Project Spreadsheets to EC2 The Concrete Centre

Client Advisory Group Made by Date Page


Location Level 2 - Beam on Grid 7 rmw 03-Apr-2017 259
POST-TENSIONED ANALYSIS & DESIGN to BS EN 1992-1:2004 Checked Revision Job No
Originated from TCC42.xls v4.0 on CD 2005-17 TCC chg - FB625

POST-TENSIONED ANALYSIS & DESIGN to BS EN 1992-1:2004 - GENERAL DATA


LOAD COMBINATIONS
TRANSFER SLS 1 Transfer prestress + dead load at transfer
SLS 2 Final prestress + dead + full imposed load on all spans NOTES
RARE SLS 3 Final prestress + dead + full imposed load on odd spans INPUT IS UNDERLINED.
SLS 4 Final prestress + dead + full imposed load on even spans FRAMES ARE ASSUMED TO BE
SLS 5 Final prestress + dead + frequent imposed load on all spans BRACED
FREQUENT SLS 6 Final prestress + dead + frequent imposed load on odd spans
SLS 7 Final prestress + dead + frequent imposed load on even spans USAGE
SLS 8 Final prestress + dead + QP imposed load on all spans Shopping
QUASI-
SLS 9 Final prestress + dead + QP imposed load on odd spans
PERMANENT
SLS 10 Final prestress + dead + QP imposed load on even spans
ULS 1 Final prestress + factored dead and imposed load on all spans VIBRATION
ULTIMATE ULS 2 Final prestress + factored dead + factored imposed load on odd spans Limiting reponse factor
ULS 3 Final prestress + factored dead + factored imposed load on even spans R=8

ULS LOADING PATTERN min max DEFLECTION


Dead 1.25 1.25 Limit QP deflection to L/ 250
Imposed 0 1.50 BS EN 1990: (6.10b) Limit after construction to L/ 500

OPTIONS Exposure class is X0, XC1 Prestress system is bonded and stressed from left end
Slab Wmax, mm = 0.2
Jacking force /fpk = 0.8 Top bonded rebar in spans? Yes (Helps to reduce deflections - recommended)
Slab type R (S)olid, (R)ibbed or (W)affle, supported by beam Damping, (1% to 4%) 1.5%

MATERIALS CONCRETE fck = 40 Ecm = 35.2205 c,max = 18.00 t,max = 5.79 Design hypothetical
tensile stresses to limit
At transfer, 4 days, fck(i) = 26.54 Ecm(i) = 31.91 c,max(i) = 11.94 t,max(i) = 4.17 cracking
Cement type R Curing time (days) = 3 c = 1.50
Ave ambient during curing = 18C Longterm R/H % 55 .

STRAND fpk = 1860 Aps, mm = 100 = 0.200 K = 0.0085


Eps = 195 Rel % = 2.5 , draw in = 6 Depth to strand centre = 41

REBAR fyk = 500 Grade A COVERS Top Bottom Sides


m = 1.15 to links 25 25 25

LOADING SEQUENCE Loading sequence for assessment 2 = 0.6 Rare combination


Load @ Age fctm fctm,fl Ecm(t) Load Ecm(t)
kN/m days MPa MPa Creep GPa kN/m Creep GPa
Dead at transfer 10.19 4 2.52 2.52 1.93 12.01 10.19 1.93 12.01
Applied dead 2.07 30 3.51 3.51 1.51 14.05 2.07 1.51 14.05
Quasi-permanent imposed 5.40 -=- 9.00
COMBINED 17.66 - 1.75 12.79 21.26 1.71 12.99

NOTES on MATERIALS
BRITISH LOW RELAXATION STRAND
Type Dia Area fpk Weight RELAXATION at 0.7fpk
Standard 15.2 139 1670 1.090 Ambient C 20 40 60 80 100
12.5 93 1770 0.730 Relaxation 1.8 3.5 5.1 7.5 10.7
Super 15.7 150 1770 1.180
12.9 100 1860 0.785
Compact 15.2 165 1820 1.295
12.7 112 1860 0.890
Project Spreadsheets to EC2 The Concrete Centre
Client Advisory Group Made by Date Page
Location Level 2 - Beam on Grid 7 rmw 03-Apr-2017 260
POST-TENSIONED ANALYSIS & DESIGN to BS EN 1992-1:2004 Checked Revision Job No
Originated from TCC42.xls v4.0 on CD 2005-17 TCC chg - FB625
Dimensions and Loads
NORMAL DIRECTION
SPANS Lm H mm bw mm hf mm Section beff mm No Bays Bay width m
Span 1 16.000 800 350 150 T 1200 10 7.200
Span 2 14.400 800 350 150 T 1200 10 7.200
Span 3 13.800 800 350 150 T 1200 10 7.200

SUPPORTS Above m H mm b mm End cond Below m H mm b mm End cond


Support 1 K
Support 2 K
Support 3 K
Support 4 K

CONFIGURATION SLAB supporting Ribbed Slab, Exposure class X0, XC1, Wk = 0.2 mm, fck = 40, Stressed from Both Ends

LOADING UDLs~kN/m (char), PLs~kN (char), Position~m


Dead at Applied Imposed Position Loaded Dead at Applied Imposed Position Loaded
SPAN 1 transfer Dead Load from left Length SPAN 3 transfer Dead Load from left Length
UDL 10.19 2.07 9.00 ~~~~~ ~~~~~ UDL 10.19 2.07 9.00 ~~~~~ ~~~~~
PL 1 ~~~~~ PL 1 ~~~~~
PL 2 ~~~~~ PL 2 ~~~~~
Part UDL Part UDL
SPAN 2
UDL 10.19 2.07 9.00 ~~~~~ ~~~~~
PL 1 ~~~~~
PL 2 ~~~~~ GLOBAL STATUS
Part UDL VALID DESIGN

TENDON PROFILE (heights to strand centre: see heights specified under TENDONS below)

