Additional Checklist (P7512)

SL NO.

5
6
7

8
9
10
11

12

13

14
15
16
17
18
19
20
21
22
23

24

25

26
Additional Checklist (P7512)

27
28
29

Sl. No
1
2
3
4
5
6
7
8
Additional Checklist (P7512)

DESCRIPTION

ADHERENCE OF INPUT

For SPAU03/NPAU03 or PAUs listed below is installation temperature of 10 Deg C considered?


For SPAU03/NPAU03 or PAUs listed below is standby condition (if any) temperature of 21 Deg C
considered?
No credit shall be taken when frictional effects/Gap reduce nozzle loading or piping stresses? Run W
friction case for compressors, Pumps etc. Run without gap and with gap for first support from nozzl
Flare system design shall be performed considering ONLY vapour flow. However flare fluid density s
Max (stress specification, linelist).
Metal temperature for the solar radiation shall be 85C for the analysis i.e., if T1<85 then WNC+T4
85 deg) shall be considered
Is flanged elbow considered for elbows as required?
Is DECOUPLING of smaller branches considered as per stress spec.

XV weight/Ball valve weight/ PSV reaction force shall be as per link (Click here) and XV,PSV,PCV va
Is half of bolt weight considered for flange wt. especially for B16.47 series B.
Consider bourdon effect for line size>=18"
For CRA lined pipes (SPEC=*QN and >=6"), add 5mm to wall thickness.

Test conditions: Allowable stress for test conditions shall be considered as 0.9 of yield strength
Is un tampered/original CII (as received from layout) saved? And The latest CII file has date in filena
Ex: SI-SYS-020 (19-May-2014)?
ADHERENCE OF OUTPUT
Is Expansion stresses cleared within 90% (as per project spec)?
Is Sustained stresses close to 50%?
Is Occasional stresses close to 80%?
Is Nozzle cleared within 90% of allowables (in first run)?
Incorporate client comments (Discuss) (Click here)
Is first support from nozzle ensured to rest (at least in operating)?
Is Pump nozzle cleared for with friction and without friction OPE case?
Any increase in fillet weld thickness (> 6mm) based on Trunnion check to be captured in Isometric
Is Frequency requirement met for slug flow lines?
For PAUs, Is Transportation analysis done?
Unique ID (attribute) to be discussed and then updated (Do not repeat attributes (UID) in transport
file)
For Valves 10T and above, Valve shall have support as per 60% MR tag. Support needs to be shown
as per attachment-1.
The Longitudinal/Lateral displacement of the line on pipe racks/ Modules greater than 75mm marke
ISO. Vertical displacement > 25mm to be marked for platform penetration.
Additional Checklist (P7512)

Is Battery limit properly demarcated for all Tees and other boundary conditions?
Indicate Page no in Isometic ex: Contd on Pg 1 Contd on Pg 1 of 24
Is line diagram of vessel showing FS,SS Dia and thickness shown in stress sketch?

List of modules fabricated in Korea


CPAU04
CPAU05
CPAU06
CPAU11
CPAU15
NPAU03
SPAU03
WPAU01
Additional Checklist (P7512)

RATING ENTRY
(COMPLIED- ,
NOT REMARKS
COMPLIED- , NOT
APPLICABLE- )


Additional Checklist (P7512)