DESCRIPTION

GENERAL
Material of Duct Sheet
Thickness of Sheet
Quality of Aluminium GI Sheets
Fabrication :
Folding
Joints
Sheet Metal Flanges
Bolt Holes
Gap near Flange Termination
More small cut sheets
Cross Breaking/Bracing
Flanges :
Thickness of Angle
Uniformly cut
Welding
Primer
Black Paint
Corner /Edges
Bolt Holes
Gaskets :
Thickness
Quality of Gasket
Fixing of Gasket
Fasteners :
Quality
Material of Fastener
Support :
Thickness
Quality
Supports :
Thickness
Quality
Paint fot Cut Edges
Black Paint
Anchor Fasteners :
Size
Fixing
Erection works :
Ducting
Stiffeners
Tightness of joints
Fasteners
Flanges below beam
Gaskets
Spacing of supports
Bottom of ducts
Tie Rods
Painting of duct facing grille
Painting of false ceiling
Support facing grille
Grille/ Diffuser Fixing
Fixing Frame
Collar/ Dropper length
Alignment
Fixing / Fasteners
Damper Operation
Continuous Grille Junctions
Black Paint for Screws
Canvas :
Quality
Zip
Fresh Air Grille
Angle of Louvers
Fixing of Base Frame
Fresh Air Grille
Packaged / Split units
Finish/ Appearance
Support for units
Painting of support
Slope towards Drain
Space for Airflow
VI pads for Outdoor units
Canvas
Zip
Quality
Isolation Damper
Drain piping
Blue PVC Pipe
Joints
Insulation of GI Joints
Material of Joint Insulation
Acoustic Insulation
Thickness of Fibreglass
Thickness of Aluminium Perforated Sheet
Securing of Perforated Sheet
Fasteners
Sagging Insulation
Exposed FibreGlass
Flame spread Index
Refrigerant Pipes :
Supports
Pressure Testing
Suction Line insulation
Enclosure GI race way
Item :
Area :
Roof Insulation
Material of Insulation
Thickness
Flame Spread Index
Flare Insulation
Material of insulation
Pipe concealed in PVC Pipes
Electrical :
Cabling & Earthing
Terminations
Electronics Control Panel
Trap Doors :
Size
Operation
Equipment Easily Accessible
Insulation for Aluminium Door
Piping :
Appearance
Thickness/Class
Cutting
Welding
Supports
Span of Support
Gaskets for Valves
Pipe Sleeves for
Wall/ Ceiling Crossing
Space for insulation
Space for Equipment
Connection
Space for Equipment Access
Positioning of Valves
Drain Piping :
Blue PVC Pipe
Joints
Insulation of GI Joints
Material of joint Insulation
Acoustic Insulation
Thickness of Insulation
Thickness of Al/ Perforated Sheet
Securing of perforated sheet
Fasteners
Sagging insulation
Exposed FIbreGlass
Thermal Insulation
Material for insulation
Thickness
Whether TF Grade
Density KG/CUM. A280
Aluminium foil
Aluminium Tape
Flame Spread Index
Sagging insulation
Exposed Fibreglass
Refrigerant Pipes :
Supports
Pressure Testing
Suction Line insulation
Pipe Insulation
Material Of insulation
Thickness of Insulation
Whether TF
Finishing
Painting of Insulation
Cooling tower
Frame Work
Casing Panels
Fan stack
Basin
Fills / Nozzles
Bolts, Nuts, Misc. Hardware
Water Inlet Header
Fan Blades /Hub
DESCRIPTION
GENERAL
Material of Duct Sheet
hickness of Sheet
Quality of Aluminium GI Sheets
abrication :
olding
oints
heet Metal Flanges
olt Holes
ap near Flange Termination
More small cut sheets
ross Breaking/Bracing
langes :
hickness of Angle
niformly cut
Welding
rimer
lack Paint
orner /Edges
olt Holes
Gaskets :
hickness
Quality of Gasket
xing of Gasket
asteners :
Quality
Material of Fastener
Support :
hickness
Quality
Supports :
hickness
Quality
aint fot Cut Edges
lack Paint
Anchor Fasteners :
ize
xing
rection works :
ucting
tiffeners
ightness of joints
asteners
langes below beam
askets
pacing of supports
ottom of ducts
ie Rods
ainting of duct facing grille
ainting of false ceiling
upport facing grille
Grille/ Diffuser Fixing
xing Frame
ollar/ Dropper length
lignment
xing / Fasteners
amper Operation
ontinuous Grille Junctions
lack Paint for Screws
Canvas :
Quality
ip
resh Air Grille
ngle of Louvers
xing of Base Frame
resh Air Grille
Packaged / Split units
nish/ Appearance
upport for units
ainting of support
lope towards Drain
pace for Airflow
I pads for Outdoor units
anvas
ip
Quality
solation Damper
rain piping
lue PVC Pipe
oints
nsulation of GI Joints
Material of Joint Insulation
coustic Insulation
hickness of Fibreglass
hickness of Aluminium Perforated Sheet
ecuring of Perforated Sheet
asteners
agging Insulation
xposed FibreGlass
lame spread Index
efrigerant Pipes :
upports
ressure Testing
uction Line insulation
nclosure GI race way
tem :
Area :
oof Insulation
Material of Insulation
hickness
lame Spread Index
lare Insulation
Material of insulation
ipe concealed in PVC Pipes
lectrical :
abling & Earthing
erminations
lectronics Control Panel
rap Doors :
ize
Operation
quipment Easily Accessible
nsulation for Aluminium Door
Piping :
ppearance
hickness/Class
utting
Welding
upports
pan of Support
askets for Valves
ipe Sleeves for
Wall/ Ceiling Crossing
pace for insulation
pace for Equipment
onnection
pace for Equipment Access
ositioning of Valves
Drain Piping :
lue PVC Pipe
oints
nsulation of GI Joints
Material of joint Insulation
Acoustic Insulation
hickness of Insulation
hickness of Al/ Perforated Sheet
ecuring of perforated sheet
asteners
agging insulation
xposed FIbreGlass
hermal Insulation
Material for insulation
hickness
Whether TF Grade
ensity KG/CUM. A280
luminium foil
luminium Tape
lame Spread Index
agging insulation
xposed Fibreglass
efrigerant Pipes :
upports
ressure Testing
uction Line insulation
Pipe Insulation
Material Of insulation
hickness of Insulation
Whether TF
nishing
ainting of Insulation
Cooling tower
rame Work
asing Panels
an stack
asin
lls / Nozzles
olts, Nuts, Misc. Hardware
Water Inlet Header
an Blades /Hub
FOR COOLING TOWERS
Cooling tower foundation details with dimensions, TR, KW, operating and dry weight and power poi
Make up water line to expansion tank
Make up water line to cooling tower
Raw water point for service
Raw power point for service
Drain point for chiller
Drain point near cooling tower
Location of DDC Panel
Location of chiller panel
Pump VFD Panel Location
Legend
Notes
General Drawing Check List

