Sie sind auf Seite 1von 2

1.

Attitude and mind-setting on government dependency


2. OFWs are breadwinners and pressured in family obligations
3. Lack of propensity to save
4. Ill-prepared to pursue entrepreneurial behavior

Challenges Strategies
Government
1. Data gaps on how many 1. Strengthen the data banking of
Overseas Filipino Workers the OFWs by the concerned
(OFWs) returning to Overseas agencies (OWWA, POEA)
Work

2. Shortsightedness and short 1. Inclusive planning of


term planning of the concerned government agencies and
government stakeholders in response to the
reintegration programs
2. Long term objective
setting
3. Perceived Infectiveness of Loan 1. Revisitation of memorandum of
Program (e.g.Numerous agreement between OWWA and
requirements to avail loan Land Bank of the Philippines
programs and high percentage 2. Removal of equity or lessen the
of interest, absence of borrowers equity
microfinance loan services) 3. Establishment of loan windows
( small, micro and non-
collateralized)
4. Shortened processes in availing
the lending program.
5. Provide a comprehensive
marketing orientation for loan
applicants
6. Streamline documentary
requirements
7. Tie-up with schools and NGOs
for possible assistance in the
preparation of feasibility studies

8. Need to pursue sustainable 1. Conduct Trade Fair exclusively


programs to strengthen OFW for OFW entrepreneurs;
Family Circles 2. Access to technical assistance
from other government
agencies (DTI, DOST, DA, BFAR,
TESDA) in pursuing community
enterprise and other productive
endeavor; and
3. Establishment of Reintegration
Fund as part of Family Circles
social preparation and
livelihood project
9. Lack of alternatives on the 1. Offer a wide-range of
livelihood programs offered by alternatives to the OWWA
the government Members
2. Strengthen the linkages with
non-government organizations
offering livelihood opportunities
10.Palliative approach by the 1. Revisitation of the reintegration
government in addressing the program policy.
reintegration program 2. Inclusion of stakeholders in the
planning process
11.LGUs mainstreaming on the 1. Empowerment of the LGUs by
reintegration program providing trainings and
seminars to PESO Managers
2. Establishment of conduit
system with the LGUs
12.Peace and Order 1. Strengthen the OFCs situated in
the armed conflict area

Das könnte Ihnen auch gefallen