UMM LULU PHASE II FULL FIELD DEVELOPMENT

PROJECT PACKAGE 2 - UMM LULU SUPER COMPLEX


AND SUBSEA COMPOSITE POWER CABLES

COMPANY Requisition No. AD197-473-G-02151

COMPANY Manual No. AD197-473-G-02097

VENDOR Document No. 14C040F03-2674-VVV-5V107

Data Sheet for


Amine Contactor
576-PU/V-2674/1

VENDOR NAME: COMART

TAG No.: 576-PU/V-2674/1

PURCHASE ORDER No: 9456D-000-PO-4110-01-506

CONTRACTOR REQUISITION No: 9451Y-000-SR-4110-001

CONTRACTOR Doc. Code (AS PER SR PART II): A1001

ITEM NAME: Amine Contactor 576-PU/V-2674/1

C 18/12/2014 Issued for Approval M.B J.E.L. A.V.G.


B 22/10/2014 Issued for Approval M.B J.E.L. A.V.G.
A 01/09/2014 Issued for Approval F.T. J.E.L. A.V.G.
Rev Date Description Prepared By Checked By Approved By
AMINE CONTACTOR

MECHANICAL DATA SHEET


Sheet 2 of 7
1 MANUFACTURER TBA SERVICE AMINE CONTACTOR
2 QUANTITY 1 LOCATION UMM LULU FULL FIELD DEVELOPMENT PROJECT, PACKAGE -2
3 HORIZONTAL VERTICAL EQUIPMENT TAG 576-PU/V-2674/1
4 DESIGN DATA OPERATING CONDITIONS
ASME VIII Div.1 2013 Edition
5 CODE (+ Project Spec. AD197-473-G-02000) FLUID COMPOSITION WET SOUR GAS / LEAN AMINE

6 HEAD TYPE 2:1 ELLIPTICAL FLOW RATE SOUR GAS/LEAN AMINE C 34482 / 56094 kg/h
7 TOTAL LENGTH (TAN-TAN) 10800 mm OPERATING PRESSURE 45,4 barg
8 LENGTH BOTTOM PART (TAN-TAN) C 1350 mm OPERATING TEMPERATURE C 39.9-77.9 C
9 LENGTH UPPER PART (TAN-TAN) C 9025 mm AMINE OP. LL (FROM B.T.L.) C 800 mm
10 INTERNAL DIAMETER BOTTOM PART (F) 2000 mm AMINE VOLUME AT NLL (from bottom of vessel) 3.56 m
11 INTERNAL DIAMETER UPPER PART (F) 1150 mm HC OPERATING LIQ.LEVEL (from bucket bottom) - mm
12 CONICAL TRANSITION Toriconical type 45/length 425mm HC VOLUME AT NLL - m
13 SHELL THICKNESS BOTTOM/TOP C (83) 40+3/24+3 mm LIQUID DENSITY LEAN AMINE 1019 kg/m3
14 HEAD THICKNESS BOTTOM/TOP (83) 40+3/24+3 mm PRESSURE DROP 0.3 bar
15 CLADDING THICKNESS (29-33) 3mm SS 316L MAWP by manufacturer
16 DESIGN PRESSURE 52 barg
17 FULL VACUUM DESIGN YES FV@ 150C
18 DESIGN MAX TEMP. C 104 C
19 DESIGN MIN TEMP (MDMT) C -28 (HOLD) C
20 HYDROTEST (75) YES barg
21 SEISMIC LOAD NOT REQUIRED MATERIALS
22 WIND VELOCITY (20) SEE APPL. SPEC HEAD TOP SA 516 Gr.70N + SS 316L CLAD / OVERLAY
23 BLAST LOAD (76) YES HEAD BOTTOM SA 516 Gr.70N + SS 316L CLAD / OVERLAY

24 TRANSPORTATION LOAD (72) YES NO SHELL SA 516 Gr.70N + SS 316L CLAD / OVERLAY

25 EXTERNAL NOZZLE LOADS (D) YES FORGINGS SA 350 LF2 cl.1+ SS 316L Clad.
26 CORROSION ALLOWANCE 0 mm REINFORCING PAD N.A.

