Beruflich Dokumente
Kultur Dokumente
DESCRIPCION UNID.
Partida
01.00 TRABAJOS PRELIMINARES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und
01.02 CARPAS PARA CAMPAMENTO und
01.03 MOVILIZACION DE MAQUINARIAS Y HERRAMIENTAS PARA LA OBRA GLB
02.00 BOCATOMA
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL m2
02.01.02 TRAZO NIVELACION Y REPLANTEO m2
02.01.03 ENCAUSAMIENTO DE CURSOS DE AGUA CON ENROCADO m3
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION MANUAL TERRENO ROCOSO m3
02.02.02 EXCAVACION EN ROCA/CON EXPLOSIVOS m3
02.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 30 M m3
02.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3
02.02.05 DEMOLICION DE ESTRUCTURAS DE CONCRETO. m3
02.03 OBRAS DE CONCRETO SIMPLE
02.03.01 SOLADO E= 2" m2
02.03.02 MAMPOSTERIA DE PIEDRA Y CONCRETO FC=140 KG/CM2 m3
02.03.03 CONCRETO CICLOPEO FC=175 KG/CM2 + 30 % PG. m3
02.03.04 ENCOFRADO Y DESENCOFRADO DE MUROS m2
02.04 OBRAS DE CONCRETO ARMADO
02.04.01 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MUROS m2
02.04.02 CONCRETO FC=175 KG/CM2 m3
02.04.03 CONCRETO F'C= 210 KG/CM2 m3
02.04.04 ACERO FY= 4200 KG/CM2 kg
02.05 VARIOS
02.05.01 COMPUERTAS PLANCHA METALICA EN BOCATOMA GLB
02.05.02 REJILLA EN LA VENTANA DE CAPTACION (0.25x0.80 m) und
02.05.03 CURADO DE CONCRETO CON ADITIVO m2
02.05.04 JUNTA DE CONTRUCCION SELLADO CON ELASTOMERICO DE POLIURETANO ML
02.05.05 JUNTA CON WATER STOP PVC 4" + SELLO ELASTOMERICO ML
03.00 DESARENADOR
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL m2
03.01.02 TRAZO NIVELACION Y REPLANTEO m2
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION MANUAL TERRENO ROCOSO m3
03.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3
03.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 30 M m3
03.03 OBRAS DE CONCRETO SIMPLE
03.03.01 SOLADO E= 2" m2
03.03.02 CONCRETO FC=175 KG/CM2 m3
03.03.03 ENCOFRADO Y DESENCOFRADO DE MUROS m2
03.04 OBRAS DE CONCRETO ARMADO
03.04.01 CONCRETO F'C= 210 KG/CM2 m3
03.04.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MUROS m2
03.04.03 ACERO FY= 4200 KG/CM2 kg
03.05 VARIOS
RESUMEN DE METRADO
MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN, DISTRITO DE CAJACAY - BOLOGNESI
Presupuesto: -ANCASH
Fecha : July , 2014
DESCRIPCION UNID.
Partida
03.05.01 COMPUERTA METALICA CON VOLANTE 0.30 x0.80m, H=1.00M und
03.05.02 JUNTA CON WATER STOP PVC 4" CANAL RECTANGULAR + SELLO ELASTOMERICO ML
03.05.03 CURADO DE CONCRETO CON ADITIVO m2
04.00 AFORADOR PARSHALL
04.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL m2
04.01.02 TRAZO NIVELACION Y REPLANTEO m2
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION MANUAL TERRENO ROCOSO m3
04.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3
04.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 30 M m3
04.03 OBRAS DE CONCRETO SIMPLE
04.03.01 SOLADO E= 2" m2
04.04 OBRAS DE CONCRETO ARMADO
04.04.01 ENCOFRADO Y DESENCOFRADO DE MUROS m2
04.04.02 CONCRETO F'C= 210 KG/CM2 m3
04.04.03 ACERO FY= 4200 KG/CM2 kg
04.05 REVOQUES Y ENLUCIDOS
04.05.01 TARRAJEO C/IMPERMEABILIZANTE MORTERO C:A 1:5 E=1.5 CM m2
04.05.02 TARRAJEO MORTERO C:A 1:5 E=1.5 CM EXTERIOR m2
04.06 VARIOS
04.06.01 ACCESORIOS AFORADOR PARSHALL und
04.06.02 JUNTA CON WATER STOP PVC 4" CANAL RECTANGULAR + SELLO ELASTOMERICO ML
05.00 CANAL REVESTIDO (3,232.50 ML)
05.01 OBRAS PRELIMINARES
05.01.01 LIMPIEZA DE TERRENO MANUAL m2
05.01.02 DESBROCE DE BERMA DEL CANAL m2
05.01.03 TRAZO NIVELACION Y REPLANTEO INICIALES DE LA OBRA ML
