1 B
changeover

0.1 B
0.1 B
rough bearing.
Oil Flushing Log Sheet

Unit:2 Date:08.03.2013
Equipment:APH- 2B(GB) Recommended Lube Oil:
Pump In Pump Discharge Oil Lub Oil Tank
Time Service Pressure Temp
S. No. (Hrs.) (A/B) (Kg/cm2) (C)
1 18:00 B 2 30
2 22:00 B 2.1 26

3 1:00 A 2.1 22
4 5:00 A 2.2 20
5 8:00 A 2.3 17

6 11:00 B 2 26
7 14:00 B 2.2 31
16:00 Oil Sample Report Moist.-28 PPM & MI-211 PPM Found.
8 18:00 B 2 31

9 21:00 A 2.2 29

11 1:00 A 2.2 29

12 5:00 B 2.4 22
13 9:00 B 2 18

14 12:00 A 1.5 28
15 16:00 A 1.5 34

16 20:00 B 1.1 31
17 23:00 B 1.3 26

20 0:00 B 1.4 24
21 4:00 B 1.6 20

22 7:00 A 1.8 18
10:20 Oil Sample Report Moist.-31 PPM & MI-111 PPM Found.
23 11:00 A 2 25

24 12:00 B 2 30
25 16:00 B 1.9 33

26 18:00 A 2 34
27 22:00 A 2.1 32

28 23:00 B 1.8 34
29 2:00 B 1.9 30

30 3:00 A 1.9 30

31 7:00 B 2 23
36 10:00 B 1.9 25

09:55 Oil Sample Report Moist.-26 PPM & MI-75 PPM Found. Oil Flushing declared
completed(By Pass Bearing).Clearance Given Through Bearing
heet

lube oil flow Remarks


LPM
14
14
Date:09.03.2013

18 Pump changeover
18
20

15 Pump changeover
12
MI-211 PPM Found.
14

15 Pump changeover
Date:10.03.2013
15

20 Pump Changeover
20

16 Pump Changeover
14

15 pump changeover
15
Date:11.03.2013
16
16

18 pump changeover
MI-111 PPM Found.
16

18 pump changeover
13

14 pump changeover
14

14 pump changeover
Date:12.03.2013
14

15 pump changeover

16 pump changeover
16

shing declared
Given Through Bearing
Oil Flushing Log Sheet

Unit:2 Date:11.03.2013
Equipment:APH- 2B(SB) Recommended Lube Oil:
Pump In Pump Discharge Oil Lub Oil Tank
Time
S. No. Service Pressure Temp
(Hrs.) (A/B) (Kg/cm2) (C)
1 21:00 A 2 30
2 0:00 A 1.9 28

3 1:00 B 1.9 23

4 5:00 B 2 24

5 6:00 A 1.9 20

6 10:00 A 2.3 24
Pump stopped due to leakage in line. Again resumed on 13.03.13 at 10:15

8 11:00 B 0.9 28

9 13:00 B 0.9 31

11 14:00 A 0.8 33

12 18:00 A 0.7 34

13 21:00 B 0.8 31

14 0:00 A 0.7 25
15 16:00 A 1.5 34

16 20:00 B 1.1 31
17 23:00 B 1.3 26

20 0:00 B 1.4 24
21 4:00 B 1.6 20

22 7:00 A 1.8 18
10:20 Oil Sample Report Moist.-31 PPM & MI-111 PPM Found.
23 11:00 A 2 25

24 12:00 B 2 30
25 16:00 B 1.9 33

26 18:00 A 2 34
27 22:00 A 2.1 32

28 23:00 B 1.8 34
29 2:00 B 1.9 30

30 3:00 A 1.9 30

31 7:00 B 2 23
36 10:00 B 1.9 25
completed(By Pass Bearing).Clearance Given Through Bearing
heet

lube oil flow Remarks

LPM
22
22
Date:12.03.2013

22 Pump changeover

23

24 Pump changeover

24
umed on 13.03.13 at 10:15
Date:13.03.2013

22 Pump changeover

20

20 Pump changeover

20

16 Pump changeover

16 Pump changeover
14

15 pump changeover
15
Date:11.03.2013
16
16

18 pump changeover
MI-111 PPM Found.
16

18 pump changeover
13

14 pump changeover
14

14 pump changeover
Date:12.03.2013
14

15 pump changeover

16 pump changeover
16
e Given Through Bearing