27 VESSEL SUPPORT TYPE SKIRT FORGED NOZZLE NECKS SA 350 LF2 cl.1+ SS 316L CLAD
28 INSULATION THICKNESS (77) 25 (PP) 50 (HC) (77A) mm PIPE NOZZLE NECKS SA 333 GR.6smls + SS 316L CLAD
29 INSULATION SUPPORTS (77) YES NO FITTING NOZZLE NECKS C SA 420 WPL6smls + SS 316L CLAD
B5 30 FIREPROOFING YES NO FLANGES SA 350 LF2 cl.1+ SS 316L CLAD
31 LADDERS & PLATFORMS (78) YES NO BLIND FLANGES SA 350 LF2 cl.1+ SS 316L CLAD
32 LADDERS & PLATFORMS CLIPS YES NO SUPPORT SKIRT SA 516 Gr. 70N
33 PIPE SUPPORTS CLIPS YES NO TRUNNIONS & TAILING SA 516 Gr. 70N
34 LIFTING LUGS YES NO DAVIT LUG SA 516 Gr. 70N
35 EARTHING LUGS YES NO DAVIT ARM HOLD
36 MANWAY COVERS HINGED DAVIT NAMEPLATE SS 316L
37 WEIGHTS (NOTE 83) C NAMEPLATE SUPPORT SA 516 Gr. 70N
38 EMPTY (WITHOUT INTERNALS) 20500 kg EARTHING BOSS As per fig. 1 of GIS 46-020
39 OPERATING 25520 kg EXTERNAL BOLTS/NUTS C SA 320 L7M/SA 194 Gr.7M
40 HYDROTEST 36100 kg INTERNAL BOLTS/NUTS SA 193 B8MA/SA 194 B8MA
41 ESTIMATED WEIGHT OF THE INTERNALS 700 kg EXTERNAL GASKET 316SS OCTOGONAL RING (TYPE R)
42 CAPACITY 15.6 m INTERNAL GASKET N.A.
43 FABRICATION & INSPECTION INTERNAL SUPPORT CLIPS DIRECTLY WELDED ON SHELL SS 316L

44 MATERIAL CERTIFICATE REQUIREMENT (24) ACC. EN 10204 - 3.2 EXTERNAL SUPPORT CLIPS DIRECTLY WELDED ON SHELL SA 516 Gr. 70N

45 POSTWELD HEAT TREATEMENT (9) YES ANCHOR BOLT ASTM A 325M


46 MATERIAL IMPACT TESTS SEE APPL. STD / AS PER CODE INTERNALS (FREE ISSUED BY COMART TO MANUFACTURER)
47 WELD TEST COUPONS (8) SEE APPL. STD / AS PER CODE VALVE TRAYS SA 240 316L C
(100% BUTT C
48 RADIOGRAPHY FULL JOINT EFFICIENCY=1
WELDS)
GAS INLET DEVICE (N1) (Schoepentoeter) SA 240 316L
49 MAGNAFLUX TEST SEE APPL. STD / AS PER CODE MIST ELIMINATOR (N1) SA 240 316L
50 DYE PENETRANT SEE APPL. STD / AS PER CODE INTERNALS (SUPPLY BY FABRICATOR)
51 ULTRASONIC SEE APPL. STD / AS PER CODE INTERNAL BUCKET FOR HYDROCARBON SKIMMING SA 240 316L
52 ASME CODE STAMP REQUIREMENT YES NO SUPPORTS FOR ALL ABOVE MENTIONED INTERNALS SA 240 316L
53 LETHAL SERVICE (60 - 71) YES NO COLLECTOR PIPE C SA 312 316L
54 HIC TEST NACE TM0284 / NACE TM0177 (79) C YES NO C SA 276 316L
55 ALTERNATIVE TO HIC TEST C (79) YES NO
56 POSITIVE MATERIAL IDENTIFICATION (12) YES NO MISCELLANEA
57 NACE MR.01-75 / ISO 15156 edition 2003 YES NO SURFACE PREPARATION SA 2,5 ISO 8501-1
58 SOUR SERVICE (51 - 59) YES NO PAINTING CYCLE (CS) PSN 340
59 PAINTING (14) YES NO TOP COLOUR TBA
60 TEMPORARY SADDLE FOR TRANSPORT YES NO
61 PICKLING AND PASSIVATION FOR SS YES
62 CRITICALITY RATING (81) 3
63 INSPECTION AND TESTING AS PER ITP
64
AMINE CONTACTOR