05.01.04 TRAZO, NIVELACION DURANTE LA EJECUCION DE LA OBRA ML
05.02 MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION MANUAL EN TIERRA m3
05.02.02 EXCAVACION EN ROCA SUELTA m3
05.02.03 DEMOLICION DE ESTRUCTURAS DE CONCRETO. m3
05.02.04 EXCAVACION EN ROCA/CON EXPLOSIVOS m3
05.02.05 PERFILADO Y REFINE MANUAL DE CAJA DE CANAL m2
05.02.06 CONFORMACION Y COMPACTACION DE LA SUBRASANTE C/EQUIPO m2
05.02.07 RELLENO COMPACTADO CON MATERIAL PROPIO m3
05.02.08 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 30 M m3
05.03 OBRAS DE CONCRETO
05.03.01 CONCRETO F'C= 175 KG/CM2, EN CANAL m3
05.03.02 ENCOFRADO Y DESENCOFRADO DE CANALES m2
05.04 JUNTAS
05.04.01 JUNTA DE CONTRACCION SELLADO CON ELASTOMERICO DE POLIURETANO ML
05.04.02 JUNTA DE DILATACION SELLADO CON ELASTOMERICO DE POLIURETANO ML
05.05 VARIOS
05.05.01 CURADO DE CONCRETO CON ADITIVO m2
06.00 OBRAS DE ARTE
06.01 TOMAS PARCELARIAS (68 UND)
RESUMEN DE METRADO
MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN, DISTRITO DE CAJACAY - BOLOGNESI
Presupuesto: -ANCASH
Fecha : July , 2014
DESCRIPCION UNID.
Partida
06.01.01 EXCAVACION MANUAL EN TIERRA m3
06.01.02 RELLENO COMPACTADO A MANO m3
06.01.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 30 M m3
06.01.04 SOLADO E= 2" m2
06.01.05 CONCRETO F'C= 210 KG/CM2 m3
06.01.06 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MUROS m2
06.01.07 ACERO FY= 4200 KG/CM2 kg
06.01.08 COMPUERTA METALICA TIPO IZAJE 0.30x0.40 M, H=0.80M und
06.01.09 ATAGUIAS DE MADERA DE 30X40m und
06.01.10 JUNTA CON WATER STOP PVC 4" CANAL RECTANGULAR + SELLO ELASTOMERICO ML
06.02 PASES DE AGUA (02)
06.02.01 EXCAVACION MANUAL TERRENO ROCOSO m3
06.02.02 RELLENO COMPACTADO A MANO m3
06.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 30 M m3
06.02.04 MAMPOSTERIA DE PIEDRA Y CONCRETO FC=140 KG/CM2 m3
06.02.05 CONCRETO CICLOPEO FC=175 KG/CM2 + 30 % PG. m3
06.02.06 CONCRETO FC=175 KG/CM2 m3
06.02.07 CONCRETO F'C= 210 KG/CM2 m3
06.02.08 ENCOFRADO Y DESENCOFRADO DE MUROS m2
06.02.09 ACERO FY= 4200 KG/CM2 kg
06.03 MURO DE CONTENCIN (17m)
06.03.01 EXCAVACION MANUAL TERRENO ROCOSO m3
06.03.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3
06.03.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 30 M m3
06.03.04 CONCRETO FC=175 KG/CM2 + 30% P.M. m3
06.03.05 ENCOFRADO Y DESENCOFRADO DE MUROS m2
06.03.06 TUBERIA DE DRENAJE DE 4" ML
06.03.07 JUNTA DE CONTRACCION SELLADO CON ELASTOMERICO DE POLIURETANO ML
06.04 PASARELA PEATONAL (02)
06.04.01 EXCAVACION MANUAL EN TIERRA m3
06.04.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3
06.04.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 30 M m3
06.04.04 CONCRETO FC=175 KG/CM2 + 30% P.M. m3
06.04.05 CONCRETO F'C= 210 KG/CM2 m3
06.04.06 ENCOFRADO Y DESENCOFRADO DE MUROS m2
06.04.07 ENCOFRADO Y DESENCOFRADO DE LOSA m2
06.04.08 ACERO FY= 4200 KG/CM2 kg
06.05 CAIDA VERTICAL (06 UND)
06.05.01 EXCAVACION MANUAL EN TIERRA m3
06.05.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3
06.05.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 30 M m3
06.05.04 SOLADO E= 2" m2
06.05.05 CONCRETO F'C= 210 KG/CM2 m3
06.05.06 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MUROS m2
06.05.07 ACERO FY= 4200 KG/CM2 kg
06.05.08 JUNTA CON WATER STOP PVC 4" CANAL RECTANGULAR + SELLO ELASTOMERICO ML
06.06 POZA DE DISIPACION (05 UND)
06.06.01 EXCAVACION MANUAL EN TIERRA m3
RESUMEN DE METRADO
MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN, DISTRITO DE CAJACAY - BOLOGNESI
Presupuesto: -ANCASH
Fecha : July , 2014
DESCRIPCION UNID.