826

501 501

41 80

EQUIVALENT LOADS in service

80
60 52 kN/m
52 kN/m 52 kN/m
38 kN/m
40 31 kN/m
23 kN/m
20
0 -11 kN/m -13 kN/m -7 kN/m
-20
-40
Project Spreadsheets to EC2 The Concrete Centre
Client Advisory Group Made by Date Page
Location Level 2 - Beam on Grid 7 rmw 03-Apr-2017 261
POST-TENSIONED ANALYSIS & DESIGN to BS EN 1992-1:2004 Checked Revision Job No
Originated from TCC42.xls v4.0 on CD 2005-17 TCC chg - FB625
Tendons & bonded reinforcement
(a) TENDONS Pj = 149 kN Pi/A = 1.52 MPa max
Supt 1 Span 1 Supt 2 Span 2 Supt 3 Span 3 Supt 4
Pi/Pj 71.7% 53.7% 43.0%
P30/Pj 70.6% 52.6% 42.1%
Pf/Pj 63.3% 46.0% 35.6%
No of strands
Recommended 5 5 5 3 3 3 3 3 3
Use 5 5 5 5 5 5 4 4 4
Recommend'd height 501 41 759 41 759 41 501
Height mm 501 41 826 826 41 826 826 41 501
Length Straight mm 0 0 0 0 0 0
x to max Sag mm 7056 7200 7714
Pi kN 618 618 534 515 454 400 320 282 256
Balance Load kN 80.6 108.5 99.1 99.1 57.4 42.7
Pf kN 550 553 471 453 396 342 274 238 212
Balance Load kN 61.4 82.7 74.6 74.6 43.1 32.0

CHECKS 'EFFICIENCY' a 45%


Tendons (a) OK
b(C) 24%
Stresses at transfer (b) OK
b(T) 12%
Stresses in service (c) OK for (c) see
ULS MOR (d) OK c(C) 31%
Shear (e) OK c(T) 79%
Vibration (f)
OK - see note
d 70%
Deflection (g) OK
Neutral axis depth OK e 23%
Rebar stress OK f 7% for n. a.
g 82% for rebar
GLOBAL STATUS VALID DESIGN
0.000 1.309

REINFORCEMENT Input bonded rebar arrangement (Support bars cutailed at 0.3L)


Span 1 Span 2 Span 3
Supt 1 btm top Supt 2 btm top Supt 3 btm top Supt 4
Required at SLS 1662 956 1196 1662 485 1196 1662 1278 1196 1662
Main bar 16 25 16 16 16 16 16 20 16 16
No 9 4 7 9 4 7 9 4 7 9
As provided 1810 1963 1407 1810 804 1407 1810 1257 1407 1810
% 0.646% 0.701% 0.503% 0.646% 0.287% 0.503% 0.646% 0.449% 0.503% 0.646%
Link = 8
No of legs 3 3 3 3 3 3 3 3 3 3

(d) ULS MOMENTS With bonded reinforcement


Supt 1 Span 1 Supt 2 Span 2 Supt 3 Span 3 Supt 4
Mu 0.0 441.9 421.0 421.0 133.3 357.9 357.9 413.1 0.0
MOR 756.6 1017.3 885.1 874.1 559.7 806.9 758.6 592.0 646.0

1500 ULS MOMENT ENVELOPE/MOR

1000

500

-500

-1000

-1500
Project Spreadsheets to EC2 The Concrete Centre
Client Advisory Group Made by Date Page
Location Level 2 - Beam on Grid 7 rmw 03-Apr-2017 263
POST-TENSIONED ANALYSIS & DESIGN to BS EN 1992-1:2004 Checked Revision Job No
Originated from TCC42.xls v4.0 on CD 2005-17 TCC chg - FB625
Results (2)
(e) SHEAR Link = 8
Span 1 Span 2 Span 3
Left Right Left Right Left Right
VEd - Vtd 170.3 217.7 160.1 168.9 194.2 159.1
cracked ? N Y Y Y Y N
(VEd - Vtd)/VRdc 0.856 1.138 0.845 0.945 1.129 0.959
No of legs 3 3 3 3 3 3
Link spacing 425 425 425 425 425 425

ULS SHEAR ENVELOPE (VEd)


400.0
300.0
200.0 204.1 206.9 224.7
100.0
0.0
-100.0
-200.0 -208.0 -172.8
-256.8
-300.0
-400.0

(f) VIBRATION Span 1 Span 2 Span 3


Response factor 0.46 0.40 0.52
OK OK OK

(g) DEFLECTION

MAX DEFLECTIONS (mm)


5
0
-5
-10
-15
-20
-25
-30
At transfer Span 1 = -0.4mm Span 2 = -1.8mm Span 3 = 0.2mm
Quasi-permanentSpan 1 = 13.4mm < 64 OK Span 2 = 3.1mm < 57.6 OK = 25.5mm < 55.2 OK
Span 1 = 11.3mm < 32
After construction OK Span 2 = 5.1mm < 28.8 OK = 22.5mm < 27.6 OK

SUPPORT REACTIONS Supt 1 Supt 2 Supt 3 Supt 4


ULS 1 194.6 478.1 432.7 167.8 kN
ULS 2 194.7 384.3 328.2 171.7 kN
ULS 3 91.6 360.2 343.8 75.4 kN
Dead 83.3 199.6 186.8 72.0 kN
Imposed 58.1 154.5 135.2 50.0 kN

COLUMN MOMENTS Supt 1 Supt 2 Supt 3 Supt 4


Above 0.00 0.00 0.00 0.00 kNm
ULS 1
Below 0.00 0.00 0.00 0.00 kNm
Above 0.00 0.00 0.00 0.00 kNm
ULS 2
Below 0.00 0.00 0.00 0.00 kNm
Above 0.00 0.00 0.00 0.00 kNm
ULS 3
Below 0.00 0.00 0.00 0.00 kNm
Project Spreadsheets to EC2 The Concrete Centre
Client Advisory Group Made by Date Page
Location Level 2 - Beam on Grid 7 rmw 3-Apr-17 264
POST-TENSIONED ANALYSIS & DESIGN to BS EN 1992-1:2004 Checked Revision Job No
Originated from TCC42.xls v4.0 on CD 2005-17 TCC chg - FB625

TYPICAL CALCULATION
for Span 1 at 4.80 m from C/L of LH support EC2 Ref
Class X0, XC1 Tee section, h = 800 mm, bw = 350 mm hf = 150 mm, bf =1200 Table 4.1
Ac = 407500mm, Z top = 81.9E6 mm, and Z bottom = 48.7E6 mm
Tendons are bonded, Ap = 100mm, fpk = 1,860 N/mm2 and 101.8 mm from soffite
There are 5 tendons, jacked to 1,488 N/mm or 80% fpk
Prestress losses at this section are 126.1 kN at transfer and 192.2 kN longterm 5.10.5 & 6

