Sie sind auf Seite 1von 6

Daily Report

www.GQIS.co.uk

Project: HPC-HINKLEY POINT C-


AGGREGATE JETTY-
Customer: EDGEN MURRAY
PRELIMINARY STEEL
PILE PROJECT
Sub-Vendor: ZHEJIANG CHANKONG
Vendor: ESC GROUP
STEEL PIPE CO., LTD
PUTUO, SHANG HAI, Sub-Vendor Address: TIANNING, JIASHAN,
Vendor Address:
CHINA ZHEJIANG

Vendor Reference: Sub-Vendor Reference:

Purchase Order No: 3568 Customer Reference:

GQIS Assignment No: Report No: 057

Date of Visit: 8 AM-- 8 PM, 18th Oct. 2016 Next Visit Date:

MATERIAL INSPECTED THIS VISIT


Item No. Quantit Description Tag No., Batch No., Serial
No., Cast, Heat No.
y

SUMMARY / AREAS OF CONCERN

GUI-036-00 (Revision 0) Flash Report Dated: 22nd March 2016


Daily Report
www.GQIS.com
Customer: EDGEN MURRAY Purchase Order 3568
No.:

1.0 SUMMARY / AREAS OF CONCERN

1.1 LIST OF APPLICABLE DOCUMENTS

EM-COS007-2500307-A-DM-PILE-
001 Devi
EM-COS007-2500307-A-NM-PILE-
001tion Register and Requests (If
Applicable) - Piles
Concession Requests (If Applicable) - Piles
EM-COS007-2500307-C-NP-PILE-
001 Handling, Packing and Shipping Procedure - Piles
EM-COS007-2500307-E-BMC-PILE-
001 Base Material Certificates - Piles
EM-COS007-2500307-A-TL-PILE-
001 Plate Traceability List - Piles
EM-COS007-2500307-E-MC-PILE-
001 Material Certificates - Piles
EM-COS007-2500307-MB-PILE-
001 Manufacturing Record Book - Piles
EM-COS007-2500307-W-CC-PILE-
001 Welding Consumables Certificates - Piles
EM-COS007-2500307-F-BQ-PILE-
001 Calibration Test Certificates - Piles
EM-COS007-2500307-D-UP-PILE-
001 NDT Procedures - Piles
EM-COS007-2500307-MM-PILE-
001 Welding Consumable Handling Procedure - Piles
EM-COS007-2500307-D-WP-PILE- Welding Procedure and Welding Qualification Procedure
001 (WPS / WPQR) inc Repair Procedure - Piles
EM-COS007-2500307-A-IP-PILE-
001 Inspection and Test Plan - Piles
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Berthing
001 Island (1/3)
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Berthing
002 Island (2/3)
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Berthing
003 Island (3/3)
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Dolphin
004 A,B,D,F
EM-COS007-2500307-B-GM-PILE-
005 Fabrication Drawings - Piles - Shop Drawing for Dolphin C
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Jetty Bridge
006 (1/3)
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Jetty Bridge
007 C01(2/3)
EM-COS007-2500307-B-GM-PILE- Fabrication Drawings - Piles - Shop Drawing for Jetty Bridge
008 (3/3)
EM-COS007-2500307-D-ZP-PILE-
001 Manufacturing Procedure Specification - Piles
EM-COS007-2500307-E-UQ-PILE- NDT Operator Qualifications - Piles
GUI-035-00 (Revision 0) Inspection Report Dated: 22nd March 2016
Daily Report
www.GQIS.com
Customer: EDGEN MURRAY Purchase Order 3568
No.:

001
EM-COS007-2500307-D-DP-PILE-
001 Dimensional Control Procedure - Piles
EM-COS007-2500307-W-UQ-PILE-
001 Welder Qualification Records - Piles

During visit paid on 18th of October, following activities have been monitored/witnessed.
1) Review Raw Material Retest Report
2) Review Steel Material Inspection Report

Phase 30.1 Compile and submit MDR


GQIS inspector reviewed mill certificates for materials of pile, verification that these MTCs are in line with EN
10025-2:2004; S355J2 and EN 10025-4:2004; S420M, verified chemical components, mechanical property, the
delivery condition and NDE per the requirement of code, the result is satisfactory.

Phase 30.2 Compile and submit MDR


GQIS inspector reviewed Review SSAW end product inspection record of piles, confirm the original inspection
record was real and reliable, the inspected result was in line with the requirement of drawing and project
specification, the result is satisfactory.

Phase 30.3 Compile and submit MDR


GQIS inspector reviewed visual inspection report of welds for piles, verification that inspected result was in line
with the requirement of drawing and project specification, the result is satisfactory.

Typical photo of activities monitored / witnessed

review visual inspection report of welds

GUI-035-00 (Revision 0) Inspection Report Dated: 22nd March 2016


Daily Report
www.GQIS.com
Customer: EDGEN MURRAY Purchase Order 3568
No.:

GUI-035-00 (Revision 0) Inspection Report Dated: 22nd March 2016


Daily Report
www.GQIS.com
Customer: EDGEN MURRAY Purchase Order 3568
No.:

GUI-035-00 (Revision 0) Inspection Report Dated: 22nd March 2016


Daily Report
www.GQIS.com
Customer: EDGEN MURRAY Purchase Order 3568
No.:

From 10th ~13th Oct. 2016 GQIS inspector conducted final inspection jointly with Bureau Veritas inspector
Mr. Wen (represent NNB) , during inspection no any dimension out of tolerance found, all inspected items
were conformed to drawing and project specification, the result is satisfactory.
No issue/comment issued by BV inspector
Until 8 PM, 14th Oct. 2016 all piles of this project had finished production, GQIS inspector performed final
inspection (visual and dimension inspection) for each piles, confirmed all the inspected items satisfied the
requirement of drawing and project specification (dimension, welding quality, etc.), also this batch of piles
(66 pieces) meet the delivering condition.
Sub-vendor is now preparing the final documents for the second batch of piles (66 pieces), at the same time
GQIS inspector should review the documentation immediately once the sub-vendor submitted.

Accepted Yes Non-Compliant No

Technical Specialist: Su Jinlong Operations Coordinator:


CSWIP 3.2/3.1, CWI, API 510, API 570, ASNT Level Date:
II RT&UT&PT&MT&VT
Date: 8 AM-- 8 PM, 18th Oct. 2016

GUI-035-00 (Revision 0) Inspection Report Dated: 22nd March 2016

Das könnte Ihnen auch gefallen