Partida
06.06.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3
06.06.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 30 M m3
06.06.04 SOLADO E= 2" m2
06.06.05 CONCRETO F'C= 210 KG/CM2 m3
06.06.06 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MUROS m2
06.06.07 ACERO FY= 4200 KG/CM2 kg
06.06.08 JUNTA CON WATER STOP PVC 4" CANAL RECTANGULAR + SELLO ELASTOMERICO ML
7.00 CAPACITACION
7.01 CAPACITACION EN OPERACION Y MANTENIMIENTO GLB
8.00 MITIGACION DE MPACTO AMBIENTAL NEGATIVO
8.01 REFORESTACION Y/O REVEGETACION HA
8.02 ACONDICIONAMIENTO DE MATERIAL DE DESECHO EN BOTADERO m3
8.03 RESTAURACION DE AREAS UTILIZADAS EN PREPARACION DE CONCRETO m2
9.00 PLAN DE SEGURIDAD INDUSTRIAL
9.01 IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD GLB
10.00 FLETES
10.01 FLETE TERRESTRE GLB
10.02 FLETE RURAL GLB
Metrado
1.00
4.00
1.00
-
-
91.00
91.00
7.20
-
10.46
60.87
89.16
30.83
1.50
-
6.98
11.00
53.11
78.99
-
58.40
4.65
4.99
567.81
-
1.00
1.00
137.38
4.20
1.20
-
-
21.60
21.60
-
12.94
5.81
8.91
-
22.66
0.19
1.92
-
2.84
21.57
116.64
-
Metrado
1.00
35.20
2.00
-
-
17.65
17.65
-
7.25
3.34
4.88
-
6.50
-
1.13
18.05
81.89
-
7.51
7.51
-
1.00
1.50
-
-
9,701.52
9,701.52
3,233.84
3,233.84
-
1,684.12
431.83
77.28
73.40
2,263.69
1,778.61
2,061.55
205.08
-
572.26
3,467.38
-
1,478.96
250.35
-
3,467.38
-
-
Metrado
119.83
39.94
99.86
115.19
36.63
357.33
1,563.56
68.00
68.00
163.20
-
17.24
1.55
19.61
5.81
2.71
5.41
2.46
56.65
179.27
-
99.82
54.99
56.05
43.35
110.11
17.00
19.40
-
11.70
4.03
9.59
4.07
2.94
16.24
16.16
76.84
-
10.66
6.39
5.33
20.18
8.37
69.98
321.43
13.80
-
16.20
Metrado
6.75
11.81
27.60
10.78
58.32
267.37
11.50
-
1.00
-
0.50
50.00
150.00
-
1.00
-
1.00
1.00
PLANILLA DE METRADOS
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)
02.00 BOCATOMA
canal de salida
Losa canal de salida 1.00 4.10 1.10
Muros canal de salida izquierdo 1.00 4.10 0.15
Muros canal de salida derecha 1.00 3.40 0.15
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)
Acero Vertical 1/2" @0.20m (muro h =1.90m , L1.40) 2.00 7.00 3.05
Acero Vertical 1/2" @0.20m (muro h =1.26m L=3.0) 2.00 18.00 2.39
Acero losa de Operacin barraje 1/2" @ 0.20 m longitudinal 1.00 5.00 1.20
Acero losa de Operacin barraje 1/2" @ 0.20 m transversal 1.00 4.00 1.10
Acero losa de Oper comp. Limpia 1/2" @ 0.20 m longitudinal 1.00 5.00 1.10
Acero losa de Oper comp. Limpia 1/2" @ 0.20 m transversal 1.00 4.00 1.10
Acero losa de Oper. comp. Descarga 1/2" @ 0.20 m longitudinal 1.00 3.00 0.80
Acero losa de Oper. comp. Descarga 1/2" @ 0.20 m transversal 1.00 3.00 0.80
