WAGHA ROAD FACILITY FROM DAROGHAWALA TO WAGHA BORDER WITH SERVICE ROAD AND DRA
BUILT UP AREA (KM 11.88 TO KM 28.33) LENGTH 16.365 KM I.C CANAL BANK ROAD ANLONG BR
LENGTH 1.20 KM
Sr
Description Qty Unit
#
1 Columns Bracing
Bottom Chord
Top Chord
5 Platform
Sides
a-M.S Channel (250x75x8x10 mm)
04 Nos x 24.6 ' = 98.40 Rft
04 Nos x 22.06 ' = 88.24 Rft
186.64
@ 8 kg/ft = 1,493.1 Kg
Add 5 % wastage = 74.66 Kg
1,567.78 Kg 1567.78 Kg
Stairs Platform
a-M.S Channel (250x75x8x10 mm)
04 Nos x 6.97 ' = 27.88 Rft
08 Nos x 5.9 ' = 47.20 Rft
75.08 Rft
@ 8 kg/ft = 600.6 Kg
Add 5 % wastage = 30.03 Kg
630.67 Kg 630.67 Kg
b-M.S Angle Iron (50 x 50 x 6 mm)
12 Nos x 2.33 ' = 27.96 Rft
@ 1.4 kg/ft = 39.14 Kg
Add 5 % wastage = 1.96 Kg
41.10 Kg 41.10 Kg
c-MS Chequrd Plate 6 mm Thk
02 No x 2mx 1.8 m = 7.20 m2
OR 77.501 Sft
@ 4.3773 kg/Sft = 339.25 Kg
Add 10 % wastage = 33.92 Kg
373.17 Kg 373.17 Kg
Steps
a-M.S Angle Iron (50 x 50 x 6 mm)
86 Nos x 5.91 ' = 508.26 Rft
@ 1.4 kg/ft = 711.56 Kg
Add 5 % wastage = 35.58 Kg
747.14 Kg 747.14 Kg
b-MS Chequrd Plate 6 mm Thk
86 No x 1.8 m x 0.43 m = 66.56 m2
OR 716.495 Sft
@ 4.3773 kg/Sft = 3,136.33 Kg
Add 10 % wastage = 313.63 Kg
3,449.96 Kg 3449.96 Kg
7 Stairs Railing
Top Railing
a-M.S Angle Iron (50 x 50 x 6 mm)
08 Nos x 24.47 ' = 195.76 Rft
08 Nos x 6.84 ' = 54.72 Rft
08 Nos x 22.11 ' = 176.88 Rft
12 Nos x 3.71 ' = 44.52 Rft
471.88 Rft
@ 1.4 kg/ft = 660.6 Kg
Add 5 % wastage = 33.03 Kg
693.66 Kg 693.66 Kg
Vertical Posts
a-M.S Angle Iron (50 x 50 x 6 mm)
116 Nos x 3.17 ' = 367.72 Rft
@ 1.4 kg/ft = 514.8 Kg
Add 5 % wastage = 25.74 Kg
540.55 Kg 540.55 Kg
Diagonals
a-M.S Angle Iron (50 x 50 x 6 mm)
36 Nos x 3.1 ' = 111.60 Rft
@ 1.4 kg/ft = 156.2 Kg
Add 5 % wastage = 7.81 Kg
164.05 Kg 164.05 Kg
Retaining Bars
a-M.S Flat Bar (30 x 5 mm)
12 Nos x 53.6 ' = 643.2 Rft
@ 0.36 kg/ft = 231.55 Kg
Add 5 % wastage = 11.58 Kg
243.13 Kg 243.13 Kg
8 Columns
Main Bridge
a-M.S H-Beam (250 x 250 x 13 x 14)
12 Nos x 16.84 ' = 202.08 Rft
@ 23.01 kg/ft = 4,649.86 Kg
Add 5 % wastage = 232.49 Kg
4,882.35 Kg 4882.35 Kg
For Stairs
a-M.S H-Beam (250 x 250 x 13 x 14)
04 Nos x 7.31 ' = 29.24 Rft
@ 23.01 kg/ft = 672.81 Kg
Add 5 % wastage = 33.64 Kg
706.45 Kg 706.45 Kg
Stairs Column
Size: Dia 25 x 750mm Lg (Dia 1" x 2'.6" Long) 24 Nos 24.00 Nos.
