JPL Commissioning
ID Fan Motor No Load Trial Log Sheet
Jindal Power Limited(4x600MW),Tamnar
Rated Current: Started at:
Starting Current: Stopped at:
No-load Current: CDT
Temp.C(DCS
MDE(micron-
Exiter Winding
Temp.(DCS)
Motor Brg.
Motor Brg.
Channel-1 RPM
Channel-2 RPM
Vibration
mm/sec)
(Local)C
Winding
Temp.
Channel-1
Channel-2
Temp.
Time(hrs)
Current
Current
)
Sl no
NDE
NDE
DE
DE
1 2 3 4 5 6 C H
8
JPL BHEL
Mechanical Erection: Erection:
C&I Erection:
Quality:
Commissioning:
Remarks:
Vibration
V
MDE(micron-
mm/sec)
A
H
Vibration
V
MNDE(micro
n-mm/sec)
A
Mill Coupled Trial Log Sheet
Jindal Power Limited(4x600MW),Tamnar
Unit: Mill: Date:-
Vibration Motor
Temp. (Local)C
Motor(DCS) C
MDE(micron-
DE (mm/sec)
Gear Box Oil Level
Thrust Brg.
Brg. Temp.
Motor Brg.
Vibration
mm/sec)
Temp
Current(A)
Time(hrs)
Sl no
NDE
NDE
DE
DE H V A H V
3
1
BHEL
(Commissioning) JPL (Project) JPL (Commissioning
BHEL
(Commissioning) JPL (Project) JPL (Commissioning
Vibration
MDE(micron-
mm/sec)
(Commissioning)
(Commissioning)
Jindal Power Limited (4 X 600 MW)
Unit: Fan:
Discharge Pressure
Current (Amp)
(%)
DE NDE DE NDE 1 2 3 1 2
8
9
10
Date:
3 H V H V H V
Sl no
Unit:
8
7
6
5
4
3
2
1
Time(hrs)
Rated Current:
Starting Current:
Current(A)
BHEL
Blade Pitch Position%
Air Flow
DE
Motor Brg.
Temp. (Local)C
NDE
DE
Motor Brg.
Temp.(DCS) C
NDE
2
(Local)C
Started at:
Stopped at:
JPL (Project)
1
3
H
Jindal Power Limited(4x600MW),Tamnar
PA Fan Load Trial Log Sheet
Vibration Fan
V
(mm/sec)
A
H
Date:-
Vibration
MDE(micron-
mm/sec)
JPL (Commiss
BHEL JPL (Project) JPL (Commiss
Date:-
Vibration
V
MDE(micron-
mm/sec)
JPL (Commissioning)
H
Vibration
V
MNDE(micron-
mm/sec)
A
JPL (Commissioning)
Sl no
Unit:
8
7
6
5
4
3
2
1
Time(hrs)
Rated Current:
Starting current:
Current(A)
VFD%
BHEL
IGV%
RPM
Channel-1 Status
Channel-2 Status
DE Motor Brg.
Temp.
NDE (Local)C
DE
Fan:
Brg. Temp.
Motor(DCS) C
Started at:
NDE
Stopped at:
DE Fan Brg.
Temp.
NDE (Local)C
JPL (Project)
DE
Fan Brg.
Temp. (DCS)C
NDE
H
Vibration Fan
V
Jindal Power Limited(4x600MW),Tamnar
DE(mm/sec)
ID Fan Load Trial Log Sheet
A
H
Date:-
Vibration Fan
V
NDE(mm/sec)
A
H
Vibration
MDE(micron-
mm/sec)
JPL (Commissioning)
BHEL JPL (Project) JPL (Commissioning)
Vibration
V
MDE(micron-
mm/sec)
missioning)
A
H
Vibration
V
MNDE(micron-
mm/sec)
A
missioning)
SADC Log Sheet
Jindal Power Limited(4x600MW),Tamnar
Unit:
Command 0 25 50
1 Feedback in DCS
Position in Field
Command 0 25 50
2 Feedback in DCS
Position in Field
Command 0 25 50
3 Feedback in DCS
Position in Field
Command 0 25 50
4 Feedback in DCS
Position in Field
Command 0 25 50
5 Feedback in DCS
Position in Field
Command 0 25 50
6 Feedback in DCS
Position in Field
Command 0 25 50
7 Feedback in DCS
Position in Field
Command 0 25 50
8 Feedback in DCS
Position in Field
Command 0 25 50
9 Feedback in DCS
Position in Field
Command 0 25 50
10 Feedback in DCS
Position in Field
Command 0 25 50
11 Feedback in DCS
Position in Field
Command 0 25 50
12 Feedback in DCS
12
Position in Field
Command 0 25 50
13 Feedback in DCS
Position in Field
Command 0 25 50
14 Feedback in DCS
Position in Field
Command 0 25 50
15 Feedback in DCS
Position in Field
Command 0 25 50
16 Feedback in DCS
Position in Field
Command 0 25 50
17 Feedback in DCS
Position in Field
eet
0MW),Tamnar
Date:
75 100
75 100
75 100
75 100
75 100
75 100
75 100
75 100
75 100
75 100
75 100
75 100
75 100
75 100
75 100
75 100
75 100
ID Fan Motor No Load Trial Log Sheet
Jindal Power Limited(4x600MW),Tamnar
Rated current: Started at:
MDE(micron-
Channel-1 Status
Channel-2 Status
Motor(DCS)
Brg. Temp.