Acero Sobre ventana de captacion
Acero Hz 1/2" longitudinal @0.20m (L=0.79m) 1.00 5.00 0.79
Acero Hz 1/2" transversal @0.20m (L=1.5) 1.00 4.00 1.50
Canal de salida
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)
02.05.05 JUNTA CON WATER STOP PVC 4" +SELLO ELASTOMERICO ML 1.00
Junta vertical en los muros del canal de salida y canal principal 2.00 0.40
Junta: en la losa de del canal de salida y canal principal 1.00 0.40
04.06 VARIOS
04.06.01 ACCESORIO PARA AFORADOR PARSHALL GBL 1.00
05.04 JUNTAS
05.04.01 JUNTA DE CONTRACCION SELLADO CON ELASTOMERICO DE ML
Tramo I Tipo I
Tramo 0+000 - 0+020
Junta de Contraccin @ 3 m 1.00 5.00 1.07
Tramo 1+760 - 2+340
Junta de Contraccin @ 3 m 1.00 67.00 1.07
Tipo II
Tramo 0+034.36- 1+760
Junta de Contraccin @ 3 m 2.00 460.00 1.02
Tramo 2+340 - 2+408
Junta de Contraccin @ 3 m 2.00 18.00 1.02
Tramo II Tipo III
0+000 - 0+825.84
Junta de Contraccin @ 3 m 2.00 220.00 0.97
05.05 VARIOS
05.05.01 CURADO DE CONCRETO CON ADITIVO M2
Tramo I Tipo I
Tramo 0+000 - 0+020
Muros de Canal 2.00 2.00 20.00
Tramo 1+760 - 2+340
Muros de Canal 2.00 2.00 250.00
Tipo II
Tramo 0+034.36- 1+760
Muros de Canal 2.00 2.00 1,725.64
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)
Losa Fondo
Tipo II en Km 0.034 al 1+760 14.00 2.00 2.72
Tipo I en Km 1+760 al 2+340 30.00 2.00 1.20
Tipo II en Km 2+340 al 2+408 2.00 2.00 0.61
Tipo III en Km 0+000 al 825.84 22.00 2.00 0.80
Muros canal de derivacion 68.00 4.00 0.62
Dados 68.00 4.00 0.25
Losa 68.00 2.00 0.87
Muro de la toma Acero 3/8" @ 0.20m horozontal (poza) 68.00 4.00 1.20
Muro de la toma Acero 3/8" @ 0.20m vertival (poza) 68.00 6.00 0.35
Muro Pozo
Acero 3/8 @ 25 vertical 12.00 7.00 1.20
Acero 3/8 @ 25 horizontal 12.00 4.00 1.80
Muro Pozo aguas abajo
Acero 3/8 @ 25 vertical 12.00 5.00 0.30
Acero 3/8 @ 25 horizontal 12.00 3.00 1.16
06.05.08 JUNTA CON WATER STOP PVC 4" CANAL RECTANGULAR + SE ML
Juntas Ingreso Poza 6.00 1.15
Juntas salida Poza 6.00 1.15
Muro Pozo
Acero 3/8 @ 25 vertical 10.00 7.00 1.20
Acero 3/8 @ 25 horizontal 10.00 4.00 1.80
Muro Pozo aguas abajo
Acero 3/8 @ 25 vertical 10.00 5.00 0.30
Acero 3/8 @ 25 horizontal 10.00 3.00 1.16
06.06.08 JUNTA CON WATER STOP PVC 4" CANAL RECTANGULAR + SE ML
Juntas Ingreso Poza 5.00 1.15
Juntas salida Poza 5.00 1.15
07.00 CAPACITACION
07.01 CAPACITACION EN OPERACIN Y MANTENIMIENTO gbl 1.00
10.00 FLETES
LARGO ANCHO
10.01 FLETE TERRESTRE GBL 1.00
1.00
1.00
4.00 4.00
1.00
1.00
0.00
91.00 91.00
91.00 91.00
7.20
0.80 7.20
10.46
1.20 10.46
alto (m) Parcial Total
60.87
0.90 6.05
0.30 4.50
0.30 4.50
0.30 4.50
0.70 5.04
0.70 3.78