(b) STRESSES at TRANSFER


M = 21.7 kNm hogging, and prestressing force = 617.9 kN
Max compression (bottom) = M/Z + P/A = -21.7E3 / 81.9 + 617.9 / 407.5 = 1.96 N/mm
< 11.94 N/mm allowed
5.10.2.2(5)
Max tension (top) = M/Z - P/A = 21.7E3 / 81.9 - 617.9 / 407.5 = 0.00 N/mm
< 4.17 N/mm allowed TR43
(c) STRESSES in SERVICE
Frequent M = 217.7 kNm sagging, and prestressing force = 551.8 kN
Max compression (top) = 217.7E6 / 81.9E6 + 551.8E3 / 407.5E3 = 3.77 N/mm
< 18.00 N/mm allowed
5.10.2.2(5)
Quasi-permanent M = 197.5 kNm sagging
Max tension (bottom) = 197.5 / 48.7 - 551.8 / 407.5 = 3.12 N/mm
< 5.79 N/mm allowed TR43
(d) MOR at ultimate limit state
M = 414.7 kNm sagging, and prestressing force = 551.8 kN
pe = 1000 x 551.8 / 5 / 100 = 1,103.5 N/mm
Reinforcement d = 754.5 mm
Tendon force = 0.9 (551.8 + 100 /1000 x 5 x 100) = 541.6 kN 5.10.8(2)
As = /4 x 25 x 4 = 1,963 mm
Rebar force = 500 / 1.15 x 1,963 / 1000 = 853.7 kN
Total tensile force = 541.6 + 853.7 = 1,395.3 kN
fcd = 1 x 0.85 x 40/1.5 = 22.67 N/mm 3.1.7(3)
Compression block depth, x = 1000 x 1,395.3 / 22.67 / 1200 = 51.30 mm Fig 3.5
MOR = (541.6 ( 800 - 101.8 - 51.30 / 2) + 853.7 x (754.5 - 51.30 / 2)) / 1000
= 986.5 kNm > 414.7 ok
Project Spreadsheets to EC2 The Concrete Centre
Client Advisory Group Made by Date Page
Location Level 2 - Beam on Grid 7 rmw 03-Apr-2017 272
POST-TENSIONED ANALYSIS & DESIGN to BS EN 1992-1:2004 Checked Revision Job No

Originated from TCC42.xls v4.0 on CD 2005-17 TCC chg - FB625


Detailed calculations (8)
Loadings 0 0
Span 3 Left < > PL1 < > PL2 < > Right UDL PL1 PL2 pUDL 13.8
V SLS 1 72.0 0 72.0 0 72.0 100 68.5 10.2 0.0 0.0 0.0
SLS 2 166.3 0 166.3 0 166.3 100 127.0 21.3 0.0 0.0 0.0
SLS 3 157.7 0 157.7 0 157.7 100 135.6 21.3 0.0 0.0 0.0
SLS 4 98.0 0 98.0 0 98.0 100 71.2 12.3 0.0 0.0 0.0
SLS 5 144.1 0 144.1 0 144.1 100 112.0 18.6 0.0 0.0 0.0
SLS 6 137.5 0 137.5 0 137.5 100 118.5 18.6 0.0 0.0 0.0
SLS 7 95.9 0 95.9 0 95.9 100 73.3 12.3 0.0 0.0 0.0
SLS 8 136.6 0 136.6 0 136.6 100 107.0 17.7 0.0 0.0 0.0
SLS 9 130.8 0 130.8 0 130.8 100 112.8 17.7 0.0 0.0 0.0
SLS 10 95.1 0 95.1 0 95.1 100 74.0 12.3 0.0 0.0 0.0
ULS 1 224.7 0 224.7 0 224.7 100 172.8 28.8 0.0 0.0 0.0
ULS 2 220.9 0 220.9 0 220.9 100 176.6 28.8 0.0 0.0 0.0
ULS 3 130.9 0 130.9 0 130.9 100 80.3 15.3 0.0 0.0 0.0

Untensioned bars at SLS


Supt 1 Span 1 Supt 2 Span 2 Supt 3 Span 3 Supt 4
Right btm top Left Right btm top Left Right btm top Left
fctm 3.51 3.51 2.52 3.51 3.51 3.51 2.52 3.51 3.51 3.51 2.52 3.51
d 759.0 754.5 759.0 759.0 759.0 759.0 759.0 759.0 759.0 757.0 759.0 759.0
As,min 1662 482 1196 1662 1662 485 1196 1662 1662 483 1196 1662 (9.1N)
ct 0.000 3.402 0.000 1.761 1.806 0.628 0.000 1.860 2.027 4.548 0.000 0.000
Ft 0 299 0 93 95 55 0 98 98 399 0 0
As 0 956 0 298 305 177 0 314 314 1278 0 0

ULS MOMENT CHECKS Supt 1 Supt 2 Supt 3 Supt 4


Span 1 Span 2 Span 3
(d) Right Left Right Left Right Left
Design moment 0.0 441.9 421.0 421.0 133.3 357.9 357.9 413.1 0.0
Tendon height 501.0 46.1 826.0 826.0 41.0 826.0 826.0 41.2 501.0
dp 501.0 753.9 826.0 826.0 759.0 826.0 826.0 758.8 501.0
dr 759.0 754.5 759.0 759.0 759.0 759.0 759.0 757.0 759.0
Tendon force 540 543 469 452 401 353 283 250 227
As 1810 1963 1810 804 1810 1257 1810
Rebar force 786.8 853.7 786.8 786.8 349.7 786.8 786.8 546.4 786.8
TOTAL TENSION 1326 1396 1256 1239 751 1140 1069 797 1013
x 167.2 51.3 158.3 156.2 27.6 143.7 134.8 29.3 127.7
Rebar stress 435 435 435 435 435 435 435 435 435
Zp 417.4 728.2 746.9 747.9 745.2 754.2 758.6 744.1 437.1
Zr 675.4 728.8 679.9 680.9 745.2 687.2 691.6 742.4 695.1
MOR 756.6 1017.3 885.1 874.1 559.7 806.9 758.6 592.0 646.0