MECHANICAL DATA SHEET


Sheet 3 of 7
1 NOZZLES
2 PROCESS NOZZLES

3 MARK No OFF SIZE RATING THK TYPE FACING SERVICE PROJECT FROM C.L.
4 I1 1 C 8" 600# TBA LIP TYPE WNRTJ GAS INLET (with inlet device, Schoepentoeter) C NOTES'(3)' (47) '(74)
5 I2 1 4'' 600# TBA LIP TYPE WNRTJ LEAN AMINE INLET NOTES'(3)' (47) '(74)
6 O1 1 8'' 600# TBA LIP TYPE WNRTJ GAS OUTLET NOTES'(3)' (47) '(74)
7 O2 1 2" 600# TBA LIP TYPE WNRTJ HC SKIMMING (with collector pipe) C NOTES'(3)' (47) '(74)

8 O3 1 4'' 600# TBA LIP TYPE WNRTJ RICH AMINE OUTLET NOTES'(3)' (47) '(74)

9 C RD 1 2" 600# TBA LIP TYPE WNRTJ PSV NOTES'(3)' (47) '(74)
10 UC 1 2" 600# TBA LIP TYPE WNRTJ UTILITY CONNECTION NOTES'(3)' (47) '(74)
11 V 1 2" 600# TBA LIP TYPE WNRTJ VENT NOTES'(3)' (47) '(74)

12 C D 1 2" 600# TBA LIP TYPE WNRTJ DRAIN NOTES'(3)' (47) '(74)
13
14 SKIRT
15 Sa 1 24" - - - - SKIRT ACCESS
16 So 1 6" - - - - SKIRT OPENING
17 Sv 1-6 6 4" - - - - SKIRT VENT
18
19 INSTRUMENT CONNECTIONS
20 P1A/B 2 3" 600# TBA LIP TYPE WNRTJ PRESSURE TRANSMITTER NOTES'(3)' (47) '(74)
21 P2 1 2" 600# TBA LIP TYPE WNRTJ PRESSURE TRANSMITTER NOTES'(3)' (47) '(74)

22 P3A/B 2 C 2" 600# TBA LIP TYPE WNRTJ PRESSURE TRANSMITTER NOTES'(3)' (47) '(74)

23 L1A/B 2 3" 600# TBA LIP TYPE WNRTJ LEVEL TRANSMITTER NOTES'(3)' (47) '(74)

24 L2A/B 2 2" 600# TBA LIP TYPE WNRTJ LEVEL TRANSMITTER NOTES'(3)' (47) '(74)
25 LG1A/B 2 2" 600# TBA LIP TYPE WNRTJ LEVEL GAUGE NOTES'(3)' (47) '(74)
26 LG2A/B C 2 2" 600# TBA LIP TYPE WNRTJ LEVEL GAUGE NOTES'(3)' (47) '(74)

27 T 1 2" 600# TBA LIP TYPE WNRTJ TEMPERATURE INDICATOR NOTES'(3)' (47) '(74)
28 P4 C 2 2" 600# TBA LIP TYPE WNRTJ PRESSURE INDICATOR NOTES'(3)' (47) '(74)
29
30
31 MANHOLES - HANDHOLES

32 MW1 1 24" 600# TBA LIP TYPE RTJ MANWAY NOTES'(3)' (47) '(74)
33 MW2 1 24" 600# TBA LIP TYPE RTJ MANWAY NOTES'(3)' (47) '(74)

34 C MW3 1 24" 600# TBA LIP TYPE RTJ MANWAY NOTES'(3)' (47) '(74)
35
36
37 LIQUID LEVELS
38 LEVEL SET(from BTL)

39 LLLL mm 350
40 LLL mm 500

41 NLL mm 800
42 HLL mm 1100
43 HHLL mm 1375 C

44
45 INCLUSIONS BY MANUFACTURER
46 1 WELDED INTERNALS
47 2 WELDED EXTERNAL ATTACHMENTS FOR PLATFORMS, LADDERS, PIPING CLIPS
48 3 FOUNDATION BOLTS DESIGN AND SUPPLY
49 4 DETAIL DESIGN OF EXTERNAL LADDERS AND PLATFORMS BASED ON INPUT BY COMART, SUPPLY IS EXCLUDED
50 5 SUPPORTS FOR HEAT INSULATION
51 6 ALL LIFTING/TAILING LUGS
52 7 NITROGEN FILLING PRIOR TO SHIPMENT
53 8 LIQUID VORTEX BREAKER
54 9 INTERNAL BUCKET FOR HYDROCARBON SKIMMING
55
56 INTERNALS FREE ISSUED BY COMART
57 1 VALVE TRAYS
58 2 GAS INLET DEVICE
59 3 MIST ELIMINATOR
60
61
62
AMINE CONTACTOR

MECHANICAL DATA SHEET


Sheet 4 of 7
1 VESSEL SKETCH
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
(hold)

58
59
60
61
62
63
64
65
AMINE CONTACTOR

MECHANICAL DATA SHEET


Sheet 5 of 7
1 NOTES
2 GENERAL NOTES
3 1 UNLESS OTEHRWISE NOTED ALL DIMENSIONS ARE IN MILLIMETERS.

