Date of Visit: 8 AM-- 8 PM, 18th Oct. 2016 Next Visit Date:
EM-COS007-2500307-A-DM-PILE-
001 Devi
EM-COS007-2500307-A-NM-PILE-
001tion Register and Requests (If
Applicable) - Piles
Concession Requests (If Applicable) - Piles
EM-COS007-2500307-C-NP-PILE-
001 Handling, Packing and Shipping Procedure - Piles
EM-COS007-2500307-E-BMC-PILE-
001 Base Material Certificates - Piles
EM-COS007-2500307-A-TL-PILE-
001 Plate Traceability List - Piles
EM-COS007-2500307-E-MC-PILE-
001 Material Certificates - Piles
EM-COS007-2500307-MB-PILE-
001 Manufacturing Record Book - Piles
EM-COS007-2500307-W-CC-PILE-
001 Welding Consumables Certificates - Piles
EM-COS007-2500307-F-BQ-PILE-
001 Calibration Test Certificates - Piles
EM-COS007-2500307-D-UP-PILE-
001 NDT Procedures - Piles
EM-COS007-2500307-MM-PILE-
001 Welding Consumable Handling Procedure - Piles
EM-COS007-2500307-D-WP-PILE- Welding Procedure and Welding Qualification Procedure
001 (WPS / WPQR) inc Repair Procedure - Piles
EM-COS007-2500307-A-IP-PILE-
001 Inspection and Test Plan - Piles
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Berthing
001 Island (1/3)
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Berthing
002 Island (2/3)
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Berthing
003 Island (3/3)
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Dolphin
004 A,B,D,F
EM-COS007-2500307-B-GM-PILE-
005 Fabrication Drawings - Piles - Shop Drawing for Dolphin C
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Jetty Bridge
006 (1/3)
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Jetty Bridge
007 C01(2/3)
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Jetty Bridge
008 (3/3)
EM-COS007-2500307-D-ZP-PILE-
001 Manufacturing Procedure Specification - Piles
EM-COS007-2500307-E-UQ-PILE- NDT Operator Qualifications - Piles
GUI-035-00 (Revision 0) Inspection Report Dated: 22nd March 2016
Daily Report
www.GQIS.com
Customer: EDGEN MURRAY Purchase Order 3568
No.:
001
EM-COS007-2500307-D-DP-PILE-
001 Dimensional Control Procedure - Piles
EM-COS007-2500307-W-UQ-PILE-
001 Welder Qualification Records - Piles
During visit paid on 18th of October, following activities have been monitored/witnessed.
1) Review Raw Material Retest Report
2) Review Steel Material Inspection Report
From 10th ~13th Oct. 2016 GQIS inspector conducted final inspection jointly with Bureau Veritas inspector
Mr. Wen (represent NNB) , during inspection no any dimension out of tolerance found, all inspected items
were conformed to drawing and project specification, the result is satisfactory.
No issue/comment issued by BV inspector
Until 8 PM, 14th Oct. 2016 all piles of this project had finished production, GQIS inspector performed final
inspection (visual and dimension inspection) for each piles, confirmed all the inspected items satisfied the
requirement of drawing and project specification (dimension, welding quality, etc.), also this batch of piles
(66 pieces) meet the delivering condition.
Sub-vendor is now preparing the final documents for the second batch of piles (66 pieces), at the same time
GQIS inspector should review the documentation immediately once the sub-vendor submitted.