SHEAR (e) Span 1 Span 2 Span 3 fctd = 1.637


Left Right Left Right Left Right fcd = 26.67
VEd 204.3 256.8 211.8 208.0 224.7 176.6 c,lim = 13.05
MEd 0.0 421.0 421.0 357.9 357.9 0.0
NEd 549.5 471.0 452.7 342.2 274.1 211.8
ct 0.000 4.101 4.004 3.488 3.766 0.000 12.6.3 (3)
Cracked ? N Y Y Y Y N
PLAIN Acc 407500 407500 407500 407500 407500 407500
cp 1.349 1.156 1.111 0.840 0.673 0.520 Equation (12.3)
cp 0.752 0.945 0.780 0.765 0.827 0.650 Equation (12.4)
fcvd 2.211 2.139 2.121 2.014 1.945 1.879 Equations (12.5) & (12.6)
plain concrete ? Y Y Y 12.6.3
REINFORCED Vtd 33.9 39.1 51.7 39.1 30.5 17.6
VEd - Vtd 170.3 217.7 160.1 168.9 194.2 159.1 Equation (6.1)
Asl 1810 1810 1810 1810 1810 1810
d 759.0 759.0 759.0 759.0 759.0 759.0
l 0.0068 0.0068 0.0068 0.0068 0.0068 0.0068
cw 1.051 1.043 1.042 1.031 1.025 1.019
cot + tan 19.8171 15.4012 20.9079 19.6258 16.9632 20.5912
cot 2.5 2.5 2.5 2.5 2.5 2.5
VRd,max 1096 1103 1104 1115 1122 1128

vRdc 0.749 0.720 0.713 0.672 0.647 0.624


VRdc 198.9 191.2 189.4 178.6 172.0 165.9 Links required
Asw/S 0.354 0.354 0.354 0.354 0.354 0.354
S 425 425 425 425 425 425
Project Spreadsheets to EC2 REINFORCED CONCRETE COUNCIL
Client Advisory Group Made by Date Page
Location Level 2 - Beam on Grid 7 rmw 03-Apr-2017 275
POST-TENSIONED ANALYSIS & DESIGN to BS EN 1992-1:2004 Deflection calculations (2) Checked Revision Job No

Originated from TCC42.xls v4.0 on CD 2005-17 TCC chg - FB625


SPAN 2 As(b) = 804 d = 759 h = 800 bw = 350 bf = 1200 hf = 150 bd3/12 = 2E+010
Distance 0 720 1440 2160 2880 3600 4320 5040 5760 6480 7200 7920 8640 9360 10080 10800 11520 12240
Element b 360 720 720 720 720 720 720 720 720 720 720 720 720 720 720 720 720 720
d2 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41
As(t) 1810 1810 1810 1810 1810 1810 1810 1407.43 1407.43 1407.43 1407.43 1407.43 1407.43 1407.43 1810 1810 1810 1810
Transformed section properties at TRANSFER E = 31.91 m = 6.27 m - 1 = 5.27
A 421269 421269 421269 421269 421269 421269 421269 419151 419151 419151 419151 419151 419151 419151 421269 421269 421269 421269
A.Yt 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008
Yt 297.123 297.123 297.123 297.123 297.123 297.123 297.123 298.418 298.418 298.418 298.418 298.418 298.418 298.418 297.123 297.123 297.123 297.123
Yb 502.877 502.877 502.877 502.877 502.877 502.877 502.877 501.582 501.582 501.582 501.582 501.582 501.582 501.582 502.877 502.877 502.877 502.877
Ixx 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010
Transformed properties at 30 days E = 23.54 e = 8.50 e - 1 = 7.50
A 427094 427094 427094 427094 427094 427094 427094 424080 424080 424080 424080 424080 424080 424080 427094 427094 427094 427094
A.Yt 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008
Yt 296.643 296.643 296.643 296.643 296.643 296.643 296.643 298.461 298.461 298.461 298.461 298.461 298.461 298.461 296.643 296.643 296.643 296.643
Yb 503.357 503.357 503.357 503.357 503.357 503.357 503.357 501.539 501.539 501.539 501.539 501.539 501.539 501.539 503.357 503.357 503.357 503.357
Ixx 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010
Transformed section properties - LONGTERM E = 12.79 m = 15.64 m - 1 = 14.64
A 445754 445754 445754 445754 445754 445754 445754 439869 439869 439869 439869 439869 439869 439869 445754 445754 445754 445754
A.Yt 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008 1E+008
Yt 295.19 295.19 295.19 295.19 295.19 295.19 295.19 298.591 298.591 298.591 298.591 298.591 298.591 298.591 295.19 295.19 295.19 295.19
Yb 504.81 504.81 504.81 504.81 504.81 504.81 504.81 501.409 501.409 501.409 501.409 501.409 501.409 501.409 504.81 504.81 504.81 504.81
Ixx 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010
Cracked section properties - LONGTERM bt = 912
bc - bw 0 0 850 850 850 850 850 850 850 850 850 850 850 850 850 850 850 0
bt - bw 850 850 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 846
Flange centre 725 725 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 725
As 1810 1810 804 804 804 804 804 804 804 804 804 804 804 804 804 804 804 1810
As2 804 804 1810 1810 1810 1810 1407 1407 1407 1407 1407 1407 1407 1407 1407 1810 1810 804
d 759 759 759 759 759 759 759 759 759 759 759 759 759 759 759 759 759 759
d2 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41 41
Uncracked X 504.8 504.8 295.2 295.2 295.2 295.2 298.6 298.6 298.6 298.6 298.6 298.6 298.6 298.6 298.6 295.2 295.2 504.5
Uncracked I 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010
Cracked X (w) 257.8 257.8 108.8 108.8 108.8 108.8 110.8 110.8 110.8 110.8 110.8 110.8 110.8 110.8 110.8 108.8 108.8 257.8
Cracked X (f) 257.8 257.8 84.6 84.6 84.6 84.6 85.8 85.8 85.8 85.8 85.8 85.8 85.8 85.8 85.8 84.6 84.6 257.8
Cracked X 257.8 257.8 84.6 84.6 84.6 84.6 85.8 85.8 85.8 85.8 85.8 85.8 85.8 85.8 85.8 84.6 84.6 257.8
Cracked I 1E+010 1E+010 6E+009 6E+009 6E+009 6E+009 6E+009 6E+009 6E+009 6E+009 6E+009 6E+009 6E+009 6E+009 6E+009 6E+009 6E+009 1E+010
p 1.016 1.003 0.990 0.990 0.978 0.965 0.952 0.952 0.939 0.926 0.913 0.900 0.888 0.876 0.852 0.840 0.828 0.816
Mcr 439.5 438.2 255.5 255.5 254.8 254.1 251.7 251.7 250.9 250.2 249.5 248.8 248.1 247.4 246.0 247.0 246.3 419.2
Deflections at TRANSFER
M (SLS 1) 37.8 67.1 55.4 25.0 -1.8 -24.9 -44.4 -60.2 -72.4 -80.9 -85.9 -87.1 -84.8 -78.8 -69.2 -55.9 -39.0 -18.4
1/R 5E-008 8E-008 7E-008 3E-008 -2E-009 -3E-008 -5E-008 -7E-008 -9E-008 -1E-007 -1E-007 -1E-007 -1E-007 -1E-007 -8E-008 -7E-008 -5E-008 -2E-008
Load 2E-005 6E-005 5E-005 2E-005 -2E-006 -2E-005 -4E-005 -5E-005 -6E-005 -7E-005 -8E-005 -8E-005 -7E-005 -7E-005 -6E-005 -5E-005 -3E-005 -2E-005
Load x dist 0.00296 0.04198 0.06929 0.04688 -0.00445 -0.07788 -0.16657 -0.26513 -0.3644 -0.45841 -0.54031 -0.60321 -0.64025 -0.64457 -0.60602 -0.52472 -0.39039 -0.19618
End slope -0.00019
Span 0 -0.14 -0.33 -0.55 -0.79 -1.03 -1.25 -1.44 -1.60 -1.71 -1.77 -1.78 -1.73 -1.62 -1.47 -1.28 -1.05 -0.79
Cant 0 -5.15 -5.07 -5.03 -5.01 -4.98 -4.94 -4.87 -4.76 -4.61 -4.40 -4.15 -3.83 -3.47 -3.05 -2.59 -2.10 -1.58
0 -0.14 -0.33 -0.55 -0.79 -1.03 -1.25 -1.44 -1.60 -1.71 -1.77 -1.78 -1.73 -1.62 -1.47 -1.28 -1.05 -0.79
Deflections at 30 days
M -56.0 -12.4 -5.8 -17.1 -27.1 -35.8 -43.1 -49.1 -53.8 -57.1 -59.1 -59.8 -59.2 -57.2 -53.9 -49.2 -43.2 -35.9
1/R -9E-008 -2E-008 -9E-009 -3E-008 -4E-008 -6E-008 -7E-008 -8E-008 -9E-008 -9E-008 -1E-007 -1E-007 -1E-007 -9E-008 -9E-008 -8E-008 -7E-008 -6E-008
Load -3E-005 -1E-005 -7E-006 -2E-005 -3E-005 -4E-005 -5E-005 -6E-005 -6E-005 -7E-005 -7E-005 -7E-005 -7E-005 -7E-005 -6E-005 -6E-005 -5E-005 -4E-005
Load x dist -0.0058 -0.01022 -0.0096 -0.04252 -0.0898 -0.14811 -0.21416 -0.28677 -0.35891 -0.42884 -0.49324 -0.54878 -0.59212 -0.61994 -0.62421 -0.61108 -0.57262 -0.50553
End slope -0.00044
Span 0 -0.30 -0.59 -0.86 -1.13 -1.37 -1.59 -1.76 -1.90 -1.99 -2.04 -2.03 -1.98 -1.87 -1.72 -1.52 -1.29 -1.01
Cant 0 -7.83 -7.71 -7.60 -7.47 -7.31 -7.13 -6.91 -6.65 -6.35 -6.00 -5.60 -5.15 -4.65 -4.10 -3.51 -2.87 -2.20
0 -0.30 -0.59 -0.86 -1.13 -1.37 -1.59 -1.76 -1.90 -1.99 -2.04 -2.03 -1.98 -1.87 -1.72 -1.52 -1.29 -1.01
Deflections - LONGTERM
M (SLS 4) -139.6 -50.6 0.5 30.5 56.3 77.7 94.8 107.6 116.2 120.4 120.3 115.9 107.2 94.2 76.8 55.2 29.3 -0.9
M (SLS 10) -104.6 -33.1 2.3 18.5 32.3 43.7 52.6 59.0 63.1 64.7 63.8 60.5 54.8 46.7 36.1 23.0 7.5 -10.4
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Final I 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010 3E+010
1/R -3E-007 -9E-008 6E-009 5E-008 9E-008 1E-007 1E-007 2E-007 2E-007 2E-007 2E-007 2E-007 2E-007 1E-007 1E-007 6E-008 2E-008 -3E-008
Load -0.0001 -7E-005 5E-006 4E-005 6E-005 9E-005 0.0001 0.00012 0.00013 0.00013 0.00013 0.00012 0.00011 9E-005 7E-005 5E-005 1E-005 -2E-005
Load x dist -0.01848 -0.04684 0.00654 0.0786 0.18274 0.30861 0.45196 0.59217 0.72297 0.83388 0.91441 0.9541 0.94245 0.86898 0.72322 0.48804 0.17057 -0.2495
End slope 0.00049
Span 0 0.41 0.88 1.35 1.80 2.20 2.53 2.80 2.97 3.06 3.06 2.96 2.77 2.51 2.18 1.80 1.39 0.96
Cant 0 3.51 3.82 4.13 4.41 4.65 4.82 4.92 4.93 4.86 4.69 4.43 4.08 3.65 3.16 2.62 2.04 1.45
0 0.41 0.88 1.35 1.80 2.20 2.53 2.80 2.97 3.06 3.06 2.96 2.77 2.51 2.18 1.80 1.39 0.96
Deflections - after construction
0 0.71 1.47 2.22 2.93 3.57 4.12 4.56 4.88 5.05 5.09 4.99 4.75 4.39 3.90 3.33 2.68 1.98
12960 13680 14400
720 720 360
41 41 41
1810 1810 1810