4 C 2 UNLESS OTHERWISE INDICATED, ALL GIRTH FLANGES AND FLANGE CONNECTIONS BOLT HOLES MUST BE STAGGERED TO MAIN AXIS OF THE EQUIPMENT.

5 3 UNLESS OTHERWISE INDICATED NOZZLE PROJECTIONS ARE MEASURED FROM EQUIPMENT CENTERLINE TO CONTACT FLANGE FACINGS.

6 4 ALL ELEVATIONS ARE MEASURED FROM BOTTOM TANGENT LINE

7 C 5 ALL CARBON STEEL EXTERNAL BOLTS ARE PAINTED AS PER PROJECT SPECIFICATION

8 6 ALL EXTERNAL PARTS WELDED TO THE SHELL ARE SAME GRADE OF MATERIAL AS THE SHELL TO WHICH THEY ARE ATTACHED.

9 7 STATIC EQUIPMENT SUPPORTS SHALL BE IN ACCORDING TO AD197-473-G-02000_Rev.1 Para 6.6

10 8 WELD IS IN ACCORDANCE WITH AD197-473-G-00502_Rev.1

11 9 PWHT IS IN ACCORDANCE WITH AD197-473-G-00501_Rev.0.

12 10 IN CASE OF PWHT VESSELS, ALL NON-DESTRUCTIVE TESTING (RADIOGRAPHY, UT, DP, WFMT) SHALL BE DONE AFTER PWHT

13 11 DELETED C

14 12 PMI IS IN ACCORDANCE WITH AD197-473-G-00503_Rev.0

15 13 THE TOLERANCES OF EQUIPMENT ARE IN ACCORDANCE WITH;

16 A. GIS 46-010, 7.1.5 and 8.1.h

17 B. GIS 46-020, Annex Y

18 C. GIS 46-040, 5.10

19 14 PAINTING IN ACCORDANCE WITH AD197-473-G-02344_Rev.0

20 15 GASKETS USED FOR HYDROTEST SHALL BE SAME GRADE/QUALITY/SPECIFICATION WITH THE SERVICE GASKET. GASKETS SHALL BE REPLACED AFTER HYDROTEST

21 16 THE HYDROSTATIC TEST IS MAINTAINED AT LEAST 20, BUT NOT EXCEED 50. AS PER GIS 46-010, Para. 9.5 WATER SHALL NOT CONTAIN MORE THAN 10PPM SUSPENDED SOLIDS.

22 THE CHLORIDE CONTENT OF THE TEST WATER FOR AUSTENITIC STAINLESS STEEL IS NOT EXCEED 30 ppm AS PER SP-1021, Para. 5.5.

23 17 EQUIPMENT IS INTERNALLY DRIED, CLEANED AND HERMETICALLY SEALED BEFORE SHIPPING.

24 18 FLANGED OPENINGS ARE PROTECTED WITH METAL, NOT PLASTIC, COVER PLATES. COVERS ARE A MINIMUM OF 6MM THICK AND ARE INSTALLED WITH A FULL-WIDTH GASKET USING A MINIMUM OF

25 4 PCS OF FULL DIAMETER BOLTS/NUTS. THE COVER AND FLANGE ARE TAPED FOR WATERPROOF PROTECTION AS PER AD197-473-G-02002, Para. 6.8.5.

26 19 HEADS SHALL BE OF ONE PIECE OF CONSTRUCTION.

27 20 WIND CONDITIONS AS PER PROJECT SPECIFICATION AD197-473-G-02000 para. 6.4.1

28 DELETED

29 DELETED

30 DELETED

31 DELETED

32 DELETED

33 DELETED

34 DELETED

35 21 FOR VERTICAL STATIC EQUIPMENT, THE MAXIMUM DEFLECTION AT THE TOP SHALL NOT EXCEED 1/200 OF THE TOTAL STATIC EQUIPMENT HEIGHT.

36 THE VESSEL MANUFACTURER SHALL CHECK THE STATIC DEFLECTION AND STRESSES INDUCED UNDER FULL WIND LOADING IN BOTH, THE OPERATION AND SHUTDOWN CASES.