0.70 1.76
0.60 5.76
0.70 0.63
0.70 3.78
0.70 1.76
0.60 5.76
0.70 2.58
1.20 10.46
alto (m) Parcial Total
89.16
89.16
30.83
1.40 19.15
1.20 11.68
1.50
0.50 1.50
6.98
3.30
3.68
11.00
0.30 4.50
0.30 4.50
1.00 2.00
53.11
6.91
0.60 4.32
0.60 3.24
0.60 1.51
0.40 3.84
0.60 0.54
0.60 3.24
0.60 1.51
0.40 3.84
1.90 4.94
1.90 3.71
1.58 1.44
1.26 4.16
1.90 0.62
alto (m) Parcial Total
1.90 3.71
1.58 1.44
1.26 4.16
78.99
1.90 15.20
1.90 11.40
1.58 4.42
1.26 15.12
1.90 1.90
1.90 11.40
1.58 4.42
1.26 15.12
alto (m) Parcial Total
58.40
1.70 13.94
1.70 11.56
1.25 4.50
1.25 2.38
1.25 5.38
0.40 0.96
1.00 3.60
1.90 5.32
1.26 8.06
0.20 0.38
0.20 0.25
0.72
0.72
0.63
4.65
0.20 0.90
1.70 1.05
1.70 0.87
alto (m) Parcial Total
0.15 0.08
0.15 0.04
1.25 0.34
0.15 0.45
1.25 0.18
1.25 0.40
0.40 0.07
1.00 0.27
4.99
0.40 0.56
0.40 1.02
1.90 0.53
1.26 0.81
0.72
0.72
0.63
567.81
Peso acero
Kg/m
0.99 42.27
0.99 85.18
0.99 41.58
0.99 80.59
0.99 5.94
0.99 4.36
0.99 5.45
0.99 4.36
0.99 2.38
0.99 2.38
0.99 3.91
0.99 5.94
alto (m) Parcial Total
0.99 21.29
0.99 19.31
0.99 34.06
0.99 37.62
0.99 28.51
0.99 28.22
0.99 4.36
0.99 4.95
0.99 1.78
0.99 1.98
0.99 6.53
0.99 3.96
0.99 14.02
0.99 17.42
0.99 6.83
0.99 7.18
0.99 13.96
0.99 7.18
0.99 2.77
0.99 2.97
0.99 8.71
0.99 9.90
1.00 1.00
1.00 1.00
alto (m) Parcial Total
137.38
1.90 15.20
1.90 11.40
1.58 4.42
1.26 15.12
1.90 1.90
1.90 11.40
1.58 4.42
1.26 15.12
1.70 13.94
1.70 11.56
1.25 4.50
1.25 2.38
1.25 5.38
0.40 0.96
1.00 3.60
1.90 5.32
1.26 8.06
0.20 0.38
0.20 0.25
0.72
0.72
0.63
1.00 4.20
3.40
0.80
1.00 1.20
0.80
0.40
21.60 21.60
21.60 21.60
12.94
0.60 2.42
0.60 9.86
0.30 0.66
5.81
alto (m) Parcial Total
0.80 3.17
0.80 2.64
8.91
8.91
22.66
4.03
16.43
2.20
0.19
0.40 0.11
0.40 0.02
0.10 0.06
1.92
0.30 1.68
0.30 0.24
2.84
alto (m) Parcial Total
0.44 0.18
0.72 0.45
0.72 0.42
0.87 0.08
0.87 0.13
0.87 0.06
0.87 0.13
0.15 0.18
0.15 1.01
0.15 0.11
0.15 0.08
21.57
0.44 2.38
0.72 6.05
0.72 5.62
0.87 1.08
0.87 1.74
0.87 0.78
0.87 1.74
0.15 0.33
0.15 1.35
0.15 0.15
0.15 0.35
0.58 116.64
Peso acero
Kg/m
0.56 4.70
0.56 10.28
0.56 9.41
0.56 11.33
0.56 8.74
0.56 11.33
alto (m) Parcial Total
0.56 1.04
0.56 1.80
0.56 2.02
0.56 3.00
0.56 1.09
0.56 1.20
0.56 2.02
0.56 2.40
0.56 2.91
0.56 4.03
0.56 15.79
0.56 16.02
0.56 2.02
0.56 2.18
0.56 1.51
0.56 1.82
1.00 1.00
35.20
0.44 2.38
0.72 6.05
0.72 5.62
0.87 1.08
0.87 1.74
0.87 0.78
0.87 1.74
1.60 3.52
1.20 10.80
0.45 0.46
0.45 1.04
2.00
1.20
0.80
17.65 17.65
17.65 17.65
7.25
alto (m) Parcial Total
0.60 7.25
3.34
0.60 1.67
0.60 1.67
4.88
4.88
6.50 6.50
1.13
0.15 0.99
0.15 1.13
18.05
