Sie sind auf Seite 1von 3

INSPECTION - FLASH REPORT

1. Client PETROPERU
2. Vendor /Sub-vendor John Zink Hamworthy
Jiangsu process Metal equipment CO.,LTD.
3. Inspector Name Shao Chunwei
4. PO number 020700114
5. Project Name P02070, Modernizacion de la Refineria de Talara
(TRM)
6. Inspection Location Dongping Town,Lishui District,
Nanjing,Jiangsu,P.R.China
7. Date of Inspection Fab. 16, 2016
8. Next Inspection date Tomorrow
9. Type of Inspection Dimension inspection and review MTC for ASTM
A106-15
10. Material Inspected piping dimension
11.Details and Results of Inspection:
11.1 REVIEW MTC
TR inspector reviewed the mill certificate for materials of steam piping; verification that this
MTC is in line with 3.1 certificate of EN-10204:2004;verified chemical components,
mechanical property and satisfactory.
Also checked the piping quality, Heat Lot No. , product No., dimension, quantity etc.Details
as below table
Material Heat Lot Product Equip./ Dimension Use for Actual
quality No. No. Tag No. thickness
ASTM 5E8178 P16012- FB2L-003 5.49*88.9 Steam 5.50-5.57
A106-15 01 (15JZ-38-1) piping

11.2 verified the repaired result


FB2-L-002 (15JZ-37-1): Last time found diameter of anchor hole should be 44mm as per
the drawings, but actual value42mm.
Manufacturer was repaired and final result value is 44mm-45mm and two hole are
concentricity, can acceptable.

11.3 confirm the with comment point


FB2-L-002(15JZ-35-1): Last report state than C content could not be checked by XRF PMI
detector, advanced PMI detector is required for Grade 316L.
According to the client approval document of V-020700114-J093-FB2-L-001-0033-B-PMI
Procedure Grade 316L not need test C content, only require to test CrNi and Mo content
and the require range are Cr:14.4-19.8; Ni:9.0-15.4; Mo:1.8-3.3.
The Grade 316L of CrNi and Mo content within the range of requirement so can closed
this Log.

Photos:

Checking piping dimension Checking piping information

Piping thickness measurement FB2-L-002 (15JZ-37-1)


Checking anchor hole dimension after Checking testing bar outside diameter and
repaired verified that two hole are concentricity

12.NCR Raised : Yes No


If Yes, please attach the NCR copy.

14.Inspector Signature: Date: Fab.15,2016

Das könnte Ihnen auch gefallen