421269 421269 421269


1E+008 1E+008 1E+008
297.123 297.123 297.123
502.877 502.877 502.877
3E+010 3E+010 3E+010

427094 427094 427094


1E+008 1E+008 1E+008
296.643 296.643 296.643
503.357 503.357 503.357
3E+010 3E+010 3E+010

445754 445754 445754


1E+008 1E+008 1E+008
295.19 295.19 295.19
504.81 504.81 504.81
3E+010 3E+010 3E+010
bt = 846
0 0 0
846 846 846
725 725 725
1810 1810 1810
804 804 804
759 759 759
41 41 41
504.5 504.5 504.5
3E+010 3E+010 3E+010
257.8 257.8 257.8
257.8 257.8 257.8
257.8 257.8 257.8
1E+010 1E+010 1E+010
0.804 0.792 0.792
418.1 416.9 416.9
5.7 11.3 -24.2
7E-009 1E-008 -3E-008
5E-006 1E-005 -1E-005
0.06473 0.134 -0.14559
-0.00037
-0.52 -0.26 0
-1.05 -0.52 0
-0.52 -0.26 0

-27.3 -39.0 -92.7


-4E-008 -6E-008 -1E-007
-3E-005 -4E-005 -5E-005
-0.4065 -0.61324 -0.73883
-0.00055
-0.71 -0.39 0
-1.50 -0.78 0
-0.71 -0.39 0

