Beruflich Dokumente
Kultur Dokumente
1. PROJECT MANAGERS
The PMs are required to complete the following:
i. Assembling their own team of 13 personnel (Total 2 Teams).
ii. Team management is totally the responsibility of the selected
PMs
iii. The PMs are required to deciding between one another on the
given chapter that their team wish to present (either CH5 or
CH6)
iv. Each PM is required to present their selected chapters
content in full. Refer (2) for full presentation content.
The selected PMs for this presentation by lucky draw are as follow:
2. CONTENT OF PRESENTATION
2.1 The content of the presentation is as shown in Table 2
3. PRESENTATION RUBRICS
3.1 Only the slides for the presentation is required to be submitted in
softcopy format on the 5th of April 2017.
3.2 The assessment rubrics for the presentation is as shown in Table
3.