Sie sind auf Seite 1von 3

EXTRACTIONPLANTPT.

PERTASAMTANGAS
MAINTENANCEREPORT
14February2017
I.SKGX
No. Equipment RH Activities Status Remark
1 FeedGasMeteringPackage VisualCheck Good
2 LeanGasMeteringPackage VisualCheck Good
3 FuelGasMeteringPackage VisualCheck Good OnprogressapprovalbyMigas
4 InletSlugCatcher VisualCheck Good
5 CondensateDegasserVessel VisualCheck Good

II.GASTURBINECOMPRESSORS&FACILITIES
No. Equipment RH Activities Status Remark
1 FeedGasSuctionScrubbersA/B/C VisualCheck Good
A=29599 PMLubeoilfancoolerGTCFeedA/B,Regreasebearing A=Running
2 FeedGasCompressorsA/B Good
B=28978 motor&bearingfan(completed). B=Running

3 FeedGasComp.Disch.CoolersA/B/C VisualCheck Good


4 FeedGasDisch.ScrubbersA/B/C VisualCheck Good
5 CommonSpareCompressorC C=21213 VisualCheck Good C=Standby

A=27152 1.PMCheck2000Hoursofelectricmotor01EM2101
A=Running
A1/A2/B1/B2
6 LeanGasCompressorsA/B Good B=Running
2.WeeklyCheckVibrationdischargeFinfancoolers3.Check
B=27612
lubeoilcoolerfanGTCLean

7 LeanGasComp.Disch.CoolersA/B VisualCheck Good

III.GASDEHYDRATIONUNIT
No. Equipment RH Activities Status Remark
1 DehydrationVesselsA/B/C VisualCheck Good
2 KVValve VisualCheck Good
3 DustFilter VisualCheck Good
1.PMVisualCheck&LogSheetParameter Monitoringincreasesealleakage
4 RegenerationGasCompressor Good
2.PMcheckalarmsummary from0.4psigto2.7psig
1.PMchecksettingpressurefuel
BNR=22438
2.PMcheckminmaxreadingflamescanner
5 RegenerationGasHeater Good
3.PMCheckalarmsummary
SYS=36266
4.PMcheckinstrumentairpurgingenclosure
6 RegenGasCooler VisualCheck Good
7 K.O.Drum VisualCheck Good

IV.CRYOGENICUNIT
No. Equipment RH Activities Status Remark
1 GasLiquidExchanger VisualCheck Good
2 FeedResiduExchanger VisualCheck Good
3 ColdSeparator VisualCheck Good
Undermonitoringafterresetting:
TogetherwithLABcrewtotakeOilsampleofturbo 1.TimedelayOST3S
4 TurboExpanderPackage 35616
expanderaftermakeupwithPreslia68,statuscompleted 2.TimedelayHighVibTripComp
Side5S

5 ExpanderComp.DischargeCooler VisualCheck Good


6 DeEthanizerColumn&Reboiler VisualCheck Good
7 RefluxExchanger VisualCheck Good
A=19763 A=Standby
8 RefluxPumpsA/B VisualCheck Good
B=4549 B=Running
9 RefluxAccumulator VisualCheck Good
A=17392 A=Running
10 NGLPumpsA/B VisualCheck Good
B=15731 B=Standby
EXTRACTIONPLANTPT.PERTASAMTANGAS
MAINTENANCEREPORT
14February2017
V.UTILITIES
No. Equipment RH Activities Status Remark
PM2000potablewaterpump01P5901B,status
A=19870
completed A=Standby
1 PotableWater Good
PMCheck2000Hoursofelectricmotor01PM5901B, B=Running
B=16004 statuscompleted

A=16704 PMCheck2000Hoursofpump01P5802A,Replacelubeoil
A=Running
2 UtilityWaterPump(01P5802A/B) withthenewones,checkcoupling,checkmounting,check Good
B=Standby
B=18513 vibration&temperaturepump(completed).