-35.5 -91.1 -184.6


-30.7 -70.3 -145.9
0 0 0
3E+010 3E+010 3E+010
-8E-008 -2E-007 -4E-007
-6E-005 -0.00014 -0.00014
-0.78256 -1.89008 -1.98696
0.00023
0.55 0.19 0
0.88 0.35 0
0.55 0.19 0

1.27 0.58 0
Project Spreadsheets to EC2 The Concrete Centre
Client Advisory Group Made by Date
Location Level 2 - Beam on Grid 7 rmw 03-Apr-2017
Graphics
POST-TENSIONED ANALYSIS & DESIGN to BS EN 1992-1:2004 Checked Revision Job No

Originated from TCC42.xls v4.0 on CD 2005-17 TCC chg - FB625


GEOMETRY -306.44
BEAM X 0 0 0 16000 16000 16000 16000 30400 30400 30400 30400 44200 44200 44200
BEAM Y -306.44 0 0 0 -306.438 0 0 0 -306.438 0 0 0 -306.438 0
C SECa X 0 0 0 0 0 16000 16000 16000 16000 16000 30400 30400 30400 30400 30400 44200 44200 44200 44200 44200
C SECa Y 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500
C SECb X 0 0 0 0 0 16000 16000 16000 16000 16000 30400 30400 30400 30400 30400 44200 44200 44200 44200 44200
C SECb Y -806.44 -806.44 -806.44 -806.438 -806.438 -806.438 -806.438 -806.438 -806.438 -806.438 -806.438 -806.438 -806.438 -806.438 -806.438 -806.438 -806.438 -806.438 -806.438 -806.438
B SEC X 7400 8600 8600 8175 8175 7825 7825 7400 7400 22600 23800 23800 23375 23375 23025 23025 22600 22600 36700 37900 37900 37475 37475 37125 37125 36700 36700
B SEC Y -1500 -1500 -1650 -1650 -2300 -2300 -1650 -1650 -1500 -1500 -1500 -1650 -1650 -2300 -2300 -1650 -1650 -1500 -1500 -1500 -1650 -1650 -2300 -2300 -1650 -1650 -1500

LOADING scaling factor 35.28


UDL X 0 0 16000 16000 16000 16000 30400 30400 30400 30400 44200 44200
DEAD 0 432.47 432.465 0 0 432.465 432.465 0 0 432.465 432.465 0
IMPOSED 432.47 750 750 432.465 432.465 750 750 432.465 432.465 750 750 432.465
PUD X 0 0 0 0 16000 16000 16000 16000 30400 30400 30400 30400
PUD D 750 750 750 750 750 750 750 750 750 750 750 750
PUD L 750 750 750 750 750 750 750 750 750 750 750 750
PL X 0 0 0 0 16000 16000 16000 16000 30400 30400 30400 30400
PLs D 750 750 750 750 750 750 750 750 750 750 750 750
PLs L 750 750 750 750 750 750 750 750 750 750 750 750
DRAPE AXES
STRESS DIAGRAMS X 0.00 16.00 16.00 30.40 30.40 44.20 44.20 0 0 16 16 30.4 30.4 44.2 44.2
Balance scaling = 1 x profile Top 800 800 800 800 800 800 800 880.00 -80 880 -80 880 -80 880 -80
n/a 501.69 501.69 501.69 501.69 501.69 501.69 501.69 16 0 16 0 16 0 16 0
Vl Vr W1 we Vl Vr W1 we Vl Vr W1 we 56.9957 -18.13 56.9957 -18.135 56.9957 -18.135 56.9957 -18.135
83.89 112.23 68.51 -12.56 86.39 90.12 85.39 -14.83 96.48 72.68 50.96 -8.05
71.31 91.69 80.56 -14.77 69.04 77.66 99.10 -17.20 78.69 61.89 57.45 -9.07
141.39 198.73 61.42 -11.26 155.44 150.67 74.61 -12.95 171.32 122.04 43.11 -6.81
148.13 191.99 61.42 -11.26 91.42 85.08 74.61 -12.95 162.69 130.66 43.11 -6.81
79.76 116.36 61.42 -11.26 149.93 156.18 74.61 -12.95 102.94 66.21 43.11 -6.81
123.97 172.95 61.42 -11.26 134.85 132.38 74.61 -12.95 149.05 107.04 43.11 -6.81
SPAN 1