Motor Brg.
Vibration
mm/sec)
(Local)C
Temp.C
Winding
Temp.
Current(A)
Time(hrs)
C
Sl no
RPM
NDE
NDE
DE
DE
1 2 3 4 5 6 H
V
MDE(micron-
mm/sec)
JPL (Commissioning)
H
Vibration
V
MNDE(micro
n-mm/sec)
A
JPL (Commissioning)
Jindal Power Limited (4 X 600 MW)
Motor Brg. Temp. Pump Brg. Temp. Motor Vibration DE Motor Vibratio
Time Current Suction Dish. (Local) C (Local) C (mm/sec) (mm
S. No. Tank Lvl
(Hrs) (Amp) Pressure Pressure
DE NDE DE NDE H V A H
JPL NAME
Mechanical Erection:
Electrical Erection:
C&I Erection:
Quality:
Commissioning:
BHEL NAME
Erection:
Commissioning:
Remark
Limited (4 X 600 MW)
og Sheet Date:
Unit No:
Started at:
Stopped at:
SIGN.
SIGN.
Jindal Power Limited (4 X 600 MW)
CDT:
JPL BHEL
C&I Erection:
Quality:
Commissioning:
Remarks:
Date:
Unit No:
Started at:
Stopped at:
V A
HT Motor No Load Tria
Jindal Power Limited(4x600
Rated current: Started at:
Motor(DCS)
Brg. Temp.
Motor Brg.
(Local)C
Temp.C
Winding
Temp.
Current(A)
Time(hrs)
C
Sl no
NDE
NDE
DE
DE
1 2
MDE(micron-
MNDE(micro
n-mm/sec)
Vibration
Vibration
mm/sec)
Temp.C
Winding
3 4 5 6 H V A H V
JPL (Commissioning)
Vibration
MNDE(micro
n-mm/sec)
A
Jindal Power Limited (4 X 600 MW)
JPL BHEL
C&I Erection:
Quality:
Commissioning:
Remarks:
Date:
A H V A
missioning:
Oil Flushing Log Sheet
18:00 Oil Sample Report Moist.-21 PPM & MI-47.6 PPM Found. Oil Flushing declared completed(By Pass Bearing).Clearance Given Through Bearin
ate: 05.03.2013
commended Lube Oil:
Filter In
Remarks
Service
(A/B)
arted at 11:15 (Bearing By-Pass)
A
B Filter Cleaned
B Filter Cleaned
B
B
Date: 06.03.2013
B
B
A Filter Cleaned
B
A Filter Cleaned
A
A
A Filter Cleaned
A
Date: 07.03.2013
A
Filter In
Remarks
Service
(A/B)
A
B
B
B
Date: 09.03.2013
B
B
B Filter Cleaned
Date: 10.03.2013
B
A
B
A Filter Cleaned
A
A
A
B
Date: 11.03.2013
B
B
B
Filter In
Remarks
Service
(A/B)
A Filter Cleaned
A
A
B Filter Cleaned
B
Date: 12.03.2013
B
A Filter Cleaned
A
A
A
B Filter Cleaned
B
ort Moist.-16 PPM & MI-40.67 PPM Found.
