1.4 Inspection fit-up and welding between pipe 3568-DF-038-A2 with 3568-DF-038-A5.
As per ITP step 18&19(welding inspection-welding preparation& welding process), GQIS inspector checked
fit-up and welding between pipe 3568-DF-038-A2 with 3568-DF-038-A5, checked the fit-up gap was 2mm,
alignment was 1.5mm, polished the weld area of two side welding seam about 20mm, during welding checked
consumable was H08MnMoA(SJ101), current about 813A and voltage about 30.9V, which is in accordance
with WPS and specification, after finished one side of welding back gouging by electric arc, not found any
indication of welding defect and polish the groove then process back welding, also the reinforce about 2mm
after finished welding, the inspection result is satisfactory.