37 22 AFTER DESIGNING THE EQUIPMENT AS A STATIC STRUCTURE, THOSE WITH OVERALL HEIGHT TO DIAMETER RATIO EXCEEDING 10 SHALL BE INVESTIGATED FOR WIND INDUCED VIBRATIONS (WIV)

38 OR DYNAMIC BEHAVIOUR UNDER WIND LOADING CONDITIONS. THE DAMPING COEFFICIENT OF 0.01 SHALL BE USED FOR THIS ANALYSIS FOR ALL CONDITIONS.

39 23 DESIGN FOR SEISMIC LOADING IS NOT REQUIRED

40 24 MATERIAL CERTIFICATION:

41 - PRESSURE PARTS (PLATES, PIPES, FITTINGS, FORGINGS, FLANGES,HEAT EXCHANGER TUBES, FINNED TUBES, PLUGS ETC) OF PRESSURE VESSELS AND HEAT EXCHANGERS

42 (INCLUDING AIR COOLERS, PLATE EXCHANGERS, SHELL AND TUBE) ARE AS PER AD197473G02002 clause 6.1.7.4 - CERTIFICATION AS PER BS EN 10204/ISO 10474: 3.2.

43 VENDOR TO APPOINT THIRD PARTY (BV/GL/DNV/LLOYDS/ABS/TUV/VELOSI )

44 - NON PRESSURE PARTS OF PRESSURE VESSEL AND HEAT EXCHANGERS (THIS INCLUDES INTERNALS AND EXTERNALS & SUPPORTS, CLEATS, BASE PLATES, PIPE SUPPORT CLEATS,

45 PLATFORM SUPPORT CLEATS, WRAPPER PLATES, SADDLE WEBS, SUPPORT FRAME FOR AIR COOLERS, PLENUM FOR AIR COOLERS, BASE PLATES, ANODES INSIDE THE VESSELS ETC) -

46 ARE AS PER AD197473G02002 CLAUSE 6.1.7.4 - CERTIFICATION AS PER BS EN 10204/ISO 10474: 3.1

47 - PRESSURE PARTS FASTENERS OF PRESSURE VESSELS AND HEAT EXCHANGERS (INCLUDING AIR COOLERS, PLATE EXCHANGERS, SHELL AND TUBE), A193/A194, A320/A194, 9925 ETC -

48 CP-102 PAGE 15, SECTION 4.11 - CERTIFICATION AS PER BS EN 10204/ISO 10474: 3.1. ALL EXTERNAL GASKETS SHALL BE TO 3.1 CERTIFICATION.

49 25 DESIGN CONDITION: FULL VACUUM AT 150C.


C
50 26 PRESSURE VESSELS SHALL BE CODE STAMPED.

51 27 THIS EQUIPMENT SHALL BE ASME CODE STAMPED FOR "LETHAL SERVICE"

52 28 ALL EQUIPMENT SHALL BE SUITABLE FOR OFFSHORE INSTALLATION

53 CLADDING

54 29 CLAD STEEL WHICH IS EITHER EXPLOSION BONDED OR ROLL BONDED ARE ACCEPTABLE FOR SHELL AND HEAD COMPONENTS. WELD OVERLAY SURFACING IS ACCEPTABLE

55 FOR THICK SECTIONS SUCH AS TUBE SHEETS OR TO REPLACE STRIPPED-BACK CLADDING WITH ALLOY STEEL WELD METAL.

56 30 FOR MANUFACTURING NOZZLES, WELD OVERLAID CONSTRUCTION IS ACCEPTABLE OR INTEGRALLY CLAD PLATES SHALL BE USED.

57 31 UNLESS NOTED OTHERWISE, ALL CARBON STEEL PLATES WITH ALLOY CLADDING SHALL BE ULTRASONICALLY EXAMINED (100%SCANNING)PER SA-578, LEVEL C AND QUALITY LEVEL (CLASS-1)

58 REQUIREMENTS TO VERIFY THE INTEGRITY OF CLAD BOND WITH THE BACKING STEEL. ALL ALLOY OVERLAYS SHALL BE 100% LIQUID PENETRANT EXAMINED.

59 32 REQUIREMENTS FOR CLADDED EQUIPMENTS AS PER THE WELDING SPECIFICATIONAD197-473-G-00502 AND BP PRESSURE VESSEL SPECIFICATIONS ANNEXURE C OF GIS 46-010

60 AND BP GIS 18-013 IN ADDITION TO OTHER BP WELDING SPECIFICATIONS

61 33 REQUIREMENT WITH REGARD TO WELD OVERLAY SHALL BE A MINIMUM OF 5 MM THICKNESS WITH A GUARANTEED UNDILUTED CHEMISTRY TO A

62 DEPTH OF 3 MM FROM THE SURFACE AFTER FINAL MACHINING AS PER C.8.1 OF GIS 46-010.
AMINE CONTACTOR

MECHANICAL DATA SHEET


Sheet 6 of 7
1 NOTES
2
3 MANHOLE, NOZZLE, FLANGE, GASKET ETC.

