Sie sind auf Seite 1von 4

Questions (TRUE or FALSE)

(Answers at end of this post)

1. Invoices can be released on item and header level?

2. On a Purchase Order with more than one line item, the different items can have prices (Gross
price condition) that are on DIFFERENT currencies?

3. Public holidays are specified in the Factory calendar that are link to a specific Purchase
Organization?

4. A Material number template can be set per MATERIAL TYPE?

5. The Quantity & Value update in the material type configuration can be set per Plant?

6. Number ranges for Vendor Masters (set at Account Group) must be either Internal or External - it
can not be both?

7. Screen Sequence (which identifies the screen sequence for the display of the header details in the
evaluation of the planning run) is set on lot size?

8. Purchase Organization + Purchasing Groups = Purchasing Area?

9. The validity period (start / end) can be entered in a Purchase Order and Purchase Requisition on
header level?

10. Transaction "Create PO, Vendor unknown" can be used to create Purchase Orders and
Purchase Requisitions?

11. With availability check, the current unrestricted stock can not be excluded from the calculation?

12. Regular Vendor (used in Info Records) is activated per Purchase Organization?

13. Freezing of Book inventory as used in Physical Inventory is only allowed if activated on
Plant / S.Loc level?

14. If the posting Block was set for Physical Inventory document, you will not be able to process
material movements until the difference is posted?

15. For invoice verification, a default tax code can be set up per company code?
16. When creating Contracts, a Purchase Organization must be specified?

17. One step Transfer postings can done between plants if the plants belong to different company
codes?

18. In external service management a service entry sheet is the same as a goods receipt?

19. If the Source List selection is set in the material master then you must maintain a source list for
the material?

20. If the Quota Arrangement option is set in a material master then you must maintain a quota
arrangement for the material?

21. For valuation, a plant is assigned a chart of accounts?

22. For a Framework requisition (type FO) the validity dates are entered on header level?

23. MRP Area is a grouping of PLANTS?

24. MRP can create reservations?

25. Exchange rates can be changed during invoice verification (ref to PO) but it must be done before
the PO number is typed in?

26. Manual postings to stock (GL) accounts can only be made if the current stock quantity is zero?

27. A material type can be configured to allow pipeline or pipeline mandatory?

28. Goods receipt to 'GR block stock' for valuated material will create a material document?

29. Only one plant / storage location can be used in one Physical Inventory document?

30. Consignment info records can only be created in the currency of the company?

31. The same material (for a specific plant) can be set up for either batch management or split
valuation not both?

32. For MRP to create stock transport requisitions (PR with item category U) a source list must be
set up?
33. When creating a Purchase Requisition for a material the price in the PR is from the material
master?

34. Source lists can be created for a material group?

35. Planned delivery costs is specified in pricing conditions and can not be changed during
invoicing?

36. Field selection can be linked to release indicator (status)?

37. Returnable transport packaging stocks are never valued?

38. Consignment stock can be receipted in block stock?

39. Stock can only go negative if the material is valued as standard price, not moving average price?

40. Reservations that are flagged for deletion can be un-deleted by simply removing the flag?

41. Purchase requisitions that are flagged for deletion can be un-deleted by simply removing the
flag?

42. Requirements date on a reservation is specified on header level?

43. If the 'Shelf live expiration date' (SLED) is set in the material master but not in the Purchase
Order then it will not be checked during Goods Receipt?

44. End User training takes place during the Go-Live and Support phase of a project?

45. SAP Solution Manager provides the methodology through 3 roadmaps - Implementation, Solution
Management & Global?

46. A Parked invoice is visible in the PO History?

47. A Hold document (invoice) is only visible in PO History if the balance is zero?

48. Automatic Invoice reduction can take place if the vendor specific tolerance is set up. Invoice
reduction can only take place for positive differences and not for negative diverences?

49. Subsequent debit / credit will not post to GR/IR account?


50. Unplanned delivery costs will always post either to stock or consumption account?

51. The duplicate invoice check is activated on company code level?

52. Account assignment U can be used in PR and contract but not in Purchase Orders?

53. The same Valuation Grouping code can be linked to multiple plants belonging to different
company codes?

54. Configuration takes place during the realization phase?

55. The project definition activity takes place in Blueprint phase?

56. For missing parts check to function, the availability checking must be activated for a material?

57. A message schema contains message types?

58. A Quote can be accepted or rejected?

59. In the material type configuration a setting is available to indicate if the material can be managed
as consignment stock?

60. Reservations from production are called manual reservations?

Das könnte Ihnen auch gefallen