Beruflich Dokumente
Kultur Dokumente
2. CALCULOS
TANQUE ELEVADO
VOLUMEN
LARGO ANCHO ALTURA UTIL
2.6 2.39 1.45 9
SELECCIN DE LA BOMBA
DATOS
CALCULOS
3
CAUDAL DE ENTRADA 1.32 LPS 21.11 GPM
CALCULO DE LA CARGA DISPONIBLE H 12.30 LBS/PULG2 H = Pr -Ps - Ht
SELECCIN DEL MEDIDOR (50% DE LA CARGA DISPONIBLE) 6.15 LBS/PULG2
PARA ESTOS DATOS, EN EL ABACO DE MEDIDORES SE TIENE:
DIAMETRO PERDIDA DE CARGA
5/8" 11.00 LBS/PULG2
3/4" 4.10 LBS/PULG2
1" 1.80 LBS/PULG2
POR LO TANTO SELECCIONAMOS EL MEDIDOR DE 3/4"
TRAMO L nivel U.H. Q D V Codo # tee # Reduc. V.C. Long. Long. Prd. Prd. Presin Pto. TRAMO
(m) (m) (l/s) (pulg) (m/s) (m) codos (m) tees (m) (m) Equiv(m) Total (m) Unit. (m) Total (m) (m)
1-2 1 0.3 3 0.12 0.5 0.95 0.443 3 0.354 0 0.2 0 1.529 2.529 0.107 0.270 2.570 2 1-2
2-3 6.2 0 6 0.25 0.75 0.877 0.648 5 0.518 1 0 0.16 3.918 10.118 0.058 0.584 3.154 3 2-3
3-4 2 0 18 0.5 1 0.987 0.65 0 0.52 1 0 0 0.52 2.52 0.051 0.129 3.283 4 3-4
4-5 4.5 0 28 0.71 1.5 0.623 0.85 4 0.68 1 0.2 0.22 4.5 9 0.014 0.123 3.406 5 4-5
5-6 20 0.85 30 0.75 1.5 0.658 0 0 0.68 1 0.3 0 0.98 20.98 0.015 0.317 4.573 6 5-6
6-7 1 0 56 1.2 1.5 1.053 0 0 1.36 1 0 0 1.36 2.36 0.036 0.085 4.658 7 6-7
7-8 5 0 128 1.85 2 0.913 1.705 1 1.36 1 0 0 3.065 8.065 0.020 0.160 4.818 8 7-8
8-T.E. 5 5.2 122 1.85 2 0.913 1.705 2 1.36 1 0 0.432 5.202 10.202 0.020 0.202 -0.905 TE 8-TE
6-9 10.5 0 86 1.51 1.5 1.325 0 0 1.36 1 0.25 0 1.61 12.11 0.055 0.668 3.905 9 6-9
9-10 10.6 0 56 1.2 1.5 1.053 0 0 1.36 1 0 0 1.36 11.96 0.036 0.431 3.474 10 9-10
10-11 5 0 30 0.75 1.5 0.658 0 0 1.36 1 0 0 1.36 6.36 0.015 0.096 3.378 11 10-11