Sie sind auf Seite 1von 4
RL (M&E) CHECKLIST Project No. : Ee Project Title MECHANICAL VENTILATION / AIR-CONDITIONING SYSTEM (GENERAL Layout generally according to plan SISIR labelled fire-damper of approved rating provided “Access panel provided for fire damper Gap surrounding fire-damper fire stopped Fire-damper properly mounted Fire rated duct properly installed Not passing through unprotected area / fire-rated GENERAL TESTING Independent system for smoke lobby / protected corridor connected to secondary power supply 2. | Fire pump room ventilation fan connected to secondary power > supply 3. | Fire Command Centre ventilation fan connected to secondary power supply 4. | Smoke stop lobbies, protected corridor ventilation fan connected to secondary power supply (ogy, x= dacs not comply, NA oo appeaDEy Inspected By : Sigutite Date 7 ncastosronsis) WSP-Ng RI. (M&F) CHECKLIST Project No. ——————— ee Project Title MECHANICAL VENTILATION / AIR-CONDITIONING SYSTEM (Cont'd) B_| MECHANICAL VENTILATION SYSTEM BI__| BASEMENT CARPARK MECHANICAL VENTILATION/SMOKE EXTRACT SYSTEM 1. | GENERAL Intake/discharge location within at least Sm separation Safety guard provided to exhaust grille Exhaust discharge directed to external 2,_| TESTING OF BASEMENT CARPARK VENTILATION SYSTEM a. | Testing of interlock and secondary power described under combined test | Manual switch provided at FIB, Test fnction Bz_ | PRESSURISATION SYSTEM 1._ | GENERAL 2, _| Fan location according o plan b._| Separate manual reset switch provided ©._| Manual activation switch and visual indicator provided at FIB 2, _ | TEST ON PRESSURISATION SYSTEM a. | Average air velocity > 1 m/s (3 doors in open position - 1 at I* storey & 2 other consecutive floors) b. | Force required to open any door < 100N ©. _| Pressure differential across each door > 50 Pa 44. _| Fan operation can only be stopped manually ©. _| Pressurisation test report submitted by Professional Engineer (1 comply, X= doesnot comply, NA not applica Inspected By : Signature Date nicest) B=WSP-Ng R.L (M&E) CHECKLIST Project No. EE ene Project Title MECHANICAL VENTILATION / AIR-CONDITIONING SYSTEM (Cont'd) B_| MECHANICAL VENTILATION SYSTEM (Cont'd) B3_| KITCHEN EXHAUST SYSTEM 1, | Duct run outside kitchen area are fire rated B4_| ATRIUM SMOKE CONTROL SYSTEM 1 | GENERAL a. _| Smoke detectors provided to perimeter of the atrium 2_ | TESTING a. _| System activates under fire alarm b.__| Functions under secondary power supply ©. | Auto supply mode activated by fire alarm system (where applicable) under secondary power supply 4. _| Individual reset (manual) provided | Manual activation provision at FIB £_| Atrium test result submitted by Professional Engineer ¥(F- comply, X= Joos wat comply, NA nok applcabley Inspected By : Signature: Date : owsTERsFORNSG) WSP - Ng RI. (M&E) CHECKLIST Projecto. : Ee Project Title: a MECHANICAL VENTILATION / AIR-CONDITIONING SYSTEM (Cont'd) C_| AIR-CONDITIONING SYSTEM. c1_| GENERAL ‘Smoke cut-off switch provided within return air stream of AHU room 2._| Fresh air duct fire rated (if passing through unprotected area) 3.__| Fresh air intake at least 5m from exhaust c2_| TESTING 1, _| Activation of smoke cut-off switch shuts down AHU c3_| DOCUMENTS 1. | Certificate of Supervision submitted and complied with accepted code 2.__ | Iftransfer of PE, proper Documents available (comply, x= does nak comply, NA nat appicabe) Inspected By : Signature Date ee RLS TPSFORNE) BWSP- Ng

Das könnte Ihnen auch gefallen