List of work orders placed for O&M works O/o SE (Elect.

)
Contract
S. Name & address Period Name of executing
Description of work value in
No. of contractor Xen/Aen
Rs.
From To

Annual Contract for Routine breakdown &


capital maintenance work of LT
switchgear, LT bus duct, ash handling
plant control panel, battery Bank and
M/s MC Sharma
battery charger, all CA area LT panels, Sh. D. N. Tiwari
1 Engineering 2893049 01.02.2016 31.01.2017
cable laying, glanding, jointing and /Sh. M.I. Haque
Works, Kota
termination and cable cleaning including
River water system of CTPP stage-I (Unit-I
to IV), Phase -I &II CTPP, Chhabra, against
TN-24/2015-16 (Elect.).

Annual contract for, routine operation in


shift of 6.6KV SWGR unit#-I to IV and
routine/capital/ breakdown maintenance
work of 6.6 KV SWGR of main plant M/s Shree
Sh. D. N. Tiwari/Sh.
area, \river water system, maintenance of Jayanti
2 4095235 01.01.2016 31.12.2016 Rajesh Kumar
SPBD, cable laying and termination work, Enterprises,
Meena
O&M of lift and elevators of unit# I to IV Guna
(4x250 MW) phase-I &II of stage-I, CTPP
Chhabra.
against TN- 39/2015-16 (Elect.).
Annual Contract for routine, breakdown &
capital maintenance work of 4x750 KVA M/s Shree
Sh. D. N. Tiwari
D.G. set & Electrical System of E.S.P, Soot Jayanti
3 2215328 22.01.2016 21.01.2017 /Smt. Meena
Blower of 4X250MW ,Unit-I to IV, Stage-I Enterprises,
Lakshkar
Phase-I&II CTPP Chhabra, against TN- Guna
28/2015-16 (Elect.).

Two years Contract for Routine, Breakdown


& Capital Maintenance work of LT Motors,
Actuators of Valves and Dampers etc. of M/s Sunil
Sh. D. N. Tiwari
4 main plant area (Including River Water Enterprises, 4499611.2 07.07.2016 06.07.2018
/Sh. M.I. Haque
System) of Unit 1,2,3&4, Stage-I, Phase- Kota
I&II, CTPP, Chhabra, against TN-65/2015-
16(SWGR).

Two years Contract for Rewinding & Repair


work of LT motors of main plant area
M/s Allied
(including River Water system and CHP Sh. D. N. Tiwari
5 Electric works, 5650774 13.07.2016 12.07.2018
Area) of Unit # 1,2,3&4 (4X250 MW) /Sh. M.I. Haque
Kota
Stage-I, Phase-I&II, CTPP, Chhabra,
against TN-66/2015-16(SWGR).

Annual Contract for Routine /Breakdown &


Capital maintenance of 6.6KV Motor
M/s Sunil Sh. D. N. Tiwari
including 6.6 KV motor of River Water
6 Enterprises, 2096610 07.06.2016 06.06.2017 /Sh. Rajesh Kumar
System of Unit #1 to 4 (4X250MW) Phase-
Kota Meena
I&II, Stage-I CTPP, Chhabra,
against TN-58/2015-16 (Elect.).
Two years Contract for Routine operation
of Air-conditioning, Ventilation system,
General area & equipment cleaning, M/s Govind
General servicing, Minor and Major Singh
D. N. Tiwari /M.I.
7 maintenance of Central Air Conditioning Contractor, 7852131 12.10.2016 11.10.2018
Haque
system, Package units, Evaporative Kota
cooling units of Phase I&II of CTPP,
Chhabra. against NIB No. 14/2016-
17/SE(SWGR)/CTPP.

