Sie sind auf Seite 1von 4

PRACTICA DOMICILIARIA DE RESERVORIOS I

Apellido: Malvaceda Requejo Codigo: 20131425J


Nombre: Christian Andre Fecha: 17/12/16
-----------------------------------------------------------------------------------------------------------
-------------------------

PROBLEM N1: CONSTANT-RATE DRAWDOWN


TEST
Fig. 4-4 is a plot of a flowing well pressure versus
time on semilog paper. After about half of a day,
the well behavior is affected by a nearby barrier in
the reser- voir. Using the early straight line of the
plot determine the undamaged perme ability and
the skin iactor, S. The reservoir data are as
tollows:
Initial pressure=2800 psia
Production rate=80 stb/d
Oil formation volume factor=1.25 res bbl/stb
Effective porosity=0.20
Formation thickness=10 ft
Saturation pressure=1,800 psia
Rw=0.25 ft
=1.2 cp

C= 105 /psi

SOLUTION:
From graph:
psi
m=80
cycle

0.165 q Kh (0.1625)(80)(1.25)
m= . i. e . = =0.20
Kh 80

K
Por lo tanto. =0.02Cuando K est en Darcies y K =( 0.002 ) 1.2=0.024 darcies

Usando la presin a 10 das de la extrapolacin:


t 0 +0.809
ln +S
0.5
Pw =Pi0,867 m

( 6.33 ) ( 0.02 ) (10 )


+0.809
( 0.2 ) ( 105 ) ( 1/16 )
ln

0.5 ( ln t 0 0.809 )=0.5

2404=2800( 0.867 ) [ ( 80 )( 8.47 )+ S ]

S=2.76

PROBLEM N2: PRODUCTIVITY-


INDEX EVALUATION
A. The flow-test data plotted in Fig.
4-2 is obtained from a fractured
well in a solution-gas-drive
reservoir. This well has produced
for 1 month. It drains about 40
acres and has a well radius of 4
in. The undamaged permeability
to oil as determined from a DST
pressure buildup is 20.5 md, and
Bo is 1.25. The net thickness is 14 ft, and the reservoir oil viscosity is
1.2 cp. Plot the productivity index versus pw. What is the damage
ratio based on the straight-line portion of Fig 4- 2 data? Estimate the
maximum pumping rate. What is the maximum pumping rate
indicated if the test rates are all less than 270 b/d?
B. It is estimated that production of 35,000 stb of oil from this reservoir
will result in a pressure at the well drainage boundary of 2,800 psia
and a reservoir gas saturation of 5%. K ro will be 0.5, krg will be 0.0,
0 will be 1.1 cp, and Bo will be 1.15. Use kro in part A as 1.0. Plot
the productivity index versus pw at this time. Estimate the maximum
flowing and pumping rates.
C. Productivity-index tests are planned for the well at the time described
in part B. The flowing tubing-head pressure has been declining at a
uniform rate of about 3 psi/d. while producing at 75 stb/d. Find the
2
product cr e . What stabilization times are required?

SOLUTION:
A.
(1) (2) (3) (4) (5)
inicial When Np=35,000stb
pw qo Pl Pl qo
psig stb/d Stb/d/psig Stb/d/psig stb/d
3.000 0 -- -- --
2,660 90 0.265 0.157 --
2.380 165 0.266 0.158 --
1.980 270 0.265 0.157 --
1.600 330 0.236 0.140 --
197 maximum flow
1.195 373 0.207 0.123
rate
252 maximum pump
0 455** 0.152 0.09
rate
(1) From Fig 4-2
(2) From Fig 4-2; ** Tasa de bombeo mxima obtenida por extraclacin.
(3) q/(pe-pw)=q/(3,00-pw) Donde q est en stb. Basado en la Ec. 4.1.
Donde se obtienen 3.000 de la Fig. Extrapolacin 4-2.
(4) (Pl when Np is 35,000) =initial Pl(Ko/Bo 0 )35,000/(Ko/Bo 0 )inhitial
(4.6)

= initial Pl (0.5/(1.15x1.1))35,000/(.0/(1.25x1.2))inhitial
Initial Plx0.5925
(5) (qo)35,000=Plx(pe-pw)=(Pl)35,000x(2,800-pw)
(4.1)B.

B.
Si se utiliza slo menos de 270b/d en la prueba, la velocidad mxima
indicada se basa en la Pl de 0,265 stb/d / psi o (3,000) x (0,265) = 795
stb/d.

DR=K undamaged /K actual

7.08 K act h
J=
B o o [ ln ( r e / r w )0.5 ]

7.08 K act 14
0.265=
1.25 1.2 [ ln ( 745/0.333 ) 0.5 ]

K actual=0.0288 Sehan mejorado losdarcies alrededor del pozo

20.5
DR= =0.712Se ha mejorado la permeabilidad alrededor
28.8

C.
( pt ) pseudo
=
1.79 q
( c r e 2 ) 14
1.79 75 1.15
3.0=
( c r e 2) 14

3.7 ft 2
cr e 2=
psi

2
0.04( c r e )
t s=
k

Das könnte Ihnen auch gefallen