Sie sind auf Seite 1von 3

Alabel National Science High School

Alabel, Sarangani Province


BRIGADA ESKWELA PLUS ACTION PLAN
May 23 31 , 2012

Objectives Targets Strategies MOVs Persons Time Su


involved
1.Prepare and
improve school At the end
facilities, Prepare and designate Designation letter Principal May 23-
of im
landscaping a committee for the signed by the School 28, 2012
Brigada Eskwela w
,painting, signage conduct of Brigada school Head. Development
and school ground
, 80 % to Eskwela in school. planning Team ma
100% of the 8
projected b
physical
facilities
development
and
beautification
will have been
manifested.
Conduct a Principal
2. To identify and meeting with the Attendance School April23 -
prioritize facilities persons involve Minutes of the Development 27
and equipment in the Brigada meeting planning Team
requiring repair. Eskwela with all Action Plan Year level
year level List of priorities advisers
advisers in and costing Brigada
preparing the Committee
Brigada Eskwela
Action Plan.

3. To facilitate the
implementation Make a listing of Minutes of the
through the agreed priorities based on meeting and I
scheme. inspection pictorials. the
Prepare projected imp
cost estimates bee
Identify potential Principal,
donors/ benefactors. April23 -
Brigada
Conduct SGC/ PTA 27
Committee, SGC
Board meeting with
Implementation and PTA Board.
the Committee.
Scheme.
Strategized scheme
on its projected
implementation
Send communication Returned letters
to the identified with
benefactors. acknowledgement
Send communication
and acknowledge
early pledges
through letters
4. To strengthen 75% of the Conduct advocacy Graduation W
stakeholders projected through announcement Principal March 30, targ
participation as co- stakeholders should announcement , streamer Teachers 2012 ma
owner of the school. have been streamer, broadcast
participated on the media, streamers Brigada Stakeholders May 23-
conduct of Brigada attendance 31,2012
Eskwela. Implementation of Pictorials , Reports
Brigada Eskwela
Maintenance Week.
5. Establish the 75% of parents / Continued School Parents , June to Wh
institutionalization of students during implementation by memorandum teachers, May hav
Brigada Eskwela school days brigade month or quarterly attendance students , ma
activity during school will have been per year level per ,pictorials principal
days. manifested and section. Brigade
institutionalization of committee
the program will
have been achieved.

Prepared by

NORMA P. RENDON
Principal -I