0.15 2.82
0.15 0.21
15.02
81.89
Peso acero
Kg/m
0.56 36.81
0.56 45.08
7.51
7.51
7.51
7.51
1.00 1.00
1.50
1.00
0.50
alto (m) Parcial Total
9,701.52
7,224.00
2,477.52
9,701.52
7,224.00
2,477.52
3,233.84
1,871.34
536.66
825.84
3,233.84
1,871.34
536.66
825.84
1,684.12
636.68
707.19
0.35 262.95
0.30 77.30
431.83
163.25
181.33
0.35 67.42
0.30 19.82
77.28
0.35 45.08
0.12 32.20
73.40
alto (m) Parcial Total
48.16
16.52
0.35 6.74
0.30 1.98
2,263.69
1,309.94
375.66
578.09
1,778.61
1,029.24
295.16
454.21
2,061.55
1,115.96
0.50 80.50
638.72
0.35 168.56
0.35 57.81
205.08
2,266.63
-2,061.55
572.26
0.30 1.80
0.15 2.10
0.30 22.50
0.15 60.90
0.30 155.31
0.15 168.25
0.30 6.12
0.15 6.63
0.30 74.33
0.15 74.33
3,467.38
alto (m) Parcial Total
0.30 24.00
0.30 300.00
0.30 2,070.77
0.30 81.60
0.30 991.01
1,478.96
5.35
71.69
938.40
36.72
426.80
250.35
1.07
17.12
117.30
8.16
106.70
3,467.38
0.30 24.00
0.30 300.00
0.30 2,070.77
alto (m) Parcial Total
0.30 81.60
0.30 991.01
alto (m) Parcial Total
119.83
0.70 98.53
0.40 21.30
39.94
0.70 32.84
0.40 7.10
99.86
99.86
115.19
115.19
36.63
0.30 1.22
0.45 2.75
0.30 5.51
0.60 5.51
0.60 3.06
0.15 3.71
0.15 3.78
0.15 0.12
0.15 1.58
0.30 2.53
0.30 1.53
0.15 5.32
357.33
0.30 16.32
0.45 36.72
0.30 73.44
0.60 73.44
0.60 40.80
alto (m) Parcial Total
0.15 11.42
0.15 10.80
0.15 0.37
0.15 5.28
0.30 50.59
0.30 20.40
0.15 17.75
1,563.56
Peso acero
Kg/m
0.56 310.73
0.56 346.53
0.56 350.34
0.56 293.22
0.56 182.78
0.56 79.97
68.00
68.00
68.00
68.00
163.20
51.00
30.60
51.00
30.60
17.24
0.90 7.13
0.90 2.97
0.20 1.12
0.20 2.16
0.20 1.35
alto (m) Parcial Total
0.30 0.73
0.50 1.78
1.55
0.40 1.55
19.61
19.61
5.81
0.20 2.18
0.20 2.16
0.20 1.47
2.71
0.15 0.20
0.35 0.92
0.60 1.58
5.41
5.41
2.46
0.15 1.98
0.40 0.48
56.65
0.40 6.40
0.90 11.88
0.90 11.88
13.20
0.15 1.20
0.15 1.98
0.40 6.40
0.40 3.71
alto (m) Parcial Total
1.02 179.27
Peso acero
Kg/m
0.56 38.44
0.99 83.16
0.99 34.75
0.56 21.91
99.82
Area Promed
5.08 35.54
6.43 64.29
54.99
Area Promed
3.00 20.99
3.40 34.00
56.05
56.05
43.35
0.60 16.83
2.40 26.52
110.11
0.60 20.40
alto (m) Parcial Total
2.51 42.67
2.40 40.80
2.40 6.24
17.00
17.00
19.40
17.00
2.40
11.70
1.30 11.70
alto (m) Parcial Total
4.03
0.80 1.60
0.45 2.43
9.59
9.59
4.07
4.07
2.94
0.20 2.30
0.35 0.64
16.24
1.30 13.00
3.24
16.16
11.50
0.15 0.75
0.15 0.69
0.35 3.22
Kg/m 76.84
0.56 13.10
0.99 17.82
0.25 15.00
0.56 30.91
alto (m) Parcial Total
alto (m) Parcial Total
10.66
0.40 10.66
6.39
0.60 6.39
5.33
13.32
-7.99
20.18
4.20
15.98
8.37
0.15 0.63
0.25 0.16
0.30 0.54
1.30 1.05
0.15 2.52
0.25 0.16
0.70 2.27
0.50 1.04
69.98