FOR AHU'S
Dimensions of AHU
Weight of AHU
KW of AHU
AHU air quantity
Capacity of AHU in TR
Chilled Water piping
AHU room Floor Drain
VFD Location
Sound attenuators for Supply and Return Air
Fire Damper for Supply and return air
Volume control Dampers
Power point for Fire Dampers
Power point for 2 way/ 3way Valve
DDC Panel and power point for DDC Panel
AHU Supply plenum size
Location of 2way valve thermostat
Fresh air Louver with damper Location
Exhaust air Louver with damper location
Section view with all Levels
AHU Cable Entry
Notes
General Drawing Check List
weight and power point
Project Schedule Weeks Start Date End Date
MEP Works 12/1/2016 1/31/2019
Water Supply & Sewerage 111.62 12/14/2016 1/31/2019
Design & Detailed Engineering 21.45 12/14/2016 5/12/2017
Construction Work 26.36 8/1/2018 10/31/2018
Supply of material 13.12 8/1/2018 10/31/2018
Fabrication Work 11.19 8/15/2018 10/31/2018
Erection, Testing & Commissioning 21.91 9/1/2018 1/31/2019

HVAC 106.83 2/1/2016 12/14/2018


Design & Detailed Engineering 12.79 12/1/2016 2/28/2017
Construction Work 54.44 12/1/2017 12/14/2018
AHU 20 12/1/2017 4/19/2018
In First Floor 10 12/1/2017 3/8/2018
In Second Floor 10 3/8/2018 4/19/2018
In Third Floor 10 12/1/2017 3/8/2018
In Fourth Floor 10 3/8/2018 4/19/2018
Ducting 15 3/8/2018 6/10/2018
Indoor unit Supply 5 3/8/2018 4/12/2018
Outdoor Unit Supply 5 4/12/2018 5/8/2018
Insulation Supply 5 5/8/2018 6/10/2018
False Ceiling Frame Work 5 3/8/2018 4/12/2018
Chilled Water piping 5 4/12/2018 5/8/2018
Supply of material 38.08 12/1/2017 8/24/2018
Fabrication Work 38.08 1/1/2018 9/24/2018
Erection, Testing & Commissioning 31.03 5/15/2018 12/14/2018

Fire Figthing 106.83 12/1/2016 12/14/2018


Design & Detailed Engineering 12.79 12/1/2016 2/28/2017
Construction Work 54.44 12/1/2017 12/14/2018
Supply of material 38.08 12/1/2017 8/24/2018
Fabrication Work 38.08 1/1/2018 9/24/2018
Erection, Testing & Commissioning 31.03 5/15/2018 12/14/2018