SPAN 2

SPAN 3
129.06 167.86 61.42 -11.26 90.08 86.43 74.61 -12.95 142.53 113.56 43.11 -6.81
81.41 114.71 61.42 -11.26 130.68 136.55 74.61 -12.95 100.84 68.31 43.11 -6.81
118.16 164.36 61.42 -11.26 127.98 126.28 74.61 -12.95 141.63 102.04 43.11 -6.81
122.70 159.82 61.42 -11.26 89.63 86.88 74.61 -12.95 135.81 107.86 43.11 -6.81
81.95 114.17 61.42 -11.26 124.27 130.00 74.61 -12.95 100.14 69.02 43.11 -6.81
194.57 266.33 61.42 -11.26 211.79 203.03 74.61 -12.95 229.69 167.84 43.11 -6.81
194.70 266.20 61.42 -11.26 118.10 102.32 74.61 -12.95 225.87 171.66 43.11 -6.81
91.58 153.32 61.42 -11.26 206.86 207.96 74.61 -12.95 135.88 75.35 43.11 -6.81
TypiCalc!
SPAN 1 0.8 Btm 0 0 0 0 0 0 0 20 0 20 0 20 0 20 0
X 0 0 0 0 0.8 1.6 1.6 2.4 3.2 4 4.80 5.6 6.4 7.2 8 8.8 9.6 10.4 11.2 12 12.8 13.6 14.4 14.4 15.2 16 16 0 16 7.200 7.200 6.400 6.400 6.400
profile X 0 0.8 1.6 1.6 2.4 3.2 4 4.8 5.6 6.4 7.2 8 8.8 9.6 10.4 11.2 12 12.8 13.6 14.4 14.4 15.2 16 16 7.200 7.200 6.400 6.400 6.400
PROFILE 501.0 501.0 501.0 501.0 474.9 396.7 396.7 300.0 218.7 152.6 101.8 66.3 46.1 41.2 51.7 77.4 118.4 174.7 246.2 333.1 435.3 552.8 685.6 685.6 790.9 826.0 826.0 41.2 41.2 46.1 46.1 46.1
BALANCE 0.00 0.00 0.00 38.39 38.39 38.39 -11.26 -11.26 -11.26 -11.26 -11.26 -11.26 -11.26 -11.26 -11.26 -11.26 -11.26 -11.26 -11.26 -11.26 -11.26 -11.26 -11.26 51.68 51.68 51.68 0.00
Beam 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
30 days 0 0 0 0 -49.486 -63.7238 -63.7238 -60.4335 -57.3351 -54.4285 -51.7137 -49.1908 -46.8597 -44.7204 -42.773 -41.0174 -39.4537 -38.0817 -36.9017 -35.9134 -35.117 -34.5124 -34.0997 -34.0997 -8.16983 68.9862 0.00 56.00
M-SLS 1 0 0 0 0 -37.679 -36.6125 -36.6125 -17.6387 -1.59576 11.5163 21.6976 28.948 33.2675 34.6562 33.114 28.641 21.2371 10.9023 -2.36331 -18.5598 -37.6871 -59.7453 -84.7343 -84.7343 -86.2381 -37.8406 34.6562 7.2 0.00 -37.84 34.6562
M-SLS 2 0 0 0 0 -94.0293 -149.886 -149.886 -183.456 -210.627 -231.398 -245.769 -253.741 -255.313 -250.485 -239.257 -221.63 -197.603 -167.176 -130.35 -87.1238 -37.4979 18.5277 80.953 80.953 169.917 305.558 0.00 305.56 -250.485
M-SLS 3 0 0 0 0 -99.4156 -160.658 -160.658 -199.615 -232.172 -258.329 -278.087 -291.445 -298.403 -298.961 -293.12 -280.879 -262.238 -237.198 -205.757 -167.917 -123.678 -73.0385 -15.9994 -15.9994 67.5783 197.834 -298.961 7.2 0.00 197.83 -298.961
M-SLS 4 0 0 0 0 -47.6055 -62.7984 -62.7984 -61.4651 -59.492 -56.8793 -53.6268 -49.7346 -45.2027 -40.031 -34.2197 -27.7686 -20.6778 -12.9473 -4.57709 4.43285 14.0825 24.3719 35.301 35.301 67.0087 139.634 0.00 139.63 -40.031
M-SLS 5 0 0 0 0 -80.9505 -125.456 -125.456 -149.404 -168.68 -183.284 -193.217 -198.477 -199.066 -194.984 -186.229 -172.803 -154.705 -131.936 -104.495 -72.3816 -35.5969 5.85948 51.9876 51.9876 122.926 238.815 0.00 238.81 -199.066
M-SLS 6 0 0 0 0 -85.023 -133.601 -133.601 -161.622 -184.97 -203.647 -217.652 -226.985 -231.647 -231.636 -226.955 -217.601 -203.576 -184.879 -161.51 -133.469 -100.757 -63.3735 -21.3179 -21.3179 45.5484 157.364 -231.647 6.4 0.00 157.36 -231.647
M-SLS 7 0 0 0 0 -48.9193 -65.4258 -65.4258 -65.4062 -64.7469 -63.4478 -61.5091 -58.9306 -55.7124 -51.8545 -47.3568 -42.2195 -36.4424 -30.0256 -22.9691 -15.2729 -6.93699 2.03866 11.654 11.654 42.0481 113.36 0.00 113.36 -55.7124
M-SLS 8 0 0 0 0 -76.5909 -117.313 -117.313 -138.053 -154.697 -167.246 -175.699 -180.056 -180.318 -176.483 -168.553 -156.528 -140.406 -120.189 -95.8761 -67.4676 -34.9633 1.63675 42.3325 42.3325 107.263 216.567 0.00 216.57 -180.318
M-SLS 9 0 0 0 0 -80.2255 -124.582 -124.582 -148.957 -169.236 -185.419 -197.507 -205.498 -209.394 -209.195 -204.899 -196.508 -184.022 -167.439 -146.761 -121.987 -93.1172 -60.1518 -23.0907 -23.0907 38.2051 143.874 -209.394 6.4 0.00 143.87 -209.394
M-SLS 10 0 0 0 0 -49.3572 -66.3017 -66.3017 -66.7199 -66.4985 -65.6374 -64.1365 -61.9959 -59.2156 -55.7956 -51.7359 -47.0365 -41.6973 -35.7184 -29.0998 -21.8415 -13.9435 -5.40574 3.77173 3.77173 33.7278 104.602 0.00 104.60 -59.2156
M-ULS 1 0 0 0 0 -134.157 -225.311 -225.311 -289.347 -342.151 -383.725 -414.067 -433.179 -441.059 -437.708 -423.126 -397.313 -360.269 -311.993 -252.487 -181.749 -99.7807 -6.58091 97.85 97.85 233.651 420.961 0.00 420.96 -441.059
M-ULS 2 0 0 0 0 -134.262 -225.52 -225.52 -289.66 -342.569 -384.247 -414.694 -433.91 -441.895 -438.648 -424.171 -398.462 -361.523 -313.352 -253.95 -183.317 -101.453 -8.35735 95.969 95.969 231.665 418.871 -441.895 6.4 0.00 418.87 -441.895
M-ULS 3 0 0 0 0 -56.0856 -77.8071 -77.8071 -81.051 -81.7038 -79.7655 -75.236 -68.1155 -58.4039 -46.1011 -31.2072 -13.7223 6.35382 29.021 54.2793 82.1288 112.569 145.601 181.224 181.224 239.576 340.798 0.00 340.80 -58.4039
Pi 617.9 617.9 617.9 617.9 617.9 617.9 617.9 617.9 617.9 617.9 616.5 609.0 601.5 594.0 586.4 578.9 571.4 563.9 556.4 548.8 548.8 541.3 533.8 616.5 616.5 617.9 617.9 617.9
Pf 549.5 549.9 550.3 550.3 550.6 551.0 551.4 551.8 552.1 552.5 551.5 544.2 536.9 529.5 522.2 514.9 507.6 500.3 492.9 485.6 485.6 478.3 471.0 551.5 551.5 552.5 552.5 552.5
C top @ trans 0 1.516 1.516 1.516 1.976 1.963 1.963 1.732 1.536 1.376 1.251 1.163 1.110 1.090 1.090 1.126 1.198 1.306 1.450 1.629 1.844 2.095 2.382 2.382 2.382 1.772 1.090
C btm @ trans 0 1.516 1.516 1.516 0.742 0.764 0.764 1.154 1.483 1.753 1.962 2.111 2.200 2.225 2.175 2.064 1.894 1.663 1.372 1.021 0.610 0.138 0.000 0.000 0.000 0.533 2.225
T top @ trans 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
T btm @ trans 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.574 1.574 1.771 0.000 0.000
C top, final 0 1.349 1.349 1.349 2.329 2.872 2.872 3.170 3.419 3.618 3.766 3.865 3.913 3.908 3.838 3.717 3.547 3.326 3.056 2.735 2.365 1.944 1.474 1.474 0.762 0.000 1.353 1.356 3.913 1.356
C btm, final 0 1.349 1.349 1.349 0.336 0.000 0.000 0.000 0.000 0.005 0.037 0.082 0.140 0.207 0.273 0.351 0.443 0.548 0.666 0.797 0.941 1.243 2.061 2.061 3.377 5.604 1.353 1.356 0.140 1.356
T top, final 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.310 7.044 0.000 0.000 0.000 0.000
T btm, final 0 0.000 0.000 0.000 1.587 5.575 5.575 7.873 9.788 11.318 12.465 13.228 13.608 13.617 13.304 12.608 11.527 10.063 8.215 5.983 3.367 0.368 0.000 0.000 0.000 0.000 0.000 13.608 0.000 0.000
C top, ULS 0 1.483 1.483 1.483 3.124 4.240 4.240 5.024 5.671 6.181 6.554 6.790 6.888 6.846 6.649 6.316 5.845 5.237 4.491 3.609 2.589 1.433 0.139 0.139 0.000 0.000 6.753
C btm, ULS 0 1.483 1.483 1.483 0.332 0.000 0.000 0.000 0.000 0.000 0.000 0.091 0.292 0.542 0.828 1.167 1.560 2.006 2.505 3.057 3.662 4.321 5.033 5.033 6.212 9.917 0.156
T top, ULS 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.080 2.758 4.563 4.563 7.478 16.404 0.000
T btm, ULS 0 0.000 0.000 0.000 6.173 13.667 13.667 18.933 23.276 26.697 29.195 30.771 31.423 31.166 30.041 27.993 25.023 21.130 16.315 10.577 3.916 0.000 0.000 0.000 0.000 0.000 7.720
National Annex values - BS EN 1992-1
EC2 Ref Function Value National Annex values - BS EN 1990
2.4.2.2 (1) p,fav 0.9 TABLE A1.1 0 1 2
2.4.2.2 (2) p,unfav 1.1 A 0.7 0.5 0.3
Table 2.1 c 1.5 concrete B 0.7 0.5 0.3
Table 2.1 s 1.15 steel C 0.7 0.7 0.6
3.1.6 (1)P cc 0.85 strength factor (flexure) D 0.7 0.7 0.6
3.1.6 (1)P cc 1.00 strength factor (shear) E 1 0.9 0.8
3.1.6 (2)P ct 1.00 -=- F 0.7 0.7 0.6
3.3.4 (5) K 1.1 fpk /fp0.1k G 0.7 0.5 0.3
5.1.2 (1)P Pattern loading b alternate & all spans H 0.5 0.2 0
5.5(4) k1 0.4 redistribution factor J 0 0 0
-=- k2 a 1 a(b+c/cu2)
-=- k2 b 0.6 -=- G,sup 1.35 dead load factor
-=- k2 c 0.0014 -=- G,inf 1 dead load factor
-=- k3 0.4 redistribution factor Q 1.5 imposed load factor
-=- k4 a 1 a(b+c/cu2) Allow 6.10a & b? Yes loading equations
-=- k4 b 0.6 -=- 0.925 Gk modification factor
-=- k4 c 0.0014 -=-
-=- k5 0.7 redistribution factor
-=- k6 0.8 redistribution factor
5.10.2.1 K1 0.8 p,max
-=- K2 0.9 p,max
5.10.8 (2) p,ULS 100 prestress reduction at ULS
6.2.2 (1) CRd,c 0.18 basic shear stress 0.12
-=- vmin 0.035 x k3/2fck1/2
-=- k1 0.15 prestress factor
6.2.3(2) cotmin/max 1 max/min strut angle 2.5
6.2.3(3) cw 1 for VRdmax
7.2(5) k3 1 max steel stress
9.2.2(6) St,max 0.75 xd
12.6.3 (2) k 1.5 torsional factor

