1. Client PETROPERU
2. Vendor /Sub-vendor John Zink Hamworthy
Jiangsu process Metal equipment CO.,LTD.
3. Inspector Name Shao Chunwei
4. PO number 020700114
5. Project Name P02070, Modernizacion de la Refineria de Talara
(TRM)
6. Inspection Location Dongping Town,Lishui District,
Nanjing,Jiangsu,P.R.China
7. Date of Inspection Fab. 16, 2016
8. Next Inspection date Tomorrow
9. Type of Inspection Dimension inspection and review MTC for ASTM
A106-15
10. Material Inspected piping dimension
11.Details and Results of Inspection:
11.1 REVIEW MTC
TR inspector reviewed the mill certificate for materials of steam piping; verification that this
MTC is in line with 3.1 certificate of EN-10204:2004;verified chemical components,
mechanical property and satisfactory.
Also checked the piping quality, Heat Lot No. , product No., dimension, quantity etc.Details
as below table
Material Heat Lot Product Equip./ Dimension Use for Actual
quality No. No. Tag No. thickness
ASTM 5E8178 P16012- FB2L-003 5.49*88.9 Steam 5.50-5.57
A106-15 01 (15JZ-38-1) piping