H BEARING) DECLARED COMPLETED ON 12.03.13 AT 16:00
Oil Flu
Unit:2
Equipment:FD FAN- 2B
Lube oil supply line - return line and control oil su
Lub Oil Tank Lub Oil Tank Pump In
Time
S. No. Level Temp Service
(Hrs.) (%) (C) (A/B)
1 17:00 70 27 A
2 20:00 70 36 A
3 21:00 70 37 B
4 0:00 70 37 B
5 1:00 70 36 B
6 5:00 70 32 B
7 6:00 65 32 B
8 9:00 70 32 A
9 13:00 70 37 A
10 17:00 70 40 A
11 18:00 70 40 A
12 19:00 70 40 B
13 23:00 70 38 B
14 3:00 70 36 B
15 7:00 70 35 B
16 9:00 70 33 B
17 10:00 70 29 A
18 14:00 68 38 A
12:30 Oil Sample Report M
19 18:00 67 40 A
18:00 Oil Sample Report Moist.-20 PPM & MI-45.1 PPM Found. Oil F
Lube oil supply line - equalising line and c
20 21:00 70 40 B
21 1:00 70 40 B
22 4:00 70 35 B
23 8:00 70 32 B
24 9:00 70 32 A
25 13:00 70 35 A
26 17:00 70 39 A
27 20:00 70 38 A
28 21:00 70 35 B
29 1:00 70 35 B
30 5:00 70 33 B
31 9:00 70 32 B
36 11:00 70 34 A
37 15:00 70 38 A
38 17:00 70 41 A
39 21:00 70 40 A
40 22:00 70 39 B
41 1:00 70 36 B
42 5:00 70 36 B
43 9:00 70 35 A
44 13:00 70 40 A
45 17:00 70 43 A
46 21:00 70 43 A
47 0:00 70 41 A
48 1:00 70 40 B
49 5:00 70 41 B
50 9:00 70 36 B
51 12:00 70 39 B
12:00 Oil Sample Report Moist.-18 PPM & MI-67 PPM Found. Oil F
Oil flushing
52 22:00 55 42 A
53 1:00 55 40 A
54 5:00 55 36 A
55 6:00 55 36 B
56 10:00 55 36 B
57 14:00 55 40 B
15:00 Oil Sample Report Moist.-26 PPM & MI-42 P
Oil Flushing Log Sheet
Date:05.03.2013
Recommended Lube Oil:
e - return line and control oil supply line- control oil return line and circuit taken in service
Pump Discharge Oil Filter O/L Oil
lube oil pressure lube oil flow
Pressure Pressure
(Kg/cm2) (Kg/cm2) (kg/cm2) LPM
14 13 2.3 4
10 10 4.5 5
10 10 4.5 5
10 10 4.9 5.5
10 10 5 5.2
10 11 5.5 5.4
11 11 5.5 5.4
11 10 5.1 7
9 9 4.2 6
9 9 4.6 4.3
9 9 4.6 4.3
10 10 5 4.2
11 10 5.4 4.4
11 11 5.6 6.5
10 10.5 5.7 7
9 9 3.8 6.6
12:30 Oil Sample Report Moist.-26 PPM & MI-25.47 PPM Found.
9 9 4.3 5
-20 PPM & MI-45.1 PPM Found. Oil Flushing declared completed(By Pass Bearing).Clearance Given Through Be
il supply line - equalising line and control line- leak off line and circuit taken in service
9 9 4.6 4
Date:08
9 9 4.6 4
11 11 5.5 4.1
11 11 5.7 4.1
11 10 5.8 7.5
10 9.5 4.2 6.5
9 9 3.8 6
9 9 3.8 6
10 10 4.4 6.4
10 9 4.4 6.4
10 10 4.8 6.4
10 10 4.8 6.9
10 10 4.4 6.5
9 9 3.8 6.7
9 9 4.1 4.5
9 9 4.3 5
10 10 5.2 5.2
10 10 4.8 6
10 10 4.4 5.5
9 9 4.4 5
10 9 4.4 5
10 10 5 5
9 10 5.1 5
9 10 5.2 5
10 9 4.5 4.5
10 9 4.7 4.5
10 10 4.8 6
10 10 4.6 5.5
t.-18 PPM & MI-67 PPM Found. Oil Flushing declared completed(By Pass Bearing).Clearance Given Through Bea
Oil flushing started through bearing
12 12 5.1 6
12 12 5.2 5.5
12 12 4.6 5.5
13 12 4.6 5.5
12 13 4.9 5.5
12 12 4.7 5.5
mple Report Moist.-26 PPM & MI-42 PPM Found. Oil Flushing declared completed through bearing.
cuit taken in service
DP across Duplex Filter In
Remarks
Filter Service
(Kg/cm2) (A/B)
1 A
1 A
1 A pump changeover
1 A
Date:06.03.2013
1 A
1 A
1 B filter changeover
1 B Filter Cleaned.
0.5 B
0.5 B
0.5 A
Clearance Given Through Bearing
n service
0.5 B
Date:08.03.2013
0.5 B
0.5 B
0.5 B
cooler and filter
1 A changeover
0.5 A
0.5 A
0.5 A
1 A filter changeover
1 A
1 A pump changeover
Date:10.03.2013
0.5 B filter changeover
0.5 B
0.5 B
0.5 B
0.5 B
earance Given Through Bearing
0.1 B
Date:12.03.2013
0.1 A filter changeover
0.1 A
0.1 B
0.1 B
rough bearing.
