If a cracked splice plate is found, the SPLICE PLATE STRUCTURAL DAMAGE INSPECTION must be performed
and structural damage repaired or replaced as required. When new splice plates are installed, the inspection cycle
is repeated with the first inspection due at 10,000 hours. If unusual conditions are encountered that cannot be
resolved locally or if an alternate splice plate replacement procedure is desired, contact Hawker Beechcraft
Corporation Technical Support for consultation.
b. Visually inspect the edges of the splice plates on top of the upper spar forward flange for cracks. If a crack is
found in one of the splice plates, proceed to the splice plate replacement procedure.
c. Thoroughly examine the edges of the splice plates from on top of the spar forward flange to the forward ends.
Focus close attention on the area from the bulkhead to immediately forward of the main spar. If any cracks are
located in this area, proceed to the splice plate replacement procedure.
d. Anytime a crack is found in a splice plate, the splice plate must be replaced and the SPLICE PLATE
STRUCTURAL DAMAGE INSPECTION procedure in this chapter must be performed.
Page 201
C7 57-13-04 Feb/12
KING AIR 90 SERIES STRUCTURAL INSPECTION AND REPAIR MANUAL
Page 202
Feb/12 57-13-04 C7
KING AIR 90 SERIES STRUCTURAL INSPECTION AND REPAIR MANUAL
Page 203
C7 57-13-04 Feb/12
KING AIR 90 SERIES STRUCTURAL INSPECTION AND REPAIR MANUAL
b. If the nacelle rib attach channel is damaged, it must be replaced with a new channel. If any of the other structural
components are damaged, repairs may be effected utilizing one of the standard repair procedures (Ref. Chapter
20-10-00).
Page 204
Feb/12 57-13-04 C7
KING AIR 90 SERIES STRUCTURAL INSPECTION AND REPAIR MANUAL
Page 205
C7 57-13-04 Feb/12
KING AIR 90 SERIES STRUCTURAL INSPECTION AND REPAIR MANUAL
a. To prevent unacceptable loading of the nacelle structure when the splice plates are removed, support the
engine with a 50-590141-1 or other Hawker Beechcraft Corporation approved sling and a hoist.
CAUTION: Do not drill into the spar cap.
b. Remove the fasteners attaching the aft nacelle skin to the center section and remove the skins shown as shaded
areas (Ref. Figure 203, Sheet 1).
c. Remove the plumbing and equipment as necessary to gain access to the splice plate fasteners forward of the
main spar.
d. Remove the rivets attaching the splice plates (Ref. Figure 203, Sheet 2) to the structure. Remove the lock bolts
that secure the splice plates to the spar (Ref. Chapter 20-50-04).
f. Vacuum up all debris that may have been caused by the drilling operation.
CAUTION: When using the old splice plate as a template, ensure that it is the splice plate which was removed from
the location for which the new splice plate is being prepared,
h. Install the aft nacelle skins utilizing the fasteners shown (Ref. Figure 203, Sheets 3, 4 and 5).
Page 206
Feb/12 57-13-04 C7
KING AIR 90 SERIES STRUCTURAL INSPECTION AND REPAIR MANUAL
Page 207
C7 57-13-04 Feb/12
KING AIR 90 SERIES STRUCTURAL INSPECTION AND REPAIR MANUAL
Page 208
Feb/12 57-13-04 C7
KING AIR 90 SERIES STRUCTURAL INSPECTION AND REPAIR MANUAL
Page 209
C7 57-13-04 Feb/12
KING AIR 90 SERIES STRUCTURAL INSPECTION AND REPAIR MANUAL
Page 210
Feb/12 57-13-04 C7
KING AIR 90 SERIES STRUCTURAL INSPECTION AND REPAIR MANUAL
Page 211
C7 57-13-04 Feb/12