TABLE 7.1N Values of Wmax


Exposure class Unbonded Bonded
X0, XC1 0.3 0.2 0.2
XC2, XC3, XC4 0.3 0.2 0.2
XD1, XD2, XS1, XS2, XS3 0.3 0 0
BS EN 1990

1
Loading equation selection 0 = 0.7

Span 1 2 3
Gk 196.1 176.5 169.2
Qk 144.0 129.6 124.2
6.10a 416.0 374.4 358.8 1149.095 Dead 1.24875 b
6.10b 460.9 414.8 397.5 1273.25 Imposed 1.5 a
Checks 0 0 0 0
BS EN 1990: (6.10b)
.
Disclaimer
All advice or information from MPA-The Concrete Centre is intended for those who will evaluate the significance and limitations of its
contents and take responsibility for its use and application. No liability (including that for negligence) for any loss resulting from such
advice or information is accepted by MPA-The Concrete Centre or its subcontractors, suppliers or advisors. Users should note that
all MPA-The Concrete Centre software and publications are subject to revision from time to time and they should therefore ensure
that they are in possession of the latest version.

This spreadsheet should be used in compliance with the accompanying publication 'User Guide RC Spreadsheets: v4' available
from The Concrete Centre www.concretecentre.com/rcdesign Tel +44 (0)1276 606800

Status of spreadsheet This spreadsheet is shareware but may not be used for commercial purposes until the user has
registered with The Concrete Centre using the licence validation form available on The Concrete
Public release version Centre website www.concretecentre.com/rcdesign

Revision history TCC42 Post tensioned Analysis & Design


Date Version Action Size (kB)
25-Mar-10 TCC42 v4.0 Updated to revised UK National Annex 2332
7-Dec-09 TCC42 v3.2 Correction to minimum ULS support moments. 2323
3-Sep-07 TCC42 v3.1 Correction to 2 for vehicular useage. 2301
6-Feb-07 TCC42 v8 Improvement to loss calculations. 2305
4-Jan-07 TCC42 v7 Enablement of negative partial UDLs. 2357
Improvement to vibration checks when slabs selected. Included in v3 release.
28-Jun-06 TCC42 v6 2230
Page nos, User Guide and registration details amended.
29-Apr-06 TCC42 v5 Various minor improvents and de-bugs during ECFE data generation. 2316
22-Mar-06 TCC42 v4 65% of centreline moment limit added to ULS design. 2315
7-Mar-06 TCC42 v3 Separate cc value added for shear. 2321
Tool tips added for beff, heff and column end conditions. Level of prestress (Pi/A)
6-Mar-06 TCC42 v2 2318
added. Correction to switch for stressing at left, right or both ends.
19-Oct-05 TCC42 v1 First version for comment. 2411