4 34 ALL PROCESS NOZZLES SHALL BE CAPABLE OF TAKING EXTERNAL PIPING LOADS. VENDOR SHALL INDICATE MAXIMUM PERMISSIBLE NOZZLE LOADS AND MOMENTS FOR ALL SUCH NOZZLES.

5 35 ALL INTERNAL BOLTED ATTACHMENTS SHALL BE SECURED WITH DOUBLE NUTS SYSTEM (NUT & LOCKNUT)

6 36 ALL INSIDE EDGES OF NOZZLES AND CONNECTIONS, WHETHER FLUSH OR EXTENDED, SHALL BE ROUNDED OFF TO A MINIMUM RADIUS OF 3MM.

7 37 THE MINIMUM NOZZLE DIAMETER PERMITTED SHALL BE 2 NOMINAL (NPS), SCHEDULE 160 OR ALTERNATIVELY, 2 INCH LONG WELD NECK TYPE.

8 38 THE MINIMUM RATING OF 300# SHALL BE USED FOR NOZZLE FLANGES FOR THE FOLLOWING:

9 FOR 2 INCH AND 3 INCH NOZZLES FOR ALL SERVICE

10 FOR ALL SIZES OF INSTRUMENT NOZZLES.

11 FOR ALL SIZES OF NOZZLES FOR EQUIPMENT IN LETHAL SERVICE.

12 39 UNLESS OTHERWISE SPECIFIED ON MECHANICAL DATASHEET ALL NOZZLES SHALL HAVE WELD NECK TYPE FLANGES

13 40 NOZZLE FLANGES UP TO THE SIZE OF 24 INCH NPS AS PER ASME B 16.5. NOZZLE FLANGES LARGER THAN 24 INCH NPS SHALL BE AS PER ASME B 16.47 SERIES A.

14 41 FLANGE FACING SHALL BE RING TYPE JOINT (RTJ) FOR VESSEL IN LETHAL SERVICE.

15 DELETED

16 42 THE FINISH OF THE GASKET CONTACT SURFACE OF FLANGE FACINGS SHALL CONFORM TO ASME B16.5 OR ASME B16.47 AS APPLICABLE.

17 43 UNLESS NOTED OTHERWISE, THE FLANGE GASKET SEATING FACE SHALL BE AS PER AD197-473-G-02000 para.6.8.8

18 44 THE MINIMUM NECK THICKNESS FOR ALL NOZZLE SIZES SHALL BE IN ACCORDANCE WITH GIS 46-010, AA 7.1 ( b )

19 45 NOZZLE REINFORCEMENT SHALL BE IN ACCORDANCE WITH GIS 46-010, PARAGRAPH 7.6.1 (e) AND 7.6.2. HOWEVER, FOR EQUIPMENT FOR LETHAL SERVICE AS IDENTIFIED IN LETHAL SERVICE,

20 REQUIREMENTS SPECIFIED IN DATASHEET AND PARAGRAPH 6.5.6.1 OF AD-197-473-G-02002 SHALL BE MET.

21 46 SOCKET WELDED, PAD TYPE, BUILT TYPE AND SCREWED NOZZLES ARE NOT PERMITTED.

22 47 PROJECTION OF FLANGED NOZZLES SHALL PERMIT REMOVAL OF BOLTING FROM EITHER SIDE WITHOUT REMOVAL OF INSULATION

23 48 THE MINIMUM SPACING BETWEEN WELDS SHALL BE AS PER ADMA OPCO CP 108

24 49 ALL NOZZLES TO SHELL OR HEAD WELDS SHALL BE FULL PENETRATION WELDS

25 50 ALL NOZZLES SHALL BE SET IN TYPE

26 SOUR SERVICE REQUIREMENTS

27 51 EQUIPMENT OPERATING UNDER WET SOUR SERVICE SHALL COMPLY WITH THE REQUIREMENTS LISTED IN:

28 - PROJECT SPECIFICATION FOR MATERIALS FOR SOUR SERVICE - AD197-473-G-02352;

29 - ADMA OPCO SPECIFICATION SP-1000;

30 - BP SPECIFICATION GP 36-25;

31 - NACE MR-0175/ ISO 15156.