A=2010 A=Standby
3 RawWaterPump VisualCheck Good
B=7654 B=Standby
A=7437 MonitoringIACBafterreplacementofcontrollerintellisys, A=Lead
4 InstrumentAirCompressorA/B Good
B=8461 statusIACBworkingnormal B=Lag

5 InstrumentAirReceiver&Header VisualCheck Good


6 MethanolInjectionPumpsA/B VisualCheck Good
7 HotOilMakeUpPump&ExpansionVessel 4,54 VisualCheck Good Standby
1.PM2000ofhotoilcirculationpump01P5702B,status
A=17075
completed A=Standby
8 HotOilCirculationPump&Filter Good
4.PMCheck2000Hoursofelectricmotor01PM5702B B=Running
B=19981 completed
BRN=32902 1.PMchecksettingpressurefuel
Monitoringplugleakageafter
9 HotOilHeater 2.PMcheckminmaxreadingflamescanner Good
SYS=37303 groutingwithSIKA
3.PMcheckalarmsummary
10 HPFlarePackage VisualCheck Good
A=7.48
11 K.O.Drum&Pump VisualCheck Good
B=7.17
12 ColdVent VisualCheck Good
13 ClosedDrainDrum&Pump 188,52 VisualCheck Good Standby
14 ClosedDrainSumpPump 483,45 VisualCheck Good Standby
15 APISeparator&Pumps 181,67 VisualCheck Good Standby
16 WaterSumpPump 693,18 VisualCheck Good Standby
17 PigLauncher&PigReceiver VisualCheck Good
18 DieselFireWaterPump 79,00 VisualCheck Good Standby
19 JockeyPump 113,00 VisualCheck Good Standby
20 FuelGas&SealGas VisualCheck Good
A=15379 A=Running
B=30710 B=Running
21 GEGA/B/CandDEG GEGA,MakeupoilofGEGA20liters(completed) Good
C=27220 C=Standby
D=386,1 D=Standby

VI.FACILITY&PIPELINE
No. Equipment/Area Activities Remark
1 Pipeline,Piping&Facility MonitoringNGLPressurePipeline. Continuemonitoring

2 LiftingBaratGTCFeedA CheckVisualBoltingLiftingBarareaCompressor OK

3 DoubleBlockValve ApprovedDrawingDoubleBlockValveforInjectionMethanoltoKorosiSpecindo ProsecProcurement

3)DinasPerhubunganOganIlir
SigninBeritaAcarabetweenPertaSamtanandDishubOIRecomendationLetter
forsubmittoDirjenPerkeretaapianregardingextendPermitRailwayCrossingKP50
4 Pipeline,RailwayCrossing Done
&KP56
ContinuetomeetKepalaDinasPerhubunganOIforinterviewregardingcondition
railwaycrossingPertaSamtan
4)RepaintingDischargeScrubberA&B
CleaningmossofVessel
5 VesselDischargeScrubberA/B/C Continue
RushRemovalScrubber
RepaintingwithTopPaint(Grey)
CommunicationwithPakTaufikPEPforRegardingProgressPEPProjectLowering
6 PEPProjectatSKGX Continue
andFitupSpool,Remaining3JointWelding(Continue)

7 DelugeSystem MonitorleakageaftertemporaryrepairseatvalveXV6022 Continuemonitoring

VII.OTHERS
No. Equipment Activities Remark
CheckCCR,Regengasheater,Hotoilheater,TurboExpander&RegentGas
Compressor;
1.CheckDCS/ESS&PLCatCCR&MCC
2.Checktemperaturecontrolroom
1 CCRArea Completed
3.CheckhotoilheaterPackage
4.Checkregengasheaterpackage
5.Checkpanelturboexpander
6.Checkpanelregengascompressor

DailycheckMCCandswitchgear
DailychecklistandVisualcheckmotorstater,switchgear,DistributionPanellighting
2 MCCArea&BatteryChargerRoom Completed
,HVAC,checkUPS&Batterycharger,FuelGasheaterpanel,Transformerand
enerconcontrolpanelofGEG&EDG,

3 Check01FT2252 ChangeupScalerangefrom0,4MMSCFDto0,499MMSCFD

4 Check01FT5721 Changeupscalerangefrom0,6MMSCFDto0,8982MMSCFD
CreatenewMMIofruninghourspumps,Alreadycreatesome,continueforthe
5 DCS StatusContinue
others
Check,CleaningandrepositionintotherightdirectionofFlamedetector01BE
6 Flamedetector01BE3101 StatusCompleted
3101.
EXTRACTIONPLANTPT.PERTASAMTANGAS
MAINTENANCEREPORT
14February2017
VIII.MAINTENANCEISSUE/OUTSTANDINGITEM
No. Item Activities Remarks
1 LTZ1001HH(bypass)&LTZ1001LLspikevaluewhenlightning Addsurgearrestertoprotectfalsesignalduetolightning

