Sie sind auf Seite 1von 4

XYZ Page 1 of 4

QC~PLAN.
Project No. & Name: Lighting & Small Power Fittings (Lighting On-Off
Name of Client/ Consultant: Doc.No.M & E QC~Plan- 00

Sl. ACTIVITY CONTROLLING NATURE & EXTENT ACCEPTANCE PERSON RESP.


No. DOCUMENT OF INSP. / TEST CRITERIA AT LOCATION
1 Check Plan Contract Specs. Visual, 100% Signed off Plan completion Engineer/
Completion check list available. Foremen/
Quality Engineer
2 Check Lighting Drawings Visual, 100% Damage Free. Engineer/
Panel Packing material removed. Foremen/
Name plate details. Quality Engineer
Operation of D.B. Isolator.
Open & close of MCBs by
manual DB No. & Drawings.
Out going cable details.
Connections are ok.
Fuse rating is ok.
Insulation resistance valve is
ok.
3 Check Lighting Contract Specs. Visual, Work ok. Engineer/
Random Position of fitting ok. Foremen/
Earthing is ok. Quality Engineer
Current is ok.
Individual Circuit operation ok..
Manual operation ok.
Photo cell operation ok.
Total circuit current is ok on
each phases.

4 Check plan completion. Cover page for this Visual, 100% Plan completion Check-list Engineer/
QC~Plan. signed off. Foremen/
Quality Engineer

Work Location: Quality Engineer: Engineer / Foremen:

349619724.xls Date: January 26, 2001


XYZ Page 2 of 4
Remarks: Date: Date:

349619724.xls Date: January 26, 2001


XYZ Page 3 of 4

QC~PLAN.
Lighting & Small Power Fittings (Lighting On-Off Testing)
Doc.No.M & E QC~Plan- 001b/ REV. 0

RECORD

--

Lighting & Small Power


Fitting
Test Sheet
M & E QC~Form- 001-01/ REV. 0.

Lighting & Small Power


Fitting
Test Sheet
M & E QC~Form- 001-01/ REV. 0.

--

349619724.xls Date: January 26, 2001


XYZ Page 4 of 4

349619724.xls Date: January 26, 2001

Das könnte Ihnen auch gefallen