32 52 DELETED

33 C DELETED

34 DELETED

35 53 THE PRESSURE RETAINING WELD SEAMS SHALL BE MAINTAINED AWAY FROM APPURTENANCES FROM EXTERNAL AND INTERNAL APPURTENANCES TO ALLOW FULL ACCESSIBILITY IN ORDER TO MONITOR

36 THEIR INTEGRITY BY NDE IN THE FIELD.

37 54 THE CARBON, CARBON MANGANESE AND LOW ALLOY STEEL PLATES SHALL MEET THE REQUIREMENTS SPECIFIED IN THE SPECIFICATION FOR MATERIALS FOR SOUR SERVICE AD197-473-G-02352.

38 55 INTERNAL CLEAT ATTACHMENTS, INTERNAL SUPPORT RINGS & OTHER INTERNALS WELDED TO THE VESSEL SHALL BE PROVIDED WITH FULL PENETRATION WELDS.

39 56 EXTERNAL BOLTING SHALL COMPLY WITH SOUR SERVICE REQUIREMENTS REGARDLESS OF VESSEL BEING INSULATED OR NOT.

40 57 CARBON CONTENT FOR CARBON STEELS, EXCEPT HIC TESTED MATERIAL, ARE NOT EXCEED 0.20%. THE CARBON EQUIVALENT (CE = C+Mn/6 + (Cr+Mo+V)/5 + (Cu+Ni)/15) IS NOT EXCEED 0.43%

41 C AS PER GIS 46-010, Para. A.6.1.3.3.

42 58 DELETED

43
44 59 THROUGH-THICKNESS TENSILE TEST SHALL BE PERFORMED AS PER AD197-473-G02352 & SP-1000.

45 LETHAL SERVICE REQUIREMENTS

46 60 EQUIPMENT OPERATING UNDER LETHAL SERVICE SHALL COMPLY WITH THE REQUIREMENTS LISTED IN:

47 - AD197-473-G-2000-R1 and AD197-473-G-2002-R0

48 - ASME Code UW-2(a)

49 61 LEAK TEST OR VISUAL INSPECTION AFTER HYDRO TEST SHALL NOT BE WAIVED. VISUAL INSPECTION OF JOINTS & CONNECTIONS FOR LEAK SHALL BE CARRIED OUT DURING HYDRO TEST. NO INTERNAL

50 OR EXTERNAL PRESSURE PARTS SHALL BE PAINTED PRIOR TO HYDRO TEST.

51 62 ALL BUTT WELDED JOINTS (CATEGORY A, B, C AND D) SHALL BE 100 % RADIOGRAPHED AFTER POST WELD HEAT TREATMENT.

52 ALL (CATEGORY A, B, C AND D) JOINTS SHALL BE OF BUTT WELDED TYPE NO. 1 OF TABLE UW-12.

53 63 VESSELS FABRICATED OF CARBON OR LOW ALLOY STEEL SHALL BE POST WELD HEAT TREATED.

54 64 ALL NOZZLES SHALL BE INTEGRALLY REINFORCED.

55 65 THE NOZZLE TO SHELL OR HEAD JOINT SHALL BE READILY RADIOGRAPHABLE AS PER ASME CODE FIG UW 16.1 ((f-1), (f-2) or (f-4) FOR DIVISION 1 VESSELS.

56 DELETED
AMINE CONTACTOR

MECHANICAL DATA SHEET


Sheet 7 of 7
1 NOTES
2
3 66 CARBON STEEL MATERIALS SA 36 OR SA 283 GR C SHALL NOT BE USED FOR PRESSURE PARTS.

4 67 SLIP ON FLANGES ARE NOT ALLOWED.

5 68 HUB TYPE FLANGES SHALL BE OF BUTT WELDED CONSTRUCTION.

6 69 RIGIDITY INDEX (J) OF 0.85 SHALL BE USED IN THE DESIGN OF NON STANDARD FLANGE.

7 70 RING TYPE JOINT (RTJ) WITH 300 # RATING SHALL BE USED FOR NOZZLES FLANGES AS A MINIMUM.

8 71 ALL PLATES SHALL BE ULTRASONICALLY EXAMINED USING 100 % SCANNING IRRESPECTIVE OF THE THICKNESS OF THE PLATE.