Two Year Contact for the work of cleaning


and housekeeping of Electrical Equipment
M/s ARY Sh. D. N. Tiwari
House (Switchyard) & Service Building of
8 Construction 2107480.8 19.11.2016 18.11.2018 /Sh. Amit
Unit #1 to IV of Chhabra Thermal Power
Group, Chhabra Srivastava
Plant Stage-I, Phase-I ,II CTPP, Chhabra,
against NIB No. 16/2016-17SE(Swgr.)CTPP

Two years contract for the work of M/s Hemant


operation and maintenance of electrical Electrical Sh. K.P. Ojha /Sh.
9 network of residential colony of Chhabra & Electronics, 4233477 01.07.2016 30.06.2018 Satish Kumar
Thermal Power Plant StageI, against NIB Kota Vidhuri
No.03/2016-17/ SE (SWGR) CTPP.

Annual Contract for Daily and Routine


Maintenance and Checking of PA System Sh. K.P. Ojha /Sh.
M/s S. P.
10 and EPBX System of plant & Colony of 894965 02.02.2016 01.02.2017 Dharmveer
Electrical, Kota.
Chhabra Thermal Power Project Stage-I, Sharma
Phase-I&II against TN-52/2015-16 (Elect.).
Annual Maintenance contract for Routine
Sh. K.P. Ojha /Sh.
and breakdown maintenance of Station M/s S. P.
11 3761729 11.06.2016 10.06.2017 Dharmveer
Lighting of CTPP, Stage-I, Phase-I&II Electrical, Kota.
Sharma
against TN-59/2015-16 (Elect.)

Annual Contract for Routine & capital


maintenance of Power Transformers,
M/s Sunil
Service Transformers, Reactors and Sh. Harsh Singh
12 Enterprises, 2482616 12.04.2016 12.04.2017
Isolated phase bus duct of Unit #1, 2, 3 &4 /Sh. R.K. Sharama
Kota
(4X250MW), Phase-I Stage-I &II CTPP,
Chhabra against TN-55/2015-16(Elect).

Annual Contract for Routine & capital


maintenance of 4X250MW Generator and
31.12.2016
its auxiliaries i.e. seal oil system, H2 Gas M/s Gill Sh. Manoj Gupta
13 2820376.9 01.01.2016 Extended up
system, Exciter system etc. of Unit # I,II,III Brothers, Kota /B.L. Meena
to 30.04.2017
& IV(4X250MW) Stage-I, Phase-I&II CTPP,
Chhabra against TN. -27/2015-16 (Elect.).

Annual Contract for maintenance work of


33KV/220KV /400KV switchyard & 33KV
D/C line and sub-station of Bethali & M/s. M.C.
Sh. Harsh
Hindlot with operation of Bethali, Hindlot & Sharma
14 5730836 01.04.2016 31.03.2017 Singh/Sh. Sanjay
Parvati River water pump house sub- Engineering
Kumar
station and testing of DAVR and relaying of Works, Kota.
4X250MW CTPP, Stage-I Phase-I &II
against TN-57/2015-16 (Elect.).
.)
Name of
contract person
Remarks
of firm & Mobile
No.

5 HS+
Sh.Moolchand 7 S+
Sharma 2 US
9587777669 extnd. For
four months

4 HS+
14 S+
Sh. M.C. Kasyap 4 SS+
9425135165 2 US
extnd. For
four months
6 SS+
6 S+
Sh. M.C. Kasyap
4 US
9425135165
extnd. For
four months

Sh. Vidya Sagar 3 S+


9414480162 3 SS

Sh. Ayub
-
9468663542

Sh. Vidya Sagar 6 US+


9414480162 2S
3 HS+
6 S+
Sh. Bhim Singh
4 SS+
9413002377
9 US

Sh. Raesh 9 US+


Mohamamad 1 SS
9929877959

Badri Lal Nagar 5 US


9784411617 4S

2 US +
Shishupal singh 2S
8107830756 extnd. For
four months
Shishupal singh 10 US+
8107830756 10 S

Sh. Vidya Sagar 4 S+


9414480162 4 US

Sh. Manjeet
Singh 5 US
9914654645

5 HS+
Sh.Moolchand 4 S+
Sharma 5 SS+
9587777669 9 US