0.15 1.80
0.25 2.10
0.30 7.20
1.30 7.02
0.15 5.60
0.25 2.10
0.70 30.24
0.50 13.92
0.58 321.43
alto (m) Parcial Total
Kg/m
0.56 14.31
0.56 16.80
0.56 9.41
0.56 20.16
0.56 44.49
0.56 47.04
0.56 16.23
0.56 14.11
0.56 56.45
0.56 48.38
0.56 10.08
0.56 23.39
13.80
6.90
6.90
16.20
0.40 16.20
alto (m) Parcial Total
6.75
0.50 6.75
11.81
20.25
-8.44
27.60
14.40
13.20
10.78
0.15 1.64
0.40 0.72
0.35 1.21
0.15 1.98
0.15 0.36
0.30 2.63
0.60 2.16
0.30 0.09
58.32
0.15 1.50
0.25 1.75
0.30 6.00
1.30 5.85
0.15 4.67
0.25 1.75
0.70 25.20
0.50 11.60
267.37
Kg/m
0.56 11.93
0.56 14.00
0.56 7.84
0.56 16.80
0.56 37.07
0.56 39.20
alto (m) Parcial Total
0.56 13.52
0.56 11.76
0.56 47.04
0.56 40.32
0.56 8.40
0.56 19.49
11.50
5.75
5.75
1.00 1.00
0.50
0.50
50.00 50.00
150.00 150.00
1.00 1.00
ALTURA
1.00 1.00 1.00
0+000 - 0.023
0+020 0.003 0.827 20.00 0.020 8.495
0+040 0.134 0.571 20.00 1.370 13.970
0+060 0.131 0.451 20.00 2.650 10.215
0+080 0.853 1.256 20.00 9.840 17.070
0+100 0.846 0.544 20.00 16.990 18.000
0+120 0.448 0.463 20.00 12.940 10.065
0+140 0.057 0.594 20.00 5.050 10.565
0+160 0.181 0.489 20.00 2.380 10.825
0+180 0.151 0.587 20.00 3.320 10.755
0+200 0.075 1.012 20.00 2.260 15.990
0+220 0.259 0.544 20.00 3.340 15.560
0+240 0.409 0.771 20.00 6.680 13.145
0+260 1.519 0.113 20.00 19.280 8.835
0+280 2.262 0.343 20.00 37.810 4.555
0+300 0.528 1.072 20.00 27.900 14.140
0+320 0.717 0.892 20.00 12.450 19.630
0+340 0.320 1.287 20.00 10.370 21.785
0+360 1.108 1.407 20.00 14.280 26.940
0+380 0.091 0.926 20.00 11.990 23.325
0+400 0.046 1.474 20.00 1.370 23.990
0+420 0.258 0.951 20.00 3.040 24.245
0+440 2.622 0.113 20.00 28.800 10.640
0+460 1.881 0.113 20.00 45.030 2.260
0+480 0.085 1.130 20.00 19.660 12.430
0+500 2.774 0.113 20.00 28.590 12.430
0+520 0.001 1.124 20.00 27.750 12.370
0+540 0.100 1.116 20.00 1.010 22.395
0+560 0.040 1.353 20.00 1.400 24.680
0+580 0.066 1.406 20.00 1.060 27.580
0+600 0.970 0.568 20.00 10.360 19.730
0+620 1.887 0.193 20.00 28.570 7.605
0+640 2.331 0.653 20.00 42.180 8.460
0+660 4.238 0.113 20.00 65.690 7.660
0+680 4.367 0.868 20.00 86.050 9.805
0+700 0.165 1.203 20.00 45.320 20.705
0+720 2.000 0.113 20.00 21.650 13.160
0+740 - 0.113 20.00 10.000 2.260
0+760 1.592 0.705 20.00 7.960 8.175
0+780 1.593 2.818 20.00 31.850 35.225
0+800 6.229 0.113 20.00 78.220 29.310
0+820 8.570 0.113 20.00 101.630 29.310
0+826 0.123 0.035 5.84 18.550 0.432
SUB TOTAL 0+000 - 0+825.84 906.66 638.72
MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN
DISTRITO DE CAJACAY-BOLOGNESI-ANCASH
TRAMO 1:, KM 0+00 HASTA KM 0+2406.66 L=2,406.66 ML.
