Daily Report

www.GQIS.co.uk

Project: Hinkley Jetty Design


Customer: Edgen Murray
Finalisation
Sub-Vendor: Zhejiang Chankong Steel
Vendor: ESC Group
Pipe CO.,LTD
Sub-Vendor Address: Tianning, Jiashan,
Vendor Address: Putuo, Shanghai,China
Zhejiang
Vendor Reference: Sub-Vendor Reference:

GQIS Assignment No: Customer Reference:

Purchase Order No: 3568 Report No: 016

8PM 7th, September


Date of Visit:
-8AM 8th,September,2016
MATERIAL INSPECTED THIS VISIT
Item No. Quantity Description Tag No., Batch No., Serial No.,
Cast, Heat No.
3568-PS- 1 1778mmX35mmX4m(LSAW)+1778mmX25mmX28.4m
007 (SSAW)
3568-C12- 1 1778mmX25mmX2.7m(SSAW)+1778mmX30mmX5.7m
050 (LSAW) +1778mmX25mmX18.8m(SSAW)

SUMMARY / AREAS OF CONCERN

GUI-036-00 (Revision 0) Flash Report Dated: 22nd March 2016


Daily Report
www.GQIS.com
Customer: Edgen Murray Purchase Order 3568
No.:

1. SMMARY / AREAS OF CONCERN:


1.1 Inspection ancillary installation for pile 3568-C12-050
As per ITP step 15(Production and installation of ancillary) , yesterday GQIS inspector found factory installed
3NB Grouting pipe with pile fist and then dispose weld imperfection, that might be a litter difficult and
inconvenience than dispose weld imperfection before installed, today found the factory already improvement
work procedure as disposed 3NB Grouting pipe welding defect before installed with pile.

1.2 Inspection plate cutting and angle of bevel (pipe No.3568-DB-036-B1)


As per ITP step 13 (Raw material preparation-visual and dimension inspection), GQIS randomly inspected
plate cutting and angle of bevel, the result found all dimension in accordance with drawing requirement and
material can traceable, the result is acceptable.

1.3 Inspection lift padeye installation (pile No.3568-C06-058)


As per ITP step 15(Production and installation of ancillary), GQIS inspector checked lift padeye installation
with pile, factory applied frock when install lift padeye as the drawing required, that can positive control
assembling dimension and reduce deformation, and one suggestion to manufacturer was better adopt multi-
pass welding instead of single-run welding, it might be more reasonable and can reduce deformation,
meanwhile factory acceptable this advice.

1.4 Inspection fit-up and welding between pipe 3568-DF-038-A2 with 3568-DF-038-A5.
As per ITP step 18&19(welding inspection-welding preparation& welding process), GQIS inspector checked
fit-up and welding between pipe 3568-DF-038-A2 with 3568-DF-038-A5, checked the fit-up gap was 2mm,
alignment was 1.5mm, polished the weld area of two side welding seam about 20mm, during welding checked
consumable was H08MnMoA(SJ101), current about 813A and voltage about 30.9V, which is in accordance
with WPS and specification, after finished one side of welding back gouging by electric arc, not found any
indication of welding defect and polish the groove then process back welding, also the reinforce about 2mm
after finished welding, the inspection result is satisfactory.

Picture

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Edgen Murray Purchase Order 3568
No.:

Inspection the wleding quality of 3pipe

Inspection plate cutting and angle of bevel

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Edgen Murray Purchase Order 3568
No.:

Inspection plate cutting and angle of bevel

Material can traceable

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Edgen Murray Purchase Order 3568
No.:

Inspection lift padeye installation

Suggestion manufacturer adopt multi-pass welding instead of single-run welding

Inspection fit-up and welding between pipe 3568-DF-038-A2 with 3568-DF-038-A5

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Edgen Murray Purchase Order 3568
No.:

Inspection fit-up and welding between pipe 3568-DF-038-A2 with 3568-DF-038-A5

Inspection fit-up and welding between pipe 3568-DF-038-A2 with 3568-DF-038-A5


Accepted Yes Non-Compliant No

Technical Specialist: Su Jinlong Operations Coordinator:


007 (Revision 0) Daily Report Dated: 29nd August 2016
Daily Report
www.GQIS.com
Customer: Edgen Murray Purchase Order 3568
No.:

Date: 8PM 7th, September -8AM Date:


8th,September,2016

007 (Revision 0) Daily Report Dated: 29nd August 2016