2 FeedGasCompressorBconnectiontoDCSmodbad WaitingEthernetcard,POalreadysubmittotransavia
Pengecekan&VerifikasiI/ACompressorAduetoHighLamp
3 I/ACompressorA
Discharge
4 DisplayatDCS MakedisplayrunninghoursequipmentatDCS

IX.SPAREPART/WAREHOUSE
No. Item Remarks
1 RepairmanualvalveGLT16"=2ea&GLT6"=2eaforbackupKVValve Alreadydelivertovendor
2 PrepareselenoidvalveforcontrolvalvewithbrandAscoforspareitem Logistic/Procurementprocess
3 PanelsystemP6003 Procurementprocess
4 PrepareprocureEMCP+2forsparepanelGEG Procurementprocess
5 CreatePRreplaceflexiblecable,valvemembrane&columnforAT3501 Procurementprocess
6 PrepareprocurenewHMISolarTurbineforspareitem Procurementprocess
7 PergantianDoubleBlockValve ProsesPR,WaitingPO

Preparedby, Acknowledgedby,

Dandy AcepSaefuddin
(MaintenanceSuperintendent) (Operation&MaintenanceManager)

TrendingTurboExpander

15576,00015383,00015420,000 15591,00015435,00015343,000 15356,00015498,00015323,00015178,00015356,00015498,00015323,000


2,40 15304,00015272,00015297,00015352,00015204,00015490,00015478,00015196,00015354,000 15074,00015178,000 16000,000
2,20
14000,000
2,00
1,80 12000,000
1,60 1,650
1,530
10000,000
1,440 1,360
1,40
Vibration

1,320 1,230 1,190


1,280 1,200 1,090 1,080 1,090 1,080
1,20 1,040 1,140 1,030 1,040 1,040 8000,000
1,030 1,150 1,130 1,040
1,050 1,160 1,080 0,940 1,070 1,070 1,060 1,070 1,070 1,060
1,00 0,910 0,880
0,940 0,920 0,810 0,800 0,930 0,940
0,860 0,870 0,860 0,890 0,800 0,860 0,860 6000,000
0,820 0,840
0,820
0,80 0,750 0,750 0,760 0,790
0,630 0,690 0,730 0,720 0,720 0,730 0,870 0,740 0,870
0,610 0,670 0,670 0,800 0,810
0,60 0,690 0,670 0,730 0,760 4000,000
0,590 0,690 0,700 0,720 0,690 0,720 0,710 0,560 0,580 0,560 0,580
0,660 0,510 0,530 0,510 0,530
0,570 0,600 0,570 0,600
0,40 0,530 0,550 0,530 0,550
2000,000
724,000 733,000 732,000 726,000 725,000 722,000 723,000 725,000 723,000 719,000 720,000 725,000 724,000 718,000 720,000 724,000 725,000 721,000 722,000 721,000 725,000 721,000 722,000 721,000
0,20
0,000
8:25 17:00 20:00 6:00 7:40 17:00 20:00 6:00 8:25 17:15 20:00 6:00 8:34 11:10 14:31 16:53 8:35 11:02 15:47 17:10 8:35 11:02 15:47 17:10

9Feb17 10Feb17 11Feb17 12Feb17 13Feb17 14Feb17


Time

ExpVib"X"(mils) ExpVib"Y"(mils) CompVib"X"(mils) CompVib"Y"(mils) Speed(Rpm) ExpSuctPress(Psi)

PipelinePressure
350,00

300,00 286,00
278,00
270,00 263,00 256,00
248,00 243,00
250,00 237,00 232,00 230,00
210,00
Pressure(Psi)

200,00 184,91
184,04
182,28 185,00
184,76
183,96
150,00 132,24
131,89
126,77 130,00
125,00 129,43
129,10
124,84 127,85
127,06 127,00 126,00
125,00 124,85
124,39
123,09 123,00 122,00 121,22 121,00
120,00
118,00 118,00
117,00 114,92
115,04
130,32 128,00 127,60 112,08 105,70
105,50
125,20 125,00 124,00 122,48 120,00 118,00 103,30
130,76 128,00 127,75 114,00
100,00 125,48 125,00 123,00 122,65 105,20
118,00 117,00 113,34
103,60

50,00

0,00
KP0 KP9 KP21 KP33 KP42 KP54 KP63 KP68 KP78 KP79 KP86 NGLSurge
Drum
Location
PresureDesign 09Feb17 10Feb17 11Feb17 13Feb17 14Feb17