UBICACIN :
LOCALIDAD: SANTA ROSA PROV. : BOLOGNESI
DISTRITO : CAJACAY REGION.: ANCASH
02 - BOCATOMA
DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL M2 1.00 10.00 5.00 50.00 90.00
1.00 8.00 5.00 40.00
02.01.02 ENCAUSAMIENTO DE CURSO DE AGUA M3 1.00 20.00 20.00 20.00
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION MANUAL TERRENO ROCOSO M3 21.60
CANAL DE SALIDA 1.00 4.00 1.00 0.40 1.60
MUROS DE ENCAUZAMIENTO 1.00 8.00 2.50 1.00 20.00
02.05 VARIOS
02.05.01 COMPUERTA METALICA 1/8"X0.5X0.80M UND 1.00 1.00 1.00
02.05.02 REJILLA EN LA VENTANA DE CAPTACION (0.40x0.50m) UND 1.00 1.00 1.00
02.05.03 CURADO DE CONCRETO CON ADITIVO M2 62.28
PLANILLA DE METRADOS
UBICACIN :
LOCALIDAD: SANTA ROSA PROV. : BOLOGNESI
DISTRITO : CAJACAY REGION.: ANCASH
03- DESARENADOR
DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL M2 1.00 10.00 1.50 15.00 15.00
03.05 VARIOS
03.05.01 COMPUERTA DE LIMPIA TIPO TARJETA 0.30 x0.30m UND 1.00 1.00 1.00
03.05.02 REJILLA DE FIERRO 1/2" (0.50 x 0.50 M) UND 1.00 1.00 1.00
03.05.03 CURADO DE CONCRETO CON ADITIVO M2 36.00
PLANILLA DE METRADOS
MAYUCANCHA
OBRA :MEJORAMIENTO DEL CANAL DE RIEGO MOLINO
UBICACIN :
LOCALIDAD: SANTA ROSA PROV. : BOLOGNESI
DISTRITO : CAJACAY REGION.: ANCASH
DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
04.01 OBRAS PRELIMINARES
04.01.02 LIMPIEZA DE TERENO MANUAL M2 9,697.50
TRAMO 0+000 - 3+232.50 3,232.50 3.00 9,697.50
04.04 JUNTAS
04.04.01 JUNTAS ELASTOMERICAS DE DILATACION ML 1,761.20
(LONG. TOTAL: 3232.50 C/3 M) 1,035.83 1,036.00 1.70 1,761.20
04.05 VARIOS
04.05.01 CURADO DE CONCRETO CON ADITIVO M2 4,000.75
(EN SUPERFICIE DE CANAL) 3,077.50 1.30 4,000.75
PLANILLA DE METRADOS
UBICACIN :
LOCALIDADSta. Rosa PROV. : Bolognesi
DISTRITO Cajacay REGION.: Ancash
DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
corte 10 64.29
M3 44.85
05.03.04 CONCRETO FC=175 KG/CM2+30% P.M. M3 24.43
M3
MUROS (H=2.60 m) 1.00 17.00 1.10 0.50 9.35
1.00 17.00 0.30 2.60 13.26
1.00 17.00 0.20 2.60 1.82
02 TRABAJOS PRELIMINARES
03.01.07 PINTURAS
03.01.07.01 PINTURA ESMALTE EN MUROS EXTERIORES m2 35.74
Area de tarrajeo exterior 1.00 16.94 16.94
Aletas 1.00 13.20 13.20
Sellado filtro 1.00 5.60 5.60
03.02.08 PUERTA DE MALLA GALVANIZADA (inc. marco de tubo F.G. de 11/2", amfulo de 1.25und 4.00
Captacion 4.00 4.00
03.03.07 PINTURAS
03.03.07.01 PINTURA ESMALTE EN MUROS EXTERIORES m2 62.52
Area tarrajeo exterior 1.00 62.52 62.52
03.04.06 PINTURAS
03.04.06.01 PINTURA ESMALTE EN MUROS EXTERIORES m2 1.00 5.22 5.22
03.05.04 ELIMINACIN DE MATERIAL EXCEDENTE 30M APROX m3 1.00 1.25 2.10 1.60 0.60 2.52
03.06.05 EMPEDRADO E=.15M, A=0.60-0.80 EMBOQUILLADO m2 1.00 4.60 4.60 0.60 12.70
03.07.03 ELIMINACIN DE MATERIAL EXCEDENTE 30M APROX m3 1.25 18.00 0.40 0.40 0.50 1.80
03.07.05 CONCRETO f'c=175 kg/cm2 +30% PM (DADOS) m3 16.00 1.00 0.40 0.40 0.50 1.28
03.07.07 MALLA GALVANIZADA COCADA 2"x2" N10(INC. MARCO DE ANGULO 1.5") m 29.20
1.00 29.20 29.20
03.07.08 PUERTA DE MALLA GALVANIZADA (inc. marco de tubo F.G. de 11/2", amfulo de 1.25und 1.00 1.00
03.07.09 PINTURA ESMALTE CERCO DE MALLA METALICA m2 0.50 58.40 2.20 64.24
04 SEGURIDAD Y SALUD
05 CAPACITACIN Y EQUIPAMIENTO
05.01 CAPACITACIN A LA POBLACION C.D JASS EN SISTEMA DE SANEAMIENTO glb 1.00 1.00
05.02 EQUIPAMIENTO PARA LA OPERACIN Y MANTENIMIENTO DE LOS SISTEMA DE glb 1.00 1.00
06 FLETE