Oil Flushing Log Sheet
Unit:2 Date:08.03.2013
Equipment:APH- 2B(GB) Recommended Lube Oil:
Pump In Pump Discharge Oil Lub Oil Tank
Time Service Pressure Temp
S. No. (Hrs.) (A/B) (Kg/cm2) (C)
1 18:00 B 2 30
2 22:00 B 2.1 26
3 1:00 A 2.1 22
4 5:00 A 2.2 20
5 8:00 A 2.3 17
6 11:00 B 2 26
7 14:00 B 2.2 31
16:00 Oil Sample Report Moist.-28 PPM & MI-211 PPM Found.
8 18:00 B 2 31
9 21:00 A 2.2 29
11 1:00 A 2.2 29
12 5:00 B 2.4 22
13 9:00 B 2 18
14 12:00 A 1.5 28
15 16:00 A 1.5 34
16 20:00 B 1.1 31
17 23:00 B 1.3 26
20 0:00 B 1.4 24
21 4:00 B 1.6 20
22 7:00 A 1.8 18
10:20 Oil Sample Report Moist.-31 PPM & MI-111 PPM Found.
23 11:00 A 2 25
24 12:00 B 2 30
25 16:00 B 1.9 33
26 18:00 A 2 34
27 22:00 A 2.1 32
28 23:00 B 1.8 34
29 2:00 B 1.9 30
30 3:00 A 1.9 30
31 7:00 B 2 23
36 10:00 B 1.9 25
09:55 Oil Sample Report Moist.-26 PPM & MI-75 PPM Found. Oil Flushing declared
completed(By Pass Bearing).Clearance Given Through Bearing
heet
18 Pump changeover
18
20
15 Pump changeover
12
MI-211 PPM Found.
14
15 Pump changeover
Date:10.03.2013
15
20 Pump Changeover
20
16 Pump Changeover
14
15 pump changeover
15
Date:11.03.2013
16
16
18 pump changeover
MI-111 PPM Found.
16
18 pump changeover
13
14 pump changeover
14
14 pump changeover
Date:12.03.2013
14
15 pump changeover
16 pump changeover
16
shing declared
Given Through Bearing
Oil Flushing Log Sheet
Unit:2 Date:11.03.2013
Equipment:APH- 2B(SB) Recommended Lube Oil:
Pump In Pump Discharge Oil Lub Oil Tank
Time
S. No. Service Pressure Temp
(Hrs.) (A/B) (Kg/cm2) (C)
1 21:00 A 2 30
2 0:00 A 1.9 28
3 1:00 B 1.9 23
4 5:00 B 2 24
5 6:00 A 1.9 20
6 10:00 A 2.3 24
Pump stopped due to leakage in line. Again resumed on 13.03.13 at 10:15
8 11:00 B 0.9 28
9 13:00 B 0.9 31
11 14:00 A 0.8 33
12 18:00 A 0.7 34
13 21:00 B 0.8 31
14 0:00 A 0.7 25
15 16:00 A 1.5 34
16 20:00 B 1.1 31
17 23:00 B 1.3 26
20 0:00 B 1.4 24
21 4:00 B 1.6 20
22 7:00 A 1.8 18
10:20 Oil Sample Report Moist.-31 PPM & MI-111 PPM Found.
23 11:00 A 2 25
24 12:00 B 2 30
25 16:00 B 1.9 33
26 18:00 A 2 34
27 22:00 A 2.1 32
28 23:00 B 1.8 34
29 2:00 B 1.9 30
30 3:00 A 1.9 30
31 7:00 B 2 23
36 10:00 B 1.9 25
completed(By Pass Bearing).Clearance Given Through Bearing
heet
LPM
22
22
Date:12.03.2013
22 Pump changeover
23
24 Pump changeover
24
umed on 13.03.13 at 10:15
Date:13.03.2013
22 Pump changeover
20
20 Pump changeover
20
16 Pump changeover
16 Pump changeover
14
15 pump changeover
15
Date:11.03.2013
16
16
18 pump changeover
MI-111 PPM Found.
16
18 pump changeover
13
14 pump changeover
14
14 pump changeover
Date:12.03.2013
14
15 pump changeover
16 pump changeover
16
e Given Through Bearing