9 GENERAL NOTES
10 72 THE TRANSPORTATION LOADS SHALL BE ACCORDING TO AD197-473-G-02000_Rev.1 Para6.10.1

11 73 THE DESIGN AND INSTALLATION OF LIFTING OR TAILING LUGS SHALL BE ACCORDING TO AD197-473-G-02000_Rev.1 Para6.10.2

12 74 MINIMUM NOZZLE PROJECTION SHALL BE IN ACCORDING TO THESE REQUIREMENTS:

13 a. Minimum projection from the outside of the vessel wall to the nozzle face shall be:

14 1. For nozzles less than or equal to DN 200 (NPS 8): 200 mm (8 inches).

15 2. For nozzles larger than DN 200 (NPS 8): 250 mm (10 inches).

16 b. The dimension from the face of the nozzle to the vessel centreline or reference line shall be rounded up to the next greater 10 mm (1/2-inch) increment.

17 c. Projection of flanged nozzles with external piping attached shall permit removal of bolting from either side without removal of insulation.

18 C d. Deleted

19 e. Nozzles shall be extended sufficiently such that flanges and bolting are outside vessel insulation.

20 f. When establishing nozzle and manway projections, the following shall apply:

21 1. Clearance shall be provided for removing flange stud bolts from between the flange and vessel and for accessing flange stud nuts.

22 2. Clearance shall be provided for flange studs and nuts if nozzles penetrate insulation or platforms.

23 75 HYDROTEST AS PER PROJECT SPECIFICATION AD197-473-G-02002 Para 6.6

24 76 BLAST LOAD AS PER AD197-473-7046-RB AND "DESIGN BLAST LOADS SPECIFICATION VERIFICATION SHEET" PROVIDED BY COMART

25 77 FOR INSULATION AND INSULATION SUPPORTS SEE AD197-473-G-02958, AD197-473-G-02002 para. 6.2.7.1 and SP-1028

26 77A UPTO LEVEL +350 FROM BTL, PP INSULATIONTO BE INSTALLED; FROM LEVEL +350 UPWARD (TILL TOP OF VESSEL) HC INSULATION. C

27 78 Ladders and platforms are provided by COMART and not by vessel manufacturer

28 79 HIC TEST (FOR BACKING CARBON STEEL PLATE) IS IN ACCORDANCE WITH SP-1000_Rev.2 - APPENDIX D and AD197-473-G-02352
C
29 Alternatively to HIC testing, requirements as per para. 6 of AD197-473-G-02352 (Ammendent to para. 4.2.3 of SP-1000) shall be met for backing Carbon Steel plates.

30 80 All removable internals shall be passed through manway.

31 81 As per ITP AD197-576-G-00519 Rev0

32 C 82 All Carbon Steel pressure parts shall be purchased in normalized condition.


33 C 83 Shell/head thicknesses and equipment weigths are preliminary. Equipment manufacturer will provide final values.
34
35 SPECIAL NOTES FOR PRESSURE VESSELS
36 A PRESSURE VESSELS SHALL BE DESIGNED TO COMPLY WITH THE DESIGN CODE ASME SEC VIII DIV.1 Ed 2013, BP GP 46-01, BP GIS 46-010,

37 C DESIGN BASIS FOR STATIC EQUIPMENT AD197-473-G-02000,SPECIFICATION FOR PRESSURE VESSELS AD197-473-G-02002, SP-1050 MECHANICAL DESIGN CRITERIA, PART II.

38
39 B DELETED

40 C SPARE PARTS FOR CONSTRUCTION, PRE-COMMISSIONING & COMMISSIONING AS INDICATED IN SPEC. AD204-600-G-02002 Para 6.2.9

41 D ALL PROCESS NOZZLES (SHELL AND HEADS) OF PRESSURE VESSEL SHALL BE DESIGNED TO WITHSTAND NOZZLE LOADS AS PER NOZZLE LOADS

42 C TABLE ATTACHED IN THE APPENDIX OF DESIGN BASIS FOR STATIC EQUIPMENT AD197-473-G-02000.

43 E NITROGEN IS USED FOR PRESERVATION DURING TRANSPORT.

44 F VESSEL INSIDE DIAMETER IS REFERRED AFTER CLADDING. VESSEL INSIDE DIAMETER FOR NOT CLADDED PARTS SHALL BE SPECIFIED BY VENDOR

45 G DELETED

46 H ALL INTERNAL PARTS SUCH AS SUPPORTS THAT ARE WELDED TO PRESSURE BEARING PARTS AND/OR TO CLADDING ARE TO BE PROVIDED BY FABRICATOR

47 I DELETED

48
49
50
51
52
53
54
55
56
57
58
59
60
61

Das könnte Ihnen auch gefallen