Rate Amount
(Rs.) (Rs.)
130.64
65.3 179,144.79
134.69
65.3 184,702.67
135.79
65.3 186,208.36
10.49
65.3 14,390.42
68.87
65.3 94,446.97
13.81
65.3 18,933.81
94.54
65.30 129,643.20
56.83
65.3 77,935.39
7.46
72.3 11,325.30
16.27
65.3 22,308.53
3.02
78.3 2,597.27
35.42
86.3 64,198.92
19.22
65.3 26,358.91
61.98
84.3 109,716.56
27.95
65.3 38,332.09
422.93
87.3 406,136.57
74.66
72.3 113,350.20
30.03
72.3 45,597.59
1.96
65.3 2,683.91
33.92
87.3 32,577.80
35.58
65.3 48,788.39
313.63
87.3 301,181.76
33.03
65.3 45,296.23
25.74
65.3 35,297.81
7.81
65.3 10,712.60
11.58
65.3 15,876.36
232.49
84.3 411,582.43
33.64
84.3 59,553.99
58.30
78.3 50,213.85
15.71
78.3 13,527.44
78.53
76.3 65,909.54
90.47
76.3 75,927.79
13.74
76.3 11,534.17
wastage 2916.44449
800 102,400.00
Each
600 14,400.00
Each 5105301
200 25,600.00
Each Sum
176.3 440,750 3,535,002.81 Price/litre + Tax
707.0 860,419.00 Sum 5111133.89 Kgs 519.2
5,200.0 416,000.00
2,379.0 237,900.00 Galons Litre
Z 97.44 389.76 135.22222
800,000.00 P 85.26 341.04
P 73.08 292.32
400,000.00
1.35 lite/9SM
5,487.0 164,610.00
300,000.00
Total 6,713,932
17100
707,000.56
Total 7,420,932
222,628
Total Cost 7,643,560
1,528,712
G.Total 9,172,272
25 (72,500.00)
Net 9,099,772
Say 9,099,000
ESTIMATION FOR FABRICATION AND INSTALLATION OF PEDESTRIAN STEEL TRUSS BRIDGE
LANE LAHORE WAGHA ROAD FACILITY FROM DAROGHAWALA TO WAGHA BORDER WITH S
ROAD AND DRAINS IN THE BUILT UP AREA (KM 11.88 TO KM 28.33) LENGTH 16.365 KM I.C
BANK ROAD ANLONG BRB CANAL LENGTH 1.20 KM
ABSTRACT OF COST
Sr No. Description
1 PART-I
Manufacturing of Steel Structures
2 PART-II
Foundation/Civil Work
Total
OR
TEEL TRUSS BRIDGE ON 4
HA BORDER WITH SERVICE
NGTH 16.365 KM I.C CANAL
KM
Amount
(Rs.)
Rs. 9099000
Rs. 950,722
10,049,722
10.049 Million
PART-I
MANUFACTURING OF STEEL
STRUCTURE
EEL
PART-II
FOUNDATION/CIVIL WORK
RK
RATE ANALYSIS OF STEEL MATERIALS FOR THE EVALUATION OF PEDESTRIAN OVERHEAD BRIDGE
Carriage Unloading/
Input Rate 4th Loading 20 % Contractor
Sr Input Rate Charges Stacking Grand Total Grand Total
Description of Material Page/Item No.
Qtr 2010 (Oct to Charges
P.M. Charges
Profit and
P.M. Ton Per Kg
No. Dec) P.M. Ton P.M. Ton Overheads
Ton P.M. Ton
M.S Angle Iron (50 x 50 x 6 mm)
87 of 130 M.S
2" x 2" x 1/4"
1 Sections HB-1 